(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at a steady state reactor core power level not in excess of 3459 megawatts (one hundred percent of rated core power).

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.276 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3) Deleted Per Amendment 22, 11-20-79 (4) Less than Four Loop Operation PSEG Nuclear LLC shall not operate the reactor at power levels above P-7 (as defined in Table 3.3-1 of Specification 3.3.1.1 of Appendix A to this license) with less than four (4) reactor coolant loops in operation until safety analyses for less than four loop operation have been submitted by the licensees and approval for less than four loop operation at power levels above P-7 has been granted by the Commission by Amendment of this license.

(5) PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, and as approved in the NRC Safety Evaluation Report dated November 20,.1979, and in its supplements, subject to the following provision:

PSEG Nuclear LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

Amendment No.276

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the limiting Conditions for Operation contained in the succeeding specifications is required during the OPERATIONAL MODES or other conditions specified therein; except that upon failure to meet the Limiting Conditions for Operation, the associated ACTION requirements shall be met.

3.0.2 Noncompliance with a specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals. If the Limiting Condition for Operation is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.

3.0.3 When a Limiting Condition for Operation is not met except as provided in the associated ACTION requirements, within one hour action shall be initiated to place the unit in a MODE in which the specification does not apply by placing it, as applicable, in:

1. At least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />,
2. At least HOT SHUTDOWN within the following 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />, and
3. At least COLD SHUTDOWN within the subsequent 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />.

Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation. Exceptions to these requirements are stated in the individual specifications.

3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; or
b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

SALEM - UNIT 1 3/4 0-1 Amendment No. 27 6

APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other specified conditions in the Applicability for individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Condition for Operation.

Failure to perform a Surveillance within the specified frequency shall be failure to meet the Limiting Condition for Operation, except as provided in Specification 4.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.

4.0.3 If it is discovered that a Surveillance was not performed within its specified frequency, then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> or up to the limit of the specified frequency, whichever is greater.

This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.

4.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 4.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2 and 3 components shall be applicable as follows:

a. Inservice inspection of ASME Code Class 1, 2 and 3 components and inservice testing of ASME Code Class 1, 2 and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50, Section 50.55a(g) (6) (i).
b. Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:

SALEM - UNIT 1 3/4 0-2a Amendment No. 276

TABLE 3.3-1 (Continued)

REACTOR TRIP SYSTEM INSTRUMENTATION MINIMUM TOTAL NUMBER CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

11. Pressurizer Water Level--High 3 2 1, 2 6
12. Loss of Flow - Single Loop 3/loop 2/loop in 2/loop in 1 6 (Above P-8) any oper- each oper-ating loop ating loop 2 2
13. Loss of Flow - Two Loops 3/loop /loop in /loop in 1 6 (Above P-7 and below P-8) two oper- each oper-ating loops ating loop
14. Steam Generator Water Level-- 3/loop 2/loop in 2/loop in 1, 2 6 Low-Low any oper- each oper-ating loops ating loop
15. Deleted
16. Undervoltage-Reactor Coolant Pumps 4-1/bus 1/2 twice 3 6
17. Underfrequency-Reactor Coolant 4-1/bus 1/2 twice 3 1 6 Pumps SALEM - UNIT 1 3/4 3-3 Amendment No. 276

TABLE 3.3-1 (Continued)

REACTOR TRIP SYSTEM INSTRUMENTATION INSTRUMENTATION MINIMUM TOTAL NUMBER CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

18. Turbine Trip
a. Low Autostop Oil Pressure 3 2 2 1 6
b. Turbine Stop Valve Closure 4 4 3 1 6
19. Safety Injection Input from ESF 2 1 2 1,2 10
20. Reactor Coolant Pump Breaker 1/breaker 2 1/breaker 1 11 Position Trip (above P-7) per opera-ting loop
21. Reactor Trip Breakers 2 1 2 1, 2 1###, 14 3*,4*,5* 13
22. Automatic Trip Logic 2 1 2. 1, 2 10 3*,4*, 5* 13 SALEM - UNIT 1 3/4 3-4 Amendment No. 276

TABLE 3.3-1 (Continued)

TABLE NOTATION With the reactor trip system breakers in the closed position and the control rod drive system capable of rod withdrawal.

    1. High voltage to detector may be de-energized above P-6.
      1. If ACTION Statement 1 is entered as a result of Reactor Trip Breaker (RTB) or Reactor Trip Bypass Breakers (RTBB) maintenance testing results exceeding the following acceptance criteria, NRC reporting shall be made within 30 days in accordance with Specification 6.9.2:
1. A RTB or RTBB trip failure during any surveillance test with less than or equal to 300 grams of weight added to the breaker trip bar.
2. A RTB or RTBB time response failure that results in the overall reactor trip system time response exceeding the Technical Specification limit.

ACTION STATEMENTS ACTION 1 - With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, be in HOT STANDBY within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />; however, one channel may be bypassed for up to 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> for surveillance testing per Specification 4.3.1.1.1 provided the other channel is OPERABLE.

ACTION 2 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.1.
c. Either, THERMAL POWER is restricted to _*75% of RATED THERMAL POWER and the Power Range, Neutron Flux trip setpoint is reduced to *< 85% of RATED THERMAL POWER within 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br />; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />.

