ML070670473
ML070670473 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 06/28/2001 |
From: | - No Known Affiliation |
To: | Office of Nuclear Reactor Regulation |
References | |
Job Order 2000-060 | |
Download: ML070670473 (147) | |
Text
\
JOB ORDER COMPLETION FORM FOR D-ESZGN CHANGE (VYDC's, EDCR's, Minor Mod's, and Setpint Change Requests)
Section 1.
Work CompletionDate m A Y 15: 2 0 0 f (Starts 90 day closure clock)
The original completed and signed initiating document @DCR, W C ,MM or SPCR, including all attachments) is required to be contained in this Job Order File. Supporting documents (Work Orders, Event Reports, Purchase Orders,*z&dEquivalency Evaluations) must be referenced but need'not be in
. the file because they are processed via their own plant procedures. .
Each Job Order Fife shall have a Table of Contents listing ali documents contained in the file. The below lists'maybe used for that purpose or a-separatelist may be attached. . . .
List InitiatingDocument Attachments
\
JOB ORDER COMPLETIONFORM FOR DESIGN CHANGES (Continued)
,Special Processes Special Processes are welding, heat treating and non-destructivetesting processes.
- Xf Plant Special Processes are used, they need only be listed by title and revision number. The completed data sheets shall be placed in the SO File Title Rev. #
Welding r/A Heat T r h g /.'A -
W E /./A VerifiedByDate r/A /
Data Sheet Inclusion Verified Bymate /L/A /
If Nan-VY special process procedures are used they shall be listed by title and revision number and a copy placed in the JOFile along With the associated data sheets. VY Engineering review and approval ofthese non-vy special process procedures shall be documented in the JO File (or reference a generic Job Order File).-
Title Rev.#
VY Personnel qualification sheets need not be placed in the YO File but the personnel involved must be listed on the associated data sheets.
Verified By/lDate N?4 - f Non-VY personnel qualification sheets shall be placed in the 3 0 File along with the review documentation of the qualifications if applicable (or reference a generic Job Order File),
Data Sheets & Qualification Documentation Inclusion Verified ByDate Q&MW &
Procurement List Purchase Orders or the document referencing the P.O.Numbers VYAPF 6Q22.01 AI? 6022 Rev. 17 Page2of6 *.
\ JOB ORDER COMPLETION FORM FOR DESIGN CHANGES (Continued)
,Follow up e Ensure that all required documents generated during the course of work are conhined in this 3 0 File.
Verified ByDate l a !,
Ensure that documents exempted &-ominclusion in JO File are properly referenced.
Verified Bymate i
Ensure that any Event Reports associated With the work have been submitted as required by AP 0009.
Event Reports that address nonconforming conditions associated With the work shall be resolved such that the nonconforming condition(s) does not impact the operability ofthe subject structure, system, or component.
List ERs ZCWj 1/ & 9, 206 leg6 0, Zoo/ // 9s' Verified Bymate
/ "' r y
/ &+<A, Date instauation was cornpIetedaA9 /4 Z a@/ (Also record #his dat at the top ofpage 1 Notify TSPC ofwork completion PerformedBymate &&?d, DateforwardedtotheDCE 6 / ~ 9 / & ,. e 70 PW f l ~ k c k / ~ , q t
~ @ ~ " 70 + ~' SW e x GooJ&ds Section 2, 70 mM.4 7Q b#b'& LrwQl&q Design Cognizant Engineer shall:
Noti@ TSPC of receipt PerormedB~LD~~KDFA- u&a a.
been approved and documented in the JO File.
Ensure that completed work meets all required codes and standards and that any deviations have
=@147/'ar4r dgcir.M#Yio & mA 2&0 -&io v/.9 pY.rsjce C d W b S . Verified Bymat- p A-2 l$&4l,
- b. Ensure afl documentation in the $le has been reviewed and has been found to be accurate, legible, and complete.
Verified Bymate 3f Z 4 k - ' / e-$.
- c. Ensure all referenced documentation has been reviewed and has been found to be accurate, legible, and complete.
Verified B y / D a t e wk / d/27/
VYNF 6022.01 AP 6022 Rev. 17 Page 3 of6 '.
. JOB ORDER COMPWION FORM FOR DESIGN CHANGE3 (Continued)
- d. Submit marked up and new drawings for revision in accordance with AP 6802. Drawinzs not submitted per A 6802 (Le. sketches) may be retained in the JO File if they are not larger than 8.5 X 14.
Ensure that a copy of all marked up and new as-builts are retained in the JO File in a separate folder that includes a copy of the associated VYAPF 6802.02 or .03 as an index.
Inclusion Verified Bymate mF &--- ?/$I&
c I
- f. Submit U F S A R revision as required by AP 6036 [SURV9301401]. Change #f &t??
5 Issue Interim change to DBD in accordance with AP 6007. Change # MIA 4
Verified Bymate Hk I
- h. Ensure Envirbnmental Qualification records updated.
j List EQ DIs /il F
Ensure Controlled Documents, such as Fuse Listing, Appendix R Safe Shutdown Capability Analysis, and Fire Hazards Analysis, are updated. Refer to Appendix D of AP 6008 for a listing of Controlled Document so Verified BylDate HA I j.
Ensure EMPAC updated Verified Bymate fila /
or changes tracked via AP 0028 item # +t CER9707861 Verified Bymate HI& /
- k. Ensure Stores Supervisor review of obsolete parts performed Verified By/Date HA I L---
or tracked via AI? 0028 item # ~h Verified ByDate fi? I
- 1. Ensure User Department notified of stock codes that were created or made obsolete as a result of this job [ER 970786).
Verified Bymate qh /
or tracked via AI? 0028 item #
+ Verified Bymate pl/a /
VYAPF 6022.01 AP 6022Rev. 17 Page 4 of 6 LPC #2
. JOB O W E R COMXETION FORM FOR DESIGN CHANGES (Continued) rn. Ensure new or revised vendor manuals generated Verified Bymate ~,h I or the information forwarded to the applicable Department via AP 0028 # +a PR970786J VerifiedBy/Date 4s 1 I
- n. Ensure original Safety Classification Worksheets forwarded to the Technical Support Manager.
List Sheet#s P@ .
Verified ByDate #/a /
- 0. Ensure affected plant procedures revised and issued.
List of procedure #s and new revision #s r//4 . .
Verified ByDate NA f Or tracked via 0028 item ~,h VerifredByDate ?/A f
- p. Ensure other Plant Program documents changed or Coordinators notified of required program changes via AP 0028 0028#
App. R or Verified SylDate M A I App. 3 or Verified ByDate r(/a J Fire Protection or Verified Bymate HI4 f Surveillance or Verified Bymate Hb -f IS1 or Verified BylDate a f G *I IST or Verified ByDate /J/A I /
Maint. Rule or Verified By/Date /Yb -1 PMs or VerifiedBymate Hb /
Other or Verified ByDate #+A -f
- q. - Ensureaffected calculations changed and installed verified as required by AP 0017.
Verified BylDate -
or Design Engineering notified of changes via AP 0028 # J4 Veritied Sy/Date VYAPF 6022.01 AP6022Rev. 17 Page 5 of 6 LPC #2
. JOB ORDER COMPLETION FORM FOR DESIGN CHANGES (Continued)
- r. For EDCRs, close out the package as required by WE-100 and completed WE-100 forms retained in JO File.
Verified ByDate r//pt i
- s. For VYDCs, close out the package as required by AP 6008 and completed forms retained in JO File.
Verified Bymate p!A . I i
- t. For EDCRs and VYDCs; the Design Change reviewed for strengths and weaknesses, suggestions omarded to the applicable Engineering Manager and a copy of the memo retained in the JO File.
Verified Bymate HA /
- u. Ensure discrepanciesnoted during this review have been resolved.
Verified B y l D a t e a r G / #ibl
- v. Ensure duplicate documentation purged from file VerifiedByDate - / ?/$/Of
- w. Forward the completed JO File to the Co,@zant Department Manager.
Bymate af= -1
- x. Notify TSPC of file transfer to the Cognizant Department Manager.
Performed By ~3 f& /$)Ai Section 3.
Cognizant Department Manager or designee shall:
- a. Perform a review of the file to verify accuracy, legibility, and completeness by utilizing VYAPF 6022.01 and the plant procedures used to generate the initiating documents as required.
JO file closed (stops 90 day closure clock)
- b. Notify the TSPC of file closure.
ba e 4 7.s-01
- c. Ensurs 50 File prepared and transferred to DCC per AP 6806 by the Department Administrative h i s t a r i t or Clerk.
VYAFF 6022.01 AP6022Rev. 11 Page 6 of 6 LPCR
TM/MM CONTROL SHEET (Continued)
[ 1 TM [ X ] MM (Attach VYAPF 0020.08)
DESCRIPTION Print clearly name of Originator/Date: David F. Grimes 5/11/01 NO: 2000-010 TM intended to be replaced by a permanent Design Change? YES [ ]
NO [ I NA [ X ] (If yes, attach marked up-FSAR pages if applicable).
Description of Modification: (Mechanical/Electrical Modification, Safety Function Bypassed, Auto Feature Disabled, Etc.) (Attach W A P F 0020.04 for a l l electrical TMs/MMs and VYAPF 0020.05 for a l l mechanical TMs/MMs) : Provide a replacement seal desisn at the intersection of the drvwe l l shell and the concrete floor at elevation 238. The d w e l l s h e l l will be stripped of paint within a f u l l circumferential six inch band f 2 / - 0 measured from the bottom of t h e existina lserimeter kewav and recoated w i t h an amxoved, Service Level 1, protective coatinq. Concurrent with 5 these activities an ASME IWE inspection of the shell will be\$
conducted bv Project Encheerins. This nroiect is beins performed, as a result of the IWE inspections conducted durincr RFO 21. These Q inspections revealed that some lsittins was occurvins in this area. %
Research into this issue indicates that the oricrinal seal had been?
removed and an effective reconfiguration of the seal was not d performed. Reference VYM 2000/16, D w e l l Seal Project Scope Memo Q:
%?
w and VYM 2 0 0 0 / 4 3 , D w e l l Protective Coatins Oualification Memo.
Major Change: The C Z l l coating failed to bond to the prepared 9 surface and cam not be aualified as a Service Level 1 Coatincr,<
coatincz will be scram8 from the area that received the apnlication to remove loose material and create a sound ticrht substrate for adhesion of the en- coating. Vacuum blastinn will be used to grenare the area of the shell that interfaces with the seal to tzenare for the installation of the seal as detailed on 5920-12789. The seal will still nrovide the function it was orisinallv designed for in that it will Drovide a moisture barrier to mitigate water enterina the shell to concrete interface, The sealant in direct contact with the gregared steel surface is acceptable based on the manufactures technical literature for surface pre-ation. Steel in direct contact with grout is protected by the gassivating effect of the arout. In areas where CZ 11 remains, added protection is nrovided by the zinc, The drywell shell will receive a n axmlication of Carboline 890 which w i l l not meet Service Level 1 Criteria. The single coat.
azmlicatioa for one owrating cycle has been verified with Carboline Cornoration as an accentable amlication until a permanent remedy is achieved. Corrective actions for the unqualified coatina in this area will be tracked mer an Ae-0028 for nossible resairs durina RFO 23. ECCS strainer loadinqs are calculated in VYC-1677. Review of VYC-1677 documents that based on the size of the installed strainers, paint loadins has minimal affect on NPSH. Additionally, VYC-1677 assumes that all the VYAPF 0020.03 AP 0020 Rev. 21 Page 1 of 9
TM/MM CONTROL SHEET (Continued) affected paint within the zone of influence detaches f r o m the LOCA jet -act and loads on the strainer. Recent BWROG testing has documented that sianificant amounts of the Paint, especially with the VY armroach velocities, will settle to the bottom of the torus. Therefore, based on this review of VYC-1677, the addition of this small amount of notentially failed paint will have PO
-act on the onerability of the ECCS suction'strainero.
Describe how modification changes component/system weration: This modification will have no effect on comonent / system operations.
The new seal is similar in form, fit and function to the oriainal desim.
System Engineering Group input obtained and incorporated in design.
nFd---' / 5hh Originator Date Reason f o r Change: Current seal confiauration does not z>rovi.de sufficient protection acrainst corrosion of the drvwell shell.
Reliance on existina saint (primer) for corrosion protection has not proven adequate by itself. An enuineered seal and protective coatinq svstem anplied in accordance with recocrnkzed standards will -r>rovi.dean effective moisture barrier at this junction. Major Change: A nrotective coating w i l l be analled, but it will not be gualified as a Senrice Level 1 Coatincr.
Describe design requirements (wire size, pipe material, etc.):
Ernbecco 885 Grout - fill for existins kevwav, Closed Cell polyethylene tane 3M #481 - bond breaker, Dow Cornincr 795 buildins sealant - silicone based elastomer, Carboline inoruanic zinc primex, Carbo Zinc 11 SG - nrirner coat, Carboline 890 - m o w top coat. All materials to be Safetv Class 2. Major Change: The coatings have been changed to an unaualified coating. Residual unaualified CZ 11 can remain on the drvwe11 shell after scraning the loose material and restorina the surface to a sound tight substrate consisting of bare steel and ticrhtlv adhered CZ11. The shell will be vacuum blasted in the area of the elastomer seal (1 inch wide strine -0 + 1") to remove the C Z l l and ex^ose the profile that exists on the steel from the previous surface preparation efforts. A single coat of 890 will be asnlied to the area above the seal.
Describe any potential hazard presented by the modification (e.g.,
fire, flooding, rad consequences, etc.) and provide a detailed assessment if appropriate (UND9302TPl): Methanol vapors are evolved durina the sealant curins Drocess. Adequate ventilation needs to be -r>rovideddurins the amAication and curins Deriod (14 days max).Paint vapors addressed per manufacturers instructions.
Cleanins solvent vaDors will also be emitted.
JO FILE WAPF 0020.03 AP 0020 Rev. 21 Page 2 of 9
W/MM CONTROL SHEET (Continued)
Indicate the rnode(s) of operation for which the TM is acceptable/applicable.
Shutdown Refuel Startup Run Procedures affected: (TMs and MMs) None Recommendations f o r new PMs or changes to existing PMs:
None Other Plant documents and programs affected (MMs only) (drawings, DBD, FSARs, W a s , Maintenance Rule, EQ, Appendix R, S e t p o i n t Controls, -WAC, etc.) : I 5920-233 - Note added to desisnate seal detail dws and minor mod reference Add seal detail to IS1 inspection Rroqram (Note: Reference calculation for ASME XI IWE thinnincr and screeninq criteria is VYC-20431.
For TMs intended to be replaced by Design Changes, and all MMs, obtain new equipment EMPAC asset IDS and initiate all safety classifications worksheets per the W S C M .
F o r MMs, initiate Dra ing Change Notification forms in accordance with AP 6802. ' T b p k / S/hh?
Originator Date Control Room/TSC Drawings affected (see Appendix A of DP 0 0 2 9 ) :
None Review outstanding TMs/MMs and the Design Change List to ensure the cumulative a f f e c t of other TMs are factored into the TM/MM.
Comments: This modification will have no affects on pexidinq desiqn chanses or terrmorarv modifications.
3 g b / &+/a/
Originator Date All applicable elements of Appendix "A" have been considered and JO FILE VYAPF 0020.03 AP 0020 Rev. 21 Page 3 of 9
TM/MM CONTROL SHEET (Continued) addressed.
Appendix R Review completed (attach VYAPF 0020.09)
/ &4i//o/
Originator Date Discuss additional training requirements with the affected Dept.
Head(s) . Training Required? YES [ 1 NO [XI Affected Dept.(s) Project Ensineerinq - IS1 SAFETY CLASSIFICATION OF SYSTEMS, STRUCTURES AND COMPONENTS
[ 3 sc-1 [XI sc-2 [ I sc-3 1 All NNS SSCs
[ I OQA/Vital Fire INSTALLATION/~STORATIONFGQUIREMENTS:
Prerequisites: (RWPs,Housekeep-ng, Fire Perm t, etc.) :
Verify installation began within 30 days after Shift Supervisor approval.
RWP , Housekeer>ins, Individual Oualification with approved paintinq procedures. Craft manasement and craft shall be familiar with W safety manual and SSPC PA Guide 3 : A G u i d e to S a f e t y in Paint:
Awwlication. (Relative to the use of airless spravers). Discuss ALARA plans with Radiation Protection. ANI notification is remired prior to the start of work. Chemistry approval of solvents, paints and sealants.
Precautions: Trainins / Personnel crualifications for abrasive blast, Rotopeen and needle QUn. Adeauate ventilation durins coatinss asalications and seal installation. Ensure Operations is aware of paintins and sealant activities and precautions with respect to Standbv Gas Treatment. Lead paint may be encountered in seal area.
Installation Instructions: The concrete floor within 1 foot of the perimeter edse shall be insaected for cracks and reoorted to the project enqineer. Clean effected area of containment shell in accordance with SSPC SP-1 (solvent clean). Clean keywav to sound tight substrate. Clean effected area of containment shell via urit blast, Rotopeen and/or needle crun to achieve reauired profile (1-3 mils, SSPC-SP 10, Near-White Blast Cleanins). Other hand tools may be emr>loyed as remired to achieve an initial SSPC-SP 11 (Power Tool Cleaninq to Bare Metal) with final surface preparation confodnq to SSPC-SP 10. Profile verification (1 to 3 mils) by 0C reauired.
Vacuum to thorouahlv remove residuals. Surface shall be dust free prior to aoplication of primer. Notify IS1 coordinator to insDect shell of primary containment in accordance with IWE Drosram. Paint (asitated sDray aDDlication1 wall of containment with Carboline JO FILE VYAPF 0020.03 AP 0020 Rev. 21 Page 4 of 9
TM/MM CONTROL SHEET (Continued)
Carbozinc 11 SG primer. Note that the prime coat will be armlied to 1 the steel adjacent to the bottom of the kewav, which will be filled with srout. Install grout to within YZ inch of floor level. Cure in accordance with manufacturers direction. Cut and install b o n d b -
3 \
breaker Polyethvlene tape (2"overlap at ioints, Nominal.1 . Apply and-dry tool (no soap) Dow Cornincr 795 sealant. (1/2 inch m a x . ) Fiberalass screen rub prior to Mist coat and topcoat witha Carboline 890 epoxv paint. Paint is to be ins-oected for holidavs andU film thickness in accordance with amroved Procedures. Protective -
coating shall be installed in accordance with manufactures54; directions. A P D ~ Y top bead (1/4 inch nom.) of sealant after seal has$
set. EPOXV Paint may be cut aaainst the tor> bead of sealant if desired. Mask or otherwise arotect adjacent surfaces from paint overspray See Installation Reauirements and Coatinas Inspection Plan for further details. Major Chanae: The Sevice level 1 reauirements 2 B for the coating have been removed from the scone of work. A single b coat of 890 will be amlied by brush or roller at a 6 mil DFT (-1, + 2 2 mils). This coating will extend from the tog of the seal and be Q feathered into the oriqinal coating amroximately 6 inches above the floor level. The Coatings Insgection Plan no longer amlies to this project. The remaininq CZ 11 within the seal area can be left fn 8 place since it will serve to nrovide some cathodic Brotection to the q~
shell. The CZ 11 will be removed from the interface of the shell-with the Dow Corning 795 elastomer utilizing vacuum blasting. The, vacuum blasting will be nerformed to se the profile of the steel%
surface. The area will be a 1 i n c h z d ( - O r ' , +1") for the full circumference of the drvwe11 at the se allowance for the bond breaker tape all& for the irrecrular surface of the existing concrete with the inteht of makinq it as tisht to the adjacent surfaces as nractical.
Note's The I&T for this project will be modified from sten 7.13 omdrd. The original I&T Will be retained in the JO file for hidtorical mmnoses. The modified section of the I&T is attached.
Installation Verification/Testing R e q u i r e m e n t s : Inspect seal to verify that adherence has been maintained to concrete floor and steel shell. This should be verified after seven davs of curina.
Note that moisture curinq will continue after 7 davs and moisture will remain in the drvwell after closure and inertinq. Painted surfaces shall be inspected f o r drv film thickness. See attached Coatinas InsDection Plan for verification requirements. Notify ISIPC for preservice inpections of seal and protective coatinqs in accordance with PP 7024, IWE Inservice Inspection Prosram. Major Change: Wet film thickness measurements will be taken to verify amlied dllaqe. Inspection of the seal will not be nerformed after 7 days of curing. An as-left condition will be documented under the IWE nxogram as currently planned and insgection will be performed during RFO 23.
Restoration Instructions (TM only):
Restoration Verification/Testing Re ' , I Reviewed BY:
i
/ 5llllOl I I ,
30 FILE VYAPF 0020.03 AP 0020 Rev. 21 Page 5 of 9
TM/MM CONTROL SHEET (Continued)
Implementing Dept. Head Date MM Screening attached (VYAPF 0020.08) [XI YES [ ] NA (TM only) 50.59(a)(1) Screening Evaluation completed and attached [XI YES Safety Evaluation Required [ ] YES [XI NO Describe when TM will be restored:
Approximate date TM will be closed: -
TM/MM details/safety review/eval performed: -
/I n/
. )
Date Other [ I r/l#
Safety Class power supplies affected? C I YES [XI NO If " Y E S " , Desisn Engineering assessment of cumulative effects I performed? I YES Review associated MM Screening, 50.59 (a)(1) Screening and 50.59(a) (2) Safety Evaluation.
Operating Procedures af Others identified:
Procedures requiring revision prior to TM or MM implementation/
restoration:
Additional operational controls necessary:
Installation:
Awe 40 FILE VYAPF 0020.03 AP 0020 Rev. 21 Page 6 of 9
TM/MM CONTROL SHEET (Continued)
Restoration:
Reviewed By: / 5-1Y-4
{or Designee) Date APPROVAL TM/m Approved By: / 5*1/-6!
Originhtrng Dept. Head Date PURC Review at Meeting #:soor-o33,IW).dJ1 -&-oh Plant Manager Approval: W Date:
Distribution of approved TM/MM:
ImDlementinq Degartment Head - Oricrinal Trainins Manager - 1 copy OOA Manaqer - 1 copy Notify the PEAA to:
VYAPF 0020.03 AP 0020 R e v . 21 Page 7 of 9
TM/MM CONTROL SHEET (Continued)
- 1. Put cordes of the TM/MM in the Dendins chanse f i l e s I
- 2. Stamp all Control Room drawings identified that are affected by the TM/MM.
Shift Supervisor orQesi
- ' 'Date Installation Authorized By:
/ s/,///6 Shift SupeAisor Date' Copy of TM/MM filed in Control Room book with annotation that it is a copy and the original is in For TM Installation:
Installation verified complete and testing performed, tags installed, original TM returned to Control Room, TM Index updated, FSAR markups submitted, if applicable. PEAA notified of installation, and Shift Supervisor notified: . *
/
Implementin$ Department Date Post Installation Test Performed, file original (TM) in Control Room.
/
Shift S&ervisor Date l--l___l_l___________----_----
For TM Restoration:
TM Restoration Authorization: (Plant Conditions compatible with restoration, verify operating procedures revised and ready f o r issuance or controls in place to ensure procedures are revised and issued prior to operation)
/
Shift Sdervisor Date TM Restoration complete, and verified: (tags removed, testing complete, control sheets -03, -04, and .05 completed, notify Shift Supervisor)
/
Implementin& Department Date Notify the PEAA to:
- 1. remove copies of the TM from the Dendins chanqe files 90 FlL VYAPF 0020.03 AP 0020 Rev. 21 Page 8 of 9
TM/MM CONTROL SHEET (Continued)
- 2. sign all Control Room drawings that were stamped as a result of the TM.
TM Restoration Complete and Post Retest Performed: (Verify all caution tags, lineup instructions, temp labels removed, and notify Implementation Dept. that post restoration testing is complete, and forward the completed TM to the pEM). I b
N!b /
Shift Su4ervisor Date Installation verified complete and testing performed, markups copies qiven to the PEAA if applicable, MM Index updated, Shift Supervisor notified and MM package forwarded to Shift Supervisor.
revised I Post Ins tallat nd PEAA notified that MM has been installed:
1 </,-==/e[
Date Remove the copy of the MM from the Control Room MM Log Book, forward I completed original MM to the Implementing Department for JO closeout. c,~/
/ J/15A/
1 Dace NOTE Final MM drawing revisions will be distributed and filed in the Control Room and TSC (as applicable) via DP 0029, "Control Room and TSC Design Control Records".
- _ _ - - - - - - I _ - - - - - - - - - - - - - -
WAPF 0020.03 AP 0020 R e v . 21 Page 9 of 9
50.59 (a)(1) SCREENING EVALUATION Affected Document Minor Modification 2000-010 Description of Change(s) (List each change that the evaluation supports or reference that provides changes)
Installation of a drywell seal at elevation 238' and .perimeterpainting of a cicumferential strip approximately 6 + / - inches wide.
