Entergy Nuclear South Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 5047396715 Fax 504 739 6698 rmurill@entergy.com Robert J. Murillo Licensing Manager Waterford 3 W3F1-2008-0030 April 10, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
One Month Extension Request for Response to Generic Letter 2008-001, Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
On January 11, 2008, the NRC issued Generic Letter (GL) 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. The GL requires a written response that addresses the issues of the GL within nine months of the GL issue date, by October 11, 2008, or a response within three months of the GL issue date, by April 11, 2008, if the requirements of the GL can not be meet within the nine month period.
On Wednesday, April 9, 2008, Entergy's Waterford 3 Licensing Manager, Robert J. Murillo, contacted Jerry Wermiel, Deputy Director of Safety System, by telephone and requested an additional month within which to provide the three month response. Mr. Wermiel provided a verbal approval of the extension request to May 11, 2008. This letter, as requested by Mr.
Wermiel, documents the verbal approval.
Based on Waterford 3's current understanding of the potential scope of work involved in addressing the GL, additional time will be needed to provide the 3 month response. This time is required in order to identify the scope of work and corresponding schedule in sufficient detail to make an accurate projection of when the work required to address the GL can be promptly completed.
W3F1-2008-0030 Page 2 There are no new commitments contained in this submittal.
Should you have any questions concerning this request, please contact me at (504) 739-6715.
Sincerely, RJM/GCS
W3F.1 -2008-0030 Page 3 cc:
Mr. Elmo E. Collins, Jr.
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004