ML063610251

From kanterella
Jump to navigation Jump to search
Revisions to Technical Requirements Manual
ML063610251
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/15/2006
From: Gerlach R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML063610251 (49)


Text

Dec.

15, 2006 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-52161 USER INFORMATION:

Name:GERLACH*ROSE M Address: NUCSA2 Phone#:

254-3194 TRANSMITTAL INFORMATION:

EMPL#:028401 CA#:0363 TO:

GERLACH*ROSE M 12/15/2006 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF

  • RORS.

40TTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 12/04/2006 ADD MANUAL TABLE OF CONTENTS DATE: 12/14/2006 CATEGORY:

ID:

TEXT REMOVE:

DOCUMENTS 3.7.3.8 REV: 5 TYPE: TRM2 ADD:

REV:

6 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT LOES REMOVE:

REV:29 JkDD:

REV:

30 CATEGORY:

DOCUMENTS ID:

TEXT TOC TYPE: TRM2 400(

Dec.

15, 2006 Page 2 of 2 I

REMOVE:

REV:8 ADD:

REV:

9 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL

USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUTAL Manual Name:

TRM2 Snual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:

12/14/2006 Procedure Name TEXT LOES Rev Issue Date 30 12/14/2006 Change ID Change Number

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC

Title:

9 12/14/2006 TABLE OF CONTENTS TEXT 1.1 0

11/19/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1

02/04/2005

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2

Title:

5 11/22/2005 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 1

01/06/2006

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT 3.1.1 0

11/19/2002

Title:

REACTIVITY CONTROLYSYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT 3.1.3 2

11/22/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 5

10/12/2006

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

Page 1 of 15 Report Date: 12/14/06 Page 1 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0

11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION 0

TEXT 3.3.2

Title:

INSTRUMENTATION 1

04/26/2006 SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 1

04/26/2006

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 2

06/13/2006

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3. 5

Title:

INSTRUMENTATION 0

11/19/2002 THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3. 6 2

10/19/2005

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 0

11/19/2002

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9

Title:

INSTRUMENTATION 1

11/22/2004 LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1

10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1

Title:

REACTOR COOLANT 1

04/26/2006 SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Page 2 of 15 Report Date: 12/14/06 Page 2 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 0

11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 0

11/19/2002 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 1 12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1

04/2.6/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0

11/19/2002 0

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0

11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0

11/19/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN D

Page 3 of 15 Report Date: 12/14/06 Page 3 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT TEXT 3.7.5.1

Title:

PLANT TEXT 3.7.5.2

Title:

PLANT 0

11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 1

04/26/2006 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 2

04/26/2006 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 2

08/18/2005 SYSTEMS C02 SYSTEMS 1

04/26/2006 SYSTEMS HALON SYSTEMS 1

04/26/2006 SYSTEMS FIRE HOSE STATIONS 1

04/26/2006 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 6

12/14/2006 SYSTEMS FIRE DETECTION INSTRUMENTATION 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Page 4 of 15 Report Date: 12/14/06 Page 4 of 15 Report Date: 12/14/06

%SSES MANUAL

.Manual Nanme:

TRM2 ual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3 1

04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1

03/01/2005

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0

11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 5

10/12/2006

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1

08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2-004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.8.1 2

02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 1

12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTI(

CONTINUOUS TEXT 3.8.2.2 2

12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTI(

AUTOMATIC TEXT 3.8.3 0

11/19/2002

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES TEXT 3.8.4 1

02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0

11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION ON -

ON -

Page 5 of 15 Report Date: 12/14/06 Page 5 of 15 Report Date: 12/14/06

SSES MANUALJ Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0

11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 0

11/19/2002

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1

04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 1

08/28/2006

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

TEXT 3.11.1.1 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0

Page 6 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.5

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

12/14/2004 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3

04/26/2006 DOSE RATE 1

04/26/2006 DOSE -

NOBLE GASES 1

04/26/2006 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 STitle:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE TEXT 3.11.4.1

Title:

RADIOACTIVE TEXT 3.11.4.2

Title:

RADIOACTIVE TEXT 3.11.4.3

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS 3

11/14/2006 VENTILATION EXHAUST 2

12/14/2004 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

04/26/2006 TOTAL DOSE 3

04/26/2006 MONITORING PROGRAM 2

04/26/2006 LAND USE CENSUS 1

04/26/2006 INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL Page 7 of 15 Report Date: 12/14/06 Page 7 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.12.2 1

10/12/2006

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0

Title:

APPLICABILITY 1

01/06/2006 BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT B3.1.1 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT B3.1.3 2

11/22/2-005

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0

11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0

11/19/2002

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 1

02/04/2005

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 2

06/13/2006

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION Pag 8 of 5 eprt at: 1/1/0 Page 8 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name :

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.5 1

06/13/2006

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6

Title:

INSTRUMENTATION TEXT B3.3.7

Title:

INSTRUMENTATION TEXT B3.3.8

Title:

INSTRUMENTATION TEXT B3.3.9

Title:

INSTRUMENTATION TEXT B3.3.10 s

itle:

INSTRUMENTATION TEXT B3.3.11

Title:

INSTRUMENTATION TEXT B3.4.1

Title:

REACTOR COOLANT TEXT B3.4.2

Title:

REACTOR COOLANT TEXT B3.4.3

Title:

REACTOR COOLANT 3

10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 0

11/19/2002 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1

10/22/2003 BASES TRM RPS INSTRUMENTATION 1

11/22/2004 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0

11/19/2002 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1

10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0

11/19/2002 SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 0

11/19/2002 SYSTEM BASES STRUCTURAL INTEGRITY 0

11/19/2002 SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS g

Page 9 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0

11/19/2002

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0

11/19/2002

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0

11/19/2-002

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0

11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0

11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK,(UHS)

GROUND WATER LEVEL TEXT B3.7.3.1 1

04/26/2006

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2

04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0

11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS Pag 1 o 1 Rpor Dte 1/1/0 Page 10 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 0

TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT TEXT B3.7.5.3

Title:

PLANT TEXT B3.7.6

Title:

PLANT 1

04/26/2006 HALON SYSTEMS SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1

04/26/2006 FIRE HOSE STATIONS 1

04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/19/2002 FIRE RATED ASSEMBLIES 1

01/12/2004 FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SOLID RADWASTE SYSTEM 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0

11/19/2002 LIQUID HOLDUP TANKS 1

03/01/2005 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0

11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 2

Title:

PLANT SYSTEMS BASES SNUBBERS Page 11 of 15 10/12/2006 Report Date: 12/14/06

SSES MANUAL f

Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT B3.8.3

Title:

ELECTRICAL TEXT B3.8.4

Title:

ELECTRICAL TEXT B3.8.5

Title:

ELECTRICAL TEXT B3.8.6

Title:

ELECTRICAL TEXT B3.9.1 1

02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD 0

11/19/2-002 POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0

11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1

02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 0

11/19/2002 PROTECTION -

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM Page 12 of 15 Report Date: 12/14/06 Page 12 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL TEXT B3 10.1

Title:

MISCELLANEOUS TEXT B3.10.2

Title:

MISCELLANEOUS TEXT B3.10.3

Title:

MISCELLANEOUS TEXT B3.10.4

Title:

MISCELLANEOUS TEXT B3.11.1.1

Title:

RADIOACTIVE EF TEXT B3.11.1.2 STitle:

RADIOACTIVE EF TEXT B3.11.1.3

Title:

RADIOACTIVE El REQUIREMENTS 0

MANUAL UNIT 2 11/19/2002 BASES SEALED SOURCE CONTAMINATION 0

11/19/2002 BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION 0

11/19/2002 BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION CISFSI) 0 11/19/2002 BASES LEADING EDGE FLOW METER (LEFM) 0 11/19/2002

'FLUENTS BASES LIQUID EFFLUENTS CONCENTRATION 0

11/19/2-002 FLUENTS BASES LIQUID EFFLUENTS DOSE 0

11/19/2002 FFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.2.1

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.2

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS IL PARTICULATES FORM 0

11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING 1

12/14/2004 BASES DOSE RATE 0

11/19/2002 BASES DOSE -

NOBLE GASES 0

11/19/2002 BASES DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN Page 13 of 15 Report Date: 12/14/06 Page 13 of 15 Report Date: 12/14/06

SSES MANUAL.

Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.4

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.5

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3

Title:

RADIOACTIVE EFFLUENTS 0

11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4

11/14/2006 BASES VENTILATION EXHAUST 1

01/27/2004 BASES RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING 0

11/19/2002 BASES TOTAL DOSE TEXT B3.11.4.1 2

01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2

Title:

RADIOACTIVE EFFLUENTS 0

BASES 11/19/2-002 LAND USE CENSUS TEXT B3.11.4.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2

Title:

LOADS CONTROL PROGRAM 0

BASES 11/19/2002 HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 4.1 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION Page 14 of 15 Report Date: 12/14/06 Page 14 of 15 Report Date: 12/14/06

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 S

TEXT 4.3 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4

Title:

TEXT 4.5

Title:

TEXT 4.6

Title:

TEXT 4.7

Title:

ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0

09/27/2003 CONTROLS PROCEDURES & PROGRAMS 0

09/27/2003 CONTROLS REPORTING REQUIREMENTS 0

09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0

09/27/2003 CONTROLS TRAINING Page 15 o~

15 Report Date: 12/14/06 Page 15 of 15 Report Date: 12/14/06

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 30 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Pages TRM / 2.0-6 and TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM 12.0-11 Pages TRM / 2.0-12 through TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS, Pages 3.1-1 through 3.1-6 Pages TRM / 3.1-7 and TRM /3.1-8 Pages TRM / 3.1-9,and'TRM,/ 3.1-9a Page TRM / 3.1-10b-,1 CORE OPERATING LIMITS REPORT Page 3.2-1 Pages'TRM!/ 3.2-2 through TRM / 3.2-39 INSTRUMENTATION

  • Pages'TRM / 3.3-1 through TRM / 3.3-3

'Page TRM / 3.3-4 Pages 3.3-5 and 3.3-6 Page TRM 3.3-7 Page 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 11/29/2006 08/31/199.8 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 11/15/2004 12/03/2004 11/15/2004 11/15/2005 04/08/1999 03/15/2002 11/30/2005 08/31/1998 11/15/2005 02/18/1999 02/18/1999 08/31/1998 10/05/2006 07/16/1999 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/17/1998 05/30/2006 06/02/2005 05/30/2006 03/30/2001 09/13/2005 12/14/1.998 10/22/2003 3.2 3.3 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 30 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Pages TRM /3.3-21a through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages 3.4-6 through 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 3.5 3.6 3.7 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 and TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Page TRM / 3.7-9 Page TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 through TRM / 3.7-27 Page TRM / 3.7-28 06/27/2001 06/14/2002 10/22/2003 11/15/2004 11/15/2004 12/03/2004 05/16/2003 10/22/2003 03/31/2006 10/23/1998 08/31/1998 12/03/2004 03/31/2006 01/28/2005 08/31/1998 04/17/2000 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 07/29/1999 08/31/1998 03/31/2006 08/02/1999 03/31/2006 08/16/2005 01/21/2000 08/02/1999 08/09/2005 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 11/29/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 30 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-48 Pages TRM / 3.7-48a and TRM / 3.7-48b Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Pages TRM / 3.8-26 through TRM / 3.8-29 REFUELING OPERATIONS 3.8 11116/2001 11/30/2005 11/16/2001 01/09/2004 10105/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 08/31/1998 10/05/2006 10/05/2006 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 01/31/2005 04/02/2002 12/03/2004 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 11/29/2006 08/31/1998 03/31/2006 08/30/1998 03/08/2003 06/05/2002 03/31/2006 08/16/2006 3.9 3.10 Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 11129/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 30 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 09/01/1998 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 09/01/1998 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 09/30/2006 02/05/1999 08/31/1998 3.12 4.0 SUSQUEHANNA

- UNIT 2 TRM / LOES-4 EFFECTIVE DATE 11/29/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 30 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.0 B 3.1 B 3.2 B 3.3 B 3.4 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-7 Pages TRM / B 3.3-8 and TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM/ B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page TRM / B 3.3-15 Page TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a through TRM / B 3.3.19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Effective Date 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 08/31/1998 11/15/2005 02/18/1999 08/31/1998 04/07/2000 08/31/1998 01/31/2005 05/30/2006 03/30/2001 08/31/1998 09/13/2005 12/03/2004 06/25/2002 06/14/2002 06/14/2002 10/22/2003 10/22/2003 10/22/2003 11/15/2004 11/15/2004 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 B 3.5 B 3.6 08/31/1998 07/26/2001 02/01/1999 08/31/1998 SUSQUEHANNA

- UNIT 2 TRM I LOES-5 EFFECTIVE DATE 11/29/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 30 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.7 B 3.8 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and tRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 and TRM / B3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-24 Effective Date 09/23/1999 01/07/2002 12/03/2004 12/31/2002 08/31/1998 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 04/07/2000 10/05/2006 10/05/2006 12/03/2004 03/09/2001 04/15/2003

.12/03/2004 07/05/2000 04/02/2002 01/2812005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08131/1998 04/02/2002 01/28/2005 11/29/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 30 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 08/31/1998 10/23/1998 08/31/1998 03/08/2003 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 12/03/2004 08/31/1998 02/12/1999 02/05/1999 TRM2 text LOES.doc 11/29/06 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 1.0 USE AND APPLICATION............................................................................

1.0-1 1.1 D efinitio ns.....................................................................................

T R M /1.0-2 "

2.0 PLANT PROGRAMS......................................

2.0-1 2.1 P lant P rogram s......................................................................................

2.0-1 2.2 Instrument Trip Setpoint Table.....................................................

TRM/2.0-5 3.0 APPLICABILITY.................................................................................

TRM/3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability...............................

TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability..................................

TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS...........................................................

3.1-1 3.1.1 A lternate R od Injection..........................................................................

3.1-1 3.1.2 CRD Housing Support...........................................................................

3.1-4 3.1.3 Control Rod Block Instrumentation........................................................

3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve.................................................................................

T R M /3.1-9 3.2 CORE OPERATING LIMITS REPORT........................................................

3.2-1 3.2.1 Core Operating Limits Report................................................................

3.2-1 3.3 INSTRUMENTATION.........................................................................

TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation...........................................

TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation..............................................

TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation..................................

TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation............................

TRM/3.3-9 3.3.5 Section Not Used..........................................................................

TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation...............

TRM/3.3-13 3.3.7 Turbine Overspeed Protection System.........................................

TRM/3.3-17 3.3.8 Section Not Used..........................................................................

TRM/3.3-19 3.3.9 OPRM Instrumentation.................................................................

TRM/3.3-21 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops.........................................................................

TRM/3.3-22 3.3.11 MVP Isolation Instrumentation......................................................

TRM/3.3-24 3.4 REACTOR COOLANT SYSTEM..........................................................

TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry.......................................................

3.4-1 3.4.2 S tructural Integrity..................................................................................

3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors....................................

3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit............................ TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program...........................

TRM/3.4-13 3.5 EMERGENCY CORE COOLING AND RCIC......................................