SALEM U-NIT 1 3/4 3-5 Amendment No 2 7 6

TABLE 3.3-3 ENGI]NEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS APPLIICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MO[ DES ACTION

1. SAFETY INJECTION, TURBINE TRIP AND FEEDWATER ISOLATION
a. Manual Initiation 2 2 1,2,3,4 18
b. Automatic Actuation Logic 2 2 1,2,3,4 13
c. Containment Pressure-High 3 2 2 1,2,3 19
d. Pressurizer Pressure-Low 3 2 2 1,2, 3# 19
e. Differential Pressure Between 3/steam line 2/steam line 2/steam 1,2, 3## 19 Steam Lines - High any steam line line
f. Steam Flow in Two Steam 2/steam line 1/steam line 1/steam 1,2, 3## 19 Lines-High any2 steam line lines COINCIDENT WITH EITHER Tavg -- Low-Low I Tavg/loop 1 Tavg in 1 Tavg 1,2, 3## 19 any 2 loops in any 3 loops OR, COINCIDENT WITH Steam Line Pressure-Low 1 pressure/ 1 pressure 1 pressure 1,2, 3## 19 loop any 2 loops any 3 loops 27 6 SALEM - UNIT 1 3/4 3-15. Amendment No.

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS A]PPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

4. STEAM LINE ISOLATION
a. Manual 2/steam line 1/steam line 1/operating 1,2,3 23 steam line
b. Automatic Actuation Logic 1 2 1,2,3 20 C. Containment Pressure--High-High 4 2 3 1,2,3 16
d. Steam Flow in Two Steam 2/steam line 1/steam line I/steam line 1,2, 3## 19 Lines--High any 2 steam lines COINCIDENT WITH EITHER Tavg--Low-Low 1 Tavg/loop 1 Tavg in 1 Tavg in 1,2, 3## 19 any 2 loops any 3 loops OR, COINCIDENT WITH Steam Line Pressure-Low 1 pressure/ 1 pressure 1 pressure 1,2, 3## 19 loop any 2 loops any 3 loops 7

SALEM - UNIT 1 3/4 3-19 Amendment No. 2 6

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

5. TURBINE TRIP & FEEDWATER ISOLATION 3
a. Steam Generator Water level-- /loop 2/loop in 2/loop in 1,2,3 19 High-High any operating each operating loop loop
6. SAFEGUARDS EQUIPMENT 3 2 3 1,2,3,4 13 CONTROL SYSTEM (SEC)
7. UNDERVOLTAGE, VITAL BUS
a. Loss of Voltage 1/bus 2 3 1,2,3 14
b. Sustained Degraded Voltage 3/bus 2/bus 3/bus 1,2,3 14 SALEM - UNIT 1 3/4 3-20 , Amendment No. 276

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

8. AUXILIARY FEEDWATER
a. Automatic Actuation Logic **2 1 2 1,2,3 20
b. NOT USED
c. Steam Generator Water Level--Low-Low
i. Start Motor Driven Pumps 3/stm. gen. 2/stm. gen. 2/stm.gen. 1,2,3 19 any stm.gen.

ii.Start Turbine Driven Pumps 3/stm. gen. 2/stm. gen. 2/stm.gen. 1,2,3 19 any 2 stm.gen.

d. Undervoltage - RCP Start 4-1/bus 1/2 x 2 3 1,2 19 Turbine - Driven Pump
e. S.I. Start Motor-Driven Pumps See 1 above (All S.I. ini tiating functions and requirements)
f. Trip of Main Feedwater Pumps 2/pump 1/pump l/pump 1,2 21 Start Motor Driven Pumps
g. Station Blackout See 6 and 7 above (SEC and U/V Vital Bus)

SALEM - UNIT 1 3/4 3-20a Amendment No. 276

TABLE 3.3-3 (Continued)

TABLE NOTATION

  1. Trip function may be bypassed in this MODE below P-1i.
    1. Trip function may .be bypassed in this MODE below P-12.
    • Applies to Functional Unit 8 items c and d.
      • The automatic actuation logic includes two redundant solenoid operated vent valves for each Main Steam Isolation Valve,. One vent valve on any one Main Steam Isolation Valve may be isolated without affecting the function of the automatic actuation logic provided the remaining seven solenoid vent valves remain OPERABLE. The isolated MSIV vent valve shall be returned to OPERABLE status upon the first entry into MODE 5 following determination that the vent valve is inoperable. For any condition where more than one of the eight solenoid vent valves are inoperable, entry into ACTION 20 is required.

ACTION STATEMENTS ACTION 13 - With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> or, be in HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />; however, one channel may be bypassed for up to 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> for surveillance testing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.

ACTION 14 - With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed until performance of the next required CHANNEL FUNCTIONAL TEST, provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 15 - NOT USED ACTION 16 - With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is demonstrated by CHANNEL CHECK within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />; one additional channel may be bypassed for up to 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> for surveillance testing per Specification 4.3.2.1.1.

ACTION 17 - With less than the Minimum Channels OPERABLE, operations may continue provided the containment purge and exhaust valves are maintained closed.

ACTION 18 - With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.

SALEM - UNIT 1 3/4 3-21 Amendment No. 276

INSTRUMENTATION 3/4 .3.3 MONITORING INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.1 The radiation monitoring instrumentation channels shown in Table 3.3-6 shall be OPERABLE with their alarm/trip setpoints within the specified limits.

APPLICABILITY: As shown in Table 3.3-6.

