MONTHYEARML0618607302006-07-0505 July 2006 Proposed Technical Specifications Change Revision of Main Control Room and Emergency Switchgear Room Air Conditioning System Requirements Project stage: Request ML0706505242007-02-26026 February 2007 Proposed Technical Specifications Change Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping Project stage: Request ML0709600372007-04-0505 April 2007 Proposed Technical Specifications Change Re Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping Project stage: Request ML0711700902007-05-0303 May 2007 Request for Additional Information Regarding the Proposal to Revise Technical Specifications for Temporary 45-Day and 14-Day Allowed Outage Times (TAC Nos. MD46222 and MD4623) Project stage: RAI ML0713503562007-05-14014 May 2007 License Renewal Commitment, Pressurizer Surge Line Weld Inspection Plan Summary Project stage: Other ML0715502022007-05-31031 May 2007 Proposed Technical Specifications Change, Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping, Response to NRC RAI Project stage: Request ML0714902312007-05-31031 May 2007 Request for Additional Information Regarding the Proposal to Revise Technical Specification for Temporary 45-Day and 14-Day Allowed Outage Times to Replace Chilled Water Piping...(Tac Nos. MD4622 and MD4623) Project stage: RAI ML0717602122007-06-0505 June 2007 MCR &Esgr Chilled Water Piping Replacement Project stage: Other ML0718403872007-07-0303 July 2007 MCR and ESGR Chilled Water Piping Replacement (Risk Assessment RAI) Project stage: RAI ML0719401282007-07-12012 July 2007 MCR and ESGR Chilled Water A/C System Piping Replacement Project stage: Other ML0719303632007-07-12012 July 2007 MCR and ESGR e-mail Surry RAI Response for La Project stage: RAI ML0719701832007-07-13013 July 2007 Proposed Technical Specification Change, Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping Additional Information Backup Cooling Project stage: Other ML0720600222007-07-20020 July 2007 Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping, Response to Request for Additional Information Project stage: Response to RAI ML0726811712007-09-25025 September 2007 Proposed Technical Specifications Change Supplement Re Operable Definition Modification for Air Handling Units While in Temporary 45-Day Allowed Outage Times Project stage: Request ML0733212712007-11-28028 November 2007 Proposed Additional Technical Specifications Change, Operable Definition Modification for Air Handling Units While in Temporary 45-day Allowed Outage Times to Perform Required Surveillances Project stage: Request ML0801505442008-01-14014 January 2008 Revisions to Proposed Technical Specifications Changes, Temporary 45-day and 14-day Allowed Outage Times to Replace MCR and ESGR Air Conditioning System Chilled Water Piping and Operable Definition Modification to Perform Project stage: Request ML0802401202008-01-23023 January 2008 Tech Spec Pages for Amendments 258 and 257 Regarding Replacement of Main Control Room and Emergency Switchgear Room Air-Conditioning System Chilled Water Piping Project stage: Other ML0734802872008-01-23023 January 2008 Issuance of Amendments 258 and 257 Regarding Replacement of Main Control Room and Emergency Switchgear Room Air-Conditioning System Chilled Water Piping Project stage: Approval 2007-06-05
[Table View] |
Similar Documents at Surry |
|---|
|
Text
VIRGINIA ELECTRIC AND POWER COMPANY
- RICHMOND, VIRGINIA 2326 1 May 14, 2007 United States Nuclear Regulatory Commission Serial No.
07-0349 Attention: Document Control Desk NL&OS/GDM R1 Washington, D. C. 20555 Docket Nos.
50-280, 281 License Nos.
DPR-32, 37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNITS 1 AND 2 LICENSE RENEWAL COMMITMENT PRESSURIZER SURGE LINE WELD INSPECTION PLAN
SUMMARY
A specific commitment of the renewed operating licenses for Surry Power Station Units 1 and 2 is to provide for NRC review and approval a summary of the inspection plan for the pressurizer surge line weld at the connection of the surge line to the Reactor Coolant System hot-leg piping. (Reference UFSAR Section 18.3.2.4 and Table 18-1, Item 24).
Dominion provides herein the inspection plan summary for the pressurizer surge line weld to fulfill this commitment.
Dominion will revise the Surry Augmented Inservice lnspection Plan to require inspection of the pressurizer surge line weld at the RCS hot-leg pipe connection during the period of extended operation.
Specifically, baseline volumetric and surface examinations of the weld will be required in the fourth inservice inspection (ISI) interval prior to entry into the period of extended operation. The examinations will also be required in the period of extended operation at a frequency of once per inspection period thereafter (i.e., once every 40 months during each of the fifth and sixth IS1 intervals.) The inspections will be performed in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Rules for Inservice lnspection of Nuclear Power Plant Components. These inspections typically include an ultrasonic examination to meet the volumetric examination requirement and a liquid penetrant examination to meet the surface examination requirement.
Please contact Mr. Gary D. Miller at (804) 273-2771 if you have any questions or require additional information.
Very truly yours, Gerald T. Bischof Vice President -
Serial No. 07-0349 Docket Nos. 50-2801281 Page 2 of 2 Commitments made in this letter:
- 1. Baseline volumetric and surface examinations of the weld will be required in the fourth inservice inspection (ISI) interval prior to entry into the period of extended operation.
The examinations will also be required in the period of extended operation at a frequency of once per inspection period thereafter (i.e., once every 40 months during each of the fifth and sixth IS1 intervals.)
cc:
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30303-8931 Mr. D. C. Arnett NRC Resident Inspector Surry Power Station Mr. S. P. Lingam NRC Project Manager North Anna and Surry U. S. Nuclear Regulatory Commission Mail Stop 8 G9A One White Flint North 11 555 Rockville Pike Rockville, MD 20852-2738