TRM/3.5-1 3.5.1 ADS Manual Inhibit.......................................................................

TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS......................................................

3.5-6 SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.6 CONTAINMENT..........................................................................................

3.6-1 3.6.1 VENTING or PURGING.........................................................................

3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d icatio n...............................................................................................

3.6 -3 3.6.3 Suppression Pool Alarm Instrumentation...............................................

3.6-4 3.6.4 Primary Containment Closed System Boundaries........................ TRM/3.6-7 3.7 PLANT SYSTEMS..............................................................................

TRM/3.7-1 3.7.1 Emergency Service W ater System (Shutdown)............................

TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level.........................................

3.7-3 3.7.3.1 Fire Suppression Water Supply System.......................................

TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems.......................................................

TRM/3.7-8 3.7.3.3 C02 systems................................................................................

TRM/3.7-12 3.7.3.4 Halon Systems.............................................................................

TRM/3.7-16 3.7.3.5 Fire Hose Stations........................................................................

TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses.............................

TRM/3.7-22 3.7.3.7 Fire Rated Assemblies..................................................................

TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation......................................................

TRM/3.7-26 3.7.4 Solid Radwaste System................................................................

TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor...........................................

3.7-37 3.7.5.2 Main Condenser Explosive Gas-Mixture.......................................

TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks.....................................................................

TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation..............................................................

3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation....................................................................

3.7-41 3.7.8 Snubbers.....................................................................................

  • TRM/3.7-43 3.7.9 Control Structure HVAC................................................................

TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs).....................

TRM/3.7-51 3.8 ELECTRICAL POW ER.......................................................................

TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices........................................................................

TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

Continuous...................................................................................

TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A utom atic......................................................................................

T R M /3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities..................................... :3.8-13 3.8.4 24VDC Electrical Power Subsystem.............................................

TRM/3.8-15 3.8.5 Degraded Voltage Protection.......................................................

TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling..................................................

3.8-24 3.8.7 Battery Monitoring and Maintenance Program..............................

TRM/3.8-26 3.9 REFUELING OPERATIONS........................................................................

3.9-1 3.9.1 D ecay T im e...........................................................................................

3.9-1 3.9.2 Communications....................................................................................

3.9-2 3.9.3 Refueling Platform.................................................................................

3.9-3 SUSOUEHANNA - UNIT 2 TRM /TOC-2 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.10 MISCELLANEOUS.............................................................................

TRM/3.10-1 3.10.1 Sealed Source Contamination......................................................

TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation.......................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).................... TRM/3.10-7 3.10.4 Leading Edge Flow Meter (LEFM)................................................

TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS..............................................................

TRM/3.11-1 3.11.1 Liquid Effluents.............................................................................

TRM/3.1 1-1 3.11.1.1 Liquid Effluents Concentration......................................................

TRM/3.11-1 3.11.1.2 Liquid Effluents Dose...................................................................

TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System..................................................

TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation........................ 3.11-13 3.11.2 Gaseous Effluents........................................................................

TRM/3.11-17 3.11.2.1 Dose Rate.....................................................................................

TRM/3.11-17 3.11.2.2 Dose - Noble Gases.....................................................................

TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form...........................................................................

TRM/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System........................................

TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System.........................................

TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation......................................................................................

3.11-26 3.11.3 Total Dose....................................................................................

TRM/3.11-33 3.11.4 Radiological Environmental Monitoring.........................................

TRM/3.11-35 3.11.4.1 Monitoring Program......................................................................

TRM/3.11-35 3.11.4.2 Land Use Census..........................................................................

TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program............................................

TRM/3.11-47 3.12 LOADS CONTROL PROGRAM..........................................................

TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.......................................

TRM/3.12-1 3.12.2 Heavy Loads Requirements.........................................................

TRM/3.12.3 3.12.3 Light Loads Requirements............................................................

TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS..................................................................

4.0-1 4.1 O rga nizatio n..........................................................................................

4.0-1 4.2 Reportable Event Action........................................................................

4.0-2 4.3 Safety Limit Violation.............................................................................

4.0-3 4.4 Procedures and Programs.....................................................................

4.0-4 4.5 Reporting Requirements........................................................................

4.0-5 4.6 Radiation Protection Program................................................................

4.0-7 4.7 T ra in in g..................................................................................................

4.0-8 SUSQUEHANNA - UNIT 2 TRM / TOC-3 EFFECTIVE DATE 11/29/2006 SUSQUEHANNA - UNIT 2 TRM / TOC-3 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability......................................

B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability.........................................

B 3.0-9 B 3.1.1 Alternate Rod Injection..............................

TRM/B 3.1-1 B 3.1.2 CRD Housing Support........................................

................................. B 3.1-4 B 3.1.3 Control Rod Block Instrumentation..............................................

TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve.........................................................................

TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR).................................................

B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation..........................................

TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation.....................................................

B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation..................................

TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation............

  • .TRM/B 3.3-4 B 3.3.5 Section Not Used.........................................................................

TRM/B 3.3-8 B 3.3.6 TRM Containment Isolation Instrumentation........................................

B 3.3-10 B 3.3.7 Turbine Overspeed Protection System........................................

TRM/B 3.3-14 B 3.3.8 Section Not Used.........................................................................

TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation................................................................

TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops........................................................................

TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation.....................................................

TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry.........................

B 3.4-1 B 3.4.2 Structural Integrity................................................................................

B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors..................................

B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit............

TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program..................................

B 3.4-6 B 3.5.1 A DS M anual Inhibit..............................................................................

B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation..........................

B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS....................................................

B 3:5-4 B 3.6.1 VENTING or PURGING...............................................................

TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ica tio n.............................................................................................

B 3.6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation.............................................

B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)...................................

B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level.......................................

B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System......................................

TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems......................................................

TRM/B 3.7-5 B 3.7.3.3 C02 Systems..............................................................................

TRM/B 3.7-7 B 3.7.3.4 Halon Systems............................................................................

TRM/B 3.7-8 SUSQUEHANNA - UNIT 2 TRM / TOC-4 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

PPL Rev. 9 SECTION B 3.7.3.5 B 3.7.3.6 B 3.7.3.7 B 3.7.3.8 B 3.7.4 B 3.7.5.1 B 3.7.5.2 B 3.7.5.3 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 TITLE PAGE Fire Hose Stations.......................................................................

TRM/B 3.7-10 Yard Fire Hydrants and Hydrant Hose Houses............................

TRM/B 3.7-11 Fire Rated Assemblies.................................................................

TRM/B 3.7-12 Fire Detection Instrumentation........................

TRM/B 3.7-14 Solid Radwaste System...............................................................

TRM/B 3.7-15 Main Condenser Offgas Hydrogen Monitor.........................................

B 3.7-17 Main Condenser Explosive Gas Mixture..............................................

B 3.7-19 Liquid Holdup Tanks............................................................................

B 3.7-20 ESSW Pumphouse Ventilation....................................................

TRM/B 3.7-21 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..........................................................

TRM/B 3.7-22 S nubbe rs.............................................................................................

B 3.7-2 4 Control Structure HVAC...............................................................

TRM/B 3.7-31 Spent Fuel Storage Pools...........................................................

TRM/B 3.7-33 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.......................................................................

TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous..................................................................................

T R M /B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A utom atic.....................................................................................

T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities............................ TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem............................................

TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection......................................................

TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling........................................

TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program.............................

