ML080990267

From kanterella
Jump to navigation Jump to search

Order Approving Indirect Transfer of Facility Operating License
ML080990267
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/28/2008
From: Pickett D
NRC/NRR/ADRO/DORL/LPLI-1
To: Kansler M
Entergy Nuclear Operations
Pickett D
References
FOIA/PA-2009-0026, TAC MD6185
Download: ML080990267 (11)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION July 28, 2008 Mr. Michael R. Kansler President & CEO/CNO Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - ORDER APPROVING INDIRECT TRANSFER OF FACILITY OPERATING LICENSE (TAC NO.

MD6185)

Dear Mr. Kansler:

By application dated July 30, 2007, as supplemented by letters dated October 31, and December 5, 2007, and January 24, March 17, April 22, and May 2, 2008, Entergy Nuclear Operations, Inc. (ENO), acting on behalf of itself and Entergy Nuclear Vermont Yankee, LLC (EN-Vermont Yankee), requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission), pursuant to Section 50.80 of Title 10 of the Code of Federal Regulations, consent to the proposed indirect transfer of control of the Facility Operating License, No. DPR-28, for the Vermont Yankee Nuclear Power Station (Vermont Yankee).

EN-Vermont Yankee, the owner of the Vermont Yankee facility, is currently an indirect subsidiary of Entergy Corporation. Under a proposed corporate restructuring plan, a new holding company, Enexus Energy Corporation (Enexus), will be created and will be publicly owned. According to this plan, Enexus will acquire indirect ownership of 100 percent of EN-Vermont Yankee. In addition, ENO, the operator of the Vermont Yankee facility, is currently an indirect subsidiary of Entergy Corporation. Following the corporate restructuring, Entergy Corporation and Enexus will each have indirect control of 50 percent of ENO.

ENO will be converted from a corporation to a limited liability company and its name will be changed to EquaGen Nuclear LLC. Also, EN-Vermont Yankee will undergo a name change to become Enexus Nuclear Vermont Yankee, LLC. The staff understands that ENO will request an administrative license amendment to conform the Vermont Yankee license in the near future.

The enclosed Order (Enclosure 1) approves the proposed indirect transfer of control of the license held by EN-Vermont Yankee to Enexus. The Order also approves the indirect transfer of control of the Vermont Yankee license to the extent held by ENO to EquaGen LLC, a new intermediate holding company, held in equal shares by two new next tier intermediate holding companies, which are subsidiaries of Entergy Corporation and Enexus.

Enclosures 2 and 3 contain the non-proprietary and proprietary versions, respectively, of the NRC staffs safety evaluation (SE) related to the preceding actions. The non-proprietary version of the SE will be placed in the NRC Public Document Room and added to the Agencywide Document Access Management System Public Electronic Reading Room Library.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION M. Kansler The Order is being forwarded to the Office of the Federal Register for publication. If you have any questions, please contact me at (301) 415-1364.

Sincerely,

/RA/

Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

1. Order
2. Safety Evaluation (Non-proprietary)
3. Safety Evaluation (Proprietary) cc w/encls. 1 and 2: See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION

ML080990282 (Package)

ML080990267 (Letter and Order)

ML081080352 (Enclosure 2)

ML081080515 (Enclosure 3)

OFFICE LPL1-1/PM LPL1-1/LA IOLB/BC PFPB/BC NAME DPickett SLittle NSalgado ACosta (A) signed on signed on DATE 6 / 27 / 08 4 / 28 / 08 4 / 24 / 08 4 / 11 / 08 OFFICE LPL1-1/BC OGC DORL/D NAME MKowal SUttal TMcGinty for JGiitter DATE 5 / 1 / 08 7 / 01 / 08 7 / 02 / 08 Vermont Yankee Nuclear Power Station cc Regional Administrator, Region I Resident Inspector U. S. Nuclear Regulatory Commission Vermont Yankee Nuclear Power Station 475 Allendale Road U. S. Nuclear Regulatory Commission King of Prussia, PA 19406-1415 P.O. Box 176 Vernon, VT 05354 Mr. David R. Lewis Pillsbury, Winthrop, Shaw, Pittman, LLP Director, Massachusetts Emergency 2300 N Street, N.W. Management Agency Washington, DC 20037-1128 ATTN: James Muckerheide 400 Worcester Rd.

Mr. David O=Brien, Commissioner Framingham, MA 01702-5399 Vermont Department of Public Service 112 State Street Jonathan M. Block, Esq.

Montpelier, VT 05620-2601 Main Street P.O. Box 566 Mr. James Volz, Chairman Putney, VT 05346-0566 Public Service Board State of Vermont Senior Vice President 112 State Street Entergy Nuclear Operations, Inc.

Montpelier, VT 05620-2701 P.O. Box 31995 Jackson, MS 39286-1995 Chairman, Board of Selectmen Town of Vernon Vice President Oversight P.O. Box 116 Entergy Nuclear Operations, Inc.