Based on a review of the following questions, determine i f the proposed activity has the potential to impact safe operation of the facility and requires a 10CFR50.59(a)(2) evaluation. A "YES" answer to any of the questions 2 through 25 requires that a written 10CFR50.59(a)(2) evaluation be perf';;rmed. Either evaluation may require an FSAR change in accordance with AP 6036 or a TRM change in accordance with AP 0060. These questions need to be answered based on a review of the activity (i.e., procedure change, Temp. Mod.,
Equivalency Eval., Lineup Deviation, etc.) vs. the requirements of the FSAR or interim FSAR changes, the TRM and Tech. Specs. The originator should provide a response to "NO" answers that are potentially applicable to provide a basis f o r the conclusion.
FSAR, TRM & Tech. Spec. sections reviewed 5 , 1 2 . 6 , 12.2.2.2, 1 2 . 3 . 5 FSAR, TRM & Tech. Spec. sections affected None "1. Would the activity require a Tech. Spec. change prior to implementation? If "YES" then a Tech. Spec. change must be completed before the activity can commence.
YES -
NO
- 2. Would the activity result in a change that would directly or indirectly render a system, structure, or component (SSC) either different in design, or different in function or in method of performing a function (e.g., change manual to automatic, etc.) than that described (written or pictorial) in the FSAR, interim FSAR change or TRM. (Note that pictorial changes that do not effect system design parameters or system operation are not considered to satisfy this criterion; eg: addition of an instrument isolation valve.) YES NO -
The seal as described in 5920-233, will be maintained in form, fit and function.
- A yes response to the question W A P F 6002.02 (Sample) indicates that the activity cannot be - AP 6002 Rev. 7 performed under 50.59, Prior regulator Page 1 of 4 approval is required to perform activit DI # 9 9 - 5 which require a T.S. change.
50.59 (a)(1) SCFSENING EVALUATION (Continued) 3.
There is no impact on parameters specified in the FSAR or TRM.
I
- 4. Would the activity require changes to any procedural remirements identified in the FSAR, interim FSAR change or TRM? Note that "procedural requirements" includes any specific responsibilities and I activity sequences identified, but does not require a 50.59(a)(2) just I because the procedure is identified in the FSAR, TRM or T . S .
YES -
NO
- 5. Would the activity negatively affect instrument accuracies and response characteristics or render them outside the limits set forth by FSAR accidents and transients.
YES
- 6. Would the activity cause an SSC to operate outside the structure/system/component design or testing limits?
This activity mitigates the effects of corrosion on the shell YES NO and therefore, supports the safety function & design intent of primary containment.
- 7. Would the activity create additional loads {mechanical or electrical) that are greater than the design capacity of the affected equipment or would systemdiesel loading or change the or sequence sequence in be affected?}
which the loads are applied?YES(e.g.,
NO Six inches of unqualified coating material is being removed and Replaced with an unqualified coating. Based on review of W C - 1 6 7 7 , the addition of this small amount of potentially failed paint will have no impact on the operability of ECCS suction strainers.
- 8. Would the activity result in increased vibration, water hammer, fatigue, corrosion, HELB, thermal cycling, pipe whip, flooding (internal and external), missile effects, fire, heavy loads, or affected? noise such that any SSC is or could be negatively YES electrical NO This activity is to protect the drywell from corrosion and therefore supports the primary containment safety function.
- 9. Would the activity have the potential to non-conservatively change environmental conditions or create/delete air flow paths from one EQ WAPF 6002.02 AP 6002 Rev. 7 Page 2 of 4 DI #99-5
50.59 (a)(1) SCREENING EVALUATION (Continued) volume to another?
YES NO
- 10. Would the activity modify interfaces or interaction between SSC's such that any SSC's are negatively affected?
Debris potential has been assessed without negative consequences. YES NO
_ I
- 11. Does the activity (failure modes) have the potential to-result in (or increase the probability of) offsite radiological consequences that are greater than those specified in the FSAR?
YES -
NO
- 12. Would the activity change ox affect any SSC's seismic qualification, EQ equipment qualification, redundancy or separation criteria, Appendix R compliance, ISI/IST Program compliance?
Inspection of this area is included in the IS1 program.
YES NO
- 13. Would the activity introduce potential seismic I1 over I concerns?
There are no seismic concerns for this activity. YES NO
- 14. Would the activity modify any system or component whose operation affects the calculations used in the ODCM (e.g., effluent monitors, ventilation flowpaths, etc.) ?
YES NO
- 15. Would the activity negatively affect system/equipment protective features?
YES NO
- 16. Would the activity significantly increase the frequency of system operation?
YES
- 17. Would the activity introduce testing methods that are not consistent with current system/equipment testing requirements?
Test / Inspection methods are consistent with IS1 current practices.
YES -
NO
- 18. Would the activity introduce additional credible failure modes or single failures that are not bounded by FSAR assumed failure modes?
(Including consideration of analog to digital replacement concerns as discussed in Generic Letter 95-02).
YES
- 19. F o r radioactive waste systems, would the activity introduce any concerns when using the criteria of IE Circular 80-18, "10CFR50.59 VYAPF 6 0 0 2 . 0 2 AP 6002 Rev. 7 Page 3 of 4 DI #99-5
50.59 (a)(1) SCREENING EVALUATION (Continued)
Safety Evaluations for Changes to Radioactive Waste Treatment Systems" and IE Bulletin 80-10, "Contamination of Nonradioactive System and Resulting Environment" Potential for Unmonitored, Uncontrolled Release toYES as guidance. -
NO
- 20. D o e s the activity involve performing special tests,Or experiments, as required by AP 6001?
YES NO 21.
- 22. Does the activity involve a maintenance activity where a decision has been made to operate in a configuration that is different than FSAR, interim FSAR change or TRM requirements?
The seal is not described in the FSAR, the corrosion protection of the drywe11 is described in Section 1 2 . 2 . 2 . 2
- 23. Could the change affect the implementation of the E-Plan (e.g., TSC habitability during any of the accidents as analyzed in the FSAR - or interim FSAR change) ?
24.
YES NO Would the activity introduce additional possible malfunctions of safety related or non-safety related equipment that could initiate an abnormal operational transient as described in FSAR Section 14.5?
(ER 97-1644)
- 25. Are there any other nuclear safety related issues associated with the change that provide cause f o r a formal safety evaluation to be performed?
YES Additional Comments:
There are no safety related issues that provide cause f o r a formal safety evalauation.
Safety Review Performed By*: F4sz
/ r/z,/or
- personnel performing safety reviews shall be qualified by 'Date successful completion of the applicable training.
Safety Evaluation Required 3 Yes [XI No Approved By: / 5-//*0/
Date W A P F 6002.02 AP 6002 Rev. 7 Page 4 of 4 DI #99-5
MINOR MODIFICATION (MM) SCREENING EVALUATION Review the following questions to determine if a proposed change can be accomplished using a Minor Modification. A "YES"answer to any of the following questions indicates that a Minor Modification cannot be used.
I. Does the change have any programmatic implications (EQ, Appendix R, Appendix J, ISI, IST, NPDES, Setpoint Control, I etc.) that would indicate that additional Design Control (Desian/I&T) is needed? This area is currentlv part of IS1 YES NO I
- 2. Does the change involve changes to multiple SSC and is the change complex? YES
- 3. Does the change require extensive calculations or analysis to justify that would indicate that additional desian control (Desim/I&T) is needed? YES -
NO I
- 4. Are there any other attributes (e.g.,high cost, multiple contractors, scheduling constraints, etc.)
associated with the change that would warrant application of additional design or administrative controls on the change? YES Screening Performed by* F.A --
&/I//&,
- Review will be performed during MM review.
WAPF 0020.08 (Sample}
FILE AP 0020 R e v . 21 Page 1 of 1 DI #99-287
APPENDIX R REVIEW tINS9526-01, ER960433-011 MM/TM No. : MM 2000-010
Title:
D w e l l Seal Plant System Affected: Primary CCIIItaiInent Safety C_-
lass: 2 Cognizant: David F. Grimes Appendix R Review Items to be Considered:
[If any question is answered YES, additional Appendix R specialist review is required.
However, if the document is a TM which will be implemented and restored while the plant is in cold shutdown during a single outage, Appendix R specialist review is not required.]
- 1. Does change involve electrical components or wiring? YES / EQ 2, Does change involve Appendix R Safe Shutdown components, including any support system components [Refer to SSCA Appendix El and E2 for listings]? YES / No
- 3. will change impact any Appendix R lighting or visibility therefrom? YES / BQ
- 4. Will change impact any Appendix R fixe barrier, CFZ, ox Suppression zone? YES /
- 5. Will change require revision/update of CWDs? (List below) YES / EQ 6.
- 6. Will change require revision/update of CCLs? (List below) YES / No
- 7. Does change impact an Appendix R Safe Shutdown Strategy? YES /
- 8. Will change require an update/modification of Appendix R documentation (including cable list database)? YES /
Review Comments:
CWDS :
CCL :
Z h F G / &/Ai D e s i g n Engineering Reviewer (if applicable)
- ate VYAPF 0 020.09 (Sample)
AP 0020 Rev. 21 Page 1 of 1
Comments on MM 2000-010 Related to Potentid ImDact on ECCS Suction Strainer Debris Loads The MM introduces some new material into the Drywell, consisting of grout, polyethylene sheeting as a bond breaker, and a silicone sealant, to fill in a gap between the concrete floor at the 238 ft elevation and moisture barrier to from an For example, rather than use the guidelines to determine a Zone of Influence associated with a jet of water/steam from a LOCA,the sizing was conservatively based on Yz of the material in the drywell. In addition to the insulation material, the sizing also includes accommodations for sludge, rust flakes, and an allowance for qualified coatings directly impinged by water/steam jets. It was also determined during the performance tests of the strainers that, under post-DBAWA conditions of recirculation flow,only fiber is collected on the strainers,Le. heavier material sinks to the bottom of the torus. If it is conservatiVely assumed that M of the polyethylene sheeting is deposited in the torus, its total surface area would be about 12 sq ft, which is significantly less than the surface area of any one of the four strainers.
Per telecon with B Slifer, VYC-1678, the debris loading calculation for the torus is not affected by the materials installed under mod 2000-010. The maximum debris loading occurs with a pipe break outside of the 238" elevation area and is the bounding condition for the torus loading issue.
I
MECHANICAL DATA SHEET DESCRIPTION: Provide a sketch or other suitable descriDtion SEE 5920-12789 FOR SEAL DETAIL AND 5 9 2 0 - 2 3 3 FOR SEAL LOCATION Installed By Date Verified By Date Restored By Date Verified By Date VYAPF 0 0 2 0 . 0 5 (Sample)
AP 0020 Rev. 21 Page 1 of 1 RT No. 08 .LO3 - 2 0 7
MECHANICAL DATA SHEET J
DESCRIPTION: Provide a sketch or other suitable description SEE 5920-12789 FOR SEAL DETAIL AND 5920-233 FOR SEAL LOCATION Installed BuAkLlL2u $%&-
Restored By Verified By n/4 I VYAPF 0020.05 (Sample)
AP 0020 Rev. 21 Page 1 of 1 RT No. 08.L03.207
Installation Requirements for Minor Mod 2000-010 Drywell Moisture Barrier Replacement 1.o PURPOSE The purpose of this procedure is to provide detailed instructions and define technical requjrements for the replacement of the seal at the intersectiorwf the drywell liner plate and the concrete floor at elevation 238' and application of a protective coating on the drywell shell to remediate pitting and corrosion.
2.0 DISCUSSION 2.1 A SO.SS(a)(l) screening has been performed and is included with Minor Mod 2000-010. There are no nuclear safety related issues associated with the installation portion of this modification that would require a 50.59(a)(2)
Safety Evaluation to be performed.
2.2 Work Order 00-01840-00has been written for implementation of this minor mod.
2.3 The steps in these installation requirements are presented in the anticipated order of completion. Some steps may be performed out of sequence or concurrently with other steps with the prior approval of VY Project or Design Engineering.
2.5 The seal shall be inspected to verify adherence to both the concrete floor and the steel liner plate aftora minimum seven days of curing. Painted surfaces shall be inspected for dry film thickness in accordance with the attached Coatings Inspection Plan.
2.6 A mockup of the drywell shell surface preparation and the painting shall be performed at the NPS fabshop prior to the start of RFO 22.
2.7 Vermont Yankee Project Engineering is responsible for the implementation of this design change.
2.8 NPS is responsible for the installation of this minor mod with inspections performed by NPS QC. Quality oversight may be provided by VYQA.
08/30/00 MM 00-010 AlTACHMENT 1 4 PAGE I of 11
2.9 A self-contained vacuum blasting system will be used to remove the existing coating on the shell and provide the surface prep for the new coatings. This will minimize the potential for airborne contamination and dust. Protection against airborne contamination shall be per the requirements of RP.
2.10 A vapor control plan will be used to minimize the methanol fumes that are emitted from the Dow Corning sealant, the fumes from the cleaning solvents and the fumes from the Carboline paint products. Chemistry and RP will be involved in the development and implementation of the vapor fiW* c 1 w c control plan. 5 5EK 4 - 2 S - d 3.0 I REFERENCES 3.1 Codes and Standards 3.1.1 SSPC-SP-1, Steel Structures Painting Council, Surface Preparation Specification No. 1 , Solvent Cleaning.
3.1.2 SSPC-SP-10, Steel Structures Painting Council, Surface Preparation Specification No. 10, Near-White Blast Cleaning.
3.1.3 SSPC-SP-11, Steel Structures Painting Council, Surface Preparation Specification No. 11, Power Tool Cleaning to Bare Metal.
3.1.4 SSPC-Vis-1, Steel Structures Painting Council, Visual Inspection Specification No. 1, Pictorial Surface Preparation Standards for Painting Steel Surfaces.
3.1.5 ASTM 5144, Standard Guide for the Use of Protective Coatings in Nuclear Power Plants.
3.1.6 ASTM 04537-91, Standard Guide for Establishing Procedures to Qualify and Certify Inspection Personnel for Coatings Work in Nuclear Facilities 3.1.7 EPRl TR-109937 Guideline on Nuclear Safety Related Coatings.
3.1.8 Coatings Inspection Plan (attached) - Drywell Elevation 238.
3.1.9 ASME Section XI, 1992 Winter Addenda 92A 08/30/00 h1-Y MM 00-010 ATTACHMENT I PAGE2 of 11
3.2 Procedures and Documents Note: All Procedures shall be the latest approved revision.
3.2.1 MM 2000-010 and all applicable drawings and attachments 3.2.2 AP 0019 Control of Temporary andor Portable Materials 3.2.3 AP 0020 Control of Temporary and Minor Modifications 3.2.4 AP 0021 Work Orders AP 0042 Plant Fire Prevention 3.2.5 3.2.6 AP 0052 PreJob Briefing 3.2.7 AP 0070 ASME Section XI Repair and Replacement Program 3.2.8 AP 0549 Lead Practices and Metals Monitoring 3.2.9 AP 0619 Chemical ControWHazard Communication Program 3.2.10 AP 6024 Plant Housekeeping & Foreign Material Exclusion 3.2.11 AP 6025 Quality ControVlndependent Inspection 3.2.12 Vermont Yankee Safety Manual 3.2.1 3 PP-1001 NPS Project Procedure for Qualification and Certification of Inspection, Examination and Test Personnel 3.2.1 4 PP-1002 NPS Project Procedure for Quality Inspection 3.2.15 PP-0201 NPS Project Procedure for Qualification and Training of Personnel 3.2.16 PP-0951N NPS Project Procedure for Certification of NDE Personnel and Visual Inspection Personnel 3.2.1 7 PP-1701 NPS Project Procedure QuaIity Assurance Records 3.2.18 PP-0959P NPS Project Procedure for Service Level 1 Painting and Protective Coating Application 3.2.1 9 PP-0582C NPS Project Procedure for Installation of Hilti Bolts, Grouting and Core Drill Operations.
3.2.20 PP-7024 Containment Inservice Inspection Program 4.0 APPARATUS 4.1 Vermont Yankee shall supply tools, equipment and materials required for the seal replacement.
4.2 NPS shall supply the qualified personnel to complete the modification.
4.3 Tolerances shall be as stated on the installation drawings.
08/30100 MM 00-010 ATTACHMENT 1 J PAGE 3 of 11
5.0 PRECAUTIONS 5.1 All steps shall be performed sequentially unless otherwise noted or unless a sequence change has been approved by the VY Design or Project Eng.
5.2 If an unexpected action results during performance of the procedure, do not proceed with uncertainty. The user must exercise judgement, experience and training to: 1) Place the system or component in a safe condition so as to preclude a potential transient, equipment damage, or personal injury, 2) notify the VYlCE and 3) notify the Shift Supervisor of the situation if it impacts plant equipment.
5.3 Ensure all work areas are well lit and stagings are built in accordance with the requirements of the Safety Manual and AP 0019. Ensure temporafy/portable materials are properly controlled per AP 0019.
5.4 Conformance to the VY Safety Manual is mandatory and shall be monitored.
5.5 Ensure all persons working with hazardous materials are aware of MSDS requirements.
5.6 Ensure that the vapor control plan has been established with Chemistry and RP personnel. It is recommended that the drywell be continuously sampled for flammable vapors during the painting and sealing activities.
5.7 Ensure that the painting safety issue of airless sprayers has been reviewed and understood.
5.8 Ensure the VY Shift Supervisor is notified prior to beginning work activities.
5.9 Ensure the VY Shift Engineer is notified prior to the introduction of combustibles or flammables (Le. paint, solvent, sealant} into plant areas.
5.1 0 Alf precautions/have been read, understood and discussed at the pre-job briefing.
oa~o~oo MM 00-010 ATTACHMENT 1 PAGE 4 of 11
-- - ~
6.0 PREREQUISITES 6.1 Verify Minor Mod 2000-010 has been approved by the fennont Yankee Plant Manager.
6.2 Verify Work Order 00-01840-00 has been released for implementation.
I 6.3 Verify all chemicals required for this modification have been approved for use on site and in the drywell.
6.4 Verify that a flammable storage cabinet has been set up in the drywell ante room for storage of paint, solvent and sealant.
6.5 Verify all construction personnel associated with the implementation of this minor mod have been properly indoctrinated and qualified, 6.6 Ensure that a pre-job briefing has been completed with all personnel involved in the repair activities.
E'Aee.I C,~~%CR) DATE 65-01-01 6.7 Verify that the shell plate mockups have been performed and accepted by VY engineering.
6.8 Verify t k t the IWE inspections required for this MM have been coordinated with the IWE Coordinator.
6.9 Verify that housekeeping requirements per AP 6024 and any additional have been established.
05 D I 08/30/00 MM 00-010 ATTACHMENT 1
6.10 Perform a visual survey of the work areas for existing damage.
6.1 1 Notify th6 VYlCE of the intent to begin work as delineated in this DATE - -
6.12 Notify VYQA of the inteyt to begin work as delineated in this procedure.
VYlCE f&J/ I E.3. Lu:Asd DATE 0'5-aZ-ot 6.13 Notify the ANI of the intent to begin work as delineated in this procedure.
VYlCE (Hd/E.1- La,.. /* c - ,
DATE 05-02-0 1 7.0 INSTALLATION 7.1 Verify that Minor Mod 2000-010 has been released for installation and signed by the W ShifJ Supervisor.
7.2 Verify that all vapor and dust control equipment has been staged and is operational. A WICE Y
DATE 5/95/&
7.3 InsDect the concrete floor area within 12" of the perimeter for cracks.
7.4 NOTE: The Cdatings' Inspection Plan shall be followed during the preparation and application of the protective coatings.
08/30/00 M M 00-010 ATTACHMENT 1 PAGE6of 11
7.5 Clean the affected area of the containment shell in accordance with ATE O,%'-O,~ -
hell of the primary containment in accordance with PP 7024.
DATE 85- 8tdo\ -
HOLD POINT 7.6.1 !WE inspection completed and documented in accordance with PP 7024.
IW E Coordinator Q , , ~ + T E 05 ~ G - D(
I tor P = C ~ &
7.7 Remove the existggJpJnf!orn the affected area of the containment shell in accordance with AP 0549 and RP direction. Vacuum blasting, roto-peen and/or needle gun may be used to achieve the required profile of 1-3 mils in accordance with SSPC-SP-10. Other hand tools may be used as required to achieve an initial SSPC-SP-11 finish with final surface prep conforming to SSPC-SP-l O. Document per NPS Procedure PP-0959P requirements.
NPSCS . DATE 5-09-.01 7.8 QC shall verify the required profile of 1 to 3 mils has been achieved in accordance with SSPC-SP-10. ee&e/fJ 6-md:t Xep flcrsr 6 ~ r ~ d c NPSQC DATE ST/@-&/
7.9 Vacuum clean the affected area of the containment shell and the keyway to remove all dirt, dust and debris created by the surface prep. Ensure the surface is dust free prior to the application of the primer.
7.10 Notify the IWE Coordinator to inspect the shell of the primary containment VYlCE DATE 05-(3Y-0\b 08/30/00
HOLD POINT 7.10.1 IWE inspection in accordance with PP 7024.
7,11a See sheet 8A for additional steps to establish the required ventilation l.764-W lineup prior to beginning coating activities.
NPSQC DATE NlA -
+ C&,o&*c
'w I\ C O ~ ~ Y L Y Q a i U -0 dL~t ty7
~
T W T ~ ~ L ~ t3s4o-ol 7.13 Install Embeco 885 grout in the keyway in accordance with the f i a )(~ ?w,,, manufacturers instructions and drawing 592O-12789.Sil-Pro bonding 011 A O c u k i 4 d agent may be used in lieu of the 24-hour pre-soak prior to grout placement. Curing compound may be used to eliminate the need to keep bd,
CLye ';o P;WK%L NPSCS & h a & , DATE ,c D! dJF
7.1l a Establish localized ventilation utilizing charcoal filter elements in the dedicated 5k HEPA units.
VYlCE ,& DATE .%'??/&/
OR Request Operations establish/verify the following lineup. This Eovides a ventilation flowpath from the drywell, through the Torus, and out through the Reactor Building exhaust.
Equipment Position SB-I 6-19-8 (AC-8) OPEN SB-I 6-19-9 (AC-9) ' OPEN SB-16-19-10 (AC-I0) OPEN SB-16-19-7B (AC-7B) OPEN SB-16-19-7 (AC-7) OPEN SB-I 6-19-6 (SGT-6) OPEN SB-16-19-6A (AC-6A) OPEN SB-16-19-7A (AC-7A) OPEN V I 6-19-5A GAGGED OPEN V I 6-19-50 GAGGED OPEN RTF-5 OPERATING 7.1 IC Ensure that the Torus access covers are installed, or temporary covers are installed. Ensure that they are labeled to prevent inadvertent opening of the covers.
7.1% Notify Operations that the coating activities in the Drywell are completed
?;2 and that the ventilation lineup prevpusly established may be secured or If temporary Torus accesdcovers were installed, remove at this time.
Ensure that any labels installed on the covers are removed.
7.14 Cut and install the polyethylene in accordance with drawing 5920-12789. Polyethylene may be installed after the grout M a p hassured for a mi !, c ~ $ f a t - ~ ~ rThe s . gap tolerance at the edges of the&%tshall b e L. The skeet shall not extend radially past q7 03-6Lol s - \y-oi DATE 6-i3-0/
7.15 Install the Dow Corning 795 Sealant in accordance with the manufacturers instructions and drawing 5920-12789.
NPSCS DATE 5 -\5-0\
ILieC ld7 C L y NPSQC 05:& Install the" R- DATE S - / 3 - &
min. bead of Dow Corning 795 Sealant in accordance with the manufacturers instructions and drawing 5920-12789 after the NOTE: ENSURE THAT THE SEAL DOES NOT GET PANTED IN THE FOLLOWING STEP.
m+t a Si? \8 00a-t 6%
C Ljc 7.1$7 Apply Carboline 890 epoxy paint to the full l d l o 5-U-o i c i r c u m m the containment shell directly above the keyway in accordance with 2 aRet the 7
7.\$4 Se& 5 W w QA Abbm~Pl)r\,b m 6% St%~*rdG \lemllXT@.
8.0 INSTALLATION VERtFICATIONlTESTlNG REQUIREMENTS 8.1 Inspect the seal to verify that adherence has been maintained d he concrete floor and the steel shell. L .. fi&pC L , C 4f L754-0\
DATE ,T-/J -d /
e.2 z C Lye n I-q7 oS-!kQ\
C/ L 9.0 INSTALLATION f NSPECTIOWACCEPTANCE 9.1 9.2 VYICE *rL &
Verify draw' gs are compl e nd in the as-built condition.
DATE <?</&
nce with the approved drawings.
ATE T/?/@/
DATE +~--/w-H/
9.3 VYICE & e Notify the !WE Coordinator to perform a pre-service baseline inspection of the seal an he protectiv c ting in accordance with PP 7024.
DATE <h?b/
9.4 Verify the w x k area is free of yn$uction damage.
VYICE DATE 9.5 equipme P h s been removed.
