Category:Meeting Agenda
MONTHYEARML24303A2372024-10-29029 October 2024 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML24303A1712024-10-29029 October 2024 Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML24268A3272024-09-24024 September 2024 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-604, Revise Ventilation System Actions ML24207A1462024-07-25025 July 2024 Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML24207A1592024-07-25025 July 2024 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML24113A1522024-04-22022 April 2024 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML24032A4692024-02-0101 February 2024 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML24009A2622024-01-0909 January 2024 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24009A2632024-01-0909 January 2024 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-599, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators ML23299A2502023-10-26026 October 2023 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML23250A0672023-09-0707 September 2023 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-601, Extend Shield Building Completion Time After Refueling ML23243B0342023-08-31031 August 2023 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-601, Extend Shield Building Completion Time After Refueling ML23234A1742023-08-22022 August 2023 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-593, Revise Design Features ML23222A1882023-08-10010 August 2023 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML23117A3512023-04-27027 April 2023 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML23107A2592023-04-17017 April 2023 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML23075A3182023-03-16016 March 2023 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-596, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) ML23040A0902023-02-0909 February 2023 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML23033A5382023-02-0202 February 2023 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22312A4462022-11-0808 November 2022 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22291A1962022-10-18018 October 2022 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML22291A1982022-10-18018 October 2022 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML22290A1252022-10-17017 October 2022 Forthcoming Public Workshop Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML22244A2002022-09-0101 September 2022 Meeting with the Technical Specifications Task Force (TSTF) Regarding Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22244A2202022-09-0101 September 2022 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft TSTF-588, Remove List of COLR Methods ML22221A0542022-08-0909 August 2022 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22119A2482022-04-29029 April 2022 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22056A2932022-02-24024 February 2022 2/24/2022 Meeting Handout - Active Traveler Summary Report ML22041A5402022-02-10010 February 2022 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22024A4532022-01-24024 January 2022 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22024A4572022-01-24024 January 2022 Notice of Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22011A1702022-01-11011 January 2022 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 ONE-HOUR Preparation Time ML22010A2452022-01-10010 January 2022 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22007A1992022-01-0707 January 2022 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 ONE-HOUR Preparation Time ML21363A0772021-12-29029 December 2021 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML21357A0952021-12-23023 December 2021 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML21316A2532021-11-12012 November 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21300A3322021-10-27027 October 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21300A3902021-10-27027 October 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21266A4162021-09-23023 September 2021 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding Surveillance Requirements That Reference the Inservice Testing Program and 10 CFR 50.69 Categorization ML21252A5622021-09-0909 September 2021 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft TSTF-588, Remove List of COLR Methods ML21203A0152021-07-22022 July 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21147A1032021-05-27027 May 2021 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft TSTF-585, Revise LCO 3.0.3 ML21133A4882021-05-13013 May 2021 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft TSTF-585, Revise LCO 3.0.3 ML21123A1442021-05-0303 May 2021 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding TSTF-576, Revise Safety/Relief Valve Requirements ML21118A8142021-04-28028 April 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21043A2002021-02-12012 February 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21007A0362021-01-0707 January 2021 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML20329A3652020-11-24024 November 2020 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding TSTF-576, Revised Safety/Relief Valve Requirements ML20314A0382020-11-0909 November 2020 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force 2024-09-24