ACTION:

a. With a radiation monitoring channel alafm/trip setpoint exceeding the value shown in Table 3.3-6, adjust the setpoint to within the limit within 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> or declare the channel inoperable.
b. With one or more radiation monitoring channels inoperable, take the ACTION shown in Table 3.3-6.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.1 Each radiation monitoring instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIQNAL TEST operations during the modes and at the frequencies shown in Table 4.3-3.

SALEM - UNIT 1 3/4 3-35 SA.mendment No.276

INSTRUMENTATION MOVABLE INCORE DETECTORS LIMITING CONDITION FOR OPERATION 3.3.3.2 The movable incore detection system shall be OPERABLE with:

a. At least 75% of the detector thimbles,
b. A minimum of 2 detector thimbles per core quadrant, and
c. Sufficient movable detectors, drive, and readout equipment to map these thimbles.

APPLICABILITY: When the movable incore detection system is used for:

a. Recalibration of the excore neutron flux detection system,
b. Monitoring the QUADRANT POWER TILT RATIO, or
c. Measurement of 4Hand F (Z)

ACTION:

With the movable incore detection system inoperable, do not use the system for the above applicable monitoring or calibration functions. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.2 The movable incore detection system shall be demonstrated OPERABLE by normalizing each detector output to be used during its use when required for:

a. Recalibration of the excore neutron flux detection system, or
b. Monitoring the QUADRANT POWER TILT RATIO, or
c. Measurement of FýHN and FQ (Z)

SALEM - UNIT 1 3/4 3-39 Amendment No. 276

INSTRUMENTATION REMOTE SHUTDOWN INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.5 The remote shutdown monitoring instrumentation channels shown in Table 3.3-9 shall be OPERABLE with readouts displayed external to the control room.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

a. With the number of OPERABLE remote shutdown monitoring channels less than required by Table 3.3-9, either restore the inoperable channel to OPERABLE status within 30 days or be in HOT SHUTDOWN within the next 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />.

SURVEILLANCE REQUIREMENTS 4.3.3.5 Each remote shutdown monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-6.

SALEM - UNIT 1 3/4 3-46 Amendment No. 276

INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.7 The accident monitoring instrumentation channels shown in Table 3.3-11 shall be operable.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a. As shown in Table 3.3-11.

SURVEILLANCE REQUIREMENTS 4.3.3.7 Each accident monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-11.

SALEM - UNIT 1 3/4 3-53 Amendment No. 2 7 6

INSTRUMENTATION RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.8 The radioactive liquid effluent monitoring instrumentation channels shown in Table 3.3-12 shall be operable to ensure that the limits of ODCM Control 3.11.1.1 are not exceeded.

APPLICABILITY: At all times.

ACTION:

a. Not Used
b. With less than the minimum number of radioactive liquid effluent monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-12. Exert best efforts to return the instrument to OPERABLE status within 30 days and, if unsuccessful, explain in the next annual radioactive effluent release report why the inoperability was not corrected in a timely manner.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.8 Each radioactive liquid effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, CHANNEL CALIBRATION, and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-12.

SALEM - UNIT 1 3/4 3-58 Amendment No. 276

INSTRUMENTATION RADIOACTIVE GASEOUS EFFLUENT OXYGEN MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.9 The radioactive gaseous effluent oxygen monitoring instrumentation channels shown in Table 3.3-13 shall be OPERABLE with their alarm/trip setpoints set to ensure that the limits of Specification 3.112.5 are not exceeded.

APPLICABILITY: As shown in Table 3.3-13 ACTION:

a. With a radioactive gaseous effluent oxygen monitoring instrumentation channel alarm/trip setpoint less conservative than required by the above specification, declare the channel inoperable and take the ACTION shown in Table 3.3-13.
b. With less than the minimum number of radioactive gaseous effluent oxygen monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-13. Exert best efforts to return the instrument to OPERABLE status within 30 days and, if unsuccessful, prepare and submit a Special Report pursuant to Specification 6.9.2 to explain why the inoperability was not corrected in a timely manner.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.9 Each radioactive gaseous effluent oxygen monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, CHANNEL CALIBRATION, and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-13.

SALEM - UNIT 1 3/4 3-64 Amendment No.276

INSTRUMENTATION POWER DISTRIBUTION MONITORING SYSTEM LIMITING CONDITION FOR OPERATION (Continued)

APPLICABILTY: MODE 1, above 25% RATED THERMAL POWER (RTP)

ACTION:

With any of the operability criteria listed in 3.3.3.14.a, 3.3.3.14.b, or 3.3.3.14.c not met, either correct the deficient operability condition, or declare the PDMS inoperable and use the incore movable detector system, satisfying the OPERABILITY requirements listed in Specification 3.3.3.2, to obtain any required core power distribution measurements. Increase the measured core peaking factors using the values listed in the COLR for the PDMS inoperable condition.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.14.1 The operability criteria listed in 3.3.3.14.a, 3.3.3.14.b, and 3.3.3.14.c shall be verified to be satisfied prior to acceptance of the PDMS core power distribution measurement results.

4.3.3.14.2 Calibration of the PDMS is required:

a. At least once every 180 Effective Full Power Days when the minimum number and core coverage criteria as defined in 3.3.3.14.b.1 and 3.3.3.14.b.2 are satisfied, or
b. At least once every 31 Effective Full Power Days when only the minimum number criterion as defined in 3.3.3.14.b.3 is satisfied.

