MONTHYEARML21075A1582021-03-15015 March 2021 E-mail from T. Silko to J. Parrott, NMSS, Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request ML21006A0242020-12-22022 December 2020 E-mail from J. Parrott to J. Tierney and N. Creed Vermont Yankee Request to NRC for Alternate Disposal of Wastewater ML20358A0702020-12-22022 December 2020 E-mail Acceptance Review for Request for Indirect License Transfer (License DPR-28, Docket No. 50-271) ML20175A2122020-06-23023 June 2020 Acceptance Review of Request for Alternate Disposal of Wastes Under 10 CFR 20.2002 (License DPR-28, Docket No. 50-271) ML19289A1292019-10-11011 October 2019 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML19288A0292019-10-11011 October 2019 NRC Acceptance Review - Northstar Request for Exemption from 10 CFR 20, App G, Section Iii.E (License DPR-28, Docket No. 50-271) ML19198A2512019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18289A3622018-10-11011 October 2018 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML18127A5582018-04-25025 April 2018 Email to State of Vermont on Vermont Yankee Nuclear Power Station - Forthcoming Issuance of a License Amendment Regarding the Requirement for the VYNPS to Have a Cyber Security Plan ML18045A0862018-01-25025 January 2018 Email Request for Review of the Draft Safety Evaluation for Implementation of a Revised Emergency Plan at Vermont Yankee to Reflect an ISFSI-only Configuration ML17353A0092017-12-18018 December 2017 E-Mail from William Irwin, Vermont Department of Health to Y. Chen/Dsfm Response: Draft Environmental Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17289A4222017-10-16016 October 2017 E-Mail from Y. J. Chen to W. Irwin Draft Environmental Assessment Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17257A0022017-09-14014 September 2017 Email to VY Shpo W Ltr Re VYNPS Exemption Load Campaign - Sept 2017 ML17229B4842017-08-16016 August 2017 Request for Supplemental Documentation to Support Review of the Physical Security Plan ML17219A0472017-08-0303 August 2017 8/03/2017, E-Mail from Y. J. Chen/Nmss to T. B. Silko/Vermont Yankee Regarding Need for Additional Information Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated May 16, 2017 (ML17142A358) ML17144A0452017-05-23023 May 2017 5/23/2017, E-Mail to I. William/Vermont Dept. of Health from Y. Chen/Nrc Response: Draft Environment Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation (W/Attachment Ltr to Address Comments on EA) ML17080A4752017-03-16016 March 2017 3/16/2017, E-Mail from I. William/Vermont Department of Health to Yen-Ju Chen/Dsfm/Sflb, Providing Comments on Draft Environmental Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for CoC No. 72-1014, Amendm ML17055A6262017-02-24024 February 2017 Cover Email from VY Shpo W Concurrence on No Effects Determination ML17040A3372017-02-0909 February 2017 Email and Letter to Vermont Shpo ISFSI Exemption No Effects Determination ML17038A4682017-02-0707 February 2017 2/07/2017, E-mail from Yen-Ju Chen/NRC-DSFM to W. Irwin/Vermont Dept. of Health Draft Environment Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for Certificate of Compliance No. 72-1014, Amendment 10 ML17012A2472017-01-11011 January 2017 E-mail - State of Vermont Comments Regarding Vermont Yankee'S 10 CFR 20.2002 Request ML16349A2492016-12-13013 December 2016 E-Mail to T. B. Silko/Entergy from Yen-Ju Chen/Dsfm Regarding Need for Supplemental Information for Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated November 9, 2016 (ML16319A102) ML17013A2502016-12-12012 December 2016 Email Requesting Review of Draft EA and SER for Vermont Yankee Request to NRC for Alternate Disposal of Waste ML16231A0282016-08-11011 August 2016 Response to NRC Questions Related to Request for 20.2002 Disposal of Contaminated Water ML16231A2192016-07-28028 July 2016 Follow-up Questions Related to Entergy Request for 20.2002 Disposal of Contaminated Water ML16069A0952016-03-0303 March 2016 Request for 20.2002 Disposal, Request for Additional Information ML16053A5152016-02-17017 February 2016 Comment (037) of Emma Stamas on ANPR-26, 50, 52, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors ML15329A1802015-11-24024 November 2015 E-mail from J. Whited Draft RAIs Re Duke License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413 Through MF6422) ML15295A2132015-10-21021 October 2015 NRR E-mail Capture - VY RAI for Off-site Insurance Exemption (10 CFR 140.11) - MF3980 ML15289A6002015-09-24024 September 2015 La 3 - Vermont Yankee Draft Responses or Edits 9 24 15.docx ML15289A6012015-09-23023 September 2015 La 3 - Nrr_Vermont Yankee Nuclear Power Station Decommissioning Status.Docx ML15288A3532015-09-21021 September 2015 La 3 - VY Dtf LAR - Status ML15257A6172015-09-14014 September 2015 La 3 - Testing the New Profile for Vermont Yankee La 3 - Public ML15195A3592015-07-14014 July 2015 NRR E-mail Capture - Acceptance Review for Vermont Yankee Amendment -Revise Cyber Security Plan Implementation ML15289A0022015-06-17017 June 2015 La 3 - Question from Ma ML15289A5982015-06-0909 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 5 2015 Letter from Vermont, Vynpc, and Gmp to NRC Attached ML15289A0072015-06-0505 June 2015 La 3 - Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15289A2432015-06-0404 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 4 2015 Vermont Letter to NRC Attached ML15289A0062015-06-0404 June 2015 La 3 - FW: Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15288A3592015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3602015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3622015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A4822015-05-22022 May 2015 La 3 - Vermont Reply to NRC & Entergy Answers Re VY LA-3 ML15289A0042015-05-19019 May 2015 La 3 - New Proposal Dates for Phone Call with VT ML15289A0052015-05-11011 May 2015 La 3 - ML Numbers for Disbursement Letters for Vermont Yankee ML15289A5992015-05-0808 May 2015 La 3 - Call with State of VT ML15289A0032015-05-0707 May 2015 La 3 - Other than for Comanche Peak, ML15289A1252015-05-0606 May 2015 La 3 - FRN Review - VY Dtf Exemption ML15128A0232015-04-27027 April 2015 NRR E-mail Capture - Petitioners Response to Request for Comments on the Proposed Director'S Decision on the 2.206 Petition Regarding Financial Qualifications of Entergy 2021-03-15
[Table view] |
Text
[pchard Conte - Fwd: Questions on Vermont Yankee cooling towers Page I1 From: Richard Conte To: DRS-BCs Date: 08/22/2007 12:53:18 PM
Subject:
Fwd: Questions on Vermont Yankee cooling towers who was involved in power uprate. can you help
>>> Barry Norris 08/22/2007 12:16 PM >>>
can either of you help with any of the answers?