[Table view] Category:Meeting Notice
MONTHYEARML24303A1712024-10-29029 October 2024 Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML24303A2372024-10-29029 October 2024 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML24268A3272024-09-24024 September 2024 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-604, Revise Ventilation System Actions ML24207A1592024-07-25025 July 2024 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML24207A1462024-07-25025 July 2024 Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML24113A1522024-04-22022 April 2024 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML24032A4692024-02-0101 February 2024 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML24009A2632024-01-0909 January 2024 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-599, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators ML24009A2622024-01-0909 January 2024 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML23299A2502023-10-26026 October 2023 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML23250A0672023-09-0707 September 2023 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-601, Extend Shield Building Completion Time After Refueling ML23243B0342023-08-31031 August 2023 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-601, Extend Shield Building Completion Time After Refueling ML23234A1742023-08-22022 August 2023 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-593, Revise Design Features ML23222A1882023-08-10010 August 2023 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML23117A3512023-04-27027 April 2023 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML23107A2592023-04-17017 April 2023 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML23075A3182023-03-16016 March 2023 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-596, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) ML23040A0902023-02-0909 February 2023 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML23033A5382023-02-0202 February 2023 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22312A4462022-11-0808 November 2022 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22291A1982022-10-18018 October 2022 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML22291A1962022-10-18018 October 2022 Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML22290A1252022-10-17017 October 2022 Forthcoming Public Workshop Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) ML22244A2202022-09-0101 September 2022 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft TSTF-588, Remove List of COLR Methods ML22244A2002022-09-0101 September 2022 Meeting with the Technical Specifications Task Force (TSTF) Regarding Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22221A0542022-08-0909 August 2022 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22119A2482022-04-29029 April 2022 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22041A5402022-02-10010 February 2022 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22024A4572022-01-24024 January 2022 Notice of Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML22024A4532022-01-24024 January 2022 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22011A1702022-01-11011 January 2022 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 ONE-HOUR Preparation Time ML22010A2452022-01-10010 January 2022 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22007A1992022-01-0707 January 2022 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 ONE-HOUR Preparation Time ML21363A0772021-12-29029 December 2021 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML21357A0952021-12-23023 December 2021 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML21316A2532021-11-12012 November 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21300A3902021-10-27027 October 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21300A3322021-10-27027 October 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21266A4162021-09-23023 September 2021 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding Surveillance Requirements That Reference the Inservice Testing Program and 10 CFR 50.69 Categorization ML21252A5622021-09-0909 September 2021 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft TSTF-588, Remove List of COLR Methods ML21203A0152021-07-22022 July 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21147A1032021-05-27027 May 2021 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft TSTF-585, Revise LCO 3.0.3 ML21133A4882021-05-13013 May 2021 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft TSTF-585, Revise LCO 3.0.3 ML21123A1442021-05-0303 May 2021 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding TSTF-576, Revise Safety/Relief Valve Requirements ML21118A8142021-04-28028 April 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21043A2002021-02-12012 February 2021 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML21007A0362021-01-0707 January 2021 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML20329A3652020-11-24024 November 2020 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding TSTF-576, Revised Safety/Relief Valve Requirements ML20314A0382020-11-0909 November 2020 Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML20297A5082020-10-23023 October 2020 Forthcoming Teleconference with the Technical Specifications Task Force (TSTF) Regarding an Industry Proposal to Improve the Core Operating Limits Report (COLR) Requirements 2024-09-24