SALEM - UNIT 1 3 /4 3-71 Amendment No. 2 7 6

REACTOR COOLANT SYSTEM SPECIFIC ACTIVITY LIMITING CONDITION FOR OPERATION 3.4.8 The spedific activity of the primary coolant shall be limited to:

a.
  • 1.0 pCi/gram DOSE EQUIVALENT 1-131, and
b.
  • 100/EpCi/gram.

APPLICABILITY: MODES 1, 2, 3, 4 and 5 ACTION:

MODES 1, 2 and 3*

a. With the specific activity of the primary coolant > 1.0 pCi/gram DOSE EQUIVALENT 1-131 for more than 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> during one continuous time interval or exceeding the limit line shown on Figure 3.4-1, be in at least HOT STANDBY with Tavg < 500'F within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
b. With the specific activity of the primary coolant > 100/94iCi/gram, be in at least HOT STANDBY with Tavg < 500'F within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
c. LCO 3.0.4.c is applicable.

MODES 1, 2, 3, 4 and 5

a. With the specific activity of the primary coolant > 1.0 pCi/gram DOSE EQUIVALENT 1-131 or > 100/EpCi/gram, perform the sampling and analysis reauirements of item 4a of Table 4.4-4 until the specific activity of the primary coolant is restored to within its limits.

SURVEILLANCE REQUIREMENTS 4.4.8 The specific activity of the primary coolant shall be determined to be within the limits by performance of the sampling and analysis program of Table 4.4-4.

  • With Tavg - 500°F.

SALEM - UNIT 1 -3/4 4-20 Amendment No. 2 7 6

\

REACTOR COOLANT SYSTEM OVERPRESSURE PROTECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.9.3 At least one of the following overpressure protection systems shall be OPERABLE:

a. Two Pressurizer Overpressure Protection System relief valves (POPS) with a lift setting of less than or equal to 375 psig, or
b. A reactor coolant system vent of greater than or equal to 3.14 square inches.

APPLICABILITY: When the temperature of one or more of the RCS cold.legs is less than or equal to 312 0 F, except when the reactor vessel head is removed.

ACTION:

a. With one POPS inoperable in MODE 4 and the temperature of one or more of the RCS cold legs is less than or equal to 312 0 F, either restore the inoperable POPS to OPERABLE status within 7 days or depressurize and vent the RCS through a 3.14 square inch vent(s) within the next 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br />; maintain the RCS in a vented condition until both POPSs have been restored to OPERABLE status.
b. With one POPS inoperable in MODES 5 or 6 with the Reactor Vessel Head installed, restore the inoperable POPS to OPERABLE status within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />, or complete depressurization and venting of the RCS through at least a 3.14 square. inch vent(s) within the next 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br />; maintain the RCS in a vented condition until both POPSs have been restored to OPERABLE status.
c. With both POPSs inoperable, depressurize and vent the RCS through a 3.14 square inch vent(s) within 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br />; maintain the RCS in a vented condition until both POPSs have been restored to OPERABLE status.
d. In the event either the POPS or the RCS vent(s) are used to.

mitigate a RCS pressure transient, a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 30 days. The report shall describe the circumstances initiating the transient, the effect of the POPS or vent(s) on the transient and any corrective action necessary to prevent recurrence.

e. LCO 3.0.4.b is not applicable when entering MODE 4.

SALEM - UNIT 1 3/4 4-30 Amendment No. 276

REACTOR COOLANT SYSTEM 3.4.10 STRUCTURAL INTEGRITY ASME CODE CLASS 1, 2 and 3 COMPONENTS LIMITING CONDITION FOR OPERATION 3.4.10.1 The structural integrity of ASME Code Class 1, 2 and 3 components shall be maintained in accordance with Specification 4.4.10.1.1.

APPLICABILITY: ALL MODES ACTION:

a. With the structural integrity of any ASME Code Class 1 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature more than 50'F above the minimum temperature required by NDT considerations.
b. With the structural integrity of any ASME Code Class 2 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature above 200'F.
c. With the structural integrity of any ASME Code Class 3 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) from service.

SURVEILLANCE REQUIREMENTS 4.4.10.1.1 The structural integrity of ASME Code Class 1, 2 and 3 components shall be demonstrated:

a. Per the requirements of Specification 4.0.5, and
b. Per the requirements of the augmented inservice inspection program specified in Specification 4.4.10.1.2.

SALEM - UNIT 1 3/4 4-32 Amendment No. 2 7 6

EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - Tavg <350'F LIMITING CONDITION FOR OPERATION 3.5.3 As a minimum, one ECCS subsystem comprised of the following shall be OPERABLE:

a. One OPERABLE centrifugal charging pumpý and associated flow path capable of taking suction from the refueling water storage tank and transferring suction to the residual heat removal pump discharge piping and;
1. Discharging into each Reactor Coolant System (RCS) cold leg.
b. One OPERABLE residual heat removal pump and associated residual heat removal heat exchanger and flow path capable of taking suction from the refueling water storage tank on a safety injection signal and transferring suction to the containment sump during the recirculation phase of operation and;
1. Discharging into each RCS cold leg, and; upon manual initiation,
2. Discharging into two RCS hot legs.

APPLICABILITY: MODE 4.

