|
---|
Category:Annual Operating Report
MONTHYEARML24127A0012024-04-24024 April 2024 Us Dept of Commerce, National Institute of Standards & Technology (NIST) - Transmittal of Operations Report No. 76 for the Nbsr for the Year 2023 ML22094A1082022-04-0404 April 2022 Transmittal of Operations Report No. 74 for the Nbsr for January 1, 2021 to December 31, 2021 ML20093F2612020-04-0202 April 2020 National Institute of Standards and Technology Reactor (Nbsr) - 2019 Annual Report ML18302A1192018-10-22022 October 2018 U.S. Dept. of Commerce, National Institute of Standards and Technology Reactor - Submittal of Corrected Operations Report ML18103A0272018-04-0202 April 2018 Us Department of Commerce, National Institute of Standards and Technology - Transmittal of Operations Report No. 69 for the Nbsr for the Period January 1, 2017 to December 31, 2017 ML17123A3662017-04-25025 April 2017 NIST - Annual Operations Report No. 68 for the Period January 1, 2016 to December 31, 2016 ML16112A1942016-04-13013 April 2016 Us Dept. of Commerce, National Institute of Standards & Technology (Nist), Transmittal of 2015 Operations Report No. 68 for the Nbsr ML15167A0702015-06-12012 June 2015 NIST - Annual Preventative Maintenance Inspection Report ML14191A6362014-06-26026 June 2014 Correction to 2013 NIST Test Reactor (Nbsr) Annual Report ML14098A4032014-03-31031 March 2014 Us Dept of Commerce, NIST, Transmittal of Test Reactor (Nbsr) Annual Report for the Year 2013 ML1009002622010-03-26026 March 2010 National Institute of Standards and Technology Operations Report No. 62, for the Period of January 1, 2009 to December 31, 2009 ML0809207562008-03-26026 March 2008 National Institute of Standards and Technology Reactor - Transmittal of Operations Report No. 60 for Year 2007 ML0609306812006-03-21021 March 2006 2005 Operations Report No. 58 for the Nbsr, January 1, 2005 - December 31, 2005 ML0409203032004-03-23023 March 2004 Operations Report 56 for Nbsr, Covering Period January 1, 2003 to December 31, 2003 2024-04-24
[Table view] Category:Letter
MONTHYEARML24276A1062024-10-0101 October 2024 Us Dept of Commerce, National Institute of Standards and Technology - Sec Charter Update Response ML24270A0052024-09-25025 September 2024 NCNR Director Appointment Update ML24166A1992024-06-11011 June 2024 NIST - Second Nuclear Safety Culture Assessment Report ML24113A0842024-05-30030 May 2024 Examination Result Letter No. 50-184/OL-24-01, National Institute of Standards and Technology ML24113A0832024-05-30030 May 2024 Examination Report Letter No. 50-184/OL-24-01, National Institute of Standards and Technology ML24144A1002024-05-21021 May 2024 Submittal of Leadership Accountability, Sec Charter Update Response ML24127A0012024-04-24024 April 2024 Us Dept of Commerce, National Institute of Standards & Technology (NIST) - Transmittal of Operations Report No. 76 for the Nbsr for the Year 2023 ML24089A2512024-04-10010 April 2024 Examination Confirmation Letter No 50-184/OL 24-01 National Institute of Standards and Technology ML24102A2692024-04-0505 April 2024 National Institute of Standards and Technology Reactor (Nbsr) - Operations Report No. 74 for the the Period January 1, 2023 to December 31, 2023 ML24088A1342024-03-28028 March 2024 Us Dept. of Commerce, NIST - Non-Availability of Fuel and Funding to Convert Nbsr from HEU to LEU in 2024 ML24075A2992024-03-15015 March 2024 National Institute of Standards and Technology - Withdrawal of Recommended Modifications to the NIST Confirmatory Order Request ML24065A4652024-03-0707 