Tech Spec for Pages for Amendments 231 and 226 Steam Generator Alternate Repair Criteria
ML063060014
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/01/2006
From:
NRC/NRR/ADRO/DORL/LPLII-2
To:
Moroney B, NRR/DORL, 415-3974
Shared Package
ML062990193 List:
References
TAC MD1380, TAC MD1381
Download: ML063060014 (4)


Text

3 E.

Pursuant to the Act and 10 CFR Parts 40 and 70 to receive, possess, and use at any time 100 milligrams each of any source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactively contaminated apparatus; F.

Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Turkey Point Units Nos. 3 and 4.

3.

This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified below:

A.

Maximum Power Level The applicant is authorized to operate the facility at reactor core power levels not in excess of 2300 megawatts (thermal).

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 231 are hereby incorporated into this renewed license. The Environmental Protection Plan contained in Appendix B is hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

C.

Final Safety Analysis Report The licensee's Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21 (d), as revised on November 1, 2001, describes certain future inspection activities to be completed before the period of extended operation.

The licensee shall complete these activities no later than July 19, 2012.

The Final Safety Analysis Report supplement as revised on November 1, 2001,"

described above, shall be included in the next scheduled update to the Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following the issuance of this renewed license. Until that update is complete, the licensee may make changes to the programs described in such supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

Renewed License No. DPR-31 Amendment No. 231 E.

Pursuant to the Act and 10 CFR Parts 40 and 70 to receive, possess, and use at any time 100 milligrams each of any source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactively contaminated apparatus; F.

Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Turkey Point Units Nos. 3 and 4.

3.

This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified below:

A.

Maximum Power Level The applicant is authorized to operate the facility at reactor core power levels not in excess of 2300 megawatts (thermal).

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 226 are hereby incorporated into this renewed license. The Environmental Protection Plan contained in Appendix B is hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

C.

Final Safety Analysis Report The licensee's Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21 (d), as revised on November 1, 2001, describes certain future inspection activities to be completed before the period of extended operation.

The licensee shall complete these activities no later than July 19, 2012.

The Final Safety Analysis Report supplement as revised on November 1, 2001, described above, shall be included in the next scheduled update to the Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following the issuance of this renewed license. Until that update is complete, the licensee may make changes to the programs described in such supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

Renewed License No. DPR-41 Amendment No. 226

REACTOR COOLANT SYSTEM STEAM GENERATORS SURVEILLANCE REQUI REMENTS (Continued) 4.4.5.4 Acceptance Criteria

a.

As used in this specification:

1)

Imperfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications. Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections;

2)

Degradation means a service-induced cracking, wastage, wear or general corrosion occurring on either inside or outside of a tube;

3)

Degraded Tube means a tube containing imperfections greater than or equal to 20% of the nominal wall thickness caused by degradation;

4)

% Degradation means the percentage of the tube wall thickness affected or removed by degradation;

5)

Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective.

6)

Plugging Limit means the imperfection depth at or beyond which the tube shall be removed from service because it may become unserviceable prior to the next inspection and is equal to 40% of the nominal tube wall thickness. For Unit 3 during Refueling Outage 23 and the subsequent operating cycles until the next scheduled inspection, and for Unit 4 during Refueling Outage 23 and the subsequent operating cycles until the next scheduled inspection, this criterion does not apply to degradation identified in the portion of the tube below 17 inches from the top of the hot leg tubesheet. Degradation found in the portion of the tube below 17 inches from the top of the hot leg tubsheet does not require plugging. For Unit 3 during Refueling Outage 23 and the subsequent operating cycles until the next scheduled inspection, and for Unit 4 during Refueling Outage 23 and the subsequent operating cycles until the next scheduled inspection, all tubes with degradation identified in the portion of the tubewithin the region from the top of the hot leg tubesheet to 17 inches below the top of the tubesheet shall be removed from service;

7)

Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a steam line or feedwater line break as specified in 4.4.5.3c, above;

8)

Tube Inspection means an inspection of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg, or from the point of entry (cold leg side) completely around the U-bend and to the bottom of the hot leg. For Unit 3 during Refueling Outage 23 and the subsequent operating cycles until the next scheduled inspection, and for Unit 4 during Refueling Outage 23 and the subsequent.operating cycles until the next scheduled inspection, the portion of the tube below 17 inches from the top of the hot leg tubesheet is excluded; and TURKEY POINT - UNITS 3 & 4 314 4-14 AMENDMENT NOS. 231 AND 226

REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATING 3.4.6.2 Reactor Coolant System leakage shall be limited to:

a.

No PRESSURE BOUNDARY LEAKAGE,

b.

1 GPM UNIDENTIFIED LEAKAGE,

c.

150 gallons per day primary-to-secondary leakage through any one steam generator (SG),

d.

10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System, and

e.

Leakage as specified in Table 3.4-1 up to a maximum of 5 GPM at a Reactor Coolant System pressure of 2235 +/- 20 psig from any Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1.*

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

a.

With any PRESSURE BOUNDARY LEAKAGE, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, and leakage from Reactor Coolant System Pressure Isolation Valves, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c.

With any Reactor Coolant System Pressure Isolation Valve leakage greater than allowed by 3.4.6.2.e above operation may continue provided:

1.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> verify that at least two valves in each high pressure line having a non-functional valve are in, and remain in that mode corresponding to the isolated condition, i.e., manual valves shall be locked in the closed position; motor operated valves shall be placed in the closed position and power supplies deenergized.

Follow applicable ACTION statement for the affected system, and

  • Test pressure less than 2235 psig are allowed.

Minimum differential test pressure shall not be less than 150 psid.

Observed leakage shall be adjusted for the actual test pressure up to 2235 psig assuming the leakage to be directly proportional to pressure differential to the one-half power.

TURKEY POINT - UNITS 3 & 4 3/4 4-19 AMENDMENT NOS. 231 AND 226