Vernon, VT 05354-0116 P.O. Box 31995 Jackson, MS 39286-1995 Operating Experience Coordinator Vermont Yankee Nuclear Power Station Senior Manager, Nuclear Safety &

320 Governor Hunt Road Licensing Vernon, VT 05354 Entergy Nuclear Operations, Inc.

P.O. Box 31995 G. Dana Bisbee, Esq. Jackson, MS 39286-1995 Deputy Attorney General 33 Capitol Street Senior Vice President and COO Concord, NH 03301-6937 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Chief, Safety Unit White Plains, NY 10601 Office of the Attorney General One Ashburton Place, 19th Floor Assistant General Counsel Boston, MA 02108 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Ms. Carla A. White, RRPT, CHP White Plains, NY 10601 Radiological Health Vermont Department of Health P.O. Box 70, Drawer #43 108 Cherry Street Burlington, VT 05402-0070

Vermont Yankee Nuclear Power Station cc Vice President, Operations Mr. Michael D. Lyster Entergy Nuclear Operations 5931 Barclay Lane Vermont Yankee Nuclear Power Station Naples, FL 34110-7306 P.O. Box 250 Governor Hunt Road Vernon, VT 05354 Mr. James H. Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 Ms. Stacey M. Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Manager, Licensing Entergy Nuclear Operations Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354 Mr. Raymond Shadis New England Coalition Post Office Box 98 Edgecomb, ME 04556 Mr. James P. Matteau Executive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT 05301 Mr. William K. Sherman Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601

7590-01-P UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. )

)

ENTERGY NUCLEAR VERMONT YANKEE, LLC )

)

(Vermont Yankee Nuclear Power Station) ) Docket Nos. 50-271 and 72-59

)

ORDER APPROVING INDIRECT TRANSFER OF FACILITY OPERATING LICENSE I

Entergy Nuclear Operations, Inc. (ENO) and Entergy Nuclear Vermont Yankee, LLC (EN-Vermont Yankee) are co-holders of the Facility Operating License, No. DPR-28, which authorizes the possession, use, and operation of the Vermont Yankee Nuclear Power Station (Vermont Yankee). Vermont Yankee is a boiling water nuclear reactor that is owned by EN-Vermont Yankee and operated by ENO. The facility is located in the town of Vernon, Windham County, Vermont.

II By application dated July 30, 2007, as supplemented by letters dated October 31, and December 5, 2007, and January 24, March 17, April 22, and May 2, 2008, ENO, acting on behalf of itself and EN-Vermont Yankee, requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission), pursuant to Section 50.80 of Title 10 of the Code of Federal Regulations (10 CFR), consent to the proposed indirect transfer of control of the Vermont Yankee license, including the general license for the independent spent fuel storage installation.

EN-Vermont Yankee is currently a direct wholly owned subsidiary of Entergy Nuclear Vermont Investment Company, LLC which, in turn, is a direct wholly owned subsidiary of Entergy Nuclear Holding Company #3, LLC. Entergy Nuclear Holding Company #3, LLC is a direct wholly owned subsidiary of Entergy Nuclear Holding Company which, in turn, is a direct wholly owned subsidiary of Entergy Corporation. Therefore, under the current corporate structure, Entergy Corporation is the indirect owner of 100 percent of EN-Vermont Yankee.

Under the proposed corporate restructuring, a new holding company, Enexus Energy Corporation (Enexus), will be created. Initially, the shareholders of Entergy Corporation will separately own the shares of Enexus and, as such, Enexus will be owned by the public.

Entergy Nuclear Holding Company will become a direct wholly owned subsidiary of Enexus.

Accordingly, following the corporate restructuring, Enexus will acquire indirect control of 100 percent of EN-Vermont Yankee.

ENO, the operator of the Vermont Yankee facility, is currently a direct wholly owned subsidiary of Entergy Nuclear Holding Company #2 which, in turn, is a direct wholly owned subsidiary of Entergy Corporation. Therefore, Entergy Corporation is currently the indirect owner of 100 percent of ENO.

Under the proposed corporate restructuring, Entergy Nuclear Holding Company #2 will be eliminated and ENO will become a direct subsidiary of a new parent company called EquaGen LLC. EquaGen LLC will be owned in equal shares by two new intermediate holding companies as follows. Entergy EquaGen, Inc. is being created as a direct subsidiary of Entergy Corporation and will own 50 percent of EquaGen LLC. Similarly, Enexus EquaGen, LLC is being created as a direct subsidiary of Enexus and will also own 50 percent of EquaGen LLC.

Accordingly, following the corporate restructuring, Entergy Corporation and Enexus will each have indirect control of 50 percent of ENO.