[Table view] Category:Memoranda
MONTHYEARML23222A2272023-08-10010 August 2023 Request for Additional Information Traveler TSTF-592, Revision 1, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22256A2142022-09-20020 September 2022 Summary of September 12, 2022, Meeting with the Technical Specifications Task Force Revised Draft Traveler TSTF-588, Revise List of COLR Methods ML22056A2982022-03-0303 March 2022 Summary of Quarterly Meeting with Technical Specifications Task Force on 2/24/2022 ML22041B5482022-02-16016 February 2022 Summary of February 1, 2022, Meeting with the Technical Specifications Task Force Regarding Traveler TSTF-576, Revise Safety/Relief Valve Requirements ML22039A1992022-02-16016 February 2022 Summary of January 26, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML21326A2572021-12-0101 December 2021 Summary of November 18, 2021, Quarterly Meeting with the Technical Specifications Task Force ML21221A1562021-08-23023 August 2021 Summary of Quarterly Meeting with Technical Specifications Task Force ML20357A5212021-06-24024 June 2021 November 5, 2020, Summary of Meeting with the Technical Specifications Task Force Proposal to Improve the Core Operating Limits Report ML21127A2752021-06-10010 June 2021 Summary of Quarterly Meeting with Technical Specifications Task Force ML21054A2822021-03-0101 March 2021 Summary of February 4, 2021, Meeting on the Conceptual Topical Report Implementation and Oversight (Trio) Process ML19136A1072019-07-15015 July 2019 OEDO-19-00114 - OIG-18-A-15 - Status of Recommendations for the Audit of the Nuclear Regulatory Commission'S Process for Modifying and Communicating Standard Technical Specifications (OIG-18-A-15) ML19078A2692019-04-0909 April 2019 February 21, 2019, Summary of Quarterly Meeting with the Technical Specifications Task Force ML15288A4572015-11-20020 November 2015 Sept 23, 2015 Summary of Pre-Submittal Meeting TSTF-553 Creatcs Trains ML15300A4832015-10-30030 October 2015 Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML15243A3312015-09-10010 September 2015 Forthcoming Pre-Submittal Meeting with the TSTF TSTF-553, Add Action for Two Inoperable Creatcs Trains ML15041A7372015-04-28028 April 2015 Summary of Quarterly Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML15085A2002015-04-0202 April 2015 Notice of Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML15057A2482015-02-26026 February 2015 Notice of Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force TSTF-551 ML15015A5502015-01-20020 January 2015 Notice of Forthcoming Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML14307A8822014-11-0303 November 2014 Notice of Forthcoming Public Meeting Between NRC and the Technical Specifications Task Force to Discuss Technical Issues and Administrative Processes ML14252A4362014-09-11011 September 2014 Notice of Forthcoming Public Meeting Between the Us NRC and the TSTF Industry Guidance on Non-Conservative Technical Specifications ML14163A2462014-06-26026 June 2014 Meeting Notice with to Discuss Technical Issues and Administrative Processes Related to Technical Specifications Task Force (TSTF) Travelers ML14139A1282014-05-21021 May 2014 Notice of Forthcoming Public Meeting Between NRC and Technical Specifications Task Force TSTF-542, Revision 0, Reactor Pressure Vessel Water Inventory Control ML13351A4952013-12-24024 December 2013 1/9/2014 Forthcoming Public Meeting Between the U.S. Nuclear Commission and the Technical Specifications Task Force to Discuss Technical Issues and Administrative Processes Related to Technical Specifications Task Force Travelers ML12303A0412013-07-25025 July 2013 Summary of Meeting with the Technical Specifications Task Force (TSTF) to Discuss Part 9900 ML13190A4382013-07-25025 July 2013 Summary of Public Meeting with Technical Specifications Task Force Draft Regulatory Issue Summary (Ris), NRC Staff Position on the Relationship Between Gds (General Design Criteria) Requirements and Technical Specification Operability. ML13183A4452013-07-0303 July 2013 Forthcoming Public Meeting Between the NRC and the Technical Specifications Task Force ML13099A4032013-04-17017 April 2013 Notice of Forthcoming with NRC and the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML13031A1712013-01-31031 January 2013 2/12/2013 - Notice of Pre-submittal Meeting TSTF-542 on Reactor Pressure Vessel Water