ACTION:

a. With no ECCS subsystem OPERABLE because of the inoperability of either the centrifugal charging pump or the flow path from the refueling water storage tank, restore at least one .ECCS subsystem to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in COLD SHUTDOWN within the next 20 hours0.833 days <br />0.119 weeks <br />0.0274 months <br />.
b. With no ECCS subsystem OPERABLE because of the inoperability of either the residual heat removal heat exchanger or residual heat removal pump, restore at least one ECCS subsystem to OPERABLE status or maintain the Reactor Coolant System Tavý less than 350'F by use of alternate heat removal methods.
c. In the event the ECCS is actuated and injects water into the Reactor Coolant System, a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation.

cycles to date.

d. LCO 3.0.4.b is not applicable to ECCS high head subsystem
  1. A maximum of one safety injection pump or one centrifugal charging pump shall be OPERABLE in MODE 4 when the temperature of one or more of the RCS cold legs is less than or equal to 312'F, Mode 5, or Mode 6 when the head is on the reactor vessel.

SALEM - UNIT ! 3/1 5-6 Amendment No. 276

PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated manual activation switches in the control room and flow paths shall be OPERABLE with:

a. Two feedwater pumps, each capable of being powered from separate vital busses, and
b. One feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

a. With one auxiliary' feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in HOT SHUTDOWN within the following 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
b. With two auxiliary feedwater pumps inoperable be in at least HOT STANDBY within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in HOT SHUTDOWN within the following 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
c. With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at-least one auxiliary feedwater pump to OPERABLE status as soon as possible.
d. LCO 3.0.4.b is not applicable.

SURVEILLANCE REQUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

a. At least once per 31 days by:
1. Verifying that each non-automatic valve in the flow path that is not locked, sealed or otherwise secured in position, is in its correct position.
2. Verify the manual maintenance valves in the flow path to each steam generator are locked open.

SALEM - UNIT 1 3/4 7-5 Amendment No. 276

PLANT SYSTEMS 3/4.7.8 SEALED SOURCE CONTAMINATION LIMITING CONDITION FOR OPERATION 3.7.8.1 Each sealed source containing radioactive material either in excess of 100 microcuries of beta and/or gamma emitting material or 5 microcuries of alpha emitting material shall be free of Ž 0.005 microcuries of removable contamination.

APPLICABILITY: At all times.

ACTION:

a. Each sealed source with removable contamination in excess of the above limits shall be immediately withdrawn from use and:
1. Either decontaminated and repaired, or
2. Disposed of in accordance with Commission Regulations.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.8.1.1 Test Requirements - Each sealed source shall be tested for leakage and/or contamination by:

a. The licensee, or
b. Other persons specifically authorized by the Commission or an Agreement State.

The test method shall have a detection sensitivity of at least 0.005 microcuries per test sample.

4.7.8.1.2 Test Frequencies - Each category of sealed sources shall be tested at the frequency described below.

a. Sources in use (excluding startup sources and fission detectors previously subjected to core flux) - At least once per six months for all sealed sources containing radioactive materials.

SALEM - UNIT 1 3/4 7-26 Amendment No. 2 7 6

PLANT SYSTEMS 3/4.7.11 FUEL STORAGE POOL BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.7.11 The fuel storage pool boron concentration shall be Ž 800 ppm.

APPLICABILITY: When fuel assemblies are stored in the fuel storage pool and a fuel storage pool verification has not been performed since the last movement of fuel assemblies in the fuel storage pool.

ACTION:

With fuel storage pool boron concentration not within limit:

a. Immediately suspend movement of fuel assemblies in the fuel storage pool and
b. Initiate action to:
1. immediately restore fuel storage pool boron concentration to within limit or
2. immediately perform a fuel storage pool verification.
c. LCO 3.0.3 is not applicable.

SURVEILLANCE REQUIREMENTS 4.7.11 Verify the fuel storage pool boron concentration is within limit everj 7 days.

Salem Unit 1 3/4 7-35 Amendment No.276

PLANT SYSTEMS 3/4.7.12 FUEL ASSEMBLY STORAGE IN THE SPENT FUEL POOL LIMITING CONDITION FOR OPERATION 3.7.12 The combination of initial enrichment, burnup, and Integral Fuel Burnable Absorber (IFBA) of each fuel assembly stored in Region 1 or Region 2, shall be within the acceptable limits described in the surveillance requirements below.

APPLICABILITY: When any fuel assembly is stored in Region 1 or Region 2 of the spent fuel storage pool.

ACTION:

If the requirements of the LCO are not met:

a. Immediately verify the fuel storage boron concentration meets the requirements of TS 3.7.11 and
b. Immediately initiate action to move the non-complying fuel assembly to a location that complies with the surveillance requirements.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.12.1 Prior to storing fuel assemblies in Region 1, verify by administrative means that the fuel assemblies meet one of the following storage constraints:

a. Unirradiated fuel assemblies with a maximum enrichment of 4.25 wt% U-235 have unrestricted storage.
b. Unirradiated fuel assemblies with enrichments greater than 4.25 wt% U-235 and less than or equal to 5.0 wt% U-235, that do not contain IFBA pins, may only be stored in the peripheral cells facing the concrete wall.
c. Unirradiated fuel assemblies with enrichments (E) greater than 4.25 wt% U-235 and less than or equal to 5.0 wt% U-235, which contain a minimum number of IFBA pins have unrestricted storage. This minimum number of IFBA pins shall have an equivalent reactivity hold-down which is greater than or equal to the reactivity hold-down associated with N IFBA pins, at a nominal 2.35 mg B-10/linear inch loading (l.5x), determined by the equation below:

N 42.67 (E - 4.25)

Salem Unit 1 3/4 7-36 Amendment No.276

ELECTRICAL POWER SYSTEMS ACTION (Continued)

e. With two or more of the above required diesel generators inoperable, demonstrate the OPERABILITY of two independent A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> thereafter; restore at least two of the inoperable diesel generators to OPERABLE status within 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />. Restore three diesel generators to OPERABLE status within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> from time of initial loss or be in least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.
f. With one of the above required fuel transfer pumps inoperable, either restore it to OPERABLE status within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.
g. With one of the above required fuel storage tanks inoperable, either restore it to OPERABLE status within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.
h. LCO 3.0.4.b is not. applicable to DGs.

