Technical Specifications - Issuance of Amendments Regarding Inservice Testing Program
ML080990830
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/23/2008
From:
NRC/NRR/ADRO/DORL/LPLII-2
To:
Saba F 301-465-1447
Shared Package
ML080990828 List:
References
TAC MD6916, TAC MD6917
Download: ML080990830 (6)


Text

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 247, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation Of Amendment 203.

(a)

Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.

Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b (b)

Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows:

ACTION:

a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.A. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

(3)

Deleted by Amendment No. 206.

D.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Physical Security Plan, Revision 2," and "Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006, and "Guard Training and Qualification Plan, Revision 0,"

submitted by letter dated September 30, 2004.

Renewed License No. DPR-71 Amendment No. 247

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 Radioactive Effluent Controls Program (continued)

h.

Limitations on the dose rate resulting from. radioactive material released in gaseous effluents to areas beyond the site boundary shall be limited to the following:

1.

For noble gases: less than or equal to a dose rate of 500 mrems/yr to the total body and less than or equal to a dose rate of 3000 mrems/yr to the skin, and

2.

For iodine-131, iodine-133, tritium, and for all radionuclides in particulate form with half lives > 8 days: less than or equal to a dose rate of 1500 mrems/yr to any organ; Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to. areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;

j.

Limitations on the annual and quarterly doses to a member of the public from iodine-131, iodine-133, tritium, and all radionuclides in particulate form with half lives > 8 days in gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and

k.

Limitations on the annual dose or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.

5.5.5 Component Cyclic or Transient Limit This program provides controls to track the UFSAR Table 5.3.3-2, cyclic and transient occurrences to ensure that components are maintained within the design limits.

5.5.6 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves.

a.

Testing Frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda are as follows:

(continued)

Brunswick Unit 1 5.0-9 Amendment No. 247 1

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.6 Inservice Testinq Program (continued)

ASME OM Code and applicable Addenda terminology for inservice testing activities Weekly Monthly Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days 5.5.7

b.

The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities;

c.

The provisions of SR 3.0.3 are applicable to inservice testing activities; and

d.

Nothing in the ASME OM Code shall be construed to supersede the requirements of any TS.

Ventilation Filter Testing Program (VFTP)

The VFTP shall establish the required testing of Engineered Safety Feature (ESF) filter ventilation systems.

Tests described in Specification 5.5.7.a and 5.5.7.b shall be performed once per 24 months; after each complete or partial replacement of the HEPA filter bank or charcoal adsorber filter bank; after any structural maintenance on the HEPA filter or charcoal adsorber housing; and, following significant painting, fire, or chemical release in any ventilation zone communicating with the system.

(continued)

I I

Brunswick Unit 1 5.0-10 Amendment No. 247 1

as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical of physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5)

Pursuant to the Act and 10 CFR Parts 30 and 70 to posses, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No. 2 (6)

Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only i'f those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to, all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 275, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications..

Renewed License No. DPR-62 Amendment No. 275

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 Radioactive Effluent Controls Program (continued)

h.

Limitations on the dose rate resulting from radioactive material released in gaseous effluents to areas beyond the site boundary shall be limited to the following:

1.

For noble gases: less than or equal to a dose rate of 500 mrems/yr to the total body and less than or equal'to a dose rate of 3000 mrems/yr to the skin, and

2.

For iodine-131, iodine-1 33, tritium, and for all radionuclides in particulate form with half lives > 8 days: less than or equal to a dose rate of 1500 mrems/yr to-any organ; Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; Limitations on the annual and quarterly doses to a member of the public from iodine-131, iodine-133, tritium, and all radionuclides in particulate form with half lives > 8 days in gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and

k.

Limitations on the annual dose or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.

5.5.5 Component Cyclic or Transient Limit This program provides controls to track the UFSAR Table 5.3.3-2, cyclic and transient occurrences to ensure that components are maintained within the design limits.

5.5.6 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves.

a.

Testing Frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda are as follows:

(continued)

Brunswick Unit 2 5.0-9.

Amendment No. 275 1

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.6 Inservice Testincq Program (continued)

ASME OM Code and applicable Addenda terminology for inservice testing activities Weekly Monthly.

Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days

b.

The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities;

c.

The provisions of SR 3.0.3 are applicable to inservice testing activities; and

d.

Nothing in the ASME OM Code shall be construed to supersede the requirements of any TS.

Ventilation Filter Testing Program (VFTP)

I I

5.5.7 The VFTP shall establish the required testing of Engineered Safety Feature (ESF) filter ventilation systems.

Tests described in Specification 5.5.7.a and 5.5.7.b shall be performed once per 24 months; after each complete or partial replacement of the HEPA filter bank or charcoal adsorber filter bank; after any structural maintenance on the HEPA filter or charcoal adsorber housing; and, following significant painting, fire, or chemical release in any ventilation zone communicating with the system.

(continued)

Brunswick Unit 2 5.0-i0 Amendment No. 275 I