>>> Neil Sheehan 08/22/07 10:56AM ?>>
Ray, Your taking points on the Vermont Yankee towers are helpful. Here are some others I could use your help on. In particular, the first batch of questions just came in from the AP reporter in Vermont. His deadline is early this afternoon. Can someone help with these? I understand the staff is already doing research along these lines.
Thanks, Neil
L.
~.\ternp\GW}00001 TMP Page I 1 Mail Envelope Properties (46CC69FE.F92 : 13 : 55942)
Subject:
Fwd: Questions on Vermont Yankee cooling towers Creation Date 08/22/2007 12:53:18 PM From: Richard Conte Created By: RJC@,nrc.gov Recipients Action Date & Time rlrc.gov kp 1qo.KP-DO Delivered 08/22/2007 12:53:36 PM CGC CC (Christopher Cahill) Opened 08/22/2007 1:03:30 PM Deleted 09/24/2007 4:46:01 PM DJR CC (Darrell Roberts) Retracted 09/05/2007 12:01:15 AM JDK CC (John Kinneman) Deleted 08/27/2007 9:17:38 AM Opened 08/27/2007 9:17:33 AM Emptied 09/04/2007 1:22:26 AM JFR (John Rogge) Opened 08/27/2007 9:09: 18 AM Downloaded 08/27/2007 10:01:35 AM Emptied 09/04/2007 9:47:50 AM JMTl (James Trapp) Deleted 08/22/2007 1:33:40 PM Opened 08/22/2007 1:33:17 PM Emptied 08/30/2007 1:09:18 AM JRWl (John White) Opened 08/22/2007 1:21:33 PM KLG CC (Kay Gallagher) Opened 08/22/2007 1:12:16 PM Deleted 08/22/2007 1:12:26 PM Emptied 08/30/2007 1:10:29 AM
-~:\temp\GW)00001.TMP Page 2 1 LTD (Lawrence Doerflein) Opened 08/22/2007 12:55:03 PM MDSl (Marvin Sykes) Retracted 09/05/2007 12:01:15 AM MKG CC (Marsha Gamberoni) Opened 08/22/2007 1:38:00 PM WAC1 CC (William Cook) Opened 08/22/2007 1:43:50 PM WLS (Wayne Schmidt) Opened 08/22/2007 1:03:37 PM Post Office Delivered Route kplgo.KF -DO 08/22/2007 12:53:36 PM nrc.gov Files Size Date & Time MESSAGE 1132 08/22/2007 12:53:18 PM WTowerQuestions.8-2007,wpd 4152 08/22/2007 10:52:46 AM Options Auto Delete: No Expiration Date: 09/05/2007 Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: All lnformation
Questions on Vermont Yankee cooling towers:
How many nuclear plants use forced-air cooling towers? Have any of those experienced failures and/or collapses? Have there been any cooling tower issues at plants that have undergone Extended Power Uprates?
Did the Vermont Yankee power uprate accelerate the degradation of the cooling towers?
What did the NRC do to inspect the cooling towers in conjunction with the power uprate? What will the agency be doing with respect to the towers as part of its license renewal review? Are the towers being reviewed as part of the license renewal process? If not, why not?
How long will repairs to the towers take? What exactly will those repairs consist of? Could the collapse call into question the structural integrity of both banks of cooling towers?
What kind of wood makes up the cooling towers? What could have caused the wood to fail, Le.,
rot? What caused the piping to fail? How much wood and piping was affected?
How long can the plant operate at reduced power? If the plant goes above 40 percent, will it exceed its discharge maximum temperature limit? What is that limit?
Nuclear critic Arnie Gunderson is quoted in news stories as saying the kind of cooling towers used at Vermont Yankee have been prone to collapse at other power plants and refineries. Are we aware of such collapses and, if so, where and when did they take place? What happened if such collapses did in fact occur? Were there any safety impacts? Gunderson, in a Brattleboro Reformer, refers to the towers as being of a wounded knee design. What does that mean?