SALEM - UNIT 1 3/4 8-2a Amendment No. 276

REFUELING OPERATIONS FUEL HANDLING AREA VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.9.12 The Fuel Handling.Area Ventilation System shall be OPERABLE with:

a. Two exhaust fans and one supply fan OPERABLE and operating, and
b. Capable of maintaining slightly negative pressure in the Fuel Handling Building.

APPLICABILITY: During movement of irradiated fuel within the Fuel Handling Building ACTION:

a. With'no Fuel Handling Area Ventilation System OPERABLE, suspend all operations involving movement of fuel within the storage pool until the Fuel Handling Area Ventilation System is restored to OPERABLE status.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.9.12 The above required ventilation system shall be demonstrated OPERABLE:

a. At least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> by verifying that, the Fuel Handling Building is maintained at a slightly negative pressure with respect to atmospheric pressure.
b. At least once per 31 days by verifying both exhaust fans and one supply fan start and operate for at least 15 minutes, if not operating already.
c. At least once per 18 months by verifying a system flowrate of 19,490 cfm +/- 10% during system operation.

SALEM - UNIT 1 3/4 9-12 Amendment No.276

RADIOACrTIVE EFFT,TUINTS LIQUID HOLDUP TANKS*

LIMITING CONDITION FOR OPERATION 3*11.1.4 The quantity of radioactive material contained in each outdoor temporary tank shall be limited to less than or equal to 10 curies, excluding tritium and dissolved or entrained noble gases.

APPLICABILITY: At all times.

ACTION:

a. With the quantity of radioactive material in any of the above listed tanks exceeding the above limit, immediately suspend all additions of radioactive material to the tank and within 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> reduce the tank contents to within the limit.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.1.4 The quantity of radioactive material contained in each outdoor temporary tank shall be determined to be within the above limit by analyzing a representative sample of the tank's contents at least once per 7 days when radioactive materials are being added to the tank.

Tanks included in this Specification are those outdoor temporary tanks that are not surrounded by liners, dikes, or walls capable of holding the tank contents and that do not have tank overflows and surrounding area drains.

connected to the liquid radwaste treatment system.

SALEM - UNIT 1 3/4 11-7 Amendment No. 276

RADIOACTIVE EFFLUENTS EXPLOSIVE GAS MIXTURE LIMITING CONDITION FOR OPERATION 3.11.2.5 The concentration of oxygen in the waste gas holdup system shall be limited to less than or equal to 2% by volume.

APPLICABILITY: At all times.

  • ACTION:
a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volume but less than or equal to 4% by volume, reduce the oxygen concentration to the above limits within 48 hours2 days <br />0.286 weeks <br />0.0658 months <br />.
b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volume immediately suspend all additions of waste gases to the system and reduce the concentration of oxygen to less than or equal to 2% by volume without delay.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.2.5 The concentrations of hydrogen and oxygen in the waste gas holdup system shall be determined to be within the above limits by continuously monitoring the waste gases in the waste gas holdup system with the oxygen monitor required OPERABLE by Table 3.3-13. If hydrogen is not measured, the concentration of hydrogen shall be assumed to exceed 4% by volume.

  • Not applicable to portions of the Waste Gas System removed from service for..

maintenance provided that, the portions removed for maintenance are isolated, and purged of hydrogen to less than 4% by volume.

SALEM - UNIT 1 3/4 11-15 Amendment No. 276

(2) Technical Specifications and Environmental Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 258, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3) SDecial Low Power Test Program PSE&G shall complete the training portion of the Special Low Power Test Program in accordance with PSE&G's letter dated September 5, 1980 and in accordance with the Commission's Safety Evaluation Report "Special Low Power Test Program",

dated August 22, 1980 (See Amendment .No. 2 to DPR-75 for the Salem Nuclear Generating Station, Unit No. 2) prior to operating the facility at a power level above five percent.

Within 31 days following completion of the power ascension testing program outlined in Chapter 13 of the Final Safety Analysis Report, PSE&G shall perform a boron mixing and cooldown test using decay heat and Natural Circulation. PSE&G shall submit the test procedure to the NRC for review and approval prior to performance of the test., The results of this test shall be submitted to the NRC prior to starting up following the first refueling outage.

(4) Initial Test Program PSE&C shall conduct the post-fuel-loading initial test program (set forth in Chapter 13 of the Final Safety Analysis Report, as amended) without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:

(a) Elimination of any test identified in Chapter 13 of the Final Safety Analysis Report, as amended, as essential; (b) Modification of test objectives, methods or acceptance criteria for any test identified in Chapter 13 of the Final Safety Analysis Report, as amended, as essential; (c) Performance of any test at a power level different by more than five percent of rated power from there described; and Amendment No. 258

3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the limiting Conditions for Operation contained in the succeeding specifications is required ,during the OPERATIONAL MODES or other conditions specified therein; except that upon failure to meet the Limiting Conditions for Operation, the associated ACTION requirements shall be met.