Inventory Control (RPVWIC) ML12353A4762012-12-20020 December 2012 1//17/2013 - Notice of Meeting with Technical Speciifactions Task Force (TSTF) ML12303A0402012-12-0404 December 2012 Summary of October 17, 2012, Meeting with the BWROG Members of the TSTF Pre-Submittal of Reactor Pressure Vessel (RPV) Water Inventory Traveler ML12270A4002012-10-0505 October 2012 Forthcoming Public Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to Travelers ML12270A2522012-10-0303 October 2012 Notice of Forthcoming Public Meeting with the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) TSTF-529 ML12270A2612012-10-0303 October 2012 Notice of Forthcoming Meeting with the U.S. NRC and BWROG Members of the TSTF Pre-Submittal of RPV Water Inventory Traveler ML12270A1852012-10-0303 October 2012 Notice of Forthcoming Public Meeting with the U.S. Nuclear Regulatory Commission and the TSTF to Discuss Part 9900 ML12207A5072012-07-26026 July 2012 Notice of Forthcoming Public Meeting to Discuss Technical Issues and Administrative Process Related to TSTF Travelers ML12207A2112012-07-25025 July 2012 August 8, 2012 Meeting Notice with Industry Stakeholders Draft Regulatory Issue Summary (Ris), NRC Staff Position on the Relationship Between General Design Criteria Requirements and Technical Specification Operability (Supersedes ML12188A4 ML12107A1962012-04-20020 April 2012 Forthcoming Public Meeting with the Technical Specifications Task Force (TSTF) ML12039A2012012-03-14014 March 2012 Memo Plant-Specific Adoption of Traveler TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML11326A3002011-12-13013 December 2011 November 10, 2011, Summary of Quarterly Meeting with TSTF ML1132201792011-11-30030 November 2011 Summary of Meeting with TSTF Revision to TSTF-523 ML1129403022011-10-24024 October 2011 Notice of Forthcoming Meeting with the TSTF Regarding TSTF 523, Rev 0, Generic Letter 2008-01, Managing Gas Accumulation. ML1128705382011-10-21021 October 2011 Notice of Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML1122000212011-08-31031 August 2011 8/4/2011- Summary of Meeting with the Nuclear Energy Institute and the Technical Specifications Task Force Regarding Gas Accumulation Issues and TSTF-523 ML1119403292011-07-15015 July 2011 Notice of Forthcoming Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related Travelers ML1113206242011-06-0808 June 2011 5/12/11, Summary of Meeting with NRC and the Technical Specifications Task Force ML1105606302011-03-23023 March 2011 February 9, 2011, Summary of NRC Meeting with the Technical Specifications Task Force Discussed the Topics as Presented on the Agenda ML1101408502011-02-14014 February 2011 Summary of the January 12, 2011, Meeting with the TSTF Traveler TSTF-523 ML1102802652011-01-28028 January 2011 Notice of Forthcoming Meeting with the Technical Specifications Task Force to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML1032102562010-12-0808 December 2010 November 4, 2010 Summary of Meeting with the TSTF 2023-08-10
[Table view] |
Text
June 27, 2007 MEMORANDUM TO: Timothy J. Kobetz, Chief Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: Matthew Hamm, Reactor Engineer /RA/
Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation DATE & TIME: July 19, 2007 Time: 8:15 a.m. - 2:00 p.m.
LOCATION: Excel Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 PURPOSE: To discuss administrative processes matters related to TSTF Travelers under review; to review pending, in-process, and issued TSTF Travelers warranting special attention; and to address future planning issues.
PARTICIPANTS: NRC Industry T. Kobetz, NRR B. Mann, TSTF R. Telson, NRR D. Hoffman, TSTF Tech Coord.
T. Wertz, NRR J. Kenny, BWROG C. Schulten, NRR B. Yates, PWROG/W A. Lewin, NRR J. Messina, BWROG Others, NRR R. Gambrell, PWROG/B&W D. Millar, PWROG/CE CATEGORY 2: This is a category 2 meeting*. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
CONTACT: M. Hamm, NRR 301-415-1472 MEH1@nrc.gov
Enclosure:
Agenda
- *Commission=s Policy Statement on AEnhancing Public Participation in NRC Meetings,@
67 Federal Register 36920, May 28, 2002. For information regarding participating via teleconference, please contact M. Hamm at 301-415-1472 or MEH1@nrc.gov.
ML071770240 OFFICE ITSB:DIRS BC:ITSB:DIRS NAME MHamm TKobetz DATE 6/27/07 6/27/07 Memorandum to T. Kobetz, from M. Hamm dated PURPOSE: To discuss administrative processes matters related to TSTF Travelers under review; to review pending, in-process, and issued TSTF Travelers warranting special attention; and to address future planning issues.
DISTRIBUTION:
PUBLIC PMNS ITSB R/F RidsNrrAdro RidsNrrDirs RidsOpaMail Nrr_Dirs_Itsb Distribution RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDirsItsb RidsNRrAdres RidsNrrAdraDra RidsNrrDirsItsb RidsNrrAdraDraApl RidsOgcRp
PLANNED AGENDA Participants at the July 19, 2007, meeting will discuss administrative processes matters related to TSTF Travelers under review; review pending, in-process, and issued TSTF Travelers warranting special attention; and address future planning issues.
Session 1 8:15 ~ 12:00 (Attendees are encouraged to arrive 10 to 15 minutes early to facilitate an on-time start)
I. Administrative (30 minutes)
A. Introductions B. Agenda Review - Amendments & Acceptance C. Other Administrative Issues
- 1. Withdrawal of November 29, 2006 Request for Pre-Submittal Meeting on TSTF Traveler to Address Main Steam Isolation Valve Operability.
- 2. Withdrawal of August 9, 2005 Request for NRC Endorsement of TSTF-GG-05-01, Writer's Guide for Plant-Specific Improved Technical Specifications.
D. TSTF Questions Regarding NRC Review Fees for Traveler Reviews
- 1. TSTF presentation on apparently incongruous fees in relation to the complexity of the proposed change. Namely, fees in 1Q07 for TSTF-487, as well as others.
II. Process (1 Hour)
A. T Kobetz & M Hamm will lead discussion on TSTF review schedule coordination, communication & adherence
- 1. Completeness of submittals and thoroughness of acceptance reviews.
- 2. Quality of Staff=s Requests for Amplifying Information.
- 3. Expectations regarding timely notification and coordination - e.g. informal (face-to-face, telephone, email, etc.) notification before projected milestones are missed.
- 4. Posting of TSTF Review Schedule and Availability to NRC Website
- 5. Review of CLIIP NRC and Industry Actual vs. Scheduled Performance Enclosure
B. Update on, and discussion of, NRR Office Instructions under development or revision with application to TSTF Travelers, TS Conversion, and CLIIP Adoption
- 1. LIC-601, Technical Specification Conversion Accelerated Review C. How to achieve greater coordination and consistency between Topical Reports and Travelers.
D. Request for TSTF/NRC Meeting To Develop Standard CLIIP Template to Address Recurring TSTF Comments on CLIIPs.
III. Specific TSTF Traveler Issues (1 Hour)
A. TSTF and NRC Staff will discuss issues related to Travelers listed below:
- 1. TSTF-448 Model Safety Evaluation.
- 2. TSTF-425 - Industry desire for a more aggressive review schedule.
- 3. TSTF-493 - Industry desire for a more aggressive review schedule and concern that reassignment of ITSB personnel will result in delays.
IV. CLIIP Status (5 minutes)
A. TSTF will present an overview of the Updated Industry Survey on CLIIP Adoption.
V. Future Planning & Priorities (30 minutes)
A. TSTF will provide status updates on TSTF Travelers under development:
- 1. TSTF-500, Update of TSTF-360.
- 2. Traveler to Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.
- 3. Traveler on RCS Leakage Instrumentation Sensitivity.
- 4. Traveler to Revise SG Tube Inspection Program inspection end point.
B. NRR staff will address the following topics:
- 1. Risk Informed Technical Specification Licensing Reviews and Inspections.
C. Upcoming Schedule Priorities - A brief review of both TSTF and NRC staff work priorities for the coming quarter and the remainder of the calendar year.
- 1. Examining the TSTF Traveler process threshold to ensure NRC staff and industry resources remain focused on generic activities that bring the greatest benefit in safety, efficiency, and effectiveness, to ensure that effort expended on TSTF travelers is justifiable.
- 2. New NRC personnel and Potential for Meeting to Review Industry Training Program on ISTS Usage Rules.
VI. Next Meeting (5 minutes)
A. Establish date of next meeting (e.g. November 2007)
VII. Public Participation Invited (5 minutes)
VIII. Wrap-up, Seconds, Schedule Buffer (5 minutes)
XVI. Adjourn For Lunch Session 2 13:00 ~ 14:00 I. Containment Gaseous Radiation Monitor Leakage Detection Capability (1 Hour)
A. TSTF to present proposed ISTS changes to address containment gaseous radiation monitor leakage detection capability.
II. Public Participation Invited (5 minutes)
III. Adjourn