I DATE 57?4[A/
08/30/00 MM 00410 AlTACHMENT 1 PAGE 10 of If
10.0 9.6 VYICE FINAL CONDITIONS rL ,&
Verify any non- onforming are re resolved or identified.
DATE 10.1 Clear any white tags that were as a result of performing this Minor Mod. h 10.2 Verify a housekeeping closeout inspection per AP 6024 has been completed.
VYICE &/* DATE %h$?/6,4 10.3 Notifv the VY Shift Sucmrvisor that the installation is complete.
08/30/00 MM 00-010 ATTACHMENT 1 PAGE I t of 11
Coatings Inspection Plan - Drvwell Elev 238 Minor Modification 2000-010 A. Prior to the start of work
- 1. Coating Materials
- a. Age of Materids - less than 12 months.
- b. Proper Identity - Material ID and batch number legible and recorded.
- c. Storage Conditions - protected from direct sunlight and temperature extremes (40 to 100 degrees F)
- 2. Abrasive Materials - clean, dry, free from oils
- 4. Thinners Solvents and Cleaners - Carboline Thinner 21, Thinner 26
- 5. Equipment
- a. Environmental Conditions - substrate 5 degrees above dew point (min), ASTM E 337 temp., dew point and Relative Humidity at start of work and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter.
- b. Spray Equipment - Agitated pressure pot for CZ 11 SG, touch-up by brush for areas of less than 1 square foot, avoid rebrushing.
c, Mixing Equipment - Power mixers in accordance with manufactures instructions.
- d. Blotter Test - at start of work and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter, air is to be free from contaminants.
- e. Inspection Instruments - wet/@ psychrometer, - calibrated magneteic surface thermometer, - calibrated pl;we C L tp profile comparator, - e&lmted 04 C-ySN 4% *G- 9/2d01
-50 1CU ma.@-
V&en cd*s;ncR O I %*
SSPC-Vis 1-89 Surface Preparation Standard 1
/Y;w CLhy Magnetic Dry Film Thickness Gage - calibrated
- 6. Surface Inspection - by the applicator, must determine that the surface is acceptable, B. Surface Prepadon -
- 1. Cleaning (oil and grease etc.) SSPC-SP-1. Remove contaminants with solvent cleaning. Turn and replace rags frequently
- 2. Blast Cleaning
- a. Blasting SSPC-SP-10, Near-White Blast Cleaning and SSPC-Vis 1-89 d
- b. Profile ASTM D-4417 i-3 miis ymwr -t: Sb &r*E;)yB ern& X?F &la& do E m x w J/4/
&r Q r 6 G f 4 d 'p Arms
- c. General - No blasting when coating or curing, over contaminated surfaces or with ~9 584 rustback.
- 3. Recirculated Shot and Grit - Check for oil contamination via immersion test, start of work and 4 hr intervals. Discard if oil is detected, reblast areas cleaned since previous check.
4.Removal of Dust and BIast Products - dust free surface shall be maintained.
- 5. Environmental Conditions
- a. Substrate Temperature - 5 degreeQbuve dew point.
- b. Dew Point - ASTM E-377 Temp. and dew point taken at start of work and 4 hr intervals.
- 6. Protection of Surfaces and Equipment C. Coating Inspection (Basecoat)
- 1. Mxing of Coating - Unopened Containers, mix in accordance with manufactures instructions. Note: Carboline CZ-I1SG requires agitation during application. .
2
- 2. Environmental Conditions -Temp, Dew point and Relative Humidity within limits and substrate range 50 - 100 degrees. Y * , M o p c ~ ~ c cj . , ~fGfiqU Y
.&7arc.irP o h a rJ/9/4i
- a. Number of Coats (1) z.
- b. All surfaces
- c. Drying time - 0 6 0 - 80 degrees 45 minutes at 50% Relative Humidity or greater,
- d. Forced curing - as applicable, as approved
- e. Touch-up - as specified and as a result of QC Inspection. No greater than 1sf.
- f. Cure time prior to application of topcoat - per manufactures instructions and based of temperature and relative humidity.
- a. Dry Film Thickness - 3 mils, SSPC-PA 2, Tolerance -IO%, + 20% on run4 and sags, 5 samples, evenly spaced per 100 square feet of surface (min). 5- J W P L ~ ~
Fo& EAcu &Q4ctcA.rto+J.
- b. Film Imperfections - Correction of major runs, sags, drips, overspray, loss of adhesion, blistering, peeling, inadequate cure or substrate rusting.
- c. FiIm Discontinuities - Mark holidays, repair, reinspect.
D. Coating Inspection (Topcoat)
- 1. Mixing of Coating - Unopened Containers, mix in accordance with manufactures instructions.
- 2. Environmental Conditions - Temp, Dew pt and Relative Humidity within limits and substrate range 50 - 100 degrees.
- 3. Application - Topcoat - Carboline 890 epoxy 5 mils DFT
- a. Number of Coats (2), (1) Mist (after initial fiberglass screen rub and dust removal of CZ 11 SG) (1) FulI, Smils
- b. AI1 surfaces
- c. Drying time - 060 - 80 degrees Recoat 4-8 hours 50% Relative Humidity, Final Cure 24 - 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />
- d. Forced curing - as applicable, as approved
- e. Touch-up - as specified and as a result of QC Inspection.
- 4. AppIied Coating
+
- a. Dry Film Thickness - 5 mils, SSPC-PA 2, ToIerance -IO%, 20% on m s and , MtwCw ma-y. APPcIa-n@. I *w sags, 5 samples, evenly spaced per 100 square feet of surface (min). 5 5 ~ r t P ~ e KG S
7 a
- b. Film Imperfections - Correction of major runs, sags, drips, overspray, loss of adhesion, blistering, peeling, inadequate cure or substrate rusting.
4
PP-0503G Exhibit H Revision 2 NPS ENERGY SERVICES Page 1 of 3 PNZ JOB BRlEF PROJECT: b[C' .q4\bCt
/ u;ec WORK PACKAGE #: cfi-ti$, *A&LO SAFETY CLASS (YES) L/ (NO)
Pre Job'Brief reviewed by W I C E (MM I TM / EDCR 1 VYDC only):
WORK PACKAGE REVIEW:
1.) Prior to conducting the Pre-Job Briefing, the Work Group will review the Work Package and participate in a field walkdown, whenever possible, and become familiar with the work scope, drawings and field conditions involved in the tasks. The assigned members of the Work Group wiIi note any concerns or questions which need to be addressed a t the P r d o b Briefing. @+> N.P Forema BRIEFING TOPICS:
1.) Review the STAR principle Q&L Instructor 2.) 'Identify,who will be invohed'and the tasks they wilIperform. , .
. .Qg.
Instructor 3.) Review work practices that will be used such as FME,Fire Protection Control Permits, Hot Work permits, Secondary Containment Penetration Breach Requests, Confined Space Entries, Chemical Use Permits, MSDS Sheets. Identify to the work crew the equipment in the work area that is sensitive and may have operational consequences if bumped, jarred or made A contact with.
Instructor 4.) Review the AP 0140 Tagging boundaries and explain how they safely isolate the work area Instructor 5.) Identify the RWP to be used and any Rad Pro Department requirements Instructor JO FILE
PP-0503G Exhibit H Revision 2 Page 2 of 3 6.) Identify any Security Department concerns and interface.
- -~ -
-- Instructor 7.) Identify and discuss the safety requirements for each task 8.) Discuss the function of the modification and how the new system will work. ,
BBci_
Instructor 9.) Review the work package drawings with the work group to further clarify the function of the system modifications being performed. Review parts, materials andtheir Iocation.
Q !-Instructor m
10.) Discuss the sequence of the major work evolutions. Emphasue the need for workers to con-tact their supervision when the original job scope changes.
Instructor 11.) Discuss the Q.C.Hold Paints included in the Work Package.
Instructor 12.) Identify the testing requirements and related steps in the Work Package.
QSJ Instructor JO FILE
Work Package # __ PP-0503G Exhibit H Revision 2 Page 3 of 3 13.) Review the Three Point Verification Principle - Le. before performing a work step, ensure that the work step instructions, drawing information, and as-found field conditions match.
Instructor 14.) Identify any special toob required to perform the work.
Instructor IS.) Review high risk tasks and error Iikely situations.
QbCInstructor 1
2 3
4 .
5 6
7 8
9 10 11 12 13 14 15 COMMENTS:
~
PROJECT SUPERINDENT / DESIG24EE:
(PP4503GH&. 1) ~
Pre-Job Briefing Attendance Sheet MM#2000-010 04-26-01 AM I I I
Page 1 of i JO FILE
Pre-Job Briefing Attendance Sheet MM[ # 2000 - 010 04-26-01 PM I 1 1
I I
I I
Page - of
. Drywell S e a l Project PRE-JOB BRIEFLNG A. RESPONSIBILITY/AUTHORITY
- 1. Person in Charge:
- a. Ed Taintor ICE; x-5912; pager 742-9057
- b. Dennis H d e r t ; nights; x-5616; pager 742-
- c. D a r r y l Coffman; N P S Painting Sup.; pager 742-9053 B. JOB SCOPE
- 1. Restoration of the original DW Seal configuration
- a. Identify the equipment involved including train, labels, and other identifications.
I-. EMPAC A s s e t No. DRYWELL
- a. DW Shell
- b. DW concrete floor
- b. Identify the location of the work/equipment
- 1. DW 238 elevation
- c. Identify the safety class of the work/equipment
- 1. Safety Class 2 C. COMMUNICATIONS
- 1. Personnel Involved or Affected:
a, Personnel Involved
- 1. VY Mechanical Design Engineering
- 2. VY P r o j e c t Engineering
- 3. WRI!
- 4. VPALARA
- 5. NPS Painters
- 6. NPS A U R A
- 8. QC
- b. Affected Departments
- 1. RP
- 2. ALARA
- 3. Maintenance
- 4. I&C
- 5. OPS FIe
- 6. NPS
- c. Discuss 3 part communication.
. 2. Lines of Communication:
- a. Identify the communication paths to the affected personnel and the person in charge.
- b. Identify the personnel who must be informed of conditions on equipment status during the performance of the task.
- 1. ICE
- 2. NPS Painting Superviser ._-
C. Discuss communication equipment.
1 - Gaitronics
- 2. Pagers
- 3. Phones 3 - Turnover Requirements:
- a. Discuss turnover expectation and need for additional briefings.
- 1. Major Outage Project/Area S h i f t l y Update
- 2. Craft Turnovers "on-line" D. ADMINISTRATIVE CONTROLS
- a. Address FME boundaries and special work controls.
- 1. Downcomers to T o r u s (EME Zone)
- 2. Subpile room (RP Access Control}
- b. Extent of the E'ME brief should be based on the potential r i s k associated with foreign material intrusion.
- 1. B l a s t Shields posted as E'ME zone.
- 2. Permits and Requirements Applicable to Task Being Performed:
- a. Tagging Orders, Temporary Modifications, RWP, Hot Work or Fire Permits, Security Postings.
- 1) Consideration should be given to the qualification of the party receiving the brief. It will be necessary to provide a more detailed brief if the party receiving the brief is not qualified on a Darticular task (i.e. not AP 0140 qualified).
.b (ER96-0 64 9 )
- a. Non-permit Confined Space
- OOS - out of service Appendix B Precursors compiled from references [6,15,16,17,20.23,27,29.37,42,46,471 AP 0052 Rev. 1 Wed items tend to be more prevalent than other precuTsom. Page 2 of 1
. b. Lead Worker Training Required
- c. RWP No. 01-00109
- c. Safety requirements applicable to j o b (plant &
personnel).
- 1. JSA No. 22.25
- c. Any special conditions that will be incumbered.
I} Area radiological conditions, etc. -
As specified by ALARA/RP during RWP B r i e f .
- 2) Security requirements.
None.
- 3) Special equipment.
Prep and application equipment.
- 4) Parts availability.
Spares and repair parts staged in DW Anteroom.
- d. Management Expectations
- 1) Review management expectations f o r performance of task.
STAR E. PROCEDURE/JOB SEQUENCE
- 1. Purpose and Intent:
- a. Why procedure is being performed.
Correct identified ASME Section XI, XWE deficiency.
- b. What procedure will accomplish.
Restore original design configuration.
- 2. Precautions and Limitations:
- a. Special precautions associated with task.
- 1. Lead exposure controls.
- 2. H e a t stress concerns.
- 3. Vapor exposure concerns.
- 4. Radiological exposure concerns.
'00s out of servlce Appendix B Precursors compiled from references I6,15,16,17.20,23,27,29.37.42,46,471 AP 0052 Rev. 1 BaMed items tend to be more prevalem than other precursors. Page 3 of 1
. b. Review applicable portion of procedure w i t h person{s) who will be performing the task.
- 1. Task s p e c i f i c Briefs have been conducted w i t h project participants.
. 3. Expected Duration of T a s k .
- a. 10 D a y s , 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />
- 4. Sequence of Job: .-
- a. Discuss major steps and required sequence such as:
- 1) Area s e t u p ( R P )
DW Mobilization to begin 04-30 Surface Prep to begin 05-02 IWE Examination 05-06 Coatings applications to begin 0 5 - 0 6
- 2) As-Found data As found e x a d n a t i o n 05-02 3} Equipment removal Demob to begin 05-12
- 4) Required stroke W A
- 5) Post-work test As left examination 05-12 F. SAFETY MARGINS
- 1. Expected Results:
- a. Review expected indications, alarms; and plant response to task performance.
- 1. Stop work and assess hazards
- 2. Conditions/Lirnits for Stopping Task:
- a. Define specific conditions or limits at which the t a s k s h o u l d be halted. (Consider unexpected results).
- 1. Safety concerns
'00s - out of service Appendix B Precunors compiled from references 1615,16,17,20,23,27,29,37,42,46,471 AP0052 Rev. 1 Bolded items tend t o be mora prevalent than other prearrsors. Page 4 of 1
. 4. Hazardous fume exposure indications
- b. Ensure that all personnel involved in the task are aware of these conditions or limits.
G. CONTINGENCY PLANS FOR UNEXPECTED RESULTS
- 1. Reviewed Contingency Plan:
- a. Describe actions necessary to place equipment in safe condition.
- 1. C l o s e valves
- 2. Turn o f f compressor
- b. D i s c u s s who will be responsible f o r performing these actions.
- 1. Painters
- 2. Foremen
- 3. General Foremen
- c. Discuss who will determine/identify that contingency actions are required.
- 1. ICE
- 2. NPS Painting Supervisor
- 3. Ax35RA Engineer
- 4. RP Supervisor H. LESSONS LEARNED
- 1. In-House:
- a. Discuss any pertinent information from previous performance at this or similar t a s k s .
- 1. T o r u s Coating Project; RFO-20
- 2. Industry:
- a. Discuss lessons learned from industry events from performance of similar t a s k s .
- 1. INPO Operating Experience Examples
- 3. STAR Techniques:
- a. Reinforce use of Stop, Think, Act, Review (STAR) techniques.
I. EVENT PREVENTION
- 2. Review task demands.
00s - out of service Appendix B Precursors compiled from references ~6.15,16.17.20,23.27,29.37,42.46,471 AP 0052 Rev. I W e d items tend to be more prevalam than other precursors. Page 5 of 1
- 2. Determine work environment for error precursors.
- 3. Identify individuals capabilities.
- 4. Review possible human nature problems.
- 5. Identify any tools that would help prevent errors.
J. OUTLINES AND ATTENDANCE SHEETS .--
- 1. The use of pre-job brief content outline and attendance sheets to provide consistency between briefs is encouraged.
f
' 0 0 s - out of service Appendix B Precursors compiled from references [6,15,f 6.1 7,20,23,27.29,37.42,46,471 AP 0052 Rev. 1 Bolded items tend to be more prevalent than other precursors. Page 6 of 1
DAY & ZIMMERMANN NPS, INC.
QUALITY DEPARTMENT FIELD WORK PACKAGE CLOSE-OUT CHECKLIST (fur VYDC and MM closeout)
Work Order #: 00-001840-000 vYDciMM#: MM 2000-010 Reviewer: icr rm f q cv J
INITIAL ITEM# ATTRIBUTE N/A when not applicable Work Order is complete and signed off as required for turnover.
1.
Installation & Test procedure or Installation Instructions are complete up to 2.
the point of turnover to the ICE.
Supporting documentation is complete, NCRs,CRs, ERsand SRs are 3.
listed on the applicable data sheets. &I+ Tk
- Copies of NCRs and SRs are included in the package.
4.
&/fi -d(
5.
NPS Inspection Checklists are complete and included in the turnover package.
Nondestructive Examination Reports are included in the turnover package,
&!/e *.
6.
completed properly and are listed on the applicable Weld Control Records. $/fl- %.
Material Issue Tickets are included in the turnover package.
7.
(PP-OSO3GJ, Rev. 1)
W.0. #OO-1840-000 DZNPS Reported By Darryl Coffman MIcT#2000-010 Supervisor NAME Date Time Ambient Conditions NAME Date Time WlB 60l z Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time WIB '
DIB WH DIP Ambient Conditions NAME Date . Time D/B I I I I RrH QIP iurf. Temp.
3
~~~ ~
Ambient Conditions NAME Date Time Ambient Conditions W/B 70. 6 D/B 93" 3 FUH 3 0 "70 D/P 5 6 Surf. Temp. 89-F Ambient Conditions NAME Date Time r A W/B 7/*/
D/B 88.6 WH 4 3 70 D/P 6'2 '
Surf. Temp.
Ambient Conditions NAME Date Time
'44% 74,4"0 AB \os.+
0 WH #I D/P Surf. Temp. ?'?f
............................. .......... . PQ. 1
I W.0. #OO-1840-000 Reported By DZNPS Darryl Coffman MM#2000-010 Supervisor DRYWELL MOISTURE BARRIER PAINT LOG Ambient Conditions NAME Date Time W/B Sfl3.50 D/B R3,50 R/H ,q3-%
.e D/P Surf. Temp.
Ambient Conditions NAME Date Time
~ rbientn Conditions NAME Date Time W/B D/B yF=
8%. B 4
WH 7/70 D/P r&
Surf. Temp.
Ambient Conditions NAME Date Time
. '43 - 7,2 A3 Bo. oo R/H 50 %
d D/P 4
Surf. Temp.
W.O. #OO-1840-000 Reported By DZNPS Darryl Coffman MM#2000-010 Supervisor DRYWELL MOISTURE BARRIER PAINT LOG Ambient Conditions Ambient Conditions NAME Date Time R/H D/P Surf. Temp.
nrnbienf Conditions NAME Date Time D/P Surf. Temp. 78%"IC Ambient Conditions NAME Date Time DlB W/B 78"0
&/a 1 37796hi M z 5 R/H DIP Surf. Temp. 78"
'1B d3.3 79.1 0 E. J. Tani oi r!/$J' $ I :ov O S - ~ L - ~ 09
W.O. #OO-1840-000 Reported By DZNPS Darryl Coffman MM#~OOO-O~O Supervisor DRYWELL MOISTURE BARRIER PAINT LOG Ambient Conditions NAME Date Time Nmbient Conditions NAME Date Time Ambient Conditions NAME Date Time DIP 4s d Surf. Temp.
Ambient Conditions NAME Date Time
/W
'6 <I. t 0 I E. J. Taintor
-u/r I"
43 Surf. Temp.
... . . .. .. - - - ... .04. 4
Reported By W.O. #OO-1840-000 DZNPS Darryl Coffinan MM#2000-010 Supervisor DRYWELL MOISTURE BARRIER PAINT LOG Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time W/B Q\ . L o DIB 73.2 '
WH 56%
WP 53*
Surf. Temp. 78
Reported By W.O. #00-1840-000 pzNPs Darryl Coffman MM#2000-010 Supervisor DRYWELL MOISTURE BARRIER PAINT LOG Ambient Conditions NAME Date Time W/B 64.3" 0 DIB 73.5 0 WH 0
W.0.'#00-1840-000 DZNPS Reported By Darryl Cofhan MM#2000-010 Supervisor DRYWELL MOISTURE BARRIER PAINT LOG Ambient Conditions NAME Date Time W/B 5z0 DIB S8.5 Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time WIB A/./
D/B 72.0 RIH 5 3 "76 OIP . q& '0 iurf. Temp.
- W.0: #OO-1840-000 DZNPS Reported By Darryl Coffman MM#2000-010 Supervisor DRYWELL MOISTURE BARRIER PAINT LOG Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time W/B k / *Z DIB R/H DIP 78 $
'7 0
Ambient Conditions NAME Date Time Ambient Conditions NAME Date Time WIB 63 D/B 7 5 WH DtP Ambient Conditions NAME Date ' Time WH D/P Ad. Temp. Ih
Exhibit A PP-O582C, R e v . 0 GROUT PLACEMENT CHECKLIST Quality Control:
r
..-, (PP-OSOC-A, Rev.0)
I I
Application of Coatings to Steel Surfaces NAME: LPCPAIO L La',& DATE: q-/Lf-d/ '
I a VERMONT YANKEE NUCLEAR STATION NI)S ENERGY SERVICES TYPE OF APPLICATION EQUZPMENT: pbNQeNraMvq / s pg A q I
COMMENTS:
i I
READINGS WET DRY Flat Side: 3,s U'd5 2 85 *.r;\.,
Complex Side:
Pipe "H" Beam "T" Bar
~
Plate:
Description of Finished Surface:
As734 t / Z 2s T C 5 - T 5tclAU.lbRPb I lo 3.5 but/
I THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATI%GS FOR THE SURFAC INDICATED ON SAFETY RELATED AREAS OF NUCLEAR FACITLITES.
QUALIFYING AGENT: QJ& PAINTER:
1 DATE:
Journeyman Painter Qualification for Application of Coatings to Steel Surfaces ERMONT YANKEE NUCLEAR STATION II NPS ENERGY SERVICES .--
YPE OF APPLICATION EQUIPMENT: c - 3 @u d-CtO spm4 COMMENTS:
READINGS WET DRY Flat Side: 3 0 ,;ls 3.0 Lt\J 331 -;\5 3.0 +\&
z*s & l k 7 1s - 4 i S 3.g *; \ r -3 ,a d E Complex Side:
Pipe 3,o & t s %O wr(S H Beam T Bar 2.5 & I s 2.0 D I ; t s Plate:
Description of Finished Surface: AW-h 4 2 2 B Ye57 C7ANDAIZr, 1% 3.5 ,I 5 U.eFPf F O R 0 F;le Date: ./ 15-0I Material p,J eRdr;ic L Z I I DFTRange: 3 n/\i/5 3ew THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PAINTER FOR THE APPLICATION OF QJ #-
THE ABOVE COATINGS FOR THE SURFACE NDICATED OK SAFETY RELATED ARXAS OF NUCLEAR FACITLITES.
QUALIFYING AGENT: PAMTER QUALIFYmG AGENT. E.-J--T L .a46
,/ - I DATE : 1
Journeyman Painter Qualification for Application of Coatings to Steel Surfaces
/
NAME: /am c'3;crnef~h DATE: 4- / + P I VERMONT YANKEE NUCLEAR STATION NPS ENERGY SERVICES COATING SYSTEM: Q 11 MAhKJFACTURER: Cw&,(,;e TYPE OF APPLICATION EQUIPMENT:
prJ 3zrJ7iiDbJ4 1 qoettu COMMENTS:
READINGS WET DRY Fiat Side: 3 . 0 hJ-\cs 3 'b f a 5 Complex Side:
Pipe "H"Beam 1L-r-I D--
1 Ddl Plate:
Description of Finished Surface: A u 422 45 -rw- _ST+Id@& nb 1 % 3,c W;l SkILCU LE OR0 F t ' l ~c Date: 4-15-01 Material ( ' ~ g t 3 : d / 1 2 ~ ( L z I I DFT Range: 3 *A;1c %e41 8 R
THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOWWEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATINGS FOR THE SURFACE INDICATED ON SAFETY RELATED AREAS OF NUCLEAR FACITLITES.
QUALIFYING AGENT:
QJf PAINTER: S:%dL" o n g;lc
'Dzlrlps k. c6n.C-I O
QUALIFYIXG AGENT: lA7&/ E. .-r- T&+c <i .
Oyos/&
1 1 DATE:
YPE OF APPLICATION EQUIPMENT: &MllaJd7tvNr41 5p&4cc COWMENTS:
THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATINGS FOR THE SURFACE INDICATED ON SAFETY WLATED AREAS OF NUCLEAR DATE:
Journeyman Painter Qualification for Application of Coatings to Steel Surfaces VERMONT YANKEE NUCLEAR STATION NPS ENERGY SERVICES COATING SYSTEM: 0 Iv~M-TFACKJR.ER: C fi EB o c IL)
TYPE OF APPLICATION EQUIPMENT: c~NJeIcrT/orJ.I),\ 5 pew4 COMMENTS:
READINGS . WET DRY Flat Side: R.0 8.0 SI 0 5.0 Complex Side:
Pipe 8 -0 0.0 H Beam TBar Plate:
Description of Finished Surface: 4 5Tfi q7zs -
Tc<T S T Ar J b A R b ZIr3C..