3.0.2 Noncompliance with a specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals. If the Limiting Condition for Operation is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.

3.0.3 When a Limiting Condition for Operation is not met except as provided in the associated ACTION requirements, within one hour action shall be initiated to place the unit in a MODE in which the specification does not apply by placing it, as applicable, in:

1. At least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />,
2. At least HOT SHUTDOWN within the following 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />, and
3. At least COLD SHUTDOWN within the subsequent 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />.

Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation. Exceptions to these requirements are stated in the individual specifications.

3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other. specified condition in the Applicability for an unlimited period of time; or
b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

SALEM - UNIT 2 3/4 0-1 Amendment No. 258

APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other specified conditions in the Applicability for individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Condition for Operation. Failure to perform a Surveillance within the specified frequency shall be failure to meet the Limiting Condition for Operation, except as provided in Specification 4.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.

4.0.3 If it is discovered that a Surveillance was not performed within its specified frequency, then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> or up to the limit of the specified frequency, whichever is greater.

This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> and the risk impact shall be managed.

If the Surveillance .is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.

4.0.4 Entry into a MODE or other specified condition in the Applicability of an L.CO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 4.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of-the unit.

4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2 and 3 components shall be applicable as follows:

a. Inservice inspection of ASME Code Class 1, 2 and 3 components and inservice testing of ASME Code Class 1, 2 and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50, Section 50.55a(g) (6) (i).
b. Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:

SALEM - UNIT 2 3/4,0-2a Amendment No. 258

POWER DISTRIBUTION LIMITS LIMITING CONDITION FOR OPERATION (Continued)

1. Calculate the QUADRANT POWER TILT RATIO at least once per hour until:

(a) Either the QUADRANT POWER TILT RATIO is reduced to within its limit, or (b) THERMAL POWER is reduced to less than 50% of RATED THERMAL POWER.

2. Reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> and reduce the Power Range Neutron Flux-High Trip Setpoints to less than or equal to 55% of RATED THERMAL POWER within the next 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br />.
3. Identify and correct the cause of the out of limit condition prior to increasing THERMAL POWER; subsequent POWER OPERATION above 50% of RATED THERMAL POWER may proceed provided that the QUADRANT POWER TILT RATIO is verified within its limit at least once per hour for 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> or until verified at 95% or greater RATED THERMAL POWER.

SURVEILLANCE REQUIREMENTS 4.2.4.1 The QUADRANT POWER TILT RATIO shall be determined to be within the limit above 50% of RATED THERMAL POWER by:

a. Calculating the ratio at least once per 7 days when the alarm is OPERABLE.
b. Calculating the ratio at least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> during steady-state operation when the alarm is inoperable.

4.2.4.2 The QUADRANT POWER TILT RATIO shall be determined to be within the limit when above 75% of RATED THERMAL POWER with one Power Range Channel inoperable by obtaining a core power distribution measurement* to confirm that the normalized symmetric power distribution is consistent with the indicated QUADRANT POWER TILT RATIO at least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />.

  • Using either the movable incore detectors in the four pairs of symmetric thimble locations or the power distribution monitoring system.

SALEM - UNIT 2 3/4 2-15 Amendment No. 258

TABLE 3.3-1 (Continued)

REACTOR TRIP SYSTEM INSTRUMENTATION MINIMUM TOTAL NUMBER CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

11. Pressurizer Water Level--High 3 2 2 1, 2 6
12. Loss of Flow - Single Loop 3/loop 2/loop in 2/loop in 1 6 (Above P-8) any oper- each oper-ating loop ating loop
13. Loss of Flow - Two Loops 3/loop 2/loop in 2/loop in 1 6 (Above P-7 and below P-8) two oper- each oper-ating loops ating loop 14.. Steam Generator Water Level-- 3/loop 2/loop in 2/loop in 1, 2 6 Low-Low any oper- each oper-ating loops ating loop
15. Deleted
16. Undevoltage-Reactor Coolant Pumps 4-1/bus 1/2 twice 3 1 6 17.- Underfrequency-Reactor Coolant Pumps 4-1/bus 1/2 twice 3 1 6 SALEM - UNIT 2 3/4 3-3 Amendment No. 258

TABLE 3.3-1 (Continued)

REACTOR TRIP SYSTEM INSTRUMENTATION MINIMUM TOTAL NUMBER CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

18. Turbine Trip
a. Low Autostop Oil Pressure 3 2 2 1 6
b. Turbine Stop Valve Closure 4 4 3 1 6
19. Safety Injection Input from ESF 2 1 2 1,2 10
20. Reactox Coolant Pump Breaker 1/breaker 2 1/breaker 1 11 Position Trip (above P-7) per opera-ting loop
21. Reactor Trip Breakers 2 1 2 1,2 1###, 14 3*, 4*, 5* 13
22. Automatic Trip Logic 2 1 2 1,2 10 3*, 4*, 5* 13 SALEM - UNIT 2 3/4 3-4 Amendment No. 258

TABLE 3.3-1 (Continued)

TABLE NOTATION With the reactor trip system breakers in the closed position and the control rod drive system capable of rod withdrawal.

