(4)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the Sequoyah and Watts Bar Unit 1 Nuclear Plants.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The Tennessee Valley Authority is authorized to operate the facility at reactor core power levels not in excess of 3455 megawatts thermal.

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No305 are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3)

Initial Test Program The Tennessee Valley Authority shall conduct the post-fuel-loading initial test program (set forth in Section 14 of Tennessee Valley Authority's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:

a. Elimination of any test identified in Section 14 of TVA's Final Safety Analysis Report as amended as being essential;
b. Modification of test objectives, methods or acceptance criteria for any test identified in Section 14 of TVA's Final Safety Analysis Report as amended as being essential;
c. Performance of any test at power level different from there described; and Amendment No. 305
d.

Failure to complete any tests included in the described program (planned or scheduled) for power levels up to the authorized power level.

(4)

Monitorinq Settlement Markers (SER/SSER Section 2.6.3)

TVA shall continue to monitor the settlement markers along the ERCW conduit for the new ERCW intake structure for a period not less than three years from the date of this license. Any settlement greater than 0.5 inches that occurs during this period will be evaluated by TVA and a report on this matter will be submitted to the NRC.

(5)

Tornado Missiles (Section 3.5)

Prior to startup after the first refueling of the facility, TVA shall reconfirm to the satisfaction of the NRC that adequate tornado protection is provided for the 480 V transformer ventilation systems.

(6)

Design of Seismic Category Structures (Section 3.8)

Prior to startup following the first refueling, TVA shall evaluate all seismic Category I masonry walls to final NRC criteria and implement NRC required modifications that are indicated by that evaluation.

(7)

Low Temperature Overpressure Protection (Section 5.2.2)

Prior to startup after the first refueling, TVA shall install an overpressure mitigation system which meets NRC requirements.

(8)

Steam Generator Inspection (Section 5.3.1)

(a)

Prior to start-up after the first refueling, TVA shall install inspection ports in each steam generator or have an alternative for inspection that is acceptable to the NRC.

(9)

Containment Isolation Systems (Section 6.2.4)

Prior to startup after the first refueling, TVA shall modify to the satisfaction of the NRC the one-inch chemical feed lines to the main and auxiliary feedwater lines for compliance with GDC 57.

(10)

Environmental Qualification (Section 7.2.2)

a.

No later than June 30, 1982, TVA shall be in compliance with the requirements of NUREG-0588, "Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment," for safety-related equipment exposed to a harsh environment.

Amendment No. 2, 213,305

DEFINITIONS IDENTIFIED LEAKAGE 1.16 IDENTIFIED LEAKAGE shall be:

a.

Leakage, such as that from pump seals or valve packing (except reactor coolant pump seal injection or leakoff) that is captured and conducted to collection systems or a sump or collecting tank, or

b.

Leakage into the containment atmosphere from sources that are both specifically located and known either not to interfere with the operation of leakage detection systems or not to be PRESSURE BOUNDARY LEAKAGE, or

c.

Reactor coolant system leakage through a steam generator to the secondary system (primary to secondary leakage).

MEMBER(S) OF THE PUBLIC 1.17 DELETED OFFSITE DOSE CALCULATION MANUAL 1.18 The OFFSITE DOSE CALCULATION MANUAL (ODCM) shall contain the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm/trip setpoints, and in the conduct of the Radiological Environmental Monitoring Program. The ODCM shall also contain (1) the Radioactive Effluent Controls and Radiological Environmental Monitoring Programs required by Section 6.8.4 and (2) descriptions of the information that should be included in the Annual Radiological Environmental Operating and Annual Radioactive Effluent Release Reports required by Specifications 6.9.1.6 and 6.9.1.8.

OPERABLE - OPERABILITY 1.19 A system, subsystem, train, or component or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified function(s), and when all necessary attendant instrumentation, controls, a normal and an emergency electrical power source, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component or device to perform its function(s) are also capable of performing their related support function(s).

SEQUOYAH - UNIT 2 1-4 Amendment Nos. 63, 134, 146, 159, 305

DEFINITIONS OPERATIONAL MODE - MODE 1.20 An OPERATIONAL MODE (i.e., MODE) shall correspond to any one inclusive combination of core reactivity condition, power level and average reactor coolant temperature specified in Table 1.1.

PHYSICS TESTS 1.21 PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation and 1) described in Chapter 14.0 of the FSAR, 2) authorized under the provisions of 10 CFR 50.59, or 3) otherwise approved by the Commission.

PRESSURE BOUNDARY LEAKAGE 1.22 PRESSURE BOUNDARY LEAKAGE shall be leakage (except primary to secondary leakage) through a non-isolable fault in a Reactor Coolant System component body, pipe wall or vessel wall.

PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) 1.23 The PTLR is the unit specific document that provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates and the LTOP arming temperature, for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 6.9.1.15.

PROCESS CONTROL PROGRAM (PCP) 1.24 DELETED PURGE - PURGING 1.25 PURGE or PURGING is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration or other operating condition, in such a manner that replacement air or gas is required to purify the confinement.

QUADRANT POWER TILT RATIO 1.26 QUADRANT POWER TILT RATIO shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, which-ever is greater.

C 17 t-%I I t"N AL I

MI k

)f 1

I

§ r

I

_ %.itI 14 1 1

1-5,ue,umeni No. 63, 134, 146, ii9, 223, 284, 305

REACTOR COOLANT SYSTEM 3/4_4.5 STEAM GENERATOR (SG) TUBE INTEGRITY LIMITING CONDITION FOR OPERATION 3.4.5 SG tube integrity shall be maintained.

AND All SG tubes satisfying the tube repair criteria shall be plugged in accordance with the Steam Generator Program.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS*:

a. With one or more SG tubes satisfying the tube repair criteria and not plugged in accordance with the Steam Generator Program, within 7 days verify tube integrity of the affected tube(s) is maintained until the next refueling outage or SG tube inspection, or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

AND

b. Plug the affected tube(s) in accordance with the Steam Generator Program prior to startup following the next refueling outage or SG tube inspection.

SURVEILLANCE REQUIREMENTS 4.4.5.0 Verify steam generator tube integrity in accordance with the Steam Generator Program.

4.4.5.1 Verify that each inspected SG tube that satisfies the tube repair criteria is plugged in accordance with the Steam Generator Program prior to startup following a SG tube inspection.

  • Separate Action entry is allowed for each SG tube.

SEQUOYAH - UNIT 2 3/4 4-10 Amendment No. 305

Pages 3/4 4-11 through 3/4 4-16 are intentionally deleted SEQUOYAH - UNIT 2 3/44-11 Amendment No. 28, 181, 211, 213, 243, 266, 267, 291, 305

REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.6.2 Reactor Coolant System leakage shall be limited to:

a.

No PRESSURE BOUNDARY LEAKAGE,

b.

1 GPM UNIDENTIFIED LEAKAGE,

c.

150 gallons per day of primary-to-secondary leakage through any one steam generator,

d.

10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System.

APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:

a.

With any PRESSURE BOUNDARY LEAKAGE, or with primary-to-secondary leakage not within limits, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b. With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE or primary-to-secondary leakage, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.6.2.1 Verify Reactor Coolant System leakage is within limits by performance of a Reactor Coolant System water inventory balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.*

The provision of Specification 4.0.4 are not applicable for entry into MODE 3 or 4.

The above surveillance requirement is not applicable to primary-to-secondary leakage.

4.4.6.2.2 Verify primary-to-secondary leakage is <150 gallons per day through any one steam generator at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.*

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

SEQUOYAH - UNIT 2 3/4 4-18 Amendment No. 211, 213, 250, 305

ADMINISTRATIVE CONTROLS

b.

Air lock testing acceptance criteria are:

1)

Overall air lock leakage rate is < 0.05 La when tested at >_ Pa.

2)

For each door, leakage rate is _<

0.01 La when pressurized to > 6 psig for at least two minutes.

The provisions of SR 4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.

The provisions of SR 4.0.3 are applicable to the Containment Leakage Rate Testing Program.

i.

Confiquration Risk Management Proqram (DELETED)

j.

Technical Specification (TS) Bases Control Proqram This program provides a means for processing changes to the Bases of these TSs.

a.

Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.

b.

Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:

1. A change in the TS incorporated in the license or
2. A change to the updated FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
c.

The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR.

d.

Proposed changes that meet the criteria of Specification 6.8.4.j.b above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e).

k. Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the Steam Generator Program shall include the following provisions:
a.

Provisions for Condition Monitoring Assessments.

Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging of tubes. Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged, to confirm that the performance criteria are being met.

MrI

.I A*V..

LJ I IKII,,,

24n Arn-en n--lent...

4 I

rI f

'.JI'II I

£.

U MI I IU.

4O, J, 64, W,

I34, 207, 223, 231, 271, 272, 298,
305,

ADMINISTRATIVE CONTROLS

b.

Provisions for Performance Criteria for SG Tube Integrity.

SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational leakage.

1.

Structural integrity performance criterion: All in-service SG tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, cooldown, and all anticipated transients included in the design specification) and design basis accidents (DBAs). This includes retaining a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and except for flaws addressed through application of the alternate repair criteria discussed in TS 6.8.4.k.c.1, a safety factor of 1.4 against burst applied to the DBA primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the DBAs, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse. In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.

For predominantly axially oriented outside diameter stress corrosion cracking (ODSCC) at the tube support plate elevations, (refer to 6.8.4.k.c.1) the probability of burst (POB) of one or more indications given a steam line break shall be less than 1 X 10-2.

2.

Accident induced leakage performance criterion: The accident-induced leakage from all sources, excluding the leakage attributed to the degradation described in 6.8.4.k.c.1 and.2, is not to exceed 1.0 gpm for the faulted SG and 0.1 gpm for each of the non-faulted SGs.

The primary-to-secondary accident induced leakage rate for any DBA, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG.

3.

The operational leakage performance criterion is specified in Limiting Condition for Operation (LCO) 3.4.6.2, "Reactor Coolant System, Operational Leakage."

c.

Provisions for SG Tube Repair Criteria.

Tubes found by inservice inspection to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.

The following alternate tube repair criteria (ARC) may be applied as an alternative to the 40%

depth based criteria:

1.

NRC Generic Letter (GL) 95-05 Voltage-Based ARC (Tube Support Plate rTSP])

A voltage-based TSP repair criteria is used for the disposition of an alloy 600 SG tube for continued service that is experiencing predominately axially oriented ODSCC confined within the thickness of the tube support plates (TSPs). At TSP intersections, the repair criteria is described below:

~.~E'..1L)'.J I /-WI LJI'dI I £ U

lUd MIIIeIIUIIIeIILI'4U. JUJ IU-I AAi-nendi-nent 114u. 305

ADMINISTRATIVE CONTROLS a)

SG tubes, whose degradation is attributed to ODSCC within the bounds of the TSP with bobbin voltages less than or equal to 2.0 volts, will be allowed to remain in service.

b)

SG tubes, whose degradation is attributed to ODSCC within the bounds of the TSP with a bobbin voltage greater than 2.0 volts will be plugged, except as noted in Item 6.8.4.k.c.1.c) below.

c)

SG tubes, with indications of potential degradation attributed to ODSCC within the bounds of the TSP with a bobbin voltage greater than 2.0 volts, but less than or equal to the upper voltage repair limit (calculated according to the methodology in GL 95 05.

as supplemented), may remain in service if a rotating pancake coil inspection or comparable technology does not detect degradation.

d)

SG tubes with indications of ODSCC degradation with a bobbin coil voltage greater than the upper voltage repair limit (calculated according to the methodology in GL 95 05 as supplemented) will be plugged.

e)

If an unscheduled mid-cycle inspection is performed, the following mid-cycle repair limits apply instead of the limits identified in Items 6.8.4.k.c.1.a),.b),.c) and.d).

The mid-cycle repair limits are determined from the following equations:

VSL VMURL (CL-At) 1.0 + NDE + Gr-CL VMLRL = VMUL -- (VuRL -

VLRL) (CL-At)

CL where:

VURL upper voltage repair limit VLRL lower voltage repair limit VMURL mid-cycle upper voltage repair limit based on time into cycle VMLRL mid-cycle lower voltage repair limit based on VMURL and time into cycle At length of time since last scheduled inspection during which VURL and VLRL were implemented CL cycle length (the time between two scheduled SG inspections)

VSL structural limit voltage SEQUOYAH - UNIT 2 6-10Ob Amendment No.305

ADMINISTRATIVE CONTROLS Gr average growth rate per cycle length NDE 95 percent cumulative probability allowance for nondestructive examination uncertainty (i.e., a value of 20 percent has been approved by NRC)

Implementation of these mid-cycle repair limits should follow the same approach as in TS items 6.8.4.k.c.1.a),.b),.c) and.d).

2.

W* Methodoloqy The following terms/definitions apply to the W*.

a) Bottom of WEXTEX Transitidn (BWT) is the highest point of contact between the tube and tubesheet at, or below the top of tubesheet (TTS), as determined by eddy current testing.

b)

W* Distance is the larger of the following two distances as measured from the TTS: (a) 8 inches below the TTS or (b) 7 inches below the bottom of the WEXTEX transition plus the uncertainty associated with determining the distance below the bottom of the WEXTEX transition as defined by WCAP-14797, Revision 2.

Service induced flaws identified in the W* distance shall be plugged on detection.

Flaws located below the W* distance may remain in service regardless of size.

d.

Provisions for SG Tube Inspections.

Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria. The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of d.1, d.2, d.3, d.4, and d.5, below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.

1. Inspect 100% of the tubes in each SG during the first refueling outage following SG replacement.

SEQUOYAH - UNiT 2 6-- O Amendment No. 305

ADMINISTRATIVE CONTROLS

2.

Inspect 100% of the tubes at sequential periods of 60 effective full power months. The first sequential period shall be considered to begin after the first inservice inspection of the SGs.

No SGs shall operate for more than 24 effective full power months or one refueling outage (whichever is less) without being inspected.

3.

If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.

4. GL 95-05 Voltage-Based ARC for TSP Indications left in service as a result of application of the TSP voltage-based repair criteria shall be inspected by bobbin coil probe every 24 effective full power months or every refueling outage, whichever is less.

Implementation of the SG tube/TSP repair criteria requires a 100 percent bobbin coil inspection for hot-leg and cold-leg TSP intersections down to the lowest cold-leg TSP with known ODSCC indications. The determination of the lowest cold-leg TSP intersections having ODSCC indications shall be based on the performance of at least a 20 percent random sampling of tubes inspected over their full length-

5.

W* Inspection When the W* methodology has been implemented, inspect 100 percent of the inservice tubes in the hot-leg tubesheet region with the objective of detecting flaws that may satisfy the applicable tube repair criteria of TS 6.8.4.k.c.2.

e. Provisions for Monitoring Operational Primary-to-Secondary Leakage.

I. Component Cyclic and Transient Limit This program provides controls to track the FSAR, Section 5.2.1, cyclic and transient occurrences to ensure that components are maintained within the design limits.

6.9 REPORTING REQUIREMENTS ROUTINE REPORTS 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted in accordance with 10 CFR 50.4.

STARTUP REPORT 6.9.1.1 DELETED 6.9.1.2 DELETED 6.9.1.3 DELETED SEQUOYAH - UNIT 2 6-1Od Amendment No. 28, 50, 64, 66, 134, 207, 223, 231, 271, 272, 298, 305

ADMINISTRATIVE CONTROLS ANNUAL REPORTS/

6.9.1.4 Annual reports covering the activities of the unit as described below for the previous calendar year shall be submitted prior to March 1 of each year. The initial report shall be submitted prior to March 1 of the year following initial criticality.

6.9.1.5 DELETED

!/A single submittal may be made for a multiple unit station. The submittal should combine those sections that are common to all units at the station.

SEQUOYAH - UNIT 2 6-11 Amendment No. 28,-34, 50, 64, 66, 107, 134, 165, 207, 223, 231, 271, 272, 298 305

ADMINISTRATIVE CONTROLS CORE OPERATING LIMITS REPORT (continued)

5.

WCAP-1 0054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code"

6.

WCAP-10266-P-A, "The 1981 Revision of Westinghouse Evaluation Model Using BASH CODE"

7.

BAW-10227P-A, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel"

8.

BAW-10186-A, "Extended Burnup Evaluation" 6.9.1.14.b The core operating limits shall be determined so that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met.

6.9.1.14.c THE CORE OPERATING LIMITS REPORT shall be provided within 30 days after cycle start-up (Mode 2) for each reload cycle or within 30 days of issuance of any midcycle revision of the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.

REACTOR COOLANT SYSTEM (RCS) PRESSURE AND TEMPERATURE LIMITS (PTLR) REPORT 6.9.1.15 RCS pressure and temperature limits for heatup, cooldown, low temperature operation, criticality, and hydrostatic testing, LTOP arming, and PORV lift settings as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:

Specification 3.4.9.1, "RCS Pressure and Temperature (P/T) Limits" Specification 3.4.12, "Low Temperature Over Pressure Protection (LTOP) System" 6.9.1.15.a The analytical methods used to determine the RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:

1.

Westinghouse Topical Report WCAP-14040-NP-A, "Methodology used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup. and Cooldown Limit Curves."

2.

Westinghouse Topical Report WCAP-15321, "Sequoyah Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and PTLR Support Documentation."

3.

Westinghouse Topical Report WCAP-1 5984, "Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Sequoyah Units 1 and 2."

6.9.1.15.b The PTLR shall be provided to the NRC within 30 days of issuance of any revision or supplement thereto.

STEAM GENERATOR (SG) TUBE INSPECTION REPORT 6.9.1.16.1 A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with Specification 6.8.4.k, "Steam Generator (SG) Program." The report shall include:

nrn,

ý/

If IA IkIIT 1

C 4_ A A.._J.....

&I-A A C^l CA CC AflT

^fI..

I IIII I

Z.

U 19 riIIuIIUIIIUIIL I'du.

29, j

V", Uu,

IUI, 134, 146, 206,214, 231,249, 284, 303, 305

ADMINISTRATIVE CONTROLS STEAM GENERATOR (SG) TUBE INSPECTION REPORT (continued)

a. The scope of inspections performed on each SG,
b.

Active degradation mechanisms found,

c.

Nondestructive examination techniques utilized for each degradation mechanism, d, Location, orientation (if linear), and measured sizes (if available) of service induced indications,

e. Number of tubes plugged during the inspection outage for each active degradation mechanism,
f.

Total number and percentage of tubes plugged to date,

g.

The results of condition monitoring, including the results of tube pulls and in-situ testing, and

h.

The effective plugging percentage for all plugging in each SG.

6.9.1.16.2 A report shall be submitted within 90 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the steam generator program (6.8.4.k) when voltage based alternate repair criteria have been applied. The report shall include information described in Section 6.b of Attachment 1 to NRC Generic Letter 95-05, "Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking."

6.9.1.16.3 For implementation of the voltage-based repair criteria for tube support plate (TSP) intersections, notify the staff prior to initial entry into MODE 4 following completion of an inspection performed in accordance with Specification 6.8.4.k, "Steam Generator (SG)

Program," should any of the following conditions arise:

1) If circumferential crack-like indications are detected at the TSP intersections.
2)

If indications are identified that extend beyond the confines of the TSP.

3)

If indications are identified at the TSP elevations that are attributable to primary water stress corrosion cracking.

6.9.1.16.4 For implementation of W*, the calculated steam line break leakage from the application of TSP alternate repair criteria and W* inspection methodology shall be submitted within 90 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with Specification 6.8.4.k, "Steam Generator (SG) Program." The report will include the number of indications within the tubesheet region, the location of the indications (relative to the bottom of the WEXTEX transition [BWT] and TTS), the orientation (axial, circumferential, skewed, volumetric), the severity of each indication (e.g., near through-wall or not through-wall), the side of the tube from which the indication initiated (inside or outside diameter), and an assessment of whether the results were consistent with expectations with respect to the number of flaws and flaw severity (and if not consistent, a description of the proposed corrective action).

S E QU OC00YAH - UNiHT 2 4 A.a VJ I-c A,, ri-i e n d iT, e ni t I 4o. 3 0 5

ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2.1 Special reports shall be submitted within the time period specified for each report, in accordance with 10 CFR 50.4.

6.9.2.2 This specification has been deleted.

6.10 RECORD RETENTION (DELETED)

SEQUOYAH - UNIT 2 6-15 Amendment No. 28, 44, 50, 64, 66, 107, 134, 146, 153, 165, 169, 206, 214, 223, 231, 249, 284, 305