TRM/B 3.8-18 B.3.9.1 B 3.9.2 B 3.9.3 B 3.10.1 B 3.10.2 B 3.10.3 B 3.10.4 B 3.11.1.1 B 3.11.1.2 B 3.11.1.3 B 3.11.1.4 B 3.11.1.5 B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 Decay Time.....................................................................

B 3.9-1 C om m unications..................................................................................

B 3.9-2 R efueling Platform...............................................................................

B 3.9-3 Sealed Source Contamination.............................................................

B 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation........................

B 3.10-2 Independent Spent Fuel Storage Installation (ISFSI)................... TRM/B 3.10-4 Leading Edge Flow Meter (LEFM)...............................................

TRM/B 3.10-6 Liquid Effluents Concentration.............................................................

B 3.11-1 Liquid Effluents Dose..........................................................................

B 3.11-4 Liquid Waste Treatment System.........................................................

B 3.11-6 Liquid Radwaste Effluent Monitoring Instrumentation..........................

B 3.11-7 Radioactive Liquid Process Monitoring Instrumentation.............. TRM/B 3.11-10 D ose R ate....................................................................................

T R M /B 3.11-12 Dose - Noble Gases............................................................................

B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in P articulate Form..................................................................................

B 3.11-18 Gaseous Radwaste Treatment System.......................................

TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................

TRM/B 3.11-21 SUSQUEHANNA

- UNIT 2 TRM/TOC-5 EFFECTIVE DATE 11/29/2006 SUSQUEHANNA - UNIT 2 TRM /TOC-5 EFFECTIVE DATE 11/29/2006

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

PPL Rev. 9 SECTION B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B3.12 B.3.12.1 B.3.12.2 8.3.12.3 TITLE PAGE Radioactive Gaseous Effluent Monitoring Instrumentation............................................................................

TRM/B 3.11-24 T otal D ose...........................................................................................

B 3.11-26 Monitoring Program....................................................................

TRM/B 3.11-28 Land Use Census................................................................................

B 3.11-34 Interlaboratory Comparison Program...........................................

TRM/B 3.11-36 LOADS CONTROL PROGRAM...................................................

TRM/B 3.12-1 Crane Travel - Spent Fuel Storage Pool.....................................

TRM/B 3.12-1 Heavy Loads Requirements........................................................

TRM/B 3.12-2 Light Loads Requirements...........................................................

TRM/B 3.12-3 TRM2 Text TOC 11129106 SUSQUEHANNA - UNIT 2 TRM / TOC-6 EFFECTIVE DATE 11/29/2006

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 6 3.7.3 Fire Protection 3.7.3.8 Fire Detection Instrumentation TRO 3.7.3.8 APPLICABILITY:

The fire detection instrumentation for each fire detection zone shown in Table 3.7.3.8-1 shall be OPERABLE.

Whenever equipment protected by the fire detection instrument is required to be OPERABLE.

ACTIONS NOTE-------------------

N

1. Separate condition entry is allowed for each instrument.

CONDITION REQUIRED ACTION COMPLETION TIME A.

The number of OPERABLE A.1 Establish an hourly fire watch 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire detection instruments patrol less than the Minimum Instruments Operable AND requirement of Table 3.7.3.8-1 A.2.1 Inspect the accessible Once per hour zone(s) with inoperable instrument(s)

OR A.2.2 Inspect the affected area Once per hour surrounding any inaccessible zones SUSQUEHANNA - UNIT 2 TRM / 3.7-26 EFFECTIVE DATE 08/02/1999

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 6 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY

-.----------........----------------- --.....NOTE N/A When a detector is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and required Actions may be delayed for up to 15 minutes.

TRS 3.7.3.8.1 Perform CHANNEL FUNCTIONAL TEST on 12 months accessible fire detection instruments.

TRS 3.7.3.8.2 Verify that the supervised circuits supervision 12 months associated with the detector alarms of each of the fire detection instruments listed in Table 3.7.3.8-1 are OPERABLE.

TRS 3.7.3.8.3 Perform CHANNEL FUNCTIONAL TEST on Prior to startup inaccessible fire detection instruments, from each COLD SHUTDOWN exceeding 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> unless performed in the previous 12 months SUSQUEHANNA - UNIT 2 TRM / 3.7-27 EFFECTIVE DATE 08/02/1999

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 6 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATIONF INSTRUMENT OPERABLE ZONE ROOM OR AREA ELEV.

TOTAL MIN.TTAOAL MN

a.

TControl Building I____

0-21A Common Equipment Room Elevator 656'-0" NA NA 1

1 NA NA Lobby 0-22A Above Ceiling/Filter Area 687"-8" NA NA 10 5

NA NA 0-22A Elevator Lobby 676-0" NA NA 1

1 NA NA Chem Lab 0F135 High Temp. Alarm 687'-10" 2

1 NA NA NA NA Chem Lab DS-021 687'-10" 2

1 NA NA NA NA Chem Lab 0F138 High Temp. Alarm 687"-10" 2

1 NA NA NA NA Chem Lab DS-022 687'-10" 2

1 NA NA NA NA 0-22A Chem Lab 0F141 High Temp. Alarm 687'-10" 2

1 NA NA NA NA Chem Lab DS-023 687'-1 0" 2

1 NA NA NA NA Chem Lab 0F144 High Temp. Alarm 687'-1 0" 2

1 NA NA NA NA Chem Lab DS-024 687-10" 2

1 NA NA NA NA 0-23 Egress Corridor to South Stairwell 686'-6" NA NA 1

1 NA NA 0-24A UPS Panel Room U-2 698'-0" 4

2 2

1 NA NA 0-24B Corridor 698'-0" NA NA 3

2 NA NA 0-24B Corridor Elevator Lobby 698'-0" NA NA 1

1 NA NA 0-24D Ul Lower Relay Room 698'-0" 4

2 4

2 NA NA 0-24E Computer Room 698'-0" NA NA 6

3 NA NA 0-24E Computer Room (Above Ceiling) 698'-0" 12 6

4 2

NA NA Computer Room 1 U720 697"-0" NA NA 4

2 NA NA PGCC Underfloor 1 U722 697'-0" NA NA 4

2 NA NA 0-24E 1 U724 697'-0" NA NA 4

2 NA NA 1 U726 697'-0" NA NA 4

2 NA NA 2U721 697"-0" NA NA 4

2 NA NA 2U723 697'-0" NA NA 4

2 NA NA 2U725 697'-0" NA NA 4

2 NA NA 2U727 697-0" NA NA 4

2 NA NA 0-24F Computer Maintenance Rm and Office 698'-0" NA NA 2

1 NA NA 0-24G U2 Lower Relay Room 698'-0" 4

2 4

2 NA NA U-2 Lower Relay Room 2U704 697--0" 11 6

6 3

NA NA PGCC Halon Panel 2U705 697-0" 11 6

6 3

NA NA 0-24G Division II 2U706 697--0" 11 6

6 3

NA NA 2U731 697-0" 10 5

6 3

NA NA 2U732 697-0" 11 6

6 3

NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-28 EFFECTIVE DATE 11/29/2006

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 6 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRUMENTLOCATIO:

INSTRUMENT OPERABLE.,

FIRE

[

HEAT IONIZATION

..PHOTO ELECTRIC.

ZONE R

ROOM4 OR AREA ELEV.

TOTAL MIN. JTOTAL

.MIN.