Date:
THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOuRhTEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATINGS FOR THE SURFACE INDICATED ON SAFETY RELATED AREAS OF NUCLEAR FACITLITES.
QUALIFYWG AGENT: QY&@ PAINTER:
QUALIFYIYG AGENT: t(//d/ F, T.Ta-ikyor d e DATE:
Journeyman fainter Qualification for Application of Coatings to Steel Surfaces NAME: A~(s>e6& h)hLLq I DATE: q-23 -o('
VEKMONT YANKEE NUCLEAR STATION N P S ENERGY SERVICES READINGS WET DRY Flat Side: 5,o b .o 7.0 8.0 b.6 6.0 6 .O 8.0 b -0 9 .n A .(3 Plate:
THE Al30VE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATINGS TY RELATED AREAS OF NUCLEAR FACITLITES.
QUALIFYING AGENT:
QUALIFYPJG AGENT:
DATE.
Journeyman Painter Qualification for Application of Coatings to Steel Surfaces VERMONT YANKEE NUCLEAR STATION N P S ENERGY SERVICES COATING S Y S T E M : 89 0 MANUFACTURER: e .+e%0 \ 0 TYPE OF APPLICATION EQUIPMENT: Co~OE?JTtOV4ftA\ SQ4pry COMMENTS:
READINGS WET DRY Flat Side: c3.0 8.0 5.0 5.0 B.0 R.0 5. 5*0 f
8-0 P, . o 5.b 5.0
&.O %-V 5 .o 5 -0 Complex Side:
PiDe 0 8 -0 5.0 5<0 "T" Bar Description of Finished Surface:
ASTI4 "Ti57 .SThL3bPxB +-4 7.7. % am4 7,\ M C THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATINGS FOR THE SURFACE INDICATED ON SAFETY RELATED AREAS OF NUCLEAR
/
DATE:
I VERMONT YANKl3E NUCLEAR STATION N P S ENERGY SERVICES COATING SYSTEM: $(a0 MANUFACTURER: AFLRoci h3E
-~
Complex Side:
Pipe 5.0 d s s. 5 w ; , s 7.0 nil5 7.5 H Beam T3ar Plate:
, Description of Finished Surface: Z I b4.e TF b d,7/4 e-7-I t THX ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATINGS FOR THE SURFACE INDICATED ON S A E E m RELATED AREAS OF N U C L W
Journeyman Painter Qualification for Application of Coatings to Steel Surfaces NAUE: &, LD,.,,t S DATE: J - 7 0 -OI VEKMONT YANKEE NUCLEAR STATION N P S ENERGY SERVICES COATING SYSTEM: 8 4 (3 MANUFACTURER: C & K R ~Inlcc L
TYPE OF APPLICATION EQUIPMENT:
COMMENTS: *db READINGS WET DRY FIat Side: g,r3r 4-0 1 ,o M L 1 3 b.0 -815 b.0 b .o 5.0 Complex Side:
Description of Finished Surface:
A<-m cc2zg T&ST ';74?-JDa4D COATD L3m4 r,z fI QUALIFYM G AGENT:
E
VERMONT YANKEE NUCLEAR STATION N P S ENERGY SERVICES COATMG SYSTEM: MANUFACTURER C.fiERo\,h!e' READMGS WET DRY Flat Side: 5 .oKll5 .5.b f12',\5 7 . 0 M'tI5 3,o 4 5 L ,o n a b 5 .6 *;is Complex Side:
1 DLlI Plate:
I Description of Finished Surface: dtTu
,c/, . . JI VZ 7 L ~1 THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN P A N E R FOR THE APPLICATION OF
, THE ABOVE COATINGS FOR THE SURFACE INDICATED ON SAFETY' RELATED AREAS OF NUCLEAR FACITLITES.
QUALIFYING AGENT: PAINTER:
Journeyman Painter Qualification for Application of Coatings to Steel-Surfaces NAME: h w . 5 0 I 4 DATE: $ - 2 3 - 0 l VERMONT YANKEE NUCLEAR STATION I NPS ENERGY SERVICES -
COATING SYSTEM: 890 I NLANUFACTURER: cAf2go~;dc READINGS WET DRY Flat Side: - L 5.G 7,o 7,b
- 5. 0 "H"Beam "T"Bar J.5 I Plate:
~
THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PARVTER FOR THE APPLICATION OF THE ABOVE COATINGS FOR THE SURFACE INDICATED O K SAFETY RELATED AREAS OF NUCLEAR DATE:
Journeyman Painter Qualification for Application of Coatings to Steel Surfaces ERMONT YANKEE NUCLEAR STATION NPS EPERGY SERVICES -
OATING SYSTEM: MANUFACTURER: p IldE READINGS WET DRY Flat Side: 5.D 5.0 7 .D 7.0 5.0 b 1.O B.0 L .c7 b.0 4
B.0 0.0 b -D 5.Q 8 0 7 .o Conlplex Side:
Pipe H Beam T Bar Ptate:
THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATMGS FOR THE SURFA INDICATED ON SAFETY RELATED AREAS OF NUCLEAR FACITLITES.
QUALIFYING AGENT:
QUALIFYNG AGENT:
DATE:
- - _c Journeyman Painter Qualification for Application of Coatings to Steel Surfaces fE&MONT YANKEE NUCLEAR STATION NPS ENERGY SERVICES ZOATING SYSTEM: By0 MANUFACTURER: CRnRc, L N C READINGS WET DRY Flat Side: L2.
0 t .o 5 .o Complex Side:
Pipe H Beam lo c3 .s.D 3.0 7.a T
. Bar THE ABOVE APPLICANT HAS BEEN QUALIFIED AS A JOURNEYMAN PAINTER FOR THE APPLICATION OF THE ABOVE COATINGS FOR THE SURFACE INDICATED ON SAFETY RELATED AREAS OF NUCLEAR FACITLITES.
QUALIFYING AGENT:
QUALIFYPIG AGENT: d_/ E. 3.z DATE:
J
F&+cR (IS)ycan of sk;u and knowledge consking of coating valves, p ~ p heat q exchyrgws, stearn generator fed pumps, XCP pumps, impdiers, structural SKtf Sandblastmg, coating mzerboxes, m u t a p s and condensers.
W e n year; (7) yslr of supervis~ryexperience.
LcveI 1 Coatings Appficstot approved by N.E.S, at calm Cliffs Nuclear Piam.
Mechanical supesvisbr over turbine condenses inspections/c:tbning, fcedwvcr Eater rnodikations and hydrogen seal cooler deanindtahg.
Diablo Canyon Nucleat Powet Plant Shift L e d Supemiror August to Present Overseeing Main Feedwaxer Pump peedmntmls, Main Transformerreflacunenr, Sdt Water S ~ ~ ~ U X I S RCP maintenance, Stam Gtnerztor m a i n t ~ ~ e ,
concrete repairs, nuutcl cleaning NPPOK, W o l d i n g ~
containnenr Rigging Crew, Snubber prop-= and Seismic Gap Restonatioa in Turbine and Aux.
Building.
Perry Nuclear Power Plant N P S Energy Services, hc. 2/99 t o 6/99 Responsible for the opening, ins-mctiom, sad repairs ofcondusers, turbine 1ubz oil co~kr,arid feedwarer bearers. Performed tube plugeiae activities i~ low prcssure condenser and in f e d w a ~ ~
heaters. Superpiscd wel&rs in performing internal repairs to f e e d m a hearer. SrrpeNisedcraft peiforming inspectionddeanin~tc~kg of hydrogen seal coolers.
D. E Ksm Plant N P S Energy Services, IQC. I 2/98 to 1/99 Responsible forfoundsicions of P.A. Fats and for F:eedus from cod &utes to p u b e r k ; also supervisedvarious stages of scaffoldingin and around K ~ plant.
C Purchasing of tools and materials for the outage.
- 3. H. Campbell Gmerazhg S:&a N P S Energy Sendces, h e . 7/98 to 11/98 Lead supervisor on second sxfir e s p o d l e far remod of boiler pan&, asbestos removal frrm weas around boilcr and mud drcms. T h e placement of new pands or ribes in bailer a d replacemkt of aspansion joints.
Superviseds p y paining of overheadsteel in a airplane hanger.
CaVen ~33% Nudear power P'ar United Nuclw W c e s 4/97 m 5/97 Supewiscdtwoshifts ofpabatera applying nonskid on walkways, using a bIas,ct-mccto sandblast a pmMc on floor for a safety vehicle parking area on t h e d i n e deck. hddiuonal, responsibilities h l u d e d estimating various painting projects.
Cdvm Clifb Nuclear Power Plant Huor OonarctorsIntanat;onal, bc; .3/97 tu 4/97 Succtssh~lysupervisEd thircy-seveapainters during power outage within 55 day dmdlinc Workload c o n t i d asyldbfasting and coating k m k e m a s , cancaimnent liner and v a r i ~ amaintenance ~ locations in and a r o q d the hlrbinc building. Responsib!e b r managing d m r e r piping and the paint+ of newly installedaccumdxor tanks.
cslvertclifs~ea.rPowuPfaslt Bechtel- c 'on$ Inc. 1/96 to 2/96 Supemid the Ffig of b i d p d and PBigfingin &e Maia Control Roam.
Washington, DC DkthoRlaF~ 3/96 to 3/96 Responsible for paint spraying of SUryIic urerhane on cabinets for major departmrxlt store dieat, inclusive of sqervisicln of all phases of pdnting.
Fakfax Cotinty, VA Pctcr Michdl, he. 5/95 eo 12/95 Supervised and esximated application of self-level coarings on floors for Lorton Waste Vacr Tmtment hility. Also, responsible fur applying Tauntch on d srructural steel at &e Prince T i a n Counry Wase Water fadliry, during restoration program. Managed the Springfield Metro project at Francionb Road W3 BWd tns amim aom3 tSLZG6SBZ8 OS :5B SE6T/Et/01
Cdven c i i s Nuclear Power Plant W.E. & c.C d y t i c 2/95 to 5/95 Rcspnsibk for the sapenision of the sandblasthg of the acid trenches, sandbkmiq and sprayin3 the diesel exhau~r,axid p&g ei&t ~ h m e r ~ .
Cdvm Cli& Nuclear Power P h t Bcchtel Construction, I n c 4/94 to 2/99 Supervised all painting work on hterior lad exterior of aew diesel buildiig.
Calves Cliff0 NuJew Power P h t U.E. lt c.C a t a I y t i C 5/91 to 4/94 Rqotlsibilities included the superrision of the plant restomtion, cansining afseif-levelingffoors, mpainting walls, pip.., bangtn, pumps and machinery.
WasKington, M:
Edward -e., Ilz~ 6/90 5/91 SuptrPisedthe chywall finishing and the pa;tt;Zg of &et ffoors in the U.S.Post Office, calvert W s Nudear Power Plant Williams Power 3/90 u)6/90 Rmponsible for the application af self-leveling epoxy on the floors of the material pm-aemingaciliq-.
supervised the opcrarion ofthe %last -Tiack'*machine.
Wavshiugton,DC L, A. M;sn$num. hc. 6/89 to 3/90 Rirponsible for the pain; rattxation of siu Safeway grocery sore.
Washingtoq I)C G h t F a d Com.struction 10/87 to 6/89 Maaged the store rcmodtthg for sfores in t h e Washington, DC/Baltirnore, Maryfsndm a .
Huat ingcon, MD Robera D.sapp, Inc. 10/84W 10/81 Residentialand commercial painting.
Clinron,MD .
Prince George's contranors, Inc. 7182 to 16/87 Assisted an engineer and e s h w r at a asphalt company, while attending school.
EDUCATION Southern Senior High scfrod ptlzarylandDrafting htitute Pakcrs; Lo#I I773 N.E.S. Levels I $2 E Con&monr: Appliu6ons Bel2.omTechnical consuitan;
-q Apr 2001 1 4 : 3 6 : 0 6 Warehouse Issue Ticket No: 01-97222 Page 1 of 3 Work Order: 00-001840-000 SIR N o : 00-68935 R e q u e s t e r : BASSETT, KERRY Date Reqd ; 0 4 / 2 7 / 2 0 0 1 P r o j e c t No: 6714-2130 Asset : DRYWELL 000 Account No: 6 7 1 4 . 2 1 3 0 . 4 4 1 5 . 5 3 0 1 -
Notes: BASSETT, KEXRY 1 0000510014 COATING, CARBO ZINC COATING, CARBO-ZINC, 11 SG GREEN 0300, WITH ZINCNT FILLER COLOR 0904 ( 1 GAL. KIT = 075 GAL CZ 11 S G AND 14.6# ZINC FILLER.) VY CHEM CONTROL # 19 Issue Qty L o c a t i o n R o w / B i n 2 5 . 0 0 KT 00000008 FC CAB FC CAB-981697800 HEAT# p/b LOT# ?/h Safety C l a s s : 1 / E EQ: N FP: N DI:
LOT # EXPIRATION LOT QTY SERIAL NO PO #
6 3 4 1 9 30-NOV-01 24.00 W011040 63564 1.00 W011040 2 0000510015 COATING , EPOXY COATING, CARBOLINE 890 GRAY C 7 0 5 , (2 GAL KIT = 3.
GAL PART A C705 AND 1 G A L PART B 0 9 0 8 . ) VY CHEM CONTROL# 17 & 18 Issue Qty L o c a t i o n Row/Bin On Hand D i s b u r s e c 13.00 RT 0 0 0 0 0 0 0 8 FC CAB 13.00 L2 FC CAB-981697800 0.00 HEAT# p\lk LOT# k)/& '
Safety C l a s s : 1 / E EQ: N FP: N DI:
LOT # EXPIRATION LOT QTY SERIAL NO PO #
30 Apr 2001 14:36:06 Warehouse Issue T i c k e t No: 01-97221 Page 1 of 3 Work Order: 00-001840-000 SIR NO: 00-68935 Requester: BASSETT, KERRY Date Reqd : 04/27/2001 P r o j e c t No: 6714-2130 Asset DR~WELL ooo Account No: 6714.2130.4415.5301 N o t e s : BASSET", KERRY c -
1 0000511020 COATING, THINNER COATING, THINNER, f Z l , C L m 0 9 1 0 , 5 GALLON CONTAINER VY CHEMICAL CONTROL# 1297 Issue Qty Location RowjBin On Hand Disbursed 2 . 0 0 Ea 00000007 HAZMAT 2.00 HEAT# LOT# Safety C l a s s : 1 / E EQ: N FP: N DI:
LOT # EXPIRATION LOT QTY SERIAL NO PO #
63418 31-AUG-03 2.00 VY011040 2 2000120021 COMPOUND, CURING COMPOUND, CURING, 5-GAL CONTAINER, USED I N COMBINATION W I T H EBECCO 885 GROUT, VY CHEM CONTROL# 24 6O.,
APPROX 1 YEAR IF STORED I N ORIGINAL, UNOPENED CONTAINERS Issue Q t y Location Row/Bin On Hand Disbursec 1*00 Ea 00000007 HAZMAT BLD 2.00 /
r, HEAT# LOT# Safety C l a s s : in& EQ: N FP: N DI:
08 LOT # EXPIRATION
~
LOT QTY SERIAL NO .
- P Q #* .
64551 2.00 J FILE I issued By Received By ' .. Date
- e
Page 1 of 1 Work Order: 00-001840-000 SIR No: 00-68935 Requester: BASSETT, KERRY Date Reqd : 04/27/2001 P r o j e c t No: 6714-2130 Asset : DRYWELL 000 Account No: 6714.2130.4415.5301 Notes: BASSETT, KERRY --
1 0000510020 COATING, THINNER COATING, THINNER, #26, CLEAR 0910, 5 GALLON CONTAINER. VY CHEM CONTROL # 25 Issue Q t y Location Row/Bin On Hand Disbursed 2.00 EA 00000008 FC CAB 2.00 3-FC CAB-981697800 0.00 HEAT# ,?A LOT# p$& Safety Class: 1 / E EQ: N FP: N DI:
LOT # EXPIRATION LOT QTY SERIAL NO PO #
931-DEC-03 2.00 2 0000510021 COATING, THINNER COATING, THINNER, #2, CLEAR 0 9 1 0 , 5 GALLON CONTAINER, W CHEM CONTROL # 23 Issue Qty Location Row/Bin On Hand Disbursec 2.00 EA 00000008 FC CAB 2.00 '
7 FC CAB-981697800 0.00 HEAT# ?& LOT# cb LOT # EX IRATION LOT QTY SERIAL NO Safety Class: 1 / E EQ: N FP: N DI:
PO #
63416 30-NOV-03 2.00 V 3 COPY
12 J u n 2001 08:29:21 Warehouse Issue Ticket No: 01-99105 Page 1 of 1 Work Order: 00-001840-000 SIR No: 00-68935 Requester: BASSETT, KERRY Date Reqd : 04/27/2001 P r o j e c t No: 6714-2130 Asset : DRYWELL 000 Account No : 67 14 .213 0 . 4 4 15.5 3 0 1 Notes: BASSETT, KERRY .--
1 0000511020 COATING, THINNER COATING, THINNER, #21, CLEAR 0910, 5 GALLON CONTAINER W CHENICAL CONTROL# 1297 Issue Qty Location Row/Bin On Hand Disbursed 2.00 Ea 00000007 HAZMAT 2.00 h
//
Safety C l a s s : 1 / E EQ: N FP: N DI:
LOT # EXPIRATION LOT QTY SERIAL NO PO #
63418 31-AUG-03 2.00 VY011040
30 Apr 2001 14:36:06 Warehouse Issue T i c k e t No: 01-97222 Page 3 of 3 Work Order: 00-001840-000 SIR No: 00-68935 Requester: BASSETT, KERRY Date R e q d : 04/27/2001 Project No: 6714-2130 Asset : DRYWELL 000 Account No: 6714.2130.4415.5301 Notes: BASSETT, KERRY
, C' l 5 2000099430 GROUT, FIRE PENTRATION GROUT, FIRE PENETRATION, MASTER BUILDERS EMBECO, W CHEMICAL CONTROL. # 753
- SEE NOTES PAGE 8 *
- SHELF LIFE ITEM***
Issue Qty Location RowjBin On Hand Disbursed 4.00 EA 00000008 SWHSE 15.00 SWHSE-961520300 0.00 SWHSE-97 1601400 0.00 SWHSE-981705300 0.00 SWHSE-98 174740 0 0.00 HEAT# LOT# Safety C l a s s : SC2 EQ: N FP: Y DI:
LOT # EXPIRATION LOT QTY SERIAL NO PO #
31-AUG-01 3.00 31-AUG-02 12.00 Lssued By gh $&Lved By Date
12 May 2001 14:58:41 Warehouse Issue Ticket No: 01-98474 Page 1 of Work Order: 00-001840-000 SIR No: 01-71170 Requester: WORDEN, CHRIS Date Reqd : 04/27/2001 Project No: 6714-2130 Asset : DRYWELL 000 Account No: 6714.2130.4415.5301 Notes: BASSETT, KERRY 1 0000511266 TAPE, SEALANT TAPE, SEALANT, 3. WIDE, 36 YARE) ROLL LENGTH, BLACX Issue Q t y Location Row/Bin On Hand Disbursc 12.00 Ea 00000001 E6H1 35.00 HEAT# </fi LOT# p/& Safety Class: SC2 EQ: N FP: N DI:
LOT # EXPIRATION LOT QTY SERIAL NO 35.00 Issued By
Apr 2001 14:36:06 Warehouse Issue T i c k e t No: 01-97220 Page 1 of 7 Work Order: 00-001840-000 S I R No: 00-68935 Requester: BASSETT, KERRY Date Reqd : 04/27/2001 Project No: 6714-2130 Asset : DRYWELL 000 Account No: 6714.2130.4415.5301 .--
Notes: BASSETT, KERRY 1 0000507502 VALVE, BALL VALVE, BALL. 2", STAINLESS STEEL.
- .fi- .i '.>
li;.' . . /. , ! 9 :.:. ..
. I .d :..*: ./. .I.. .. Issue Q t y Location Row/Bin On Hand Disbursed i .
i' <-
.I) :r' 2 . 0 0 EA 0 0 0 0 0 0 0 1 Y12D1 2'.
0 . 00 0
'-4 Y12D1-961468215
~
HEAT# LOT# Safety Class: SC2 EQ: N FP: N DI: 1 LOT # EXPIRATION LOT QTY SERIAL NO PO #
64162 2.00 VY011207 2 2000010106 SEALANT, SILICONE SEALANT, SILICONE, DOW CORNING, TYPE 7 9 5 , GRAY, 20 0 2 . E-2 PAK FOIL SAUSAGE, W CONTROL # 2 4 5 9 ,
Issue Qty Location Row/Bin On Hand Disbursed 5 0 . 0 0 Ea 6 4 . 00 . . e-
/
I Safety Class: 2 / 0 EQ: N FP: N DI: I LOT # EXPIRATION LOT QTY SERIAL NO PO #
0-FED-02 64.00 COPY Issued By 2 f$? Received By Date $?@/
?Q Apr 2001 14:36:06 Warehouse Issue T i c k e t No: 01-97220 Page 2 of ?
Work Order: 00-001840-000 SIR No: 00-68935 Requester: BASSETT, KERRY D a t e Reqd : 04/27/2001 Project No: 6714-2130 Asset : DRYWELL 000 Account No: 6714.2130.4415.5301 -
N o t e s : BASSETT, KERRY 3 2000010107 SEALANT, SILICONE SEALANT, SILICONE, DOW CORNING, TYPE 795, GRAY, 1 0 . 3 02. DISPOSABLE PLASTIC CARTRIDGE, W CONTROL 82459 Issue Qty Location Row/Bin 24.00 Ea 00000001 I14G1 Ld '< On Hand 35.00 /L HEAT# LOT% 7yo,";?/;;2 Safety Class: 2/0 EQ: N FP: N 01:
LOT # EXPIRATION LOT QTY SERIAL NO PO #
- 64061 18-FEB-02 35.00 W011216
__c__
r- -----.--
COPY Issued By &
MEMORANDUM To: J.O.File 2000-060 Date: June 22,2001 From: Dennis Humbed /A& Fbject Engineering
Subject:
Sil-Pro Material Used in Drywell Seal Job, MM 2000-010 --
The Sil-Fro bonding agent that was specified to be used in the Installation Instructions,step 7.13, page 8 of 11, did not have an issue ticket with the material, and therefore no issue ticket was pIaced in this J.O.File for this material.
The Sil-Pro used was from stock material that was stored in the NPS Laborers gang box. The material was assumed to have been purchased by the construction contractor for another job. The original container is not available to record lot or batch number of the material.
Lead Air Sampling Protocol for Drywell Seal Work Job Revision 1 Initial Sampling:
BZAs will be placed on the worker that is expected to receive the highest exposure of each crew. (2 samples)
BZAs will be placed on one other worker of each crew. (2 samples)
Two low volume general area lead air samples will taken in the area of both work groups on the 238 level of the Drywell. (2 samples)
Two additional general area Iow volume lead air samples will be placed on the Drywell 252 grating directly above the work groups. (2 samples)
One low volume air sampler will be run outside the Drywell as a blank.
(1sample)
This is a total of 9 samples.
Procedure:
I. Change all these samples out after the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of work.
- 2. Log them and handle them per AP-0549.
- 3. Transport them to the chemistry lab ASAP.
- 4. Chemistry shall analyze the samples when they are delivered. The sample results are needed as quickly as possible.
- 5. Chemistry will deliver the results to Remi Morrissette or Doug Bruce for evaluation of the lead levels.
- 6. We will continue to sample until the lead work is complete.
The low volume samples will be changed out shiftly The workers should keep their BZAs for the entire shift
- 7. After initial sampling we will have a total of 18 to 20 samples each shift for a period of three days.
VYNPS Corrosion of the low part of the drywell is effectively prevented lly the following methods:
I 1. The ambient temperature of the drywell is maintained between 1350F and 165OF by forced draft air cooling units which continually circulate the 1 air in the drywell. These units are, in turn, cooled by the Reactor I Building Closed Cooling Water System and the moisture is removed from the air. Consequently, the steel plating surfaces will remain dry, thus minimizing any corrosive action.
- 2. The lower portion of the drywell interior and exterior surfaces are protected from any contact: with the atmosphere by complete concrete encasement. This effectively prevents any corrosive action on the plates in that area.
- 3. All interior and exterior drywell surfaces which are exposed to the atmosphere a r e protected f r d corrosion by application of a corrosion resistant coating material.
There is a remote possibility that the height of ground water during a given period could exceed the elevation of the extreme lower portion of the *ell.
Nevertheless, it is not considered possible for this ground water to reach the steel plating, assuming a crack in the foundation concrete. The bases for this conclusion are as follows:
- 1. The monolithic foundation concrete structure is greater than 18 feet thick below the drywell and is divided into three separate pours i n the horizontal plane. It is considered almost impossible for a crack to propagate completely through any given pour because of the thicknesses involved and the bedrock foundation.. Even if this were to occur, it is not considered possible for any given crack to propagate beyond the joint between pours.
- 2. Water-stop material is used at all foundation concrete joints between pours, both in the horizontal and vertical planes. This design assures that water will not propagate along any given joint in the concrete.
The possible effects of a given thermal gradient through the foundation concrete have been considered. Based on the concrete thicknesses and possible temperature differentials, it is not considered possible for any thermal gradients to exist which would damage orptherwise affect the structural 12.2-15 d 1 Revision 13 J E-=
VYNPS occur from the condenser (based on methodology in SRP 15.4.9). The leakage path was assumed to be out of the turbine hall and into the Control Room intake.
The total 30-day thyroid and whole body gamma doses excluding mairisteam isolation valve leakage have been calculated to be 8.8 rem and 0.10 rem, respectively. The 30-day thyroid and whole body gamma doses from main steam isolation valve leakage have been calculated to be 18 rem and 0.002 rem, respectively. The above calculated doses to the Control R o o m occupants are within the limits specified in Criterion 19 to 10CFR Part 50.
14.9.1.6 Materials Within the Containment No material within the primary containment will fail by decomposition or corrosion and affect vital systems. The GE program for determining the effect of hydrogen evolution by radiolysis is discussed in Appendix B of the FSAR. See also Section 5 . 2 .
The interior pressure boundary surfaces of the drywell and torus were originally prime coated during construction with an inorganic zinc paint primer that will withstand the accident environment without failure {Carboline CZ-11). This coating was radiation and DBA tested at Oak Ridge National Laboratory ( O W L Log Book No- A 7562; 11-29-6 and Log Book No. A 9675, A 1 0 - 1 3 - 3 3 ) and tolerated radiation doses of LE9 rads without failure.
The drywell primer w a s topcoated with a Keeler & Long epoxy (No. 7475). The torus primer was topcoated with a Keeler & Long phenolic paint (No. 7230).
During RFO 20, 1998, the immersion area of the torus was steel grit blasted and recoated with an inorganic zinc paint (Carboline CZ-11SG) and a belly-band of phenolic paint (Carboline 368WG) was applied from approximately one foot above and one foot .I-below normal water level to prevent tiger striping. The coating system used is a qualified Nuclear Service Level 1 coating in accordance with ANSI 101.2-1972 and was applied under an approved quality assurance program to ensure compliance with ANSI N l O l .4- 1972. 12 In response to NRC Bulletins 79-01 and 79-018, an extensive re-evaluation of post-accident radiation fields and equipment qualtfications has been performed, was submitted or review and was approved (References Y , Z , A l and El).
14.9.1.7 Conclusion All the necessary safety-related systems and equipment are capable of performing their intended functions in t h e presence of either the design basis radiation sources or postulated TID-14844 sources without exceeding the limits of 10CFR100.
I1 EDCR 97-423, RHR and CS Strainer Replacementqt 121 KTA-Tator, Inc., Technical Evaluation of New Coating Systems Suppression Chamber and Vent Header, Revision 2, April 30, 1998.
14.9-6
.. ~.
.PRODUCT GENERIC Tim 6 .
DRYm.:!
.::=rr;.a
"'TIilcKNESs. SSWDS Lc; .-
.., _.. VOLUME 2.. .'>. .-,..z.-:
7 A. c..- .._
8.- - I 4.:
'L
. _Prim& carbo zinc- 11-s~ Inorganic Z i c 3 mils .. 86% , .333'fPij
,zinc in dry .. 5 film
' -.,A2 ' I . -.,-.
F".
E .
Topcoat Carboline 89c) . EPOXY 5 mils 7 5 2 .- 240 ft:.r;;
h ... ...-.-.
E'EAmS BENEFITS ExceIIent Corrosion :protection rn Protects steel from corrosion during construction.
High solids Complies with VOC regulations, fewer solvent fumes.
890 available in Rapid Tint System Available in wide range of colors with no minimurn order.requirements. Fast delivery.
T ~ s DATA r
T+ MFX'HOD , CONDrrrON ' RESULTS Design Basis Accident ANSI N201.2-1972 300"F/48 PSIG AcceptabIe OBN ASTM D39 11-89 302*F/IIdays ( O W ) Acceptable Radiation Tolerance ANSI N5.12-1974 (CZ-11 SG) 1xi09 rads Acceptable ASTM D4-082-83 (890) 1-01 x 109 rads Decontamination ANSI N5.12-1974 Per test method and 99.96%
ASTM D4256-83 ORNL procedures (890)
Chemical Resistance ANSI N5.12-1974 5 day immersion Acceptable except for nitric ASTM D39J.2-80 acid and pocassium pdrmanganate / " p Taber Abrasion ANSI N5.12-1974 lo00 cycles 85 rug loss Fed STD 141 Method lOOOg weight 6192 CS-17 wheel (890)
EIcomerer Adhesion ANSI N5.12-1974 Per test method 350 PSI ASTM DG.541-85 1 Fire Evaluation ANSI NZOl.2-I972 ASTM E-84 Per test method Flame Spread less &an 25
carboline CARBO ZINC@1I SG SELECTION DATA SPEC1FICATION DATA GENERlC TYPE Self curing, solvent based, lnqank zinc THEORETICAL SOLlDS CONTENT OF MIXEO MATERIAL:
silicate. Bv Welaha CARBO ZINC 1I SG 79 4 2%
GWU(AL PROPERTIES: An inorganlc zinc rich @mer that. Total .tine m dry fih as% minlmum p r o w steel galvanically,eliminating subfllm m s i o n .
VOLATlLE ORGANlC CONTENT (Voc):
Excdentconoslon arid W e a h X i n g protecth The followln are nomlnal values astested per PA Method 24:
H$h zinc loadlng per square foot As S u p p l d 4.01 Ibs./gal(4al g/l)
= Meets Class '8" slip coeffident and creep &?sung mlteria fw Thinned:
s use on faylng surIaces Very good resistanceto salting
\ Thlnner &gg! Ibdqal sa Meets nudear requirements For ievel one areas 21 16 428 513 26 ' 15 4.37 524 CmpUes with FDA crfterja in gray color Available in an ASW C620,Type 2 Zinc verslcn RECOMMENPDPRY FILM THICKNESS PER COAT:
2.0-3.0 mils (5G-75 microns)
RECOMMENCED USES: As a prime coat for abblve Masted steel where inorganic dnc is spdfied. Provides 8xcellent Dry Ftim thickness Ln excess of 6 mils (1150m i m ) per coat is not protection for power plants, bridges, ChemiGal plants, refineries, recommended.
paper mills, coastal and offshore exposum and for Interiors of storage tanks cmtalning haels and organic solvents. THEOREllCAL COVERAGE PER WED GALLON:'
loocl milfts (24.5r#il at 25 microns) 333 fFat 3 mils (8.2mz/1 at 75 microns)
NOT RECOMMENDED FOR. Exposureto acids or alkalies without a soitable topcoat or br application over rust inhibitors. 'As measured per NACE WWl. Materlal losses during mildng and appllcadon will vary and must be taken into consideration when TYPICAL CHEMICAL RSI!XANCE estimating job requirements.
4-Sptash & STO- CONDITIONS: Store Indccrs.
Bwsure lmmerslon Spillaae Fumes Temperature: 4C-?OO°F (448%) Humidiw 0-sa"/.
Acids NR Very Good' Excellent' SHELF UFE: when stored Indaors at 75OF (24%).
Alkalies NR Very a&* Excellent* CARBO ZINC 11 SO Base IZmOnths Sdvents Excellent Excenent Excellent 2hc Fihr 24 monlhs Salt EXcSRent E*ceUent Excenent Special Zinc Flller {ASTM 0520, Type 2) 24 months Water Excellent ExceUent Excellent COLOR: Grean (O300) and amy (0700)
'With suitabletopcoat. GLOSS: Matte TEhdPERANAE RESISTANCE! (Non-lmmersian) ORDERING INFORMATION Untopcoated:
conHnuaus: 750°F (399%) Pdces may be owained from your Carbdlne Sales Aepresentab've Non-Continuous: 800'F (427OC) or Carboline Customer Service.
Wlth recommendedsilicone topcoats: APPROXIMATESHIPPING W W W .
Contlnuous: 1tWflOF (538%) .lB!m zia!@
113b (51kg)
Nordhntinuous: 1 2 W F (649°C) CARBOZlNCit =Base Z 3 b (1Dkg)
Thlnner26 91b(4kg) 4 2 ~ 1 9 ~
SUBSTRATES: Apply over properly prepared steel. mMf21 9 b (4W (19 w COMPATiBLE COAnNGS: May be topcoated with epoxies, R A S H POINT: (SetaRashf phenolics, aCrytics, sillwn?s, vinyls, chfortnated rubbers or others CARBO ZINC 11 SO Base 55°F (13'C) as recmended. Do not topcoat wfth alkyds. Thlnner 2fj 95°F (35°C)
Thinner 21 54°F (12°C)
APPLl CATION INSTRUCTlONS CARBO ZINC? 11 SG SURFACE PREPARATION: Remove all oil OT grease from the Alrlese:
surface to be coated with Thhner 2 01 Carboline surface Cleaner 3 Pump Ralio; 30:l (min).
(r& to Surface Cleaner 3 Instructloos) in accardance with SSPC GPM O w : 3.0 (min.) .
SP 1. Materiai Hme: 3/a' I.D. (rnh)'
Tip Size: .019-.023' STEEL Ouipuipsi: 1500-2000 Immersion Sewlce: Abrasive Mast to a Near White Metal finish Rker stze; 60mesh In accordance wllh SSPCSP 10 and obtain a 1-3 mil { 5 7 5 I micron) blast profile. Wefds must be continuous and grwnd Teflon packings are recommended and are-mailable from lhe smooth. pump manufacturer.
Non-lmmersfon SerdCe: Abrasive blast to a Commercld Finish h BRUSH: Forbuchup of ereas less than one squaIe foot only. Use accordance with SSPC-SP 6 and obtain a 1-3 mil (25-75 rnlwon) rnediun bristle brush. Avoid excessive rebrushing.
blast profile.
ROLLER: AppIication by idler is not recommended.
MIXING: Power mix base, then combine and pawer mixas follows:
DRYING TIMES: These tlmes are basad on a 2-3 mil (50-75 lAal.!B SGalKIt micron) dry film tfilckness and a 50% Relatlve Hmidily cf higher.
CAF!BOZINC 11 SG Base laal Lower humidity will require longer c m times Hlghef fihr thickness, low humidityor insufficientventilation will lengthen cure times.
tnc Rler or special zinc mer 14.6 bs suffaw Immersion sjff z!nc filler slowly into premixed base dth continuow agitation. -1 Handle Topcoat Service Mix until kee of lumps. Pour mixture throqh a 30 mesh screen. 0°F (-18'C) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 7 days NR DO NOT ~v?IX PARTIAL KITS. Keeo matend under mild auitatig 4 W (4°C) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 72 how durina adcation. W F (t6'C) 45 min. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> BO'F 27% 45 rnln. 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> I6 hours THINNING May be thinned up 10 15 odgal with Thfnner 26. In 10DeFj& 15 min. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> 14 houB mol weather, below 60°F (lS"C), may be thinned up lo 16 &gal with Thinner 21. For shop applicattons or lank linings, If the relative humidity is law, the wing Ifme can be reduced by afshg the Relative Humidity by Use of thinners other than those su@ed or approved by Carboline stearn or a water spray on !ha coated surface after an initial dry may adversely affect product performance and d l void product time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 7PF (24°C).
warram wtiether express or implied.
NOTES:
POT WE:Pot lifeends when material becomes too thick to use. I. h y satttng that appsars on the zinc surface as a resuit of . 'W pmlonged weatheflng exposure must be removed Wor to the application d additional coatings.
60°F (16°C) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 2 Loose zinc dust must be removed from the cured film by 75°F (24°C) 8hoUs M n g with fiberglass screen wire if:
WF (32OC) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> a) theCarboZhc11 SGistobeusedwlthoutatopcoatin tmmefslwl service and "zinc p i c k i " could be detrfmental, APPUCATIONCONDITIONS: or Matem Surface Ambient HumldIty b) when "dty sprayloverspray' is evident MI the cured film Normal 40-95'F 40-11PF 40-95"F 40-9OOA and a topcoat will be applied.
(QO35OC) (4-43o-c) (4.35'C)
Minimum OaF (-18%) 0°F (-1VC) F'O (-18%) 3w. VENTlLATiON & SAFETY. WARNING: VAPORS MAY CAUSE Maximut?~ 130°F (54°C) 20D"F{93"C) 130°F (54°C) 95% EXPLOSION. When used as a tank linlng or in enclosed areas, thorough air drculation must be used during and after appllcatian Do not apply Men the surface temperature is less than 5 T or 3°C until the cbatlng is cured. The ventilation system should be ebove the Uew point. capable of preventing the solvent vapor concanhation fmm reaching the lower explosion Ilmh for the solvents used. In Special thinning and rappacation 2echnlqus may be requfred above addition to ensuring proper ventiletion, fresh air respiretors or wbelownormatco~ticns. fresh air hoods must be used by atl applicaUon personnef. Where flammable solvents exist. explosionprodtightlng must be used.
SPRAY: Rle following spray equipment has been found suitable Hypersensitive persons should wear clean, p t e c W e clothing, and is available from manufacturers sucb as Binks, DeVilbiss and glwes and/or protective cream on lace, hands and all exposed Graco. Agitate the m&&d rnaterlat continuously during application. areas.
If spraykg stops for more than 10 minutes, recirculate the matwIal remahlng in the spray be. CLEANUP: Use Thinner 21 or isopropyl alcohol.
Canwlntlanal: AgiCated pressure pot equipped with dual CAWON: READ AND FOLLOW ALL CAUTION STATEMENTS regulators, 3/8" I.D. minimum material hose, SO'maximum material ON IHIS PRODUCT DATA SHEET AND ON N E MATERIAL hose . O W 1.0. Ruid tlp and appropriate alr cap. SAFETY DATA SHEET FOR THlS PRODUCT.
Oct 97 Replaces June 97 CAVTION: CONTAINS FLAMMABLE SOLVENTS. UEEP AWkY FROM SPARUS AND OPEN W E % IN CONFIED A U W WORKMEN MUST WEAR FRESH AlRUNE RESPIRATORS. HYPERSENSITIVEPERSONS SHOULD WEAR GLOVES OR USE PROTECTWE CREAM. All ELECTlW M W M E H T .,>-
AND WSl'AUAllONS SHOULD BE MADE AN0 QROUNDED W ACCORDANCE WITH THE NATIONALELECTRIC CODE. H AREAS WHERE EXPLOSKIN HAZWDS M I S T . WORKMEN SHOULD BE REQUIRED TO USE NONFERROUS TOOLS AND TO WEAR CONWCTWE AND NONSPARKtP(G SHOES.
E
WithexkndedwOrMngWe I)escrIption E M B W 885 grout is hiih precision, nonshrink metalk a-grout with extendedWorking time It is Ideally SUM far grouting machhes or plates requiring optlmum toughness and precision load-bearing support. lnduding machine bases subjectto thermal movement EMBECOd 885 grout meets the requirements of ASTM 3days 7,000 48 6,ooo 41 5,000 34 C 1407 and the Army Corn of Engineers CRD C 621, Grades B and C, 7 days 9.ODo 62 8,000 55 7,000 48 a t a highly fluid a~nsistencyover a temperature range of 45 to 2 8 w 11,OOO 76 10,ooO 69 9.m 62 90°F (7 tO 32W.
Volume mange WsTM C 1090)
Recommended for % Change ~ U i ~ p e r m c n a% 7 ,
9 Precision nonshrink grouting OF: 1 day 0.05 0.0- 030 Machinery and equipment 3days 0.05 0.0 - 0.30 Paper machine sole~lates. induding hooded dryer seaions 14days 0.06 0.0- 0.30 Turblnes. generatorsand centrifugal compressws 28days 0.07 -
0.0 0.30 Rolling, stamping. drawlng and finishing mills for the steel SettlngTlrne~C191) and aluminum industries Consistency C r d n g anchor bolts, reinforcing bars and dowel rods plastic7 FIcIWbl9 FluW Applications requiring high SUength and impact-resistance Irma1 set (Hr.:MiJ 3 3 0 5:m 5:30 Appllcations requiring nonshrink grout to achleve maximum bearingfor optimum load transFer Final Set v (Hr.:Min.) 4130 6:OO 7:m Application requtflng a metallic grout to be pumped FeatUIXS/Benefits psi MPa
= Meets ASTM C 1107 and CRD C m,Grades 8 and C requirements 3 days 880 6.1 a t a highly fluid consistency over a temperature range of 45 to 9u°F (7 to 32°C)mer a 30 m i w k worldng time High fluidity and extended working t h e ensure p r w r placement
-- under a v a w of application conditions Hardens free of bleeding,segregation or settlement shrinkage Has a high tolerance to thermal movement of machinew and 3 davs psJ 3.16 X I O 6 I#pa 2.18 x Iff equlpment. as well as other effectsof heating/mling and 7 days 3.50 x 1Q 2.41 x 10' wettingdryjng 28 days 3.69 X 106 2.54 x 1IT
= The high Qual@, well-graded blend of mefaflicand quartz eOBlficient of memal Expansion mSTM c 531)'
aggregate provides high strength, impactresistance and optimum toughness under dynamic and rePetjtive load mnditions 6.5 x ID" in./in.PF (77.7 x 10' rnm/mm/"cl split Tkrsfle and t ensile Stwngth Pa&@g/%htjng m m e496 and A S ~ Mc 1 9 ~ ) ) ~
EMBECP 885 grout is padaged in 55 Ib (25 kgl moisture-resistant Split Tensile Tensile bags It is also available in 3.300 Ib (1.500kg) bulk bags. psi Mpd psl MPa O n e 55 Ib (25 kg) bag of EMBECO 385 grout mlxed wlth approri- 3da9 350 2.4 300 2.1 mately 10Ib (4.5 kg)or I .2 US. gal (4.5L) OF water yidds approxi- 7days 490 3.4 400 2.8 mately 0.43fF (0.0?2rnj) OF grout.
28days 520 3.6 500 3.4 Note: The water requlrement may vary due to mixing efFicienw and other variables.
'?00-125% flow on flow table per ASTM C 230 Performance Data 1125-145%flow on flow table per ASTtvl C 230 The following data was developed under mntrolfed (aborafm conditions. ReasunablevaMtionsffom tbese results can te expected. '25 to 35 seconds through flow cone per A m C 939 Test mnducteda t a fluid mnsistency
E M B W E85 grWt should be placed in a CWttifluouspour. Discard grout thatbeawnes unwwkable. Grout should be p b d from one lyplcal Ultimate Tensile ana Shear Loads Anchar BOltT&ts MSM E 4881.
Ultimate Tensile Load uitlmate shear Load side to mid entmnent ofair. Make sure thatthegroutfills the entire spaceto gwtai and remainsinmntact with the plate throughout the grouting mess.Straps may be used to mave u?e grorrt to ensure that the &re space is Filed.DO NOT VIBRATE.
r Ib ICs Ib Kg I - V 4 in. Wts - 49.500 22.W 27.5cIo 12.500 curing 9 in. embedment Irnmediaix?lelyafter placement, wei cure the EMEECO, 885 grout by in a 2-1/2 In covering afl exposed grout with dean, damp rags (notburlapl. ~ e e p diameter hole moist untll g r w t surface is ready to be finlshed or unttlffnal 7A in. Bolts - 24.000 20,910 9.5% 4.340 set. Following the removalof the damp rags, immediately coat 6 in. embedment with a recommended curlng compound. such as MASTERKURE.
ip a 1-314in lobsite Testing diameter hole fstrewthtests rnu%kemade atthejobsite, use 2 in.51 mrm CUBE 1/2 In. Bdts - 7,840 3,560 2,400 1.090 molds per ASTM C 109. DO NOT use cylinder molds. Testing should 4 In. embedment be controlled on me basisofthe desired placing mnswncy rather in a 1-1M In ~ m i d f v 0 f t d E W cwsu]twithycW~bcal~kXh?C h ~ ~
diameter hole _. represeMatlvefar special procedures requiredwhen mixingand casting mmpfessivestrength tesrs of fluid. nomhrtnk grout (Data based on threaded anchor tMtts with washer and nut, in. = 25 mm)
Punchfng Shear Strength rChemRexInc. M e t h ~ l ' 'Ihe ambiemand h i i materiai tempemre d the grout shwkt 3 in. x 3 in. x 1?in (76 mm x76 mrn x279 mm)beam be in the range aF45 to 9 0 7 V to 32"c)for bath mixingand placing. ldeah, ttle amount of mlxlng water used should be that OS1 MPa which kne~essaryto acbdeve a 25 to30 second flow per ASlM c 3 days 7.600 71.0 939 (CRUC 6111. For PlaCefnentoLltsideOf45 to 90°F (7 to 32T1, 7 days 1,BMl 12.4 cDntacryour locat ChemRex Inc representative.
28 davs 2.600 17.9 For paws greater than 6 in: [I52 mml deep. consult your local ChemRex Inc. represenkitiieforspecial precautions and "Test conducted at a fluid consistency installationprocedures.
hstallation When the grout will be in contact with steel which is or will Consult the EMBECO 885 grout lnstallarion Bulletin and the be stressed Over 80,ooO Psi (5% M W use MASTERFLOW 816 product bag fw details (3rt the imtallatbnof EMBECO, 885 grout.
cabfe grout.
ENIBECP~S~.omccmp~wrt.cement-based grout isformulated 1
ChemRex lnc. recommends thatthe user request the services of for i n d W A and pr0Fessbnai use Only, and must be kept out cf the local representativefor a prejob conference to plan the the reach OF children. This Drcdud conrafns chemicals whictl may installah'on. be Wentiajly HARMKlL to your health,if not stored and used MI*ing properlv Ham&can be slgnfficanl& reduced by observing all EMBECO. 885 grout shauld be mixed wtth a mechanical mixer for precautjanswhich are found on Matenal safety Data sheets a least 5 minutes. For a fluid cons-stenw,start with 9 lb (4kg)11.? (MSDS). product labels. and f s h r n d literature. Please read this US. (4.2UI 55 Ib bag. Adjut rnildnQWater, as needed, t0 likmtm C J ~ L I U Y befwe using product.
establish the recommendedflow OF 25 to 30 m d s thmugh a flow cone (ASTM C 939/CRD c 611). Less rn'ndng water will be required to achieve stiffer cansistencfs.
PIacTng A PARTICULAR PUR- OR LEFX3WTAB!IJR S F C l l N C m pRowIcTs. and CHfMRM INC. shall have M other \labarty wrth respect therm Any clalm regardmg ~rwuct deFect inuitbe receivedm wrhng withm one t l l year frwn the dateoffc No dah w l be comdeml mthcutsuohw~ietRlmbce Wnufacfuiing Plants: Newark Cq. m r . CO: Fort Wayne. IN; or afm the SDWFied time imnml. use^ rhdl detemune mehlitaMt~ofthe CerrterViRe.IN:MXliW%l, MI;Bbft'liigton. MN:BriStoJ. PA.
woducts fur the inrended use and msume a l risks and liabgrcv ifl mcloeniOn therewith Any authorized change In the pfloted m m e n d a t l o n s RegionalWarehooM~Hayward, CA;Ontario, CA: Atlanta. Gk Chbgo concerning me use of3ur p r m m mt m r dre signaarre of the Chem~ex Inc 7ectlnical Manager mghts.It;Faifiiekl, KI; Grand Prairie.Tx; BramDtMI.ONT (Canada).
form NO. MB-164 For arufessional use only. 8M 3/W B M(x) ChWnR(?X@
~
Daw Coming 795 S m c d Glazing & Weatherproofing Sealant RO-AN Online - Page 1 of5
+-building materials 214R
- Home Sales buildingrnmterids. prtr results. Nnytime.
Site H a p Products v
Tech Info Key Links Search Contacts About Us DOW CORNING@795 STRUCTURAL GLAZING & WEATHERPROOFING SEALANT Home >- Products r > 795 I . PRODUCT NAME DOW CORNING Q 795 Silicone Structural Glazing and Weatherproofing Sealant
- 2. MANUFACTURER Dow Coming Corporation Midland, MI 48640 Phone: (517) 496-6000
- 3. PRODUCT DESCRIPTION DOW CORNING 795 silicone building sealant is a one-part silicone formulation that cures to a durable and flexible silicone rubber buildingjoint seal that can accommodate 250 percent movement in a properly designed joint.
This sealant combines the best performance characteristics of the high-modulus DOW CORNING0 9994 silicone buildin & glazing sealant and the low-modulus DOW CORNING@ 790 silicone building B
sealant. DOW CORN NG 795 silicone building sealant demonstrates: unprimed adhesion to most common construction materials; a physical property profile that is strong enough for structural and non-structuralglazing with sufficient movement capability for most weatherproofingapplications; excellent fire-resistant properties; a long cure time for easy,convenient tooling; a noncorrosive by-product; a low odor while wring; and excellent weathering, durability and recovery after extension and compression.
Bask Uses :DOW CORNING 795 silicone building sealant is designed for:
- Structural and nonstrucbral glazing of glass, metal and plastic
- Adhering stiffeners to building panels
- Weatherproofing applications, including perimeter seaIing of doors and windows DOW CORNING 795 silicone building sealant may be bctoy applied to seal shop-finished products or field applied to seal erected building components in both new and remedial applications.
The sealant forms durable, flexible, watertight bonds with most building.materials in any combination:
glass, ceramics, plastics, stone, masonry, wood, stee!, anodized and mrll-finished aluminum, and painted surfaces. In most cases,no prime coat is required.
DOW CORNING 795 silicone building sealant passes a UL Fire Resistancetest in an exterior joint configuration sealing system without a steel cover plate. The material also stands up to a high-pressure water force without a cover plate.
Umifafionsr DOW CORNING 795 silicone building sealant for stnrctural applications must be reviewed by the technical service staff, Dow Coming Corporation, Construction Sealants TS&D.
TWICAL PROPERTIES These values are not intended for use in preparing specifications.
As Supplied Color. Black, white. - - limestone, bronze, sandstone, adobe tan, dusty rose, rustic brick, blue gray.
s ruce,charcoal hR11-S-8802 Tack-Free lime, 50% RH, hours: 3 MlL-S-8802 Curing Time, 50% RH, days at 25" C (77" F): 7-14 Full Adhesion, days: 14-21 MILS-8802 Flow, sag or slump, inches: 0.1 Working Time, minutes: 20-30 http://www.roancorp.com/
Dow Corning 795 Structural Glazing & Weatherproofing Sealant - RO-AN Online Page 2 of 5 As Cured After 7 days at 25 O C (77
- 0 and 50%RH ASTM D 2240 Durometer Hardness, Shore A, points: 30 ASTM D 412 Tensile at 150% Elongation, psi: 80 ASTM D 412 UltimateTensile Strength (maximum elongation), psi: 170 MlL-S-8802 Peel Strength, milled aluminum, glass and concrete, Ib/in: 32 ASTM C 510 Staining: None ASTM D 624 Tear Strength, die 5, ppi: 27 ASTM D 1149 Ozone Resistance: Good Weathering (after 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> in Atlas Weathsrometer): Remains elastomeric Joint Movement Capability, after 14 days cure, percent: *50 UL 263 Fire Endurace, hours: 2 ASTM E 119 Specification Writers: Please contact Dow Corning Corporation, Midland, Michigan, before writing specifications on this product.
DOW CORNING 795 silicone building sealant should not be applied:
-oil-based To building materials that bleed oils, plasticizersor solvents - materials such as impregnatedwood, caulks, green or partially vulcanized tubber gaskets or tapes
- In totally confined spaces, because the sealant requires atmospheric moisture for cure
- When surface temperatures exceed 49" C (120' F)
- To frost-laden or wet surfaces
- Where painting of the sealant is required; the paint film will not stretch with the extension of the
-sealant and may crack and peel To surfaces in direct contact with food; this sealant has not been tested to determine its status under Federal Food and Drug Administration regulations. For applications involving food contact, DOW CORNING 999-A silicone building & glazing sealant is recommended
- In belowgrade applications
- For use as an interior penetration firestop sealing system
- In horizontaljoints where abrasion and physical abuse are likely to be encountered
- For continuous immersion in water Composition and Materials: DOW CORNING 795 silicone building sealant is a chemically stable, one-part, ready-to-use material that has the consistency of toothpaste. This consistency remains uniform over a wide temperature range from -37 to 71" C (-35 to 160" F) allowing the sealant to be applied easily at most temperatures.
Priming is not required for most common construction substrates.
In cases where doubt exists, a sample should be tested andlor a trial installation placed on the project.
Packaging.. DOW CORNING 795 silicone building sealant is supplied in 10.3-fl oz (305-mL) disposable plastic wrtndges and 20-fl oz (590-mL) E-Z PAKm foil sausages that fit caulking guns, and 2- and 4.5gal(7.5- and 17-L) bulk containers. It can be dispensed by many air-operated guns and most types of bulk dispensing equipment.
Colors: DOW CORNING 795 silicone building sealant is available in 1I colors: black, white, gray, limestone, bronze, sandstone, adobe tan, dusty rose, rustic brick, blue spruce and charcoal. Custom colors are available upon request.
Applicable Standards: DOW CORNING 795 silicone building sealant meets or exceeds the test requirements OF.
r:
Federal specification TT-S-OO1543A COM-NBS)Class A for silicone building sealants Federal Specification774-0023OC( OM-NBS) Class A for onecomponent building sealants ASTM Specification: C-920Type S, Grade NS, Class 25, Use NT, MG, A; and GSA (C.I.D.) No. A-A-1556 Type S, Grade NS, Class 40, Use NT, M, GIA, 0
..Fire Tests of Building Construction and Materials, UL 263 (ASTM E 119)
- Canadian Specification CAN2-19.13-M82
- 4. TECHNICAL DATA DOW CORNING 795 silicone building sealant is virtually unaffected by sunlight, rain, sleet, snow, ultraviolet radiation, atmospheric contamination, ozone and temperature extremes. Its uni ue weatherability enables it to retain original desi n properties even after years of exposure. joint R
performance does not change significantly wi aging or exposure to weather. Seals remain watertight and weatherproof. Cured sealant will not harden in cold to -54" C (-65" F) or soften with heat to 149" C (300"F). It will not become brittle, or tear or crack, and the silicone sealant stays flexible indefinitely.
http://www.roancorp.com/ 6/7/00
Dow Corning 795 Structural GIazing & Weatherproofing Sealant - RO-ANOnline Page 3 of 5 DOW CORNING 795 silicone building sealant is compatiblewith reflecthe glass, most laminated glass, most insulating glass units, and acrylic and polycarbonateglazing sheets.
DOW CORNING 795 silicone building sealant has been tested by UL for performancewhen exposed to flames. The material, when in a joint configuration sealing system without a protective steel cover plate, meets the two-hour fire resistance ratings with or without the use of mineral wool as a backer.
This is in accordancewith Standard UL 263 (ASTM E 119). DOW CORNING 795 silicone building sealant also holds up when exposed to a high-pressure water force without a protective cover plate.
- 5. INSTALLATION Joint Design: A thin bead of silicone will accommodate more movement than a thick bead. DOW CORNING 795 silicone building sealant should be no thicker fhan 1/2 inch (12.7 mm) and no thinner than 1/8 inch (3.2 mm) for joints where excessive movement is expected. Ideally, the ratio of joint width to seafant depth should be about 2:l , when appropriate.
Open-cell, polyurethanefoam or closedGel! polyethyleneare the recommended back-up materials for most joints; use polyethylenetape for joints too shallow to allow backer rod. These materials permit application of a thin bead and act as bond breakers, which allow the silicone sealant to stretch freely with the joint.
The width of building expansion joints varies because of seasonal and daily changes in temperature. If DOW CORNING 795 silicone building sealant cannot be installed when the design width is approximately halfway between the dimensional extremes, the designedjoint must be at least twice the total anticipatedjoint movement Good architectural practice calls for joint design of four times the anticipated movement due to construction tolerances and material variations.
Glazing rabbets and joints should be designed to allow installation and retention of the bond-breaking, back-up material during the installationand curing of DOW CORNING 795 silicone building sealant Lap shear joints should have a bead width that is equal to, or greater than, the total anticipated movement.
Fire Rating: In a properly designed joint, the silicone sealant can be applied without a cover plate and with or without a mineral wool backer material, yet still be fire resistant.
Joint Dimensions: Small curtainwall panels and lites should allow a minimum width of 118 inch (3.2 mm) for the sealant bead. Larger panels and likes, or those in which a great deal of movement is expected, should allow a minimum width of 3/16 to 1/4 inch (4.8 to 6.4 mrn) for the sealant bead.
Glazing of pfastic lites, and panels fabricated from plastic, require larger than usualjoint dimensions due to the plastic's high coefficient of thermal expansion.
Preparafory Work: Clean all joints and gfazing pockets, removing alf foreign matter and contaminants such as grease, oil, dust, water, frost, surface dirt, old sealants or glazing compounds and protective coatings.
. a Porous substrates should be cleaned where necessary by grinding, saw cutting, blast cleaning (sand or water) or mechanical abrading, or a combination of these methods as required to provide a sound, clean, dry surface for sealant application. Dust, loose particles, etc., should be blown out of joints with oil-free compressed air or vacuum cleaned.
Metal, glass and plastic surfaces should be cleaned b mechanicalor solvent procedures. Detergent Y
or soap and water treatments are not acceptable. In a Icases where used, solvents should be wiped on and off with clean, oil- and lint-free cloths.
CAUTION: When using ffammable sorvents, keep-away from heat, sparks and open flames. Use only with adequate ventilation. Avoid prolonged breathing of vapor and prolonged or repeated skin contact Always foflow solvent container label instructions.
Priming: When using DOW CORNtNG 795 silicone building sealant, priming is not usually required.
Prior to general job use, it is always recommended that a bead of sealant be applied on the substrate material to test adhesion. For structural applications, contact Dow Corning for consuftation.
Masking: Areas adjacent to joints may be masked to assure neat sealant lines. Do not allow masking tape to touch clean surfaces to which the silicone sealant is to adhere. Tooling should be com leted in one continuous stroke immediately afersealant application and before a skin forms.
MasKing should be removed immediately after tooling.
http://www.roancorp .c o d 6/7/00
Dow Corning 795 Structural Glazing & Weatherproofing Sealant - RO-AN Online Page 4 of 5 Methodof Appllcationr Install back-up material or joint filler, setting blocks, spacer shims and tapes as specified. Apply DOW CORNING 795 silicone building sealant in a continuous operation using a positive pressure adequate to properly fill and seal the joint. Tool or strike the DOW CORNING 795 silicone buiiding sealant with light pressure to spread the material against the back-up material and the joint surfaces. A tool with a concave profile is recommended to keep the sealant within the joint.
In glazin , tool the sealant applied at the sill so that precipitation and cleaning solutions wilf not pool.
DOW C8RNING 795 silicone building sealant can be applied at outdoor temperatures as low as -29" C (-20" F) provided that surfaces are clean, dry and frost-free.
It is imperative that uncured silicone sealants are not allowed to contact nonabradable surfaces, such as polished granites, metal or glass. Because excess silicone sealant cannot be completely removed with organic or chlorinated sohrents, these surfaces must be masked or extreme care taken to prevent any silicone sealant from contactin them during sealant application. Once an uncured sealant -
1 contacts the surhce, it will leave a Im that may change the aesthetic surface characteristicsof that substrate.
In cases where uncured sealant is inadvertently applied to adjacent surfaces, the sealant should be cleaned while still uncured using a commercial solvent such as xylol, tofuol or methyl ethyl ketone.
Observe proper precautionswhen using flammable solvents.
Precautions: CAUTION! May cause eye irritation. Avoid eye contact Avoid prolonged or repeated skin contact. KEEP OUT OF REACH OF CHILDREN.
During cure, this sealant evolves methanol. Provide adequate ventilation to prevent methanolvapors above 200 ppm. If airborne concentration exceeds 200 ppm, use air-supplied or self-contained breathing apparatus.
Shelf Life: When stored at or below 27" C (80" F , DOW CORNING 795 silicone building sealant
/
has a shelf life of 6 months from date of shipment rom the manufacturing plant Contact your local Dow Corning sealant distributor for specific lot shipment dates.
- 6. AVAILABILITY AND COST Availability: DOW CORNING 795 silicone building sealant is marketed throughout the United States through authorized building sealant distributors.
Cost= Prices per gallon depend on volume of purchase. Contact local distributor.
- 7. WARRANTY Limited Weatherseal Warranfy: Dow Corning Corporation produces and sells a full line of silicone construction sealants and adhesives. These roducts offer a variety of physical characteristicsand P
adhesion properties. DOW CORNING 795 si icone building sealant is part of that line and, when used with compatible substrates and when applied within the stated shelf life and according to manufacturer's recommendationsfor application and joint design, Dow Coming warrants that it will perform as a watertight weatherseal for a period of 20 years from the date of purchase. In addition to maintainingthe integrity of the weatherseal, the sealant will not change color when used with back-up materials and substrates that have been a proved for compatibility by Dow Coming, either aRer 8
specific testing or noted in a current Dow orning publication.
Limitafions: This warranty specifically excludes failure of the sealant due to:
-- Movement Natural causes such as lightning, earthquake, humcane, tornado, fire, flooding, etc., or of the structure resulting in stresses on the sealant that exceed Dow Corning's published specifications for elongation andlor compression for the sealant, whether due to structural settlement, design error or construction error, or
- Disintegrationof the underlying substrates, or
- Mechanicaldamage to the sealant caused by individuals, tools or other outside agents, or
- Changes in the appearanceof the sealant from the accumulation of dirt or other contaminants deposited on the sealant from the atmosphere.
Remedies: In the event of a claim under this warranty, you must notify Dow Corning Corporation in writing within 30 days of the Occurrence of hefailure. Dow Corning's sob liability shall be to furnish sufficient silicone replacement materialto restore the integrity of the weatherseal. Any labor or other cost associated with the repairs are the responsibility of the owner. DOW CORNING SHALL NOT BE LIABLE FOR AND EXPRESSLY DISCLAIMS ANY LIABILITY FOR DAMAGE TO THE CONTENTS http://www.romcorp.com/ 6/7/00
Dow Coming 795 Structural Glazing & Weatherproofing Sealant - RO-AN Online Page 5 of 5 OF THE STRUCTURE OR FOR CONSEQUENTIAL OR INCIDENTAL DAMAGE, WHETHER IN CONTRACT OR IN TORT,INCLUDING NEGLIGENCE.
THIS WARRANTY IS IN LIEU OF ALL OTHER WRllTEN OR ORAL, EXPRESS OR IMPLIED WARRANTIES AND DOW CORNING SPECIFICALLY DISCLAIMS ANY IMPLIEDWARRANTY OF MERCHANTABILITY OR FITNESS FOR PURPOSE.
SfructuraiAdhesion Warranty: DOW CORNNG 795 silicone building sealant may be used as a structural adhesive under certain conditions, but Dow Corning Corporatron disclaims any general adhesion warranty. Dow Corning will issue project-specific Structural Adhesion Warranties on a case-by-case basis. No Structural Adhesion Warranty will be issued until Dow Corning has reviewed the pertinent building prints and specifications and has corn leted adhesion and compatibility testing of P
the various materials to be used with DOW CORNING 95 silicone building sealant. For details on how to obtain the StructuralWarranty, please contact your Dow Corning field representative.
- 8. MAINTENANCE No maintenance is needed. If sealant becomes damaged, replace dama ed portion. DOW CORNING B
795 silicone building sealant will adhere to cured silicone sealant with on y a preparatory solvent wipe to remove accumulated dirt
- 9. TECHNICAL SERWCES Complete technical information and literature are available frum Dow Cornin and authorized building sealant distributors. Faborato facilities and technical service are available om Dow Coming. For assistance, please call (517) 966000.7 B I O . FILING SYSTEMS SPEC-DATA431I Sweet's Catalogs Section 079OO/DOW
- General building
- Industrial construction & renovation
- Mechanicalengineering
- Civil engineering
- Engineeringcomprehensive Architectural specifications and complete technical literature are available upon request Contact Dow Corning for specific bulletins.
About RO-AN 1
Questions? Probfems? E-Mail us at sales@roancarv.com or call us at 800-922-1600 RO-AN will use reasonable efforts to indude accurate and up-to-date information, but makes no representation as to its accuracy.or completeness. Specifications and descfiptlons are based on mfg's data sheets.
0 Copvnqht 1997-2000 and Disdalmer, RO-AN Corporation. All Rights Resewed.
RO-AN Corporation Nlenomonee Falls. W 53052 - U.SA http://www.roa.ncorp.com/
LW U U L
Preservation Sealing Tape 48 1 FOW 1478 page 1 of 3
~~~~
Supercedes January 1,1999 Product Description A black pIastic film tape. Conforms to many irregular surfkces and has excellent stain resistance. Excelient performance as an industrial and military preservation tape. Effective for many outdoor applications in hot and cold weather over two years with quick, clean removal. Applicable Military Specification: MIL-T-22085 Amendment 3 Type II.
Product Construction Backing: Black polyethylene Adhesive: Special rubber-resin formulation Color: Black Standard Roll Len& 36 yds. (33m)
Standard Widths Available: 1, 1%,2 , 3 in. (25,38, 50,75 m)
Ixsrpical Physical Note: The following technical information and data should be considered representative or Properties typical only, and should not be used for specification purposes.
ASTM TEST METHOD Adhesion to Steel: 32 ozlin. width (35N/lOOmm) D-3330 Tensile Strength: 15 Ibs.lin. width (260 D-3759 WlOOmm)
Elongationat Break: 510% D3759 Backing Thickness: 7.7 mils (0.20mm) 0-3652 Total Tape Thickness: 9.8 mils (0.25mm) D-3652 Water Vapor 0.59 H~Ol100sq. i n n 4 hrs. D-3833 Transmission Rate: (49H20/.065~ q m124
. hE.)
General Information 1. Best results are obtained when applied to a clean, dry surface between 60-80°F (15-27OC).
- 2. Tape 481 is manufactured in an IS0 9002 registered plant to meet worldwide quality standards.
Shelf Life To obtain best performance, use this product within one year from date of manufacture and store under normal conditions of 7 0 9 (21OC) and 50% R.H. in the original carton.
3 W M PreservationSealingTape FUD#1478 481 page 2 of 3 Application Ideas I. Seals and protects various types of equipment to be stored by miIitary and industry.
- 2. Splicing and patching materials used by the construction indktry.
- 3. Can be certified t o meet certain low sulfur,low halogen, and l ~ heavy w metal requirements for aerospace and nuclear facility preservation.
Features FEATURES ADVANTAGES BENEFITS Polyethylene film backing Good conformabilityto many Provides method to help irregular surfaces protect equipment and vehicles during transportation and long-term storage Rubber resin adhesive Resistant to hot and cold Effective for most short, weather medium and long term preservation with quick, dean removal Excellent stain resistance to a variety of surfaces TechnicalInformation The technical informationand data, recommendations, and other statements provided are based on tests 01 experience which 3M believes to be reliable. but the accuracy or completeness of such information is not and Data guaranteed.
Product Use Please rememberthat many factors can affed the use and performance of a 3M product in a particular application.The materialsto be bonded with the prduct, the surfam preparation of thasematerials, the product setected for use, the mnditiom in which the product is used, and the time and environmental conditions in which W product is expected to perform are among the many factm that can affect the use and performam of a 3M product Given the variety of factors vlat can affectthe use and peffcimance of a 3M product, m e of which are uniquely within the use6 knowledge and control. it is essential that the user waIuate the 3M product to determine whether it is Rf for a particularpurpose and suitablefor the used method of application.
Warranty and The 3M product wilt be free from defects 'm material and manufacture for a period of one (1) year from the date of manufacture. 3M MAKES NO OTHER WARRANTIES OR CONDITIONS, INCLUDING, BUT NOT Limited Remedy LiMlTED TO, ANY IMPLED WARRANTY OF MERCHANTABLLTP, OR FmJESS FOR A PARTICULAR PURPOSE OR ANY lMPLlE0 WARRANTYARISING OUT OF A COURSE OF DEALING, CUSTOM, OR USAGE OF TRADE. User is responsfblefor determiningwhether the 3M product is fit for a particular purposeand suitable for use$ method of application. tfthe 3M product is defective within the warranty period stated above, your exclusive remedy and W sole obligationshall be, at 3M option. to replace or repair the 3M produd or refund the purchase price of the 3M produd
3 M T M presewation &dingTape mD## 1478
- 481 page 3 of 3 cmitation of Liability Except Were prohibited by law, 3M will nd be liable for any loss or damage aWng from the 3M product, whether direct, indlred,special,incjdental,or consequentiaf,regardless of the legal theory asserted, including contract, warranty, negligence, or strict IlabiW This Indusbial Tape and Specialties Divisionprodud was manufactured under a 3M quality system registered to IS0 9002 standards.
Industrial Tape and Specialties Division 3M Center, Building 220-7W-03 St.Paul, MN 55144-1000 USA t 800.722.5463 1 800.223.7427Fax On Demand www.3Mcom @3M1999 70-010444395
REPAWREPLACEMENT REVIEW SHEET Basis Document Number: Minor Modification 2000 - Of0 Replacement of Drvwell Seal and protective coating reDairs Elev. 238' Section A Originator I. The Work Package has been prepared incorporatingall applicable elements of the guidelines identified in Appendix A of this procedure and other applicable documents.
- 2. The following elements of the Appendix A Guidehe are determined not applicable to this activity:
welding procedures and associated NDE. hvdrostagik testing.
- 3. Package forwarded to Inservice Inspection Program Coordinator for review and approval.
-a?AAe 8kdw Originator ' date Section B - Inservice Inspection Program Coordinator The Work Package has been reviewed to ensure incorporation of all necessary ASME Section XI RepairReplacement requirements. Additional requirements or comments are identified below:
-,:!*- (I' Comments: .at %I, ib:
The RepaidReplacementLog has been updated to incorporate this work action.
The ANI has been notified of this impending work action.
Work Package returned to the Work Package Initiator for implementation.
E.J. Taintor I C Inservice Inspection Program Coordinator Date 2 .
... .. I VYAPF 0070.01 (Sample)
AP 0070 Rev. 1 Page I of 1
From: Grimes, Dave Sent: Tuesday, May 01,200111:Ol AM To: Humbert, Dennis (C) cc: Taintor, Ed; McKenney, Pat; Goodwin, Scott; Coffman, Darryl (C)
Subject:
RE: Inspection of Drywell Concrete Floor Pursuant to the request to inspect the concrete adjacent to the drywell shell, MSDE and Projects (EdTaintor) conducted an inspection on 5/1/01at 0800 hrs. Some randomly tocated radial cracks were observed which extended about 8 inches inward. These are considered to be normal shrinkage cracks which occured after initial placement of the concrete. These are sound, tight cracks without structural significance.
The general floor area within a foot of the seal location is in good condition which is consistent with the previous maintanance rule walkdown. Plant structures inclusive of concrete are periodically inspected and controlled in accordance with Maintenance Rule (10CFR60.65) and VY PP-7030. There are no signs of efflorescence, no degradation of the concrete surface and no signs of structural cracking or rust staining. Based on these observations, and review of the previous Maintenence Rule Inspection Report, MSDE finds that the condition of the slab, adjacent to the seal location is satisfactory.
As stated in the Scoping Memo (VYM 2000/016)the intent of the inspection was to examine the area adjacent to the seal for open cracks to ensure that moisture will not wick into the seal area. This memo should be within the job order file and it is suggested that it be reviewed, as it provides a comprehensive overview of the entire project and its intent.
There is one area near the A recirc pump where the crack runs parallel to the shell for about 12 inches, adjacent to the seal keyway. The cause of this crack is unknown, but is consistent with impact damage. The possibility of spalling the area during paint removal activities is recognized. The accepted solution if required is contact the Maint Rule Coordinator and to repair the spalled area with Embeco 885 grout.
Please feel free to call on us again for questions or concerns regarding this project.
Original Message-----
From: Humbert, Dennis (C)
Sent- Tuesday, May 01, 200t 5:20 AM TO: Grimes, Dave cc: Tointor, Ed; McKenney, Pat; Goodwin, Scott; Coffman, Darryl (C)
Subject:
Inspection of Drywell Concrete Floor This message is to document the VYlCE inspection of the concrete floor in the Drywell at El.238 as required by Minor Mod 00-010, D w e l l Moisture Barrier Replacement, step 7.3. i made the inspection this shift and found cracks in the existing coating on the floor that run from the edge of the floor in a radial direction towards the center of the drywell.
Because the existing coating is in place on the concrete floor, the extent of cracking in the concrete {if any) is indeterminate. The scope of this Minor Mod does not include removal of the existing coating on the concrete floor to inspect the concrete.
- 1 Disposition of this condition, including inspection by you is requested. Once lead removal begins this area will require lead worker training to perform this inspection, so if you have not received this training, inspection and disposition is required by Wednesday May 2nd. ER 20010860 was written to document this condition.
1
Vagtol, Bob (C From: Taintor, Ed Sent: Wednesday, May 09,2001 1:06 PM To: Vantol, Bob (C)
Subject:
FW:Drywell Seal Surface Prep
Subject:
Drywell Seal Surface Prep The required prep to an SP-10 for the area below the seal (eg, below the overall concrete urface elevation and within the notchichampheradjacent to the steel liner) was achieved by the night crew using a rust grade D VIS-1. Therefore, this issue has been resolved for this project since the entire surface has now been determinedto meet the "Near W hite Blast Cleaning" criteria.
The profile of the rust grade D area has a maximum profile of 5.5 mils which is above the specified limit of 1-3 mils. The majority of this area is contained within the seal and will not be exposed to the environment. This area also receives an initial coat of CZ-11 which provides cathodic protection.
It is important that the high peaks within the rust grade D areas receive a complete coat of CZ-11.
These areas will need an increased mil thickness to provide coverage of the steel. Therefore the maximum mil thickness of the CZ-11 in these areas is 6 mils DFT the maximum allowed per Carboline. Remember, excess millage leads to mudcracking, which will cause rework.
Also, the general criteria for the rust grade C areas is still 3 mils D n , recognizingthat some overspray from D to C grades will be inevitable.
Please discuss these changes with QC and the painters to resolve any concerns. Notify me when the mmod is ready for signatures.
I trust that this resolves the open items to date. l e t me know if we need any further refinements.
David
. JOB SAFETY ANALYSIS JSA No. 22.25 copy Rev. I DRYWELL MOiSTURE BARRIER REPAIR WO# 00-01840-000 M M # 2000-010 Purpose The objective of this project is to replace the drywell to containment shell floor seal at elevation 238' to limit moisture from entering into the space between the shelf and the reinforced concrete floor. The Vermont Yankee drywell shelf has a limited corrosion allowance for the steel shell and therefore maintaining a protective coating and effective seal in this region is required.
Discussion (Attach JSA Check Sheet)
The first phase of the project is lead paint removal and surface prep of the drywell liner plate. This will involve prepping a 6" wide band around the perimeter of t h e 238' level of the drywel!. Existing lead paint will be removed and the surface prepped using a vacuum blasting system that has been effectively demonstrated at the NPS fab shop. These units operate as closed recycling, abrasive blasting systems. Containment occurs at the point of blasting, with the blasthead creating a "containment" that is linked to a vacuum return. Most of the abrasive and dust are collected by this unit. An additional HEPA hose will be held in close proximity to he blasthead to ensure all dust and grit are collected and the lead paint dust does not become airborne. Rotary peening tools and/or needle guns attached to a HEPA vacuum may also be used in some areas. The additional HEPA hose will be used here as well.
The second phase of the project is to apply a coat of zinc primer to the 6" wide band around the perimeter of the 238' level of the drywell that was prepped in the previous step. The surface area to be primed (70 ft.') is roughly equal to both sides of a 4' x 8' sheet of plywood. Application will be by spraying.
Solvent vapors from the primer are heavier than air, so they will primarily remain in the lower level of the drywell, where exhaust ventilation will be established. Cure time is one hour at 50% humidity, slightly longer at less than 50% humidity. Application of the pri-merwill occur during the night shift. The plan is to apply the primer as close as possible to the beginning of the night shift and allow curing overnight when there is little activity on the 238 level of the drywell.
i I Ventilation will be established in one of two manners. The first option will utiIizkge installed plant ventilation equipment. Vacuum breakers VI 6-19A and V?6-19D wil[ be fixed in the open position, creating a flow path from the Drywelf to the Torus. RTF-5 will be aligned to the Torus via vabe V36-19-7. This will establish a ventilation flow path from the Drywell to the Torus and exhausting to the Reactor Building ventilation system through RTF-5. The second option for ventifafionwif/ ufilize carbon filter elements in fhe dedicated 5k HEPA units. This will provide a localized ventilation pafh with increased air flow, Drywell ventilation will remain operable during either of thiese activityjes .
Welding and burning activities will be controlled during painting. This wilI be based on air samples by Safety Standard 102,R l Attachment 5.3 Page 1 of 3
RP and evaluations by the Shift Engineer. The air on both the 238 and 252 levels will be monitored closely t o ensure the vapors are being exhausted properly. Calculations indicate that exposure levels for this application process will be less than 50% of the allowable exposure limits stated in the MSDS for this material. Continuous communication with the plant is planned to reinforce that slight odors are to be expected but are not hazardous based on monitoring and by limits set by MSDS and vendor information.
Dow Coming 795 Silicone Building Sealant wit1 then be applied to the enire perimeter of the lower level of the drywell where the concrete floor contacts the steel shell. The length of this joint is 740 ft.
and the size of the groove to be filled with sealant {after grouting) is 1/21) deep x I1/2n wide. The total voIume of sealant that will be used to fill the groove is a little more than 5 gallons. The exposed surface area of the top of the groove is about 18 sq. fl., or about 1.0% of the surface area of the 238 elevation floor.
The sealant evolves methanol while curing. Adequate ventilation shall be provided to prevent methanol vapors from exceeding 200 ppm. Evaluation of this application process has determined that this process will generate less than 60% of the allowable exposure limits defined by the MSDS.
To further ensure personnel safety, atmospheric monitoring will be conducted during the application process and the initial curing.phase. The same ventilation path described previously will be utilized.
Drywell ventilation will remain operable during this activity.
The sealant will be applied on night shift and will be allowed to cure overnight. 70% of the solvent is given off during initial curing (about 6 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />). Based on the amount of sealant required, it is anticipated that there will not be any adverse effects from these vapors after the initial overnight cure.
Welding and burning activities wit1 be prohibited on the 238 elevation during the application of the sealant and the first night of curing.
The MSDS for the product describes it as having a slight odor. This implies that there should not be any annoyance factor associated with the product. Continuous communication with the plant is planned to reinforce that slight odors are to be expected but are not hazardous based on monitoring and by limits set by MSDS and vendor information.
The final phase of the project is to apply a coat of epoxy topcoat to the 6 wide band around the perimeter of the 238 IeveI of the dryweil that was primered in phase 2 (about 70 ft.).
Solvent vapors from the epoxy topcoat are heavier than air, so they will primarily remain in the lower level of the drywell, where exhaust ventilation has already been established. Cure time is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at 50% humidity and 75 F, slightly longer at lower temperatures. The plan is to apply the epoxy topcoat as close as possible to the beginning of the night shift and allow curing overnight when there is little activity on the 238 level ofthe drywell. Welding and burning activities will be controlled during painting.
The air on both the 238 and 252 levels will be monitored closely to ensure the vapors are being exhausted properly, Drywell ventilation will remain operable during this activity. Continuous communication with the plant is planned to reinforce that slight odors are to be expected but are not hazardous based on monitoring and by limits set by MSDS and vendor information.
Pers o nne1 Protection (Attach Hazard Identification Worksheet)
PPE will be used in accordance with the attached Hazard Identification Table.
Safety Standard 102, R1 Attachment 5.1 Page 2 of 3
~~ -
Precautions 4 Paint will be treated as lead paint unless proven othentvise.
0 Lead awareness training & baseline blood tests will be offered to all personnel who will be entering the 238 elevation of the drywell.
0 Remi Morrissette will handle lead awareness training notification via e-mail.
0 (2) 5K HEPA units (each is double the capacity of a normal HEPA unit) will be used during lead paint removal.
0 The needle guns and rotopeens are very noisy. Noise levels will be monitored 2nd double hearing protection will be used as required.
0 RP will monitor air quality throughout the various operations.
0 Paint and methanol fumes will be exhausted utilizing installed plant ventilation equipment as previously described. This equipment will provide approximately 12 air changes per hour or Iair change every 5 minutes.
e Should the optional ventilation path o f the charcoa1,fiIiersbe utilized, a slight increase in the air change rafe wifl be experienced. The 5k HEPA units are each rated at 5,000 scfm, resulting in a combined air flow rate of f0,OOO scfrn.
This evolution will involve 4he potential for cumulative stress injuries. The activities will require workers to be positioned on their knees and/or bent over at the waist to access work areas. The Pre-job brief for the project will include cautions regarding these potentia! hazards, with recommendations for preventive actions.
- 1. To ensure protection from the effectsof heat stress, coolvesfs will be available.
Prepared By: Kerry Bassett I 02-05-01 Revised By: i/&$ E.J. Taintor -I 05-01-01 Dept. Head:
(Or Designee)
Safety Coordinator:
(0r Designee)
Additional Signature ifrequired by fhe Safety Coordinator or Designee (MA and inifiaiedby the Safefy Coordinator if no f
Plant Manage Safety Standard 102, R-l Attachment 5.I Page 3 of 3
WORK ACTIVITY HAZARD IDENTIFICATION TABLE I
Work Activity Phase Safety Hazard Hazard Solution PPE Remarks 1 Lead Paint AP 0549 As required by Respirators as reqd by RP Paint Removal 1 AP0549 1 (2) dedicated 5K HEPA units I
~
I Potential Airborne Vacuum Blasters No additional Vacuum blasters are self Surface Prep of Liner Plate required contained at point of blasting.
Dust (2) 5K HEPA units HEPA units provide will remove any dust that escapes
. I Noise Double hearing Hearing Based on measured noise Surface Prep of Liner Plate protection protection levels from needle guns
~
2 Paint Fumes RxBldg ventilation as Ventilation will provide (1)air Application of Zinc Primer aligned from the reqd by RP change approximately every 5 Drywell through the minutes.
Torus and exiting through RTF-5.
Inhalation of Dust Protect eyes and skin Dust masks Standard protective clothing, Mixingllnstallationof Embeco from contact. Prevent Eye protection gloves, eye protection 885 Grout EyelSkfn Contact inhalation of dust. Proper cIothing RxBIdg ventilation Respirators as Ventilation will provide (1) air Application of Duw Corning 795 aligned from the reqd by RP change approximately every 5 SiIIcone Building Sealant 4 Methanol Fumes Drywetl through the minutes.
Torus and exiting through RTF-5.
RxBIdg ventilation Respirators as Ventilation will provide (q) air Application of Carboguard 890 aligned from the reqd by RP change approximately every 5 Paint Fumes Drywell through the minutes.
Torus and exiting I
through RTF-5.
I I Safety Standard 402, R1 Attachment 5.3
. JSA CHECK SHEET J08 TITLE/DESCRIPTlON: DryweIl Moisture Barrier Repair LOCATION/DEPT: Drywell, 238' elev. Project Engineering PREPARED BY: Kerry L. Bassett DATE: 5-Feb-01 ARE THE FOLLOWING CONDITIONS PRESENT? Yes No Comments (PPE)
Is there a need to establish special housekeeping requirements?
Heavy lifting? [X ] [ ] Chainfalls, slings Heavy pushing or pulling? 1 V I Twisting and/or,bendi.ng? I 1 [XI Trips over objects? r 1 [XI Falls to the same or lower level? l. I [XI Finger, hand, or body parts to be caught in or c 3 tx1 between objects?
Condition to cause abrasion, laceration or t I [XI puncture wounds?
To be struck by or against?
Exposure to energized eIectrical components?
Voltage?
Exposure to extremely hot surfaces or systems; i.e., high pressure steam or hot water?
Is the availability ofimmediate treatment for injuries necessary? -
Exposure to high pressure air or gas (>IO0 psi)?
Objectsltools falling on people?
Extreme temperatures for 2 20 minutes Temp F? (~25°Fand >lOO°F).
Confined space? [ ] [ X I Permit- Non-permit-.
h
\
JSA Check Sheet (Cont'd)
- 17) Are chemicals involved? If yes, circle type below: [XI s I
-Noxious odors .-
-Toxic
-Reactive
-Flammable
- 18) Personaf protection requirements?
-Gloves, hand cream Standard Equipment
-Respirators Determined by RP
-Eye protection " Standard Equipment
-Face protection Standard Equipment
-Hearing protection Possibly need double
-Safety shoes Standard Equipment
-Head coverings, i.e., hard hat Standard Equipment
-Ties, kerchiefs
-Long sleeves Standard Equipment
-Aprons Additional Comments:
MEMORANDUM VERMONT YANX(EE MARLBORUUGH -
To J. H. Callaghan Date June 22,2001 Group# VYM 2000/043 From D.F.Grimes W.O.#
~
Subject D w e l l Protective Coating Oualification I.MS.#
File # -
References (1) EPRI,TR-109937, Guideline on Nuclear Safety Related Coatings Final Report, April 1998 (2) BVY 98-147, Response to Generic Letter 98-04, November 12,1998 (3) Carboline Level I Nuclear Coating System Fax dated March 30,2000 (4)VYM 2000/016 Drywell Sed Project Scope dated March 2,2000 (5) Minor Modification 2000-010, Drywell Seal (6) Technical Evaluation of New Coating System Suppression Chamber and Vent Header, Rev. 2, KTA-Tator, Inc. dated April 30,1998 (EDCR 97-423)
(7) Containment System Response Analysis. Rev 0 (draft) GE-NE-A22-00086-02-0 1, December 1999 (8) Amendment No. 22 to License AppIication, February 25,1971 (9) E-mail D.F. Grimes to K. L. Bassett Protective Coatings May 9,2000
Background
In the Response to Generic Letter 98-04 (reference 2) Vermont Yankee states that Service Level 1 coatings used inside primary containment wilI meet the intent of ANSI N101.2, N101.4 and Reg Guide 1.54. Proposed revision 1 to Reg Guide 1.54 issued as Draft Reg Guide DG-1076 endorses the use of ASTM D-5144-97 (and others) for guidance on practice and programs for protective coatings used within nucIear power plants. This draft guidance was issued because the referenced ANSI Standards were withdrawn in 1988 and the responsibility was transferred to the American Society for Testing and Materials (ASTM).
Draft Reg Guide DG-1076endorses the EPRI Guideline on Nuclear Safety Related Coatings (reference 1) for guidance on the selection, application and maintenance of safety related components. Vermont Yankee committed to evaluate the EPRI guideline and to implement, as 1
appropriate, into our procedures for Service Level 1coatings used within primary containment (reference 2). To date, Vermont Yankee has not developed any plant-specific Service Level 1 coatings procedures. Therefore, in order to support the drywell seal project, Service Level 1 coating procedures are required.
The Drywell Seal Project (reference 4) provides for localized protective coating replacement at elevation 238 within the drywell. The coating in this area has been determined to be Nuclear Service Level 1, and based on current licensing commitments, needs to be installed in accordance with approved plant procedures. The current state of protective coating procedural development for Vermont Yankee is in the planning stages. In order to implement the project scope as defined, arid in a timely manner, necessitates the development of a project specific coating plan in accordance with the requisite commitments made relative to Generic Letter 98-04.
The EPRI document accepted as guidance for the installation of protective coatings has been used for the development of the Coating Inspection Plan and qualification of the protective coating system. This plan and qualification ensures that the appIied coatings will meet the intent of the referenced documentation. The coating installation will be implemented via Mmor Modification 2000-10 during the next refueling outage.
A three phase development of the project specific coating plan is identified on the engineering schedule. The first phase is the documentation of the Structural Steel Painting Council (SSPC) and ASTM criteria as identified in EPRI Guideline. This coating inspection plan has been completed. The second phase involves the identification of the recommended Service Level 1 coating system to be utilized and verification of the coating qualification in accordance with the EPRI guidelines. The third and final phase is the review of existing NPS procedures and possibly the development of procedures specific to this project. As stated in the scope memo (reference 4) Projects Engineering is responsible for the development of the installation instructions, or more specifically, submittal of NPS coating procedures for engineering review and comment.
Based on Mechanical / Structural reviews performed to date, the NPS personnel qualification procedure, PP- 1001is workable contingent upon satisfactory resolution of comments submitted to NPS. The NPS painting and protective coating appIication procedure, PP-0958P, is not acceptable for the project. The procedure in its current form is limited to maintenance, small touch-ups and repairs. The boiler plate of references covers a multitude of surface preparation techniques which are not employed within the actual body of the implementation section of the procedure. Also, there is an existing conflict within the procedure for surface preparation when compared to SSPC requirements. Several of the boiler plate items are used in the surface preparation and application of the selected coating system and need to be procedurally addressed. This procedure will either need a significant rework to meet SSPC requirements or will need to be broken up into multiple procedures so as not to address all aspects of surface preparation, application and coating specification for the drywell seal project with a single procedure (reference 9).
2
A coating system that satisfies design requirements in terms of performance based testing and compatability with the existing substrate is an inorganic zinc primer with an epoxy topcoat.
The inorganic zinc provides excellent corrosion resistance, weathers well and is often used in tanks.Inorganic zinc was the origind coating used in containment and has a well proven performance record. The use of this primer, with the recommended surface preparation will provide the required corrosion protection to this area of the drywell. This will satisfy one of the primary objectives of the project, mitigation of the observed corrosion at the 238 in the drywell interior region. Inorganic zinc provides a sacrificial anodic coating which assures that coating degradation in the future will not be coupled with fast corrosion of the substrate due to the inhibitor properties of the zinc. The epoxy topcoat will provide excellent abrasion resistance, decontarninability, and is a surface tolerant coating. The epoxy will also prevent damage to the zinc primer. Carboline products, Carbo Zinc 11 SG and 890 epoxy has been selected as the protective coating system for this project. These products have been previously qualified and employed at Vermont Yankee for the Torus Painting Project, EDCR 97-423.
The qualification
/-----
A=
The standards used to define DBA N101.2 and ASTM D3911. The s t a n c i a r e d e temperature, pressure, radiation and duration. ASTM D3911 requires that samples be irradiated per ASTM D4082 at an integrated dose rate of lxlOE9 rads at a rate of 1MRlhr. No checking, cracking, peeIing, flaking, delamination or blistering is permitted. The Carboline system has been qualified to both of these standards and has been documented as qualified for DBA conditions.
Technical Evaluation of New Coating System Suppression Chamber and Vent Header, Rev. 2 (reference 6),evaluates and presents the results of DBA testing for Carboline products. Carbo Zinc 11, inorganic zinc primer ,applied at a dry film thickness of 2.5 to 6.0mils, and exposed to test conditions of 340 degrees F, 70 psig and pre-irradiated to 1E9 rads, produced no coating defects or laminations. These conditions exceed that of a loss-of-coolant &OCA) event. A preliminary GE report on Containment System Response Analysis (reference 7) has indicated that the maximum post-accident drywell temperature is currently 336.1 degrees, however the peak drywell shell temperature is 272.1 degrees. The drywell shell maximum design temperature is 281 degrees F (reference 7, reference 8). The FSAR,figure 14.6-5 rev 2, identifies maximum LOCA pressure for the drywell as 30 psig, significantly less than the test pressure. VY DES Memo REG 98-029 identifies the radiation exposure for 40 years plus one hour of accident operation at 6E7rads. This document also identifies the radiation exposure for 40 years of operation plus one year of accident operation at 7E8 rads. The Carbo Zinc 11 primer is documented to remain intact at radiation levels greater than those expected for a Vermont Yankee design base accident.
Carboline 890 epoxy, applied over a pre-existing Carbo Zinc 11 primer has undergone DBA testing with a pre-irradiated dose of 2E8 rads. Test temperatures were 320 degrees, 48 degrees less than the postulated peak drywell shell temperature. Test pressure was 50 psig. Surface preparation for the test sample was SSPC-SP-2, Hand Tool Cleaning, which is considerably less stringent than the SSPC-SP-6, Commercial Blast Cleaning, specified for the 238 drywell area. This test was performed to evaluate the integrity of Carboline 890 as a maintenance 3
repair to a previously painted surface with marginal surface preparation. The test documents that the coating did not exhibit defects or delaminations.
The Carboline Level 1Nuclear Coating System test data documents that the system, proposed for use in Vermont Yankees drywell, when subjected to even higher dose rates (1E9), meets the requirements of ANSI N 101.2- 1972 and ASTM D 391 1.Temperature levels for the test were 28 degrees higher than expected maximum post-accident drywen shell temperature of 272 degrees. The test temperatures indicated on the test report were at 300 degrees F for the eleven day duration with a pressure of 48 psig. Carbo Zinc 11 has undergone stand alone testing at a temperature of 340 degrees with satisfactory results when applied as..rtmaintenance repair to a poorly profled surface. Elcometer test results for each of the components shows that the inorganic zinc coating has a lower tensile strength. Bond failure of the zinc is not expected since it has been tested to conditions exceeding that of the DBA conditions. Topcoat failure of the epoxy is also not expected since it has a higher tensile strength. Therefore the probability of a bond failure between the primer and substrate and the primer and the topcoat is not expected based on the test data.
ASTM D5144,The Standard Guide for Use of Protective Coatings Standards in Nuclear Power Plants, is endorsed by the EPRI Guidelines. Physical properties of adhesion per ASTM D4541, decontamination per ASTM D 4256, abrasion resistance per ASTM D4060,chemical resistance per ASTM D3912 and flame spread per ASTM E84 have been verified as acceptable.
ASTM D 4541, the Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers, provides a method of determining the resistance to a load perpendicular to the coated surface (tensile strength). It determines if the surface will remain in tact at a prescribed force to assess the acceptability of the coating system. The Carboline system is acceptable at 350 psi.
ASTM D 4256, the Standard Test Method for Determination of Decontaminability of Coatings Used in Light-Water Nuclear Power Plants, provides a method for determining the ease of cleaning the coating after a 7 day immersion in a radionuclide soIution. The significance of this test is that it provides a measure of the ease of decontaminating the coated surface. This can result in a reduction in the level of contamination and mitigate exposure to pIant personnel. This test is applicable to the Carboline 890 epoxy topcoat only which exhibited a 99.96%removal. This equates to a decontamination factor (DF)of 250.
ASTM D 4060, Abrasion Resistance of Organic Coatings by the Taber Abraser, qualifies the coating by subjecting it to a rotating motion under abrasive, weighted wheels. Abrasion resistance is calculated as a weight loss of the sample relative to the number of cycles. The Carboline 890 was subjected to 1000 cycles, under lOOOg with a CS-17 wheel. The results of this test is acceptable at 85 mg weight Ioss.
ASTM D 3912, Chemical Resistance of Coatings Used in Light-Water Nuclear Power Plants, is a limited test, as it does not test for a full range of potential chemical exposures. This test was performed for a simulated exposure to a chemical splash, where the solution may evaporate in place. The test is performed by immersing a sample in general service and decontamination solutions for a period of five days and evaluating the results over time.The 4
samples are evaluated for blistering, delamination and peeling. The Carboline system produced acceptable results except for exposure to nitric acid and potassium permanganate.
Neither of these reagents would be expected to be used for any purpose within containment since they are typically laboratory reagents used for metal digestion and as a titrating oxidant.
Therefore, the results of this test are acceptable.
ASTM E 84,Surface burning Characteristics of Building Materials, provides a comparative measure of surface flame spread to that of red oak (=loo)to that of inorganic reinforced cement board (= This (isIa) ,
distance / time based standard. The index for the Carboline system is reported as less than 25. This is the acceptable minimum vaIue as defined by NFPA standards for non-combustible. Individually, the Carbo Zinc has a documented flame spread index of 6. The epoxy topcoat has a flame spread index of 5.
Conclusion The Carboline Level 1 Nuclear Coating System, comprised of Carbo Zinc 11 SG primer and a Carboline 890 epoxy topcoat is an acceptable protective coating for use within the Vermont Yankee drywell steel substrate. This system satisfies the requirements of ASTM D 5144, which supercedes the ANSI standards in effect at the time of original construction. The EPRI Guideline, TR- 109937,has been reviewed and utilized for this application, and satisfies the current Vermont Yankee licensing basis.
The Coating Inspection Plan has been drafted in accordance with the SSPC guidelines contained in SSPC Publication #91-12, Steel Structures Painting Manuals, Volumes 1 and 2, Seventh Edition, and SSPC 97-07, The Inspection of Coatings and Linings. This plan will be utilized as part of Minor Modification 2000-010which implements the coating portion of the drywell seal project.
Procedural development for the application of the coatings and personnel qualification of the coating inspection personnel is currently under development. The combination of an approved Level 1 Nuclear Coating System, Inspection Plan, and qualification of inspection and application personnel will ensure that Vermont Yankee is in compliance with the applicable references and standards as was committed to in BVY 98-147.
David F. Grimes Sr. Engineer Mechanical Structural Dept.
Scott D. Goodwin Supervisor Mechanical Structural Dept, 5
C K. Bassett D. C.Girroir P.B. Corbett 6
TM/MM CONTROL SHEET
[ 1 TM [ X I MM (Attach VYAPF 0020.08)
DESCRIPTION Print clearly name of Originator/Date: David F. Grimes 8/29/00 NO: 2000-010 TM intended to be replaced by a permanent Design Change? YES [ ]
NO [ 1 NA [ X I (If yes, attach marked up FSAR pages if applicable).
ification: (Mechanical/Electrical Modification, Describe how modification changes component/system operation: This modification will have no effect on comonent / system operations.
The n e w seal is similar in form, f i t and function to the oriainal desian.
System Engineering Group input obtained and inco ted in design.
Reason for Change:
Describe design requirements (wire size, pipe material, etc.):
Embecco 885 Grout - fill f o r existins kevwav, polvethvlene &=ti- ;1,32+cm%ml bond breaker, Dow
+we , 3r)*w3(
JO FILE Rp~~
p 52000 WAPF 0020.03 (Sample)
AP 0020 Rev. 21 Page 1 of 8 RT No. 08.L03.207
TM/MM CONTROL SHEET (Continued)
Corninu 7 9 5 buildincr sealant - silicone based elastomer, Carboline inoruanic zinc primer, Carbo Zinc 11 SG - primer coat, Carboline 890 - Epoxy top coat. All materials to be Safetv Class 2.