March 2024 NIST – Request for Additional Information to Support Review of the Requested Modifications to the NIST Confirmatory Order EA-21-148 ML24064A1992024-03-0101 March 2024 Us Dept. of Commerce, National Institute of Standards & Technology (NIST) - Change to the Nbsr Requalification Plan in Response to an NRC Request for Additional Information (ADAMS Accession No. ML22223A146) ML24054A3682024-02-22022 February 2024 Recommended Modifications to the NIST Confirmatory Order IR 05000184/20232012024-01-25025 January 2024 National Institute of Standards and Technology - U.S. Nuclear Regulatory Commission 1st and 2nd Quarter Supplemental Inspection Report 05000184/2023201 ML24023A6182024-01-23023 January 2024 Us Dept. of Commerce, National Institute of Standards & Technology - Nuclear Program Assessments Response and Leadership Accountability ML23257A1982023-12-26026 December 2023 Examination Report No. 50-184/OL-23-02, National Institute of Standards and Technology ML23257A1972023-12-26026 December 2023 Examination Results Letter No. 50-184/OL-23-02, National Institute of Standards and Technology ML23306A1642023-11-0202 November 2023 Examination Report Letter No. 50-182/OL-24-01, University of Missouri - Columbia ML23306A1652023-11-0202 November 2023 Examination Result Letter No. 50-184/OL-24-01, University of Missouri - Columbia ML23207A0402023-07-26026 July 2023 Us Dept. of Commerce, National Institute of Standards & Technology, Nuclear Safety Culture Assessment and Response ML23195A1042023-07-12012 July 2023 NIST Center for Neutron Research (Ncnr), Withdrawal of License Amendment Request of December 11, 2020 ML23104A3002023-04-10010 April 2023 U.S. Dept. of Commerce, National Institute of Standards & Technology (Nist), Transmitted Herewith Is Operations Report No. 74 for the Nbsr for the Cy 2022 ML23089A1132023-03-30030 March 2023 Us Dept. of Commerce - National Institute of Standards & Technology - Non-Availability of Fuel and Funding to Convert Nbsr from HEU to LEU in 2021 ML23086B3832023-03-27027 March 2023 Us Dept. of Commerce, National Institute of Standards & Technology (NIST) - Change of Ncnr Director ML23040A3372023-03-0909 March 2023 NIST Restart Authorization Letter ML23059A0502023-03-0707 March 2023 Examination Confirmation Letter No. 50-184/OL-23-02, National Institute of Standards and Technology IR 05000184/20222022023-03-0707 March 2023 National Institute of Standards and Technology U.S. Nuclear Regulatory Commission 4th 2022 Quarter Supplemental Inspection Report 05000184/2022202 ML23055A3002023-03-0303 March 2023 NIST License Amendment 15 - Core Alternative Reload Methodology Scheme ML23020A9112023-02-0101 February 2023 National Institute of Standards and Technology Issuance of Amendment No. 14 to Renewed Facility Operating License No. TR 5 ML23033A1152023-02-0101 February 2023 Us Dept. of Commerce, National Institute of Standards & Technology, License Amendment Request IR 05000184/20222032023-01-27027 January 2023 National Institute of Standards and Technology - U.S. Nuclear Regulatory Commission Security Inspection Report 05000184/2022203 ML22350A0652022-12-13013 December 2022 Us Dept. of Commerce, National Institute of Standards & Technology (Nist), License Amendment Request ML22322A2182022-11-28028 November 2022 National Institute of Standards and Technology - Report on the Regulatory Audit Re Restart Request Following Exceedance of Cladding Temperature Safety Limit ML22322A2112022-11-17017 November 2022 NIST Center for Neutron