ML072200100

From kanterella
Jump to navigation Jump to search

Revised License Pages of Facility Operating License No. NPF-21
ML072200100
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/09/2007
From: Lyon C
NRC/NRR/ADRO/DORL/LPLIV
To: Parrish J
Energy Northwest
Lyon C Fred, NRR/DORL/LPL4, 301-415-2296
Shared Package
ML072200037 List:
References
TAC MD4521
Download: ML072200100 (2)


Text

ENCLOSURE 1 ADDITIONAL PAGE OF FACILITY OPERATING LICENSE NO. NPF-21 COLUMBIA GENERATING STATION DOCKET NO.50-397 Insert the following page of the Facility Operating License No. NPF-21. The revision to the page is identified by the date of the letter issuing the page and contains marginal lines indicating the areas of change.

Facility Operating License REMOVE INSERT

-- Page 9a

- 9a - l (31) Mitigation Strategy License Condition l l

Develop and maintain strategies for addressing large fires and explosions l and that include the following key areas: l l

(a) Fire fighting response strategy with the following elements: l

1. Pre-defined coordinated fire response strategy and l guidance l
2. Assessment of mutual aid fire fighting assets l
3. Designated staging areas for equipment and materials l
4. Command and control l
5. Training of response personnel l l

(b) Operations to mitigate fuel damage considering the following: l

1. Protection and use of personnel assets l
2. Communications l
3. Minimizing fire spread l
4. Procedures for implementing integrated fire response l strategy l
5. Identification of readily-available pre-staged equipment l
6. Training on integrated fire response strategy l
7. Spent fuel pool mitigation measures l l

(c) Actions to minimize release to include consideration of: l

1. Water spray scrubbing l
2. Dose to onsite responders l l

(32) The licensee shall implement and maintain all Actions required by l Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the l last action that requires incorporation of the strategies into the site l security plan, contingency plan, emergency plan and/or guard training l and qualification plan, as appropriate. l Revised by letter dated August 9, 2007