6.
Reactor Trip Interlocks Protective instru mentation-settings for-reactor-trip-interlocks-shall -be-as follows: -
A.
Prior to exceeding 12.2% of RATED POWER, the low pressurizer pressure trip, high pressurizer level trip, the low reactor coolant flow trips (for both loops), and the turbine trip-reactor trip are made functional.
B.
Prior to exceeding 10% of RATED POWER, the single loop loss-of-flow trip is made functional.
- 7.
Other Trips A.
Undervoltage > 75% of normal voltage B.
Turbine trip C.
Manual trip D.
Safety injection trip (Refer to Table TS 3.5-1 for trip settings)
Amendment No. 195 TS 2.3-4
TABLE TS 3.5-2 INSTRUMENT OPERATION CONDITIONS FOR REACTOR TRIP NOTES (1) One additional channel may be taken out of service for zero power physics testing.
(2) Deleted (3) When a block condition exists, maintain normal operation.
(4) Underfrequency on the 4-kV buses trips the Reactor Coolant Pump breakers, which in turn trips the reactor when power is above P-7.
Permissive/Interlock Channels Coincidence Setting Limit P-6 Intermediate Range Nuclear Instrument 1 of 2
> 10s% RATED POWER Power Range Nuclear Instrument 3 of 4
< 12.2% RATED POWER P-7 AND i
Turbine Impulse Pressure 2 of 2
< 12.2% RATED POWER (a)
P-8 Power Range Nuclear Instrument 3 of 4
<10% RATED POWER P-8 Power Range Nuclear Instrument 2 of 4
< 7.8% RATEDIPOWER P-1IOoe ag ula ntumn f478 AE!
OE (a) Setting Limit is converted to an equivalent turbine impulse pressure Amen dment No. 195 Page 4 of 4