Research, License Amendment Request. Response to NRC Questions Regarding the Primary and Effluent Monitoring Systems ML22293B8082022-10-19019 October 2022 National Institute of Standards & Technology (NIST) - License Amendment Request ML22235A1172022-08-23023 August 2022 Us Dept of Commerce, National Institute of Standards & Technology, Transmittal of Draft of a Proposed Presentation of 02/03/2021, Nbsr Event for NRC Review ML22227A1502022-08-15015 August 2022 Us Dept of Commerce, National Institute of Standards & Technology (Nist), Request NRC Permission to Restart the Reactor Upon Completion of Listed Corrective Actions and Recovery Efforts ML22223A1462022-08-11011 August 2022 Docket Number 50-184 and the Nbsr Requalification Plan ML22206A2132022-08-0101 August 2022 Letter to National Institute of Standards and Technology, Center for Neutron Research - Confirmatory Order (EA-21-148) ML22206A0102022-08-0101 August 2022 U.S. Nuclear Regulatory Commission Supplemental Inspection Plan for National Institute of Standards and Technology ML22181A1282022-07-21021 July 2022 National Institute of Standards and Technology - Issuance of Amendment No. 13 to Renewed Facility Operating License No. TR-5 ML22187A1272022-06-29029 June 2022 Nbsr Restart Request ML22160A2852022-06-0808 June 2022 Nbsr License Amendment Request Supplement ML22122A0882022-04-27027 April 2022 Letter for T. H. Newton, NIST Center for Neutron Research, from J. S. Bowen, Nrc/Nrr/Danu, NRC Office of Investigations Report No. 1-2022-005 - Release of OI Synopsis ML22094A1082022-04-0404 April 2022 Transmittal of Operations Report No. 74 for the Nbsr for January 1, 2021 to December 31, 2021 ML22084A4082022-03-30030 March 2022 NIST - Non-availability of Fuel and Funding to Convert Nbsr from HEU to LEU in 2021 IR 05000184/20222012022-03-16016 March 2022 National Institute of Standards and Technology - Us Nuclear Regulatory Commission Special Inspection Report No 05000184-2022201 ML22012A0902022-01-11011 January 2022 Nbsr License Amendment Request, Revised No Significant Hazard Consideration Determination ML21349A3772022-01-0404 January 2022 December 7, 2021, Summary of Mtg with Nist to Discuss Proposed Technical Specification Changes at the National Bureau of Standards Reactor EPID L-2021-LLN-0000 2024-09-25
[Table view] |
Text
UNITED STATES DEPARTMENT OF COMMERCE National Institute of Standards and Technology Gaithersburg, Maryland 20899-
\/lr 'lrr: ('101\ '7'C-,A"040 FAX (301) 975-9427 March 26, 2008 U.S. Nuclear Regulatory'Commission Document Control Desk Washington, DC 20555
Subject:
Docket #50-184 Gentlemen:
Transmitted herewith is Operations Report No. 60 for' the NBSR. The report covers the period January 1, 2007 to December 31, 2007.
Sincerely, Patrick Gallagher Director, NIST Center for Neutron Research Enclosure cc: U.S: Nuclear Regulatory Commission ATTN: Marcus Voth One White Flint North 11555 Rockville Pike, M/S 12-G13 Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: William Kennedy One White Flint North 11555 Rockville Pike, M/S 12-G13 Rockville, MD 20852-2738 N L2So
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY REACTOR (NBSR)
Docket #50-184 Facility License No. TR-5 Operations Report
-- #60--
January 1, 2007 - December 31, 2007 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8(3) of the NBSR Technical Specifications and covers the period from January 1, 2007 to December 31, 2007.
Section numbers in the report (such as 7.8(3)(a)) correspond to those used in the Technical Specifications.