TOTAL MNN 0-24J South Cable Chase 6981-0' 1

1 NA NA NA NA 0-24L Center Cable Chase 6981-0" 1

1 NA NA NA NA 0-24M North Cable Chase 698'-0" 1

1 NA NA NA NA 0-25A U-2 Lower Cable Spreading Room 714'-0" 20 10 6

3 NA NA 0-25B South Cable Chase 714'-0" 1

1 NA NA NA NA 0-25C Center Cable Chase 714'-0" 1

1 NA NA NA NA 0-250 North Cable Chase 714'-0" 1

1 NA NA NA NA 0-25E U-1 Lower Cable Spreading Room 714'-0" 26 13 5

3 NA NA 0-25E U-1 Lower Cable Spreading Room 714!-0" NA NA 1

1 NA NA Elevator Lobby 0-26A Copy Room 729'-1" NA NA 1

1 NA NA 0-26B South Cable Chase 729'-1" NA NA 1

1 NA NA 0-26C Center Cable Chase 729'-1" NA NA 1

1 NA NA 0-26D North Cable Chase 729'-1" NA NA 1

1 NA NA 0-26E Locker Room 729'-1" NA NA 1

1 NA NA 0-26F Vestibule Elevator Lobby 729'-1" NA NA 1

1 NA NA 0-26F Vestibule (Under Floor) 728'-1" NA NA 1

1 NA NA 0-26G Shift Office 729'-1" NA NA 1

1 NA NA 0-26G Shift Office (Under Floor) 728'-1" NA NA 2

1 NA NA 0-26H Control Room (Under Floor Unit 1) 728'-1" NA NA 15 8

NA NA 0-26H Control Room (Under Floor Unit 2) 728'-1" NA NA 12 6

NA NA 0-26H Control Room 729'-1" NA NA 10 5

NA NA 0-26H Control Room (Above Ceiling) 729'-1" NA NA 9

5 NA NA 0-261 Operational Support Center 729'-1" NA NA 1

1 NA NA 0-261 Operational Support Center 728-1" NA NA 2

1 NA NA (Under Floor) 0-26J Vestibule 729'-1" NA NA 1

1 NA NA 0-26J Vestibule (Under Floor) 728'-1" NA NA 1

1 NA NA 0-26K Technical Support Center 741'-1" NA NA 10 5

NA NA 0-26K Technical Support Center Elevator Lobby 741'-1" NA NA 1

1 NA NA 0-26K Technical Support Center 741'-1" NA NA 5

3 NA NA (Above Ceiling) 0-26L Conference Room 741'-1" NA NA 6

3 NA NA 0-26L Conference Room (Above Ceiling) 741'-1" NA NA 2

1 NA NA 0-26M U-1 TSC Soffit 729'-1" NA NA 2

1 NA NA 0-26M U-1 TSC Soffit 741'-1" NA NA 2

1 NA NA 0-26N U-1 Control Room Soffit 741'-1" NA NA 2

1 NA NA 0-26P U-2 Control Room Soffit 741'-1" NA NA 2

1 NA NA 0-26R U-2 TSC Soffit 729'-1" NA NA 2

1 NA NA 0-26R U-2 TSC Soffit 741'-1" NA NA 2

1 NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-29 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 6 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION INSTRUIMENT OPERABLE FIRE FHEAT 16INIZATION__

PHOTO ELECTRIC ZONE [ROOM:OR AREA ELEV.

TOTAL.

MINql.JjTOTA.L.ý ýMI.

ITOTAL MIN.

0-26S South Cable Chase 741'-1" 1

1 NA NA NA NA 0-26T Center Cable Chase 741'-1" 1

1 NA NA NA NA 0-26V North Cable Chase 741'-1" 1

1 NA NA NA NA 0-27A U-2 Upper Relay Room 754-0" 4

2 3

2 NA NA U-2 Upper Relay Room 2U700 753'-0" 11 6

6 3

NA NA PGCC Halon Panel 2U701 753'-0" 11 6

6 3

NA NA 0-27A Division I 2U702 753'-0" 11 6

6 3

NA NA 2U703 753'-0" 11 6

6 3

NA NA 2U730 753'-0" 11 6

6 3

NA NA 0-27B U-2 Upper Cable Spreading Room 753'-0" 24 12 5

3 NA NA 0-27C U-1 Upper Cable Spreading Room 753'-0" 23 12 7

4 NA NA 0-27C U-1 Upper Cable Spreading Room 754'-0" NA NA 1

1 NA NA Elevator Lobby 0-27D Electrician's Office 754'-0" 2

1 1

1 NA NA 0-27E U-1 Upper Relay Room 754'-0" 4

2 2

1 NA NA 0-27F South Cable Chase 754'-0" 1

1 NA NA NA NA 0-27G Center Cable Chase 754'-0" 1

1 NA NA NA NA 0-27H North Cable Chase 754'-0" 1

1 NA NA NA NA 0-28A-1 Equipment Room 771'-0" NA NA 1

1.

NA NA 0-28A-11 Equipment Room 771'-0" NA NA 3

2 NA NA 0-28B-1 Equipment Room 771 '-0" NA NA 1

1 NA NA 0-28B-11 Equipment Room 771'-0" NA NA 2

1 NA NA 0-28B-11 Equipment Room Elevator Lobby 771'-0" NA NA 1

1 NA NA 0-28C Battery Room 771'-0" NA NA 1

1 NA NA 0-28D Battery Room 771'-0" NA NA 1

1 NA NA 0-28E Battery Room 771'-0" NA NA 1

1 NA NA 0-28F Battery Room 771'-0" NA NA 1

1 NA NA 0-28G Battery Room 771'-0" NA NA 1

1 NA NA 0-28H Repair Shop 771'-0" NA NA 2

1 NA NA 0-281 Battery Room 771'-0" NA NA 1

1 NA NA 0-28J Battery Room 771'-0" NA NA 1

1 NA NA 0-28K Battery Room 771'-0" NA NA 1

1 NA NA 0-28L Battery Room 771'-0" NA NA 1

1 NA NA

[0-28M Battery Room 771'-0" NA NA 1

1 NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-30 EFFECTIVE DATE 11/30/2005

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 6 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION INSTRUMENT:OPERABLE FIRE [MEAT IONIZATION PHOTO ELECTRIC ZOE1[RO.R RAEEV OA MIN.

_TOTAL MIN.

TOTAL MIN.

0-28N Battery Room 771'-0" NA NA 1

1 NA NA 0-28P South Cable Chase 771'-0" 1

1 NA NA NA NA 0-280 Center Cable Chase 771'-0" 1

1 NA NA NA NA 0-28R North Cable Chase 771'-0" 1

1 NA NA NA NA 0-28T Battery Room 771'-0" NA NA 1

1 NA NA 0-29A Elevator Vestibule 783'-0" NA NA 1

1 NA NA 0-29B H&V Equipment Room 783'-0" NA NA 10 5

NA NA 0-30A HVAC Equipment Room 806'-0" NA NA 19 10 NA NA 0-30A Freight Elevator Lobby 806-0" NA NA 1