Finally, ENO will be converted from a corporation to a limited liability company and its name will be changed from Entergy Nuclear Operations, Inc. to EquaGen Nuclear LLC. Under Delaware law, EquaGen Nuclear LLC will assume all of the rights and responsibilities of ENO, and it will be the same company (legal entity) both before and after the conversion and name change. Also, EN-Vermont Yankee will undergo a name change to become Enexus Nuclear Vermont Yankee, LLC. The staff understands that ENO will request an administrative license amendment to conform the Vermont Yankee license in the near future.

Notice of the request for approval and an opportunity for a hearing was published in the Federal Register on January 16, 2008 (73 FR 2953). By petition dated February 5, 2008, Locals 369 and 590, Utility Workers Union of America (UWUA), American Federation of Labor-Congress of Industrial Organization, representing plant workers at the Pilgrim Nuclear Power Station located in Plymouth, Massachusetts, responded to the Federal Register notice and requested a hearing and leave to intervene as a party in the proceeding for Vermont Yankee.

On June 12, 2008, Local 369 filed a notice of withdrawal of its petition to intervene. The notice of withdrawal did not apply to Local 590.

The request for a hearing is currently pending before the Commission. Pursuant to 10 CFR 2.1316, during the pendency of a hearing, the staff is expected to promptly proceed with the approval or denial of license transfer requests consistent with the staffs findings in its safety evaluation. Notice of the staffs action shall be promptly transmitted to the presiding officer and parties to the proceeding. Commission action on the pending hearing request is being handled independently of this action.

Also, an intervenor from Oswego, New York, submitted two letters to the Commission with public comments dated January 21, 2008, along with an electronic transmission containing public comments dated January 27, 2008. The public comments are addressed by the NRCs safety evaluation dated July 28, 2008.

Pursuant to 10 CFR 50.80(a), no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission shall give its consent in writing. Upon review of the information in the application as supplemented and other information before the Commission, and relying upon the representations and agreements in the application as supplemented, the NRC staff concludes that the proposed indirect transfer of control of the license held by EN-Vermont Yankee to Enexus, as described herein, will not affect the qualifications of EN-Vermont Yankee as holder of the Vermont Yankee license. The indirect transfer of control of the license is otherwise consistent with applicable provisions of law, regulations, and orders issued by the NRC. Furthermore, the NRC staff concludes that the proposed corporate restructuring involving new intermediate and ultimate parent companies over ENO, as described herein, will not affect the qualifications of ENO as holder of the Vermont Yankee license. The indirect transfer of control of the license as held by ENO, to the extent affected by the proposed restructuring, is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission.

The NRC staff concludes that the conversion of Entergy Nuclear Operations, Inc. to EquaGen Nuclear LLC would not constitute a direct transfer of the licenses to the extent held by ENO. Therefore, no consent to the proposed conversion is necessary.

The findings set forth above are supported by the NRCs safety evaluation dated July 28, 2008.

III.

Accordingly, pursuant to Sections 161b, 161i, 161o, and 184 of the Atomic Energy Act of 1954, as amended, 42 USC §§ 2201(b), 2201(i), 2201(o), and 2234; and 10 CFR 50.80, IT IS HEREBY ORDERED that the application regarding the indirect license transfer discussed above related to the proposed corporate restructuring and establishment of Enexus is approved, subject to the following conditions:

1 EN-Vermont Yankee shall enter into the $700 million Support Agreement with Enexus Energy Corporation as described in the application, no later than the time the proposed transactions and indirect license transfer occurs. EN-Vermont Yankee shall take no action to cause Enexus Energy Corporation, or its successors and assigns, to void, cancel, or modify the Support Agreement or cause it to fail to perform, or impair its performance under the Support Agreement, without prior written consent of the NRC. The Support Agreement may not be amended or modified without 30 days prior written notice to the Director of the Office of Nuclear Reactor Regulation or his designee. An executed copy of the Support Agreement shall be submitted to the NRC no later than 30 days after the completion of the proposed transactions and the indirect license transfer.

EN-Vermont Yankee shall inform the NRC in writing anytime it draws upon the Support Agreement.

2 The ten separate support guarantees from various Entergy subsidiaries, which total $315 million, including the support guarantee relating to Vermont Yankee, may be revoked when, and conditioned upon, implementation of the new $700 million Support Agreement at the time the proposed restructuring and indirect license transfer are completed.

3 Should the proposed corporate restructuring and establishment of Enexus not be completed within one year from the date of this Order, this Order shall become null and void, provided, however, upon written application and good cause shown, such date may be extended by Order.

This Order is effective upon issuance.

For further details with respect to this Order, see the application dated July 30, 2007, as supplemented by letters dated October 31, and December 5, 2007, and January 24, March 17, April 22, and May 2, 2008, and the NRCs safety evaluation dated July 28, 2008, which are available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland and accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.gov.

Dated at Rockville, Maryland this 28th day of July 2008.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Timothy J. McGinty, Acting Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation