License Renewal Commitment, Pressurizer Surge Line Weld Inspection Plan Summary
ML071350356
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/14/2007
From: Gerald Bichof
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, NRC/NRR/ADRO
References
07-0349
Download: ML071350356 (2)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 2326 1 May 14, 2007 United States Nuclear Regulatory Commission Serial No.

07-0349 Attention: Document Control Desk NL&OS/GDM R1 Washington, D.

C. 20555 Docket Nos. 50-280, 281 License Nos. DPR-32, 37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) SURRY POWER STATION UNITS 1 AND 2 LICENSE RENEWAL COMMITMENT PRESSURIZER SURGE LINE WELD INSPECTION PLAN

SUMMARY

A specific commitment of the renewed operating licenses for Surry Power Station Units 1 and 2 is to provide for NRC review and approval a summary of the inspection plan for the pressurizer surge line weld at the connection of the surge line to the Reactor Coolant System hot-leg piping. (Reference UFSAR Section 18.3.2.4 and Table 18-1, Item 24). Dominion provides herein the inspection plan summary for the pressurizer surge line weld to fulfill this commitment. Dominion will revise the Surry Augmented Inservice lnspection Plan to require inspection of the pressurizer surge line weld at the RCS hot-leg pipe connection during the period of extended operation. Specifically, baseline volumetric and surface examinations of the weld will be required in the fourth inservice inspection (ISI) interval prior to entry into the period of extended operation.

The examinations will also be required in the period of extended operation at a frequency of once per inspection period thereafter (i.e., once every 40 months during each of the fifth and sixth IS1 intervals.)

The inspections will be performed in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Rules for Inservice lnspection of Nuclear Power Plant Components.

These inspections typically include an ultrasonic examination to meet the volumetric examination requirement and a liquid penetrant examination to meet the surface examination requirement. Please contact Mr. Gary D. Miller at (804) 273-2771 if you have any questions or require additional information. Very truly yours, Gerald T. Bischof Vice President -

Serial No. 07-0349 Docket Nos.

50-2801281 Page 2 of 2 Commitments made in this letter:

1. Baseline volumetric and surface examinations of the weld will be required in the fourth inservice inspection (ISI) interval prior to entry into the period of extended operation.

The examinations will also be required in the period of extended operation at a frequency of once per inspection period thereafter (i.e., once every 40 months during each of the fifth and sixth IS1 intervals.)

cc: U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30303-8931 Mr. D. C. Arnett NRC Resident Inspector Surry Power Station Mr. S. P. Lingam NRC Project Manager North Anna and Surry U. S. Nuclear Regulatory Commission Mail Stop 8 G9A One White Flint North 11 555 Rockville Pike Rockville, MD 20852-2738