March 26, 2008 Patrick GallaJer Director, NIST Center for Neutron Research
TABLE OF CONTENTS 7.8(3)(a) Summary of Plant Operations 7.8(3)(b) Unscheduled Shutdowns 7.8(3)(c) Tabulation of Major Items of Plant Maintenance 7.8(3)(d) Tabulation of Major Changes in the Facility and Procedures, and the Test and Experiments, Carried Out Without Prior Approval by the NRC Pursuant to 10 CFR 50.59 7.8(3)(e) Summary of Radioactive Material Released and Results of Environmental Surveys Performed 7.8(3)(f) Summary of Significant Exposures Received by Facility Personnel and Visitors 2007 Operations Report for NBSR (TR-5)
. [Docket #50-184]
Page 1
7.8(3)(a) Summary of Plant Operations During the period January 1, 2007 through December 31, 2007 the reactor was critical for 6464 hours0.0748 days <br />1.796 hours <br />0.0107 weeks <br />0.00246 months <br /> with an energy output of 128,876 MWH. Major activities during this period included: Control Room console wiring verification; building switchboards' replacement; cutting of 36 fuel elements; refurbishment of the fuel element cutting saw; installation and operation of thermal shield cooling system test device for operating cooling tubes with a negative pressure; and the licensing of one senior reactor operator.
There was one reportable occurrence, the cause of which was failure of a shim arm to scram within the required time. This was discovered during routine reactor startup testing and replacement of the shim arm clutch assembly shortened the scram time to an acceptable value.
7.8(3)(b). Unscheduled Shutdowns
- 1. There was 1 scram due to commercial power interruptions. A return to 20 MW was made within an hour of one scram.
- 2. A major scram was caused by irradiated air high activity due to Argon-41 in helium discharged to the irradiated air system. A return to 20 MW was made within an hour of the scram and the configuration of the helium system was corrected to prevent another excessive helium discharge to the irradiated air system.
7.8(3)(c) Tabulation of Major Items of Plant Maintenance Note: Some of these items may be also listed as Engineering Change Notices (ECN).
- 1. Replaced MCC A7 and B8.
- 2. Rebuilt regulating rod drive "B".
- 3. Replaced BT-1 lower shield on shutter assembly.
- 4. Cut 36 spent fuel elements for eventual shipment.
- 5. Replaced fuel element saw blades, axle, spacers, couplings, and lower gearboxes.
- 6. Replaced two confinement building door seals.
- 7. Replaced shaft and seals for #4 main D2 0 pump.
2007 Operations Report for NBSR (TR-5)
[Docket #50-184]
Page 2
- 8. Instrument calibration surveillance tests were performed for the following:
Three Wide-range Nuclear Power Channels Reactor Vessel Flow and Level Recorders and Indicators Two Reactor Differential Temperature Channels Confinement Building Area Radiation Monitors Fission Product Monitor and Secondary Cooling N16 Monitors Three Confinement Building Effluent Monitors Emergency Ventilation System Controllers
- 9. Thirty-six instrument service requests (ISR) were completed, including:
ISR# ACTION 1773 Reprogrammed DWV-23 controller for D 20 flow to cryostat.
1774 Replaced Action Pack for NC-6.
1777 Repaired regulating rod upper control limit control and alarm on rod drive assembly.
1802 Replaced FIA-9 helium sweep flow transmitter.
7.8(3)(d) Tabulation of Major Changes in the Facility and Procedures, and Tests and Experiments, Carried Out Without Prior Approval by the NRC pursuant to 10 CFR 50.59.
The following facility changes were completed this year. None required a license amendment or a change to the technical specifications, and there were no changes made pursuant to the applicable criteria of 10 CFR 50.59.
ECN 491 ) Modification to Fuel Element Transfer Head 7.8(3)(e) Summary of Radioactive Material Released and Results of Environmental Surveys Performed.
Gaseous releases consisted of 657 curies of tritium, 1585 curies of Argon-41, and 0.075 curies of other beta-gamma emitters. There were 3.26 curies of tritium and 1.1 millicuries of other beta-gamma emitters released into the sanitary sewer.
Environmental samples of the streams, vegetation, and/or soil, and air showed no significant changes.
2007 Operations Report for NBSR (TR-5)
[Docket #50-184]
Page 3
7.8(3)(f) Summary of Significant Exposures Received by Facility Personnel and Visitors.
- 1. None to visitors.
- 2. Dosimetry results for this reporting period indicated that no facility personnel received any significant exposures.
2007 Operations Report for NBSR (TR-5)
[Docket #50-184]
Page 4