1 NA NA 0-30A CREOASS 0F125A High Temp. Alarm 806"-0" 7

4 NA NA NA NA 0-30A CREOASS DS-091 806'-0" 7

4 NA NA NA NA 0-30A CREOASS 0F125B High Temp. Alarm 806'-0" 7

4 NA NA NA NA 0-30A CREOASS DS-092 806-0" 7

4 NA NA NA NA 0-30A SGTS - 0F169A High Temp. Alarm 806-0" 1

1 NA NA NA NA 0-30A SGTS - DS-093 806-0" 1

1 NA NA NA NA 0-30A SGTS - OF1 69B High Temp. Alarm 806'-0" 1

1 NA NA NA NA 0-30A SGTS - DS-094 806'-0" 1

1 NA NA NA NA b,

Rea ctor Buil ding____

2-1A Core Spray Pump Room 645'-0" NA NA 8

4 NA-NA 2-1 B Core Spray Pump Room 645'-0" NA NA 6

3 NA NA 2-1 B Elevator Lobby 645'-0" NA NA 1

1 NA NA 2-1C HPCl Pump Room 645'-0" 2

1 NA NA 7

4 2-1D RCIC Pump Room 645'-0" 2

1 NA NA 5

3 2-1E RHR Pump Room 645'-0" NA NA NA NA 13 7

2-1F RHR Pump Room 645'-0" NA NA NA NA 15 8

2-1G Sump Room 645'-0" NA NA 2

1 NA NA 2-11 Stairwell 202 645-818' NA NA 2

1 NA NA 2-2A Access Area and Remote Shutdown 670'-0" NA NA 5

3 NA NA Panel Room 2-2A Elevator Lobby 670'-0" NA NA 1

1 NA NA 2-2B Core Spray Pump Room 670'-0" NA NA 11 6

NA NA 2-3A Access Area 683'-0" NA NA 4

2 NA NA 2-3A Access Area Elevator Lobby 683'-0" NA NA 1

1 NA NA 2-3B-N Equipment Removal Area - North 683'-0" NA NA 13 7

NA NA 2-3B-S Equipment Removal Area - South 683'-0" NA NA 1

1 NA NA 2-3B-W Equipment Removal Area -Wraparound 683'-0" NA NA 2

1 NA NA 2-3C-N Equipment Access Area - North 683'-0" NA NA NA NA 4

2 SUSQUEHANNA - UNIT 2 TRM / 3.7-31 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 6 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION INSTRUMENT OPERABLE...........

FIRE HEAT IONIZATION.

PHOTO ELECTRIC.

2-3C-S Equipment Access Area - South 683'-0" NA NA NA NA 4

2 2-3C-W Equipment Access Area - Wraparound 683'-0" NA NA NA NA 5

3 2-4A-N Containment Access Area - North 719'-0" NA NA 11 6

3 2

2-4A-S Containment Access Area - South 719'-0" NA NA 10 5

NA NA 2-4A-S Containment Access Area Elevator 719'-0" NA NA 1

1 NA NA Lobby 2-4A-W Containment Access Area - Wraparound 719'-0" NA NA 5

3 NA NA 2-4B Pipe Penetration Room 719'-1" NA NA 1

1 NA NA 2-4C Switchgear Room 719'-1" NA NA 2

1 NA NA 2-4D Switchgear Room 719'-1" NA NA 2

1 NA NA 2-4G Main Steam Pipeway 719'-1" NA NA NA NA 4'

2 2-4G Exhaust Fan Room 799'-0" NA NA NA NA 2

1 2-5A-N Standby Control Systems Area 749'-0" NA NA 16 8

7 4

2-5A-S General Access Area - South 749'-0" NA NA 5

3 2

1 2-5A-S General Access Area Elevator Lobby 749'-0" NA NA 1

1 NA NA 2-5A-W Access Corridor - Wraparound 749'-0" NA NA 3

2 2

1 2-5B Valve Access Area 761'-10" NA NA NA NA 4

2 2-5C RWCU Backwash Tank 749'-1" NA NA NA NA 1

1 2-5D RWCU Pumps & Heat Exchangers 749'-1" NA NA NA NA 8-4 2-5E Penetration Room 749'-1" NA NA NA NA 2

1 2-5F Load Center Room 749'-1" NA NA 2

1 NA NA 2-5G Load Center Room 749'-1" NA NA 2

1 NA NA 2-5H Instrument Repair Room 749'-1" NA NA 2

1 NA NA 2-6A Access Area 779'-1" NA NA 11 6

NA NA 2-6B Load Center Room 779'-1" NA NA 4

2 NA NA 2-6C Electrical Equipment Room 779'-1" NA NA 2

1 NA NA 2-6D H&V Equipment Room 779'-1" NA NA 12 6

NA NA 2-6E Hatch and Laydown Area 779'-1" NA NA 2

1 NA NA 2-7A H&V Fan & Filter Rooms 799'-1" NA NA 14 7

NA NA 2-7A HVAC Filter 2F257A High Temp. Alarm 799'-0" 7

4 NA NA NA NA 2-7A HVAC Filter 2F257A DS-281 799'-0" 7

4 NA NA NA NA 2-7A HVAC Filter 2F257B High Temp. Alarm 799'-0" 7

4 NA NA NA NA 2-7A HVAC Filter 2F257B DS-282 799'-0" 7

4 NA NA NA NA 2-7A HVAC Filter 2F217A High Temp. Alarm 799'-0" 5

3 NA NA NA NA 2-7A HVAC Filter 2F217A DS-283 799'-0" 5

3 NA NA NA NA 2-7A HVAC Filter 2F217B High Temp. Alarm 799'-0' 5

3 NA NA NA NA Inaccessible SUSQUEHANNA - UNIT 2 TRM / 3.7-32 EFFECTIVE DATE 01/09/2004

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 6 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRU.MEN.T LO.CATION.................INSTRUMENT OPERABLE::

FIRE HEAT IONIZATO PHTO:ELECTRIC ZONE ROOM OR AREA......ELEV.

TOTAL MIN. JTOTAL MIN.:j TOTAL MIN..

2-7A HVAC Filter 2F217B DS-284 799'-0" 5

3 NA NA NA NA 0-6G Surge Tank Vault 779'-4" NA NA 2

1 NA NA 0-8A Refueling Floor 818'-1" NA NA NA NA 60 30 0-8A Refueling Floor Elevators 818-1" NA NA 2

1 NA NA C.

ESWumph Ouse 0-51 Pump Room 685'-6" NA NA 6

3 NA NA 0-52 Pump Room 685'-6" NA NA 6

3 NA NA C.

ESPu umphRo se 0-51 Pump Room 685'-6" NA NA 6

3 NA NA 0-52 Pump Room 685'-6" NA NA 6

3 NA NA d,

Diesel Generator Buildin..............HEAT INFRA-REC)

PHOTO-ELECTR.IC.

0-41A Diesel Generator "A" Bay 660'-0"&

22 11 2

1 15 8

677'-0" 710'-9" N/A N/A N/A N/A 8

4 660'-0"&

23 12 2

1 15 8

0-41 B Diesel Generator "B" Bay 677'-0" 710'-9" N/A N/A N/A N/A 9

5 0-41 C Diesel Generator "C" Bay 660'-0"&

22 11 2

1 15 8

677'-0" 710'-9" N/A N/A N/A N/A 8

4 0-41D Diesel Generator "D" Bay 660'-0" &

22 11 2

1 15 8

677'-0" 710'9" N/A N/A N/A N/A 8

4

e.

Diesel Gene ratorEHBuildin HEAT INFRA.-RED IONIZATION 0-41 E Diesel Generator Rooms 656'-6" &

1 1

NA NA 21 11 675'-6" &

NA NA 6

3 3

2 708'-0" NA NA 4

2 NA NA f

Outside Area HEAT IONIZATION PHOTO ECTRIC 0-00 Startup Transformer (0X103) DS-014 NA 10 5

NA NA NA NA 0-00 Startup Transformer (0X104) DS-015 NA 12 6

NA NA NA NA 0-00 ESS Transformer-DS-016 0X201 NA 6

3 NA NA NA NA OX 213 NA 6

3 NA NA NA NA 0-00 ESS Transformer-DS-017 0X203 NA 6

3 NA NA NA NA 0X211 NA 6

3 NA NA NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-33 EFFECTIVE DATE 10/05/2002

Battery Monitoring and Maintenance Program 3.8.7 PPL Rev. 0 3.8.7 Battery Monitoring and Maintenance Program TRO 3.8.7 Battery cell parameters for the Class I E 250 V batteries and Class 1 E 125 V batteries shall be within limits.

