April 26, 2007 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
CLOSEOUT FOR REVIEW OF MATERIALS RELIABILITY PROGRAM (MRP):
TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO. MC9779)
Dear Mr. Riley:
By letter dated September 7, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML052520325), the Nuclear Energy Institute (NEI) submitted for U.S.
Nuclear Regulatory Commission (NRC) staff review Electric Power Research Institute (EPRI)
Topical Report (TR) MRP-169, Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in PWRs [Pressurized Water Reactors]. By letter dated August 2, 2006 (ADAMS Accession No. ML061950468), the NRC issued an acceptance letter to NEI, which stated that the NRC would issue the request for additional information (RAI) by August 11, 2006, and the draft safety evaluation by January 15, 2007. The review schedule milestones were discussed and agreed upon in a telephone conference between you and the NRC staff on July 21, 2006.
In a letter dated August 3, 2006 (ADAMS Accession No. ML062050337), the NRC staff issued a the RAI for TR MRP-169. In a telephone conversation on July 21, 2006, between you and the NRC staff, it was agreed upon that the RAI responses would be submitted to the NRC by September 29, 2006.
The RAI response has not been received by the NRC. In addition, attempts by the NRC staff to obtain a revised milestone for the RAI response have been unsuccessful. As discussed with Mike Melton, Senior Project Manager, of your staff on April 19, 2007, all NRC staff efforts to support the review of TR MRP-169 have been discontinued and TAC MC9779 has been closed.
Sincerely,
/RA/
Jennifer M. Golder, Acting Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 cc: See next page
ML062050337), the NRC staff issued a the RAI for TR MRP-169. In a telephone conversation on July 21, 2006, between you and the NRC staff, it was agreed upon that the RAI responses would be submitted to the NRC by September 29, 2006.
The RAI response has not been received by the NRC. In addition, attempts by the NRC staff to obtain a revised milestone for the RAI response have been unsuccessful. As discussed with Mike Melton, Senior Project Manager, of your staff on April 19, 2007, all NRC staff efforts to support the review of TR MRP-169 have been discontinued and TAC MC9779 has been closed.
Sincerely,
/RA/
Jennifer M. Golder, Acting Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrDpr RidsNrrDprPspb PSPB Reading File RidsNrrPMTMensah RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDciCpnb SRosenberg (Hardcopy)
ADAMS ACCESSION NO.: ML071130113 NRR-106 OFFICE PSPB/PM PSPB/LA DCI/CPNB PSPB/BC DPR/DD NAME TMensah DBaxley TChan SRosenberg JGolder DATE 04/25/07 04/25/07 04/19 /07 04/25 /07 04/26/07
Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:
Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com
3/8/07 Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. Jay Thayer, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jkt@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 man@nei.org Mr. David J. Modeen Vice President and Chief Nuclear Officer EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 jgaertner@epri.com Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 ryang@epri.com Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com