Describe any potential hazard presented by the modification (e.g.,
fire, flooding, rad consequences, etc.) and provide a detailed assessment if appropriate (UND9302TPl): Methanol vabors are evolved durincr the sealant curincr process. Adequate ventilation needs to be nrovided durinu the application and curina period (14 days m a x ) .Paint vanors addressed per manufacturers- instructions.
Cleanins solvent vapors will also be emitted.
Indicate the mode(s) of operation for which 'the TM is acceptable/applicable.
Shutdown Refuel Startup RUJl-Procedures affected: (TMs and MMs) 'None Recommendations f o r new PMs or changes to existing PMs:
Other Plant documents and programs affected (MMs only) (drawings, DBD, FSARs, VYEMs, Maintenance Rule, EQ, Appendix R, Setpoint Controls, --Act etc.} :
5920-233 - Note added to desimate seal detail dws and minor mod reference
? Add seal detail to I S 1 inmection prouram (Note: Reference calculation f o r ASME XI IWE thinnins and screenins criteria is WC-2043).
For T M s intended to be replaced by Design Chan obtain new equipment EMPAC asset IDS and initiate all safety classifications worksheets per the W S C M .
For MMs, initiate Drawing Change Notification forms in accordance with AP 6802. > F a d / e/zs/oc Originator date' Control Room/TSC Drawings affected ( s e e Appendix A of DP 0029):
Review outstanding TMs/MMs and the Design Change List to ensure the VYAPF 0020.03 (Sample)
JQ Flb AP 0020 Rev. 21 Page 2 of 8 RT No. 08.L03.207
TM/MM CONTROL SHEET (Continued) cumulative affect of other TMs are factored into the TM/MM.
Comments: This modification will have no affects on pendina desiqn chanses or temporaw modifications.
aF/&4--w / r9..27/6&
Originator ' Date All applicable of Appendix "A" have been considered and addressed.
cQ/z9/00 Originator / D&e Appendix R Review completed (attach WAPF 0020.09) z3Originator f4- N
/ 8/!z9/00
' D6te Discuss additional training requirements with the affected Dept.
Head(s) . Training Required? YES E ] NO [XI Affected Dept.(s) Project Ensheerinor - IS1 SAFETY CLASSIFICATION OF SYSTEMS, STRUCTURES AND COMPONl3NTS
[ ] SC-1 [XI SC-2 [ J SC-3 [ 3 SCE [ I All SSCS INSTALLATION/RESTORATION REQUIREMENTS:
Prerequisites: (RWP's, Housekeepi e Permit, etc.):
Verify installation began withi approval. 4Q* days after Shift Supervisor RWP, Housekeepinq, Individual Oualification with approved Daintinq procedures. Craft manaqement and craft shall be familiar with W safetv manual and SSPC FA Guide 3 : A G u i d e to S a f e t y in P a i n t ARplication. (Relative to the use of airless sprayers). Discuss ALARA ~ l m swith Radiation Protection. ANI notification is rewired prior to the start of work. Chemistrv aDDroval of solvents, paints and sealants.
Precautions: Trainincr / Personnel a-ualifications for abrasive blast, Rotopeen and needle qun . Adeauate ventilation durins coatinqs aoDlications and seal installation. Ensure Operations is aware of paintina and sealant activities and precautions with respect to Standby Gas Treatment. Lead paint may be encountered in seal area.
VYAPF 0020.03 AP 0020 Rev. 21 Page 3 of 8 DI #99-332
TM/MM CONTROL SHEET (Continued)
Installation Instructions: The concrete floor within 1 foot of the for further details.
-Sf sm* 481 74PE. nd;ll$i, t/
Installation Verification/Testing Requirements: Inspect seal to for preservice inpections of seal and protective coatincxs in accordance with PP 7024, IWE Inservice InsDection Prosram.
Restoration Instructions (TM o n l y ) :
Restoration Verification/Testing R Reviewed Bv
. /
ImplemeZing &&I . Head ' Date MM Screening attached (VYAPF 0020.08) [XI YES [ ] NA (TM only) 50.59 (a)(1) Screening Evaluation completed and attached [XI YES Safety Evaluation Required [ 3 YES [XI NO Describe when TM will be restored:
W A P F 0020.03 AP 0020 R e v . 21 Page 4 of 8 DI #99-332
TM/MM CONTROL SHEET (Continued)
Approximate date TM will be closed: Nh
/
TM/MM details/saety c review/eval performed: A / fi233-d drigixatingyept. Head Date gineering [XI.
Fire Protection [X EQ[I-Operating Procedures affected, identified [ 1 YES [XI NO Others identified:
Procedures requiring revision prior to TM or MM implementation/
restoration:
/
Additional operational controls necessary:
N\h Installation:
Restoration:
Reviewed By:
WAPF 0020.03 AP 0020 Rev. 21 Page 5 of 8
TM/MM CONTROL SHEET (Continued)
QSS REVIEW: (For Safety Related MMs Only)
/ 9//3/H Date
I---------
APPROVAL TM/MM Approved By: .A #h / 9.f3-m OrigEating Dept. Head Date PORC Review at Meeting # : a r f-a i tn+dtd. Date: 9//3/@
Plant Manager Approval: Date:
List location of all TM tags: -U/H For MMs JO f i l e obtained; JO # zooe> - 0060 perbis&r or Designee Review Date Installation Authorized BW.
VYAPF 0020.03 AP 0020 Rev. 21 Page 6 of 8
TM/MM CONTROL SHEET (Continued)
Shift Supervisor Date Copy of TM/MM filed in Control Room book with annotation that it is a copy and the original is in the field for installation.
ImpYementi& Dept.
/ 4b/01 Dht6 For TM Restoration:
Restoration Authorization: (Plant Conditions compatible with restoration, verify operating procedures revised and ready for issuance or controls in place to ensure procedures are revised and issued prior to operation) b/&- /
Shift Supervisor Date TM Restoration complete, and verified: (tags removed, testing complete, control sheets .03, .04, and .05 completed, notify Shift Supervisor)
Notify the PEAA to:
- 1. remove copies of the TM from the Dendim chanse f i l e s
- 2. sign all Control Room drawings that were stamped as a result of the TM.
J Bek VYAPF 0020.03 AP 0020 Rev. 21 Page 7 of 8
TM/MM CONTROL SHEET (Continued) mlr Restoration Complete and Post Retest Performed: (Verify a11 caution
'tags, lineup instructions, temp labels removed, and notify Implementation Dept. that post restoration testing is complete, and forward the completed TM to the pEM). I N14, /
Shift &pervisor Dat'e I
Shift Supervisor Date Remove the copy of the MM from the Control Room MM Log Book, forward I completed original MM to the Implementing Department f o r JO closeout.
/
Implementing Department Date NOTE Final MM drawing revisions will be distributed and filed in the Control Room and TSC (as e) via DP 0029, "Control Room and TSC ontrol Records".
W A P F 0020.03 AP 0020 Rev. 21 Page 8 of 8
APPENDIX R REVIEW (INS9526-01, ER.960433-01)
MM/TM No. : MM 2000-010
Title:
D w e l l Seal Plant System Affected: Primam C O n t a i I U n e n t Safety Class: 2 Cognizant: D a v i d F. Grimes Appendix R Review Items to be Considered:
[If any question is answered YES, additional Appendix R specialist review is required.
However, if the document is a TM which will be implemented and restored while the plant is in cold shutdown during a single outage, Appendix R specialist review is not required.]
- 1. Does change involve electrical components or wiring? YES / XQ
- 2. Does change involve Appendix R S Shutdown components, including any support system components [Refer to SSCA A 1 and E2 for listings]? YES / No
- 3. Will change impact any App 3!$n? i!@or visibility therefrom?
lighting YES / No
- 4. Will change impact any Appendix R fire barrier, CFZ, or Suppression zone? YES /
- 5. Will change require revision/update of CWDs? (List below) YES /
6.
- 6. Will change require revision/update of CCLs? (List below) YES /
- 7. Does change impact an Appendix R Safe Shutdown Strategy? YES / XQ
- 8. Will change require an update/modification of Appendix R documentation (including cable list database)? YES / No Review Comments:
/
iewer (if applicable) Date WAPF 0020.09 (Sample)
AP 0020 Rev. 21 Page 1 of 1
MINOR MODIFICATION (MM) SCREENING EVALUATION Review the following questions to determine if a proposed change can be accomplished using a Minor Modification. A "YES" answer to any of the following questions indicates that a Minor Modification cannot be used.
- 1. Does the change have any programmatic implications (EQ, Appendix R, Appendix J, ISI, IST, NPDES, Setpoint Control, 1 etc.) that would indicate that additional Design Control (Desicrn/I&T) is nee This area is currently Part of IS1 YES
- 2. Does the cha e changes to multiple SSC and is the change co YES -
NO
- 3. Does the change require extensive calculations or analysis to justify that would indicate that additional desim control (Desisn/I&T) is needed? YES -
NO I
- 4. Are there any other attributes (e.g., high cost, multiple contractors, scheduling constraints, etc.)
associated with the change that would warrant application of additional design or administrative controls on the change? YES NO Screening Perfo m e d by* . 3 f G @4/m
- Review will be performed during MM review.
VYAPF 0020.08 (Sample)
AP 0020 Rev. 21 E
8% -Page 1 of 1
& D I #99-287 ha!?xtrza
5 0.59 (a)( 1) SCREENING EVALUATION Affected Document Minor Modification 2000-010 Description of Change(s) (List each change that the evaluation supports or reference that provides changes)
Installation of a drywell seal at elevation 238' and perimeter painting of a cicumferential strip approximately 6 c/- inches wide.
Based on a review of the following questions, determine if the proposed activity has the potential to impact safe operation of the facility and requires a 10CFR50..59(a)(2) evaluation. A "YES" answer to any of the questions 2 through 25 requires that a written 10CFR50.59(a)(2) evaluation be perfzrmed. Either evaluation may require an FSAR change in accordance with AP 6036 or a TRM change in accordance with AP 0060. These questions need to be answered based on a review of the activity (i.e., procedure change, Temp. Mod.,
Equivalency Eval., Lineup Deviation, etc.) vs. the requirements of the FSAR or interim FSAR changes, the TRM and Tech. Specs. The originator should provide a response to "NO" answers that are potentially applicable to provide a basis for the conclusion.
FSAR, TRM & Tech. Spec. sections reviewed 5'12.6, 1 2 . 2 . 2 . 2 , 12.3.5 FSAR, TRM & Tech. Spec. sections affecteq)
"1. Would the activity require a Tech. Spec. change prior to implementation? If "YES" then a Tech. Spec. change must be completed before the activity can commence.
YES @
- 2. Would the activity result in a change that would directly or indirectly render a system, structure, or component ( S S C ) either different in design, or different in function or in method of performing a function (e.g., change manual to automatic, etc.) than that described (written or pictorial) in the FSAR, interim FSAR change or TRM. (Note that pictorial changes that do not effect system design parameters or system operation are not considered to satisfy this I
criterion; eg: addition of an instrument isolation valve.) YES @
The seal as described in 5920-233, will be maintained in form, fit and function.
- A yes response to the question WAPF 6002.02 (Sample) indicates that the activity cannot be AP 6002 Rev. 7 performed under 50.59. Prior regulator approval is required to perform activities which require a T.S. change.
5 0 . 5 9 (a)(1) SCREENING EVALUATION (Continued) 3.
- Would the activity modify any SSC whose configuration can significantly impact a parameter specified in the FSAR or TRM? (For example, a significant change to water level or components within the primary containment can impact the containment net free space which is specified in the FSAR and used in LOCA calculations, EOPs, and th Appendix J Program). YES There is no impact on parameters specified i n the FSAR or TRM.
- 4. Would the activity require changes to any procedural requirements identified in the FSAR, interim FSAR change or TRM? Note that I "procedural requirements" includes any specific responsibilities and activity sequences identified, but does not require a 50.59(a)(2) just because the procedure is identified in the FSAR, TRlYl or T . S . I
- 5. Would the activity negatively affect instrument accuracies and response characteristics or render them outside the limits set forth by FSAR accidents and transients.
YES @
- 6. Would the activity cause an SSC to operate outside the structure/system/component design or testing limits?
This activity mitigates the effects rosion on the shell YES @
and therefore, supports the safety n & design intent of primary containment.
- 7. Would the activity create add a1 loads (mechanical or electrical) that are greater than the design capacity of the affected equipment or system or change the sequence in which the loads are applied? (e.g would diesel loading or sequence be affected?) YES &
Six inches of unqualified coating material is being removed and Replaced with a qualified coating, decreasing potential strainer Loading. Additionally, based on the sealants higher specific gravity and limited quantity to potentially enter the torus and given the high capacity and low approach velocity to the strainers it is concluded that the use of the sealant does not constitute a reason to evaluate strainer loading capacities.
- 8. Would t h e activity result in increased vibration, water hammer, fatigue, corrosion, HELB, thermal cycling, pipe whip, flooding (internal and external), missile effects, fire, heavy loads, or electrical noise such that any SSC is or could be negatively affected? . YES @
This activity is to protect the drywell from corrosion and therefore supports the primary containment safety function.
VYAPF 6002.02 AP 6002 Rev. 7 LE Page 2 of 4 DI #99-5
50.59 (a}(1) SCREENING EVALUATION (Continued)
- 9. Would the activity have the potential to non-conservatively change environmental conditions or create/delete air flow paths from one EQ volume to another?
- 10. Would the activity modify interfaces or interaction between SSC's such that any SSC's are negatively affected?
Debris potential has been assessed without negative consequences. YES @
- 11. Does the activity (failure modes) have the potential to result in (or increase the probability of) offsite radiological consequences that are greater than those specified in the FSAR?
YES
- 12. Would the activity change or affect any SSC's seismic qualification, EQ equipment qualification, redundancy or separation criteria, Appendix R compliance, ISI/IST Program compliance?
Inspection of this area is included in the IS1 program.
YES @
- 13. Would the activity introduce potential seismic I1 over I concerns?
There are no seismic concerns for this activity. YES @
- 14. Would the activity modify any s r component whose operation affects the calculations used DCM (e.g., effluent monitors, ventilation flowpaths, etc.}?
YES @)
- 15. Would the activity negatively affect system/equipment protective features?
YES @
- 16. Would the activity significantly increase the frequency of system operation?
YES Qo)
- 17. Would the activity introduce testing methods that are not consistent with current system/equipment testing requirements?
Test / Inspection methods are consistent with IS1 current practices.
- YES
- 18. Would the activity introduce additional credible failure modes or single failures that are not bounded by FSAR assumed failure modes?
(Including consideration of analog to digital replacement concerns as discussed in Generic Letter 95-02).
YES VYAPF 6002.02 AP 6002 Rev. 7
$0 Page 3 of 4 DI #99-5
5 0 . 5 9 (a)(1) SCREENING EVALUATION (Continued)
- 19. For radioactive waste systems, would the activity introduce any concerns when using the criteria of IE Circular 80-18, "10CFR50.59 Safety Evaluations for Changes to Radioactive Waste Treatment Systems" and IE Bulletin 80-10, "Contamination of Nonradioactive System and Resulting Potential for Unmonitored, Uncontrolled .Release to Environment" as guidance. YES
- 20. Does the activity involve performing special tests or experiments, -
as required by AP 6001?
YES @
- 21. D o e s the activity change quality group classifications of any SSC?
YES @
- 22. Does the activity involve a maintenance activity where a decision has been made to operate in a configuration that is different than FSAR, interim FSAR change or TRM requirements?
The seal
_ _ ~ is not described in the FSAR, the corrosion protection of the drywell is described in Section 1 2 . 2 . 2 . 2
- 23. Could the change affect the implementation of the E-Plan (e.g., TSC habitability during any of the accidents as analyzed in the FSAR 5 interim FSAR change}? I ntroduce ad (ER 9 7 - 1 6 4 4 )
- 25. Are there any other nuclear safety related issues associated with the change that provide cause f o r a formal safety evaluation to be performed?
YES Q Additional Comments:
There are no safety related issues that provide cause for a formal safety
~
evalauation.
Safety Review Performed By* : = F A A Date
- personnel performing safety reviews shall be-qualified by successful completion of the applicable training.
Safety Evaluation Yes [XI No Approved By: / f i s- 3-00 Date VYAPF 6002.02 AP 6002 Rev. 7
7.1 l a Request Operations establishherify the following lineup. This provides a ventilation flowpath from the drywell, through the Torus, and out through the Reactor Building exhaust.
Equipment Position ,
SB-16-19-8 (AC-8) OPEN SB-16-19-9 (AC-9) OPEN -
SB-I 6-19-10 (AC-IO) OPEN c-7B) OPEN
-7) OPEN T-6) OPEN C-6A) OPEN SB-I 6-19-7A (AC-7A) OPEN V I 6-19-5A GAGGED OPEN V I 6-19-50 GAGGED OPEN RTF-5 0PERAT1NG VYlCE DATE 7.1 1b Ensure that the Torus access covers are installed, or temporary covers are installed. Ensure that they are labeled to prevent inadvertent opening of the covers.
VYlCE DATE 7.18a Notify Operations that the coating activities in the Drywell are completed and that the ventilation lineup previously established Fay
, be secured or modified to meet plant conditions.
WICE - rn 7.18b Ensure that any labels installed on the covers are removed.
VYlCE DATE MM 00-010 ATTACHMENT 1 PAGE 8Aof 11
2.9 A self-contained vacuum blasting system will be used to remove the existing coating on the shell and provide the surface prep for the new coatings. This will minimize the potential for airborne contamination and dust. Protection against airborne contamination shall be per the requirements of RP.
2.1 0 A vapor control plan will be used to minimize the methanol fumes that are emitted from the Dow Corning sealant, the fumes from the cleaning solvents and the fumes from the Carboline paint products. Chemistry and RP will be involved in the development and implementationof the vapor control plan. Coppus air-driven ventilators with no moving parts will be used to remove fumes from the drywell.
3.0 REFERENCES
3.1 Codes and 3.1.1 SSPC-SP-1, Steel Structures Painting Council, Surface Preparation Specification No. 1, Solvent Cleaning.
3.1.2 SSPC-SP-l O, Steel Structures Painting Council, Surface Preparation Specification No. 10, Near-White Blast Cleaning.
3.1.3 SSPC-SP-11, Steel Structures Painting Council, Surface Preparation Specification No. 11, Power Tool Cleaning to Bare Metal.
3.1.4 SSPC-Vis-1, Steel Structures Painting Council, Visual Inspection Specification No. 1, Pictorial Surface Preparation Standards for Painting Steel Surfaces.
3.1.5 ASTM 5144, Standard Guide for the Use of P in Nuclear Power Plants.
3.1.6 ASTM D4537-91, Standard Guide for Es Qualrfy and Certify Inspection Personnel for Coatings Work in Nuclear Facilities 3.1.7 EPRl TR-109937 Guideline on Nuclear Safety Related Coatings.
3.1.8 Coatings Inspection Plan (attached) - Drywell Elevation 238.
3.1.9 ASME Section XI, 1992 - Winter Addenda 92A 08/30/00 MM 00410 ATTACHMENT 1
HOLD POINT
'7.10.1 IWE inspection completed and documented in accordance with PP 7024.
IW E Coordinator DATE VYICE DATE 7.12 Apply Carbozinc 11 SG primer to the full circumferential 6" +/- wide band of the containment shell directly above the keyway down to the steel concrete interface in accordance with the Coatings Inspection Plan and the manufacturers instructions. Primer must be continuously agitated during application. DO NOT OVERSPRAY ON EXISTING PAINTED SURFACES. Record environmental conditions and application data per NPS Procedure PP-0959P requirements.
NPSCS DATE NPSQC DATE 7.13 Install Embeco 885 grout in the keyway in accordance with tpe -
manufacturers instructions and drawing 5920-12789. Sil-Prd bonding '
agent may be used in lieu of the 24-hour pre-soak prior to groht placement. Curing compound may be used to eliminate the need to keep the grout wet while curing. Record data per NPS Procedure PP-0582C requirements.
NPSCS DATE NPSQC DATE 08/30/00 M M 00-010 ATTACHMENT 1
PENDING CHANGE NOTIFICATION FORM Notiflcation o a pending revision to the drawing(s1 listed.
VYDC/EDCR # MM #&?-ora (N # Other Cancellation-SO File # and/or WO # ( i f applicable):
Title/Description of Change: ~ J L L ffooK /o < ~ . - Z Z t r t R7 mr a-
/-/
Component ID Numbers:
Affected Systems:
DCE/ ICE/CI : 3v i a P I;f?ircs Datez SI.loo (PLEASE PRINT]
WAPF 6802.01 (saniplel AP 6 8 0 2 Rev. 22 Page 1 of 1
t3 z
DRAWING REVISION ROUTING SLIP The f o l l o w i n g prints are submitted for corxection/revision per / % e ~ fid , --
2 oou 50 # 2.400 -at50 WO i: 00 - /BY0 If change is a Corrective Update, indicate the initiating circumstance below by checking the appropriate response:
SECTION 1 I SECTXON 2 SECTXON 3 Drawing N u d e r Rev. I Lag Number 2nd Engineering Reviewer Signature/Date S 4 z O - 233 0 59ze - / 2 7 8 9 /./cur 1' 1 1 I 1 I Additional drawings on WAPF 6 8 0 2 . 0 2 page 2 of 2? 0 Yes I&J # of PagesJ iI NOTE: Any EMPAC changes associated with corrective updates should be forwarded to the appropriate department.
c;" 4 :.<' .
DCE/ICE/Cf Initiation: The changes to the marked up drawings and/or new drawings have t I been reviewed and reflect the as installed condition of the plant or an approved alternai and the mark-ups meet the requirements of AP 6802.
' iI I
Markups sent to DaO: Date :
I M: Assistant I
1 Date :
Drawing package sent to DC Assistant:
II DDG clerk I Drawing package received by DC Assistant: Date :
I DC Assistant I
WAPF 6 8 0 2 . 0 2 (Sample)
AP 6802 Rev. 22 Page 1 of 2 RT No. 09.D04.150 LPC # 4
VERMONT YANKEE ACCOUNTABILITY REVIEW FORM TEMPORARY AND MINOR MODIFICATIONS Minor Modification : 2000-010 Originating Dept: Mechanical / Structural Refer to AP 0020 for guidance.
I ADMINISTRATIVE the initial signature of the Originating DepartmeniHead? - 7'
.2. Have all pending change notificationsbeen made (DBD,FSAR, drawings)
I I
- 2. Has a safety screedevaluation been completed in accordance with AP 6002 and included in the package? d I I
- 3. Have Electrical or MechanicalData Sheets (VYAPF 0020.04 or .05 or both) been completed and attached if necessary?
- 4. Have the appropriate items from Appendix A to AP 0020 been considered and addressed in the TM/MM?
- 5. For T M ,are the modes of operation allowable while the TM is installed identified?
- 6. Are all impacted plant documents identified and are markups included in the package as required @BD, F'SAR, Programs,Procedures, etc.)
- 7. Are markups for all drawings impacted by the TM/MM contained in the package and are they all initided and dated by the TM/MM CI?
- 8. Have training needs been documented in the TM/MM if necessarv?
- 9. Have installationhestorationrequirements been adquateIy addressed in the TPIIIIMM?
- 10. Is the descriution of the modification comulete and clear?
- 11. Are the design requirements for the modification adequately described?
- 12. Are all hazards associated with the modification identified and assessed?
- 13. Are all impacted control mom drawings identified on WAPF 020.03?
- 14. Does the TM/h4M address concerns regarding building/area modifications that may affect the EQ analysis (interference with, modification or creation of normal air flow paths) [ I N S ~ ~ ~ ~ O I T P ~ I
- 15. Does the TM/MM address potential blocking of access to equipment needed to JI safely operate the plant? [INS932601TPI]
1
II TECHNICAL (continued) including identification of responsibilities for operation(monitorin~m~tenance of the TM? 80786-01j r/
- 22. Have building permit requirements been addressed for office building changes?
~8-00291 J
- 23. Are specified parts, equipment, material, and processes suitable for the required application ?
- 24. Are post installation(restorationtesting requirements adequate to demonstrate J
that the design requirements are met? /
Reviewer: Date: $4ha Forward this form to the DEAA when complete, 2
From: Grimes, Dave Sent: Tuesday, July 03,2001 9:15 AM To: Girroir, Dennis cc: Goodwin, Scott
Subject:
Drywell Seal Closeout
- Dennis, Per AP 6022, the JO procedure, we are required to notify you that the Drywell Seal Minor Mod is bekg closed out and that the replacement seal is subject to inspections under ASME IWE. The drawing number for the seal is 5920-12739, and may be used to facilitate inspections if necessary. Please call with any questions.
David 1
W
- 3
_.-=
.._,I
>.l
.. ~
JO