APPLICABILITY:

When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS -

N -


NOTE---------------------

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more batteries A.1 Verify pilot cell electrolyte level 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one or more battery and float voltage meet cell parameters not within Table 3.8.7-1 Category C Category A or B limits, limits.

AND A.2 Verify battery cell parameters 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> meet Table 3.8.7-1 Category C limits for electrolyte level, AND average cell temperature, and float voltage.

Once per 7 days thereafter AND A.3 Restore battery cell parameters 31 Days to Category A and B limits of Table 3.8.7-1.

B. Required Action A.1 or B.1 Enter TS 3.8.6 Immediately A.2 and associated Completion Time for Condition A not met.

C. Required Action A.3 and C.1 Declare associated battery Immediately associated Completion inoperable.

Time for Condition A not met.

(continued)

SUSQUEHANNA - UNIT 2 TRM / 3.8-26 EFFECTIVE DATE 11/29/2006

Battery Monitoring and Maintenance Program PPL Rev. 0 3.8.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Entry into TS 3.8.6 D.1 Apply equalizing charge to 31 Days Condition C with battery/or affected cell.

electrolyte level below the top of the plates.

AND Verify affected cell meets Table 3.8.7-1 Category A and B Limits for float voltage and temperature.

E. Required Action D.1 and E.1 Declare associated battery Immediately associated Completion inoperable.

Time for Condition D not met.

OR One or more batteries on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with average electrolyte temperature less than the Table 3.8.7-1 Category B Limits.

OR One or more batteries on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with connection resistance

> 100.0 E-6 ohms for any single connection or the calculated average resistance for the battery is > 50.0 E-6 ohms.

SUSQUEHANNA - UNIT 2 TRM / 3.8-27 S EFFECTIVE DATE 11/29/2006

Battery Monitoring and Maintenance Program 3.8.7 PPL Rev. 0 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8.7.1 Verify for each terminal and connector:

92 Days No visible corrosion OR

a. < 50.OE-6 ohms; OR
b. < 100.OE-6 ohms with the calculated average resistance for the battery < 50.OE-6 ohms.

TRS 3.8.7.2 Verify average electrolyte temperature (minimum of 10%

92 Days of cells) is within Table 3.8.7-1 Category B limits.

TRS 3.8.7.3 Verify battery cell parameters meet Table 3.8.7-1 2 Years Category B Limits for Specific Gravity.

TRS 3.8.7.4 Verify Battery cells, cell plates, and racks show no visual 2 Years indication of physical damage or abnormal deterioration that could potentially degrade battery performance.

TRS 3.8.7.5 Verify the battery connection resistance is:

2 Years

a. < 100.0 E-6 ohms for any single connection; AND
b. The calculated average resistance for the battery is

< 50.0 E-6 ohms.

SUSQUEHANNA - UNIT 2 TRM / 3.8-28 EFFECTIVE DATE 11/29/2006

PPL Rev. 0 Battery Monitoring and Maintenance Program 3.8.7 Table 3.8.7-1 (page 1 of 1)

Battery/Battery Cell Parameter Requirements CELL CATEGORY A:

CATEGORY B:

CATEGORY C:

PARAMETER LIMITS FOR EACH LIMITS FOR EACH ALLOWABLE LIMITS DESIGNATED PILOT CONNECTED CELL FOR EACH CELL CONNECTED CELL Electrolyte Level

_> Minimum level

> Minimum level Above top of plates, indication mark, and indication mark, and and not overflowing

< % inch above

<% 1/4inch above maximum level maximum level indication mark(a) indication mark(a)

Float Voltage

> 2.13 V

_2.13 V

>2.07 V Specific Gravity(b)

N/A Not more than 0.020 N/A below average of all connected cells AND Average of all connected cells

>1.195 Cell Temperature

> 60 Degrees F

> 60 Degrees F

Ž60 Degrees F (a) It is acceptable for the electrolyte level to temporarily increase above the specified maximum level during and immediately following equalizing charges provided it is not overflowing.

(b) Corrected for cell temperature. Level correction is not required.

SUSQUEHANNA - UNIT 2 TRM / 3.8-29 EFFECTIVE DATE 11/29/2006

PPL Rev. 0 Battery Monitoring and Maintenance Program B 3.8.7 B 3.8.7 Battery Monitoring and Maintenance Program BASES BACKGROUND This TRO delineates the limits on electrolyte temperature, electrolyte level, float voltage, and specific gravity for the Unit 1, when common loads are aligned, and Unit 2 DC electrical power subsystems batteries and comprises the "Battery Monitoring and Maintenance Program" as required under Technical Specification 5.5.13. A discussion of these batteries and their OPERABILITY requirements is provided in the Bases for Technical Specification LCO 3.8.4, "DC Sources-Operating," and LCO 3.8.5, "DC Sources-Shutdown."

APPLICABLE SAFETY ANALYSES The initial conditions of Design Basis Accident (DBA) and transient analyses in FSAR, Chapter 6 (Ref. 1) and Chapter 15 (Ref. 2), assume Engineered Safety Feature systems are OPERABLE. The DC electrical power subsystems provide normal and emergency DC electrical power for the diesel generators (DGs), emergency auxiliaries, and control and switching during all MODES of operation.

The OPERABILITY of the DC subsystems is consistent with the initial assumptions of the accident analyses and is based upon meeting the design basis of the unit. This includes maintaining DC sources identified in Technical Specification Table 3.8.4-1 OPERABLE during accident conditions, in the event of:

a.

An assumed loss of all offsite AC or all onsite AC power; and

b.

A worst case single failure.

Since battery cell parameters support the operation of the DC electrical power subsystems, they satisfy Criterion 3 of the NRC Policy Statement (Ref. 3).

TRO Battery cell parameters must remain within acceptable limits to ensure availability of the required DC power to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence or a postulated DBA.

Electrolyte limits are conservatively established, allowing continued DC electrical system function even with Category A and B limits not met.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.8-18 EFFECTIVE DATE 11/29/2006

PPL Rev. 0 Battery Monitoring and Maintenance Program B 3.8.7 BASES (continued)

APPLICABILITY The battery cell parameters are required solely for the support of the associated DC electrical power subsystem. Therefore, battery cell parameters are required to be within required lirhits only when the associated DC power source is required to be OPERABLE. Refer to the Applicability discussions in Technical Specification Bases for LCO 3.8.4 and LCO 3.8.5.

ACTIONS A Note has been added to provide clarification that, for the purpose of this TRO, separate Condition entry is allowed for each battery. This is acceptable, since the Required Actions for each Condition provide appro-priate compensatory actions for each inoperable battery. Complying with the Required Actions may allow for continued operation, and subsequent inoperable batteries are governed by subsequent Condition entry and application of associated Required Actions.

A.1, A.2, and A.3 With parameters of one or more cells in one or more batteries not within limits (i.e., Category A limits not met or Category B limits not met, or Category A and B limits not met) but within the Category C limits specified in Table 3.8.7-1, the-battery is degraded but there is still sufficient capacity to perform the intended function. Therefore, the affected battery is not required to be considered inoperable solely as a result of Category A or B limits not met and continued operation is permitted for a limited period.

The pilot cell electrolyte level and float voltage are required to be verified to meet the Category C limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (Required Action A.1). This check provides a quick indication of the status of the remainder of the battery cells. One hour provides time to inspect the electrolyte level and to confirm the float voltage of the pilot cell. One hour is considered a reasonable amount of time to perform the required verification.

Verification that the Category C limits are met (Required Action A.2) provides assurance that during the time needed to restore the parameters to the Category A and B limits, the battery is still capable of performing its intended function. A period of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is allowed to complete the initial verification because average temperature measurement must be obtained for the battery. Taking into consideration both the time required to perform the required verification and the assurance that the battery cell parameters are not severely degraded, this time is considered reasonable.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.8-19 EFFECTIVE DATE 11/29/2006

PPL Rev. 0 Battery Monitoring and Maintenance Program B 3.8.7 BASES ACTIONS A.1, A.2, and A.3 (continued)

Verification of the average temperature of the battery within the design bases ensures operability. The verification is repeated at 7-day intervals until the parameters are restored to Category A and B limits.

Continued operation is only permitted for 31 days before battery cell parameters must be restored to within Category A and B limits. Taking into consideration that, while battery capacity is degraded, sufficient capacity exists to perform the intended function and to allow time to fully restore the battery cell parameters to normal limits, this time is acceptable for operation prior to declaring the DC batteries inoperable.

B.1 Failure to complete the checks required for Actions A. 1 or A.2 require immediate action. Entry into Technical Specification 3.8.6 must be entered immediately.

C._1 When any battery parameter is outside the Category C limit for any connected cell, sufficient capacity to supply the maximum expected load requirement is not ensured and the corresponding DC electrical power subsystem must be declared inoperable. Additionally, other potentially extreme conditions, such as not completing the Required Action A.3 within the required Completion Time also are cause for immediately declaring the associated DC electrical power subsystem inoperable.

D.1 Cells that have been discovered with electrolyte level below the top of the plates are equalized and tested lAW Technical Specification 5.5.13.

E. 1 Required Action E. 1 is to ensure that under extreme conditions, such as failure to complete the required Action D.1 within the required completion time, average electrolyte temperature falling below 600 F, or intercell connections found not within required connection resistance also are cause for immediately declaring the associated battery inoperable.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.8-20 EFFECTIVE DATE 11/29/2006

PPL Rev. 0 Battery Monitoring and Maintenance Program B 3.8.7 BASES (continued)

SURVEILLANCE TRS 3.8.7.1 REQUIREMENTS The quarterly inspection for visible corrosion at the terminal and connector is consistent with IEEE-450. The "OR" condition is to ensure, if there is visible corrosion, intercell connection resistance is not impacted.

TRS 3.8.7.2 The quarterly inspection of average electrolyte temperature is consistent with IEEE-450 recommendation to check 10% of the connected cells.

Lower than normal temperatures act to inhibit or reduce battery capacity.

This TRS ensures that the operating temperatures remain within an acceptable operating range. This limit is based on manufacturer's recommendations and battery sizing calculations.

TRS 3.8.7.3 IEEE-450 (Ref. 4) recommends a check of specific gravity every year. The Frequency of the TRS (every 2 years) is acceptable because other administrative controls ensure adequate battery performance during the 2-year interval and aligns performance during refueling outages. Further, operating experience has shown this component usually pass the TRS when performed at the 2-year Frequency; therefore, the frequency is acceptable from a reliability standpoint.

TRS 3.8.7.4 Visual inspection of the battery cells, cell plates, and battery racks provides an indication of physical damage or abnormal deterioration that could potentially degrade battery performance. The presence of physical damage or deterioration does not represent a failure of the TRS, provided an evaluation determines that the physical damage or deterioration does not affect the OPERABILITY of the battery (its ability to perform its design function). The Frequency of the TRS is acceptable because other administrative controls ensure adequate battery performance during the 2-year interval and aligns performance during refueling outages. Further, operating experience has shown these components usually pass the TRS when performed at the 2-year Frequency; therefore, the frequency is acceptable from a reliability standpoint.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.8-21 EFFECTIVE DATE 11/29/2006

PPL Rev. 0 Battery Monitoring and Maintenance Program B 3.8.7 BASES SURVEILLANCE REQUIREMENTS TRS 3.8.7.5 (continued)

The connection resistance limits for this SR must be below the limits specified in the SR. The calculated average resistance limit ensure that the total voltage drop across the battery connections is consistent to those assumed in the battery calculations, while the upper limit for battery resistance prevents the possibility of battery damage due to overheating of the connections.

The Frequency of this SR is acceptable because other administrative controls ensure adequate battery performance during the 2-year interval and aligns performance with refueling outage intervals.

Furthermore, operating experience has shown these components usually.pass the Surveillance when performed at the 2-year Frequency; therefore, the Frequency is acceptable from a reliability standpoint.

Table 3.8.7-1 This table delineates the limits on electrolyte level, float voltage, temperature and specific gravity for three different categories.

The meaning of each category is discussed below.

Category A defines the normal parameter limit for each designated pilot cell in each battery. The cells selected as pilot cells are those whose temperature and voltage provide an indication of the state of charge of the entire battery.

The Category A limits specified for electrolyte level are based on manufacturer's recommendations and are consistent with the guidance in IEEE-450 (Ref. 4), with the extra % inch allowance above the high water level indication for operating margin to account for temperature and charge effects. In addition to this allowance, footnote (a) to Table 3.8.7-1 permits the electrolyte level to be above the specified maximum level during equalizing charge, provided it is not overflowing. These limits ensure that the plates suffer no physical damage, and that adequate electron transfer capability is maintained in the event of transient conditions. IEEE-450 (Ref. 4) recommends that electrolyte level readings should be made only after the battery has been at float charge for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.8-22 EFFECTIVE DATE 11/29/2006

PPL Rev. 0 Battery Monitoring and Maintenance Program B 3.8.7 BASES SURVEILLANCE REQUIREMENTS Table 3.8.7-1 (continued)

The Category A limit specified for float voltage is _> 2.13 V per cell.

This value is based on the recommendation of IEEE-450 (Ref. 4) which states that prolonged operation of cells below 2.13 V can reduce the life expectancy of cells.

Category B defines the normal parameter limits for each connected cell.

The term "connected cell" excludes any battery cell that may be jumpered out.

The Category B limits specified for electrolyte level and float voltage are the same as those specified for Category A. The Category B limit specified for specific gravity for each connected cell is no more than 0.20 below the average of all connected cells with the average > 1.195. These values are based on manufacturer's recommendations for the minimum required value. The minimum specific gravity value required for each cell ensures that the effects of a highly charged or newly installed cell do not mask overall degradation of the battery.

Because of specific gravity gradients that are produced during the re-charging process, delays of several days may occur while waiting for the specific gravity to stabilize. However, following a minor battery recharge (such as equalizing charge that does not follow a deep discharge) specific gravity gradients are not significant.

Category C defines the limits for each connected cell. These values, although reduced, provide assurance that sufficient capacity exists to perform the intended function and maintain a margin of safety. When any battery parameter is outside the Category C limits, the assurance of sufficient capacity described above no longer exists, and the battery must be declared inoperable.

The Category C limit specified for electrolyte level (above the top of the plates and not overflowing) ensures that the plates suffer no physical damage and maintain adequate electron transfer capability. The Category C allowable limit for voltage is based on IEEE-450 (Ref. 4), which states that a cell voltage of 2.07 V or below, under float conditions and not caused by elevated temperature of the cell, indicates internal cell problems and may require cell replacement.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.8-23 EFFECTIVE DATE 11/29/2006

PPL Rev. 0 Battery Monitoring and Maintenance Program B 3.8.7 BASES SURVEILLANCE REQUIREMENTS Table 3.8.7-1 (continued)

Footnote (b) to Table 3.8.7-1 applies to Category B Specific Gravity and requires correction for electrolyte temperature.

REFERENCES

1.

FSAR, Chapter 6

2.

FSAR, Chapter 15

3.

Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132)

4.

IEEE Standard 450-1995 SUSQUEHANNA - UNIT 2 TRM / B 3.8-24 EFFECTIVE DATE 11/29/2006