    1. High voltage to detector may be de-energized above P-6.
      1. If ACTION Statement 1 is entered as a result of Reactor Trip Breaker (RTB) or Reactor Trip Bypass Breaker (RTBB) maintenance testing results exceeding the following acceptance criteria, NRC reporting shall be made within 30 days in accordance with Specification 6.9.2:
1. A RTB or RTBB trip failure during any surveillance test with less than or equal to 300 grams of weight added to the breaker trip bar.
2. A RTB or RTBB time response failure that results in the overall reactor trip system time response exceeding the Technical Specification limit.

ACTION STATEMENTS ACTION 1 With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, be in HOT STANDBY within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />; however, one channel may be bypassed for up to 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> for surveillance testing per Specification 4.3.1.1.1 provided the other channel is OPERABLE.

ACTION 2 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.1.
c. Either, THERMAL POWER is restricted to
  • 75% of RATED THERMAL POWER and the Power Range, Neutron Flux trip setpoint is reduced to
  • 85%

of RATED THERMAL POWER within 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br />; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />.

d. The QUADRANT POWER TILT RATIO, as indicated by the remaining three detectors, is verified consistent with the normalized symmetric power distribution obtained by using either the movable in-core detectors in the four pairs of symmetric thimble locations or the power distribution monitoring system at least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> when THERMAL POWER is greater than 75% of RATED THERMAL POWER.

SALEM - UNIT 2 3/4 3-5 Amendment No. 258

TABLE 3.3-3 ENGINEERI ENGINEER ED SAFETY FEATURE ACTUATION SYSTEM.INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS APPL ICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

1. SAFETY INJECTION, TURBINE TRIP AND FEEDWATER ISOLATION
a. Manual Initiation 2 1 2 1,2,3,4 18
b. Automatic Actuation Logic 2 1 2 1,2,3,4 13
c. Containment Pressure-High 3 2 2 1,2,3 19
d. Pressurizer Pressure-Low 3 2 2 1,2, 3# 19
e. Differential Pressure Between 3/steam line 2/steam line 2/steam 1,2, 3## 19 Steam Lines - High any steam line lines
f. Steam Flow in Two 2/steam line I/steam line 1/steam 1,2, 3## 19 Steam Lines-High any 2 steam line lines COINCIDENT WITH EITHER Tavg -- Low-Low 1 Tav /loop 1 Tavg in 1 Tavg 1, 2, 3## 19 any 2 loops in any 3 loops OR, COINCIDENT WITH Steam Line Pressure-Low 1 pressure/ 1 pressure 1 pressure 1,2,3## 19 loop any 2 loops any 3 loops SALEM - UNIT 2 3/4 3-15 Amendment. No. 258

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

4. STEAM LINE ISOLATION
a. Manual 2/steam line l/steam line 1/operating 1,2,3 23 steam line
b. Automatic Actuation Logic 2*
  • 1 2 1,2,3 20
c. Containment Pressure-- 4 2 3 1,2,3 16 High-High
d. Steam Flow in Two Steam Lines--High 2/steam line I/steam line any 2 steam 1/steam line 1,2, 3## 19 I lines COINCIDENT WITH EITHER Tav,,-Low-Low 1 Tavq/loop I T,,, in 1 Teg in 1,2, 3## 19 i any 2 loops any 3 loops OR, COINCIDENT WITH Steam Line Pressure-Low 1 pressure/ 1 pressure 1 pressure 1,2, 3## 19 I

loop any 2 loops any 3 loops SALEM - UNIT 2 3/4 3-19 Amendment No. 258

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

5. TURBINE TRIP AND FEEDWATER ISOLATION 3 2
a. Steam Generator Water /loop /loop in 2/loop in 1,2,3 19 level--High-High any operating each operating loop loop
6. SAFEGUARDS EQUIPMENT CONTROL 3 2 3 1,2,3,4 13 SYSTEM (SEC)
7. UNDERVOLTAGE, VITAL BUS
a. Loss of Voltage 1/bus 2 3 1,2,3 14
b. Sustained Degraded Voltage 3/bus 2/bus 3/bus 1,2,3 14 3/4 3-20 2 5 8 SALEM - UNIT 2 Amendment No.

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

8. AUXILIARY FEEDWATER
a. Automatic Actuation Logic ** 2 1 2 1,2,3 20
b. NOT USED'
c. Stm. Gen. Water Level-Low-Low
i. Start Motor Driven Pumps 3/stm. gen. 2/stm. gen. 2/stm. gen. 1,2,3 19 any stm. gen.

ii. Start Turbine Driven Pumps 3/stm. gen. 2/stm. gen. 2/stm. gen. 1,2,3 19 any 2 stm.gen.

d. Undervoltage - RCP Start 4-1/bus 1/2 x 2 3 1,2 19 Turbine - Driven Pump
e. S.I. Start Motor-Driven Pumps See 1 above (All S.I. initiating functions and requirements)
f. Trip of Main Feedwater Pumps 2/pump 1/pump I/pump 1,2 21 Start Motor-Driven Pumps
g. Station Blackout See 6 and 7 above (SEC and UV Vital Bus)
9. SEMIAUTOMATIC TRANSFER TO RECIRCULATION
a. RWST Level Low 4 2 3 1,2,3 16
b. Automatic Actuation Logic 2 1 2 1,2,3 20 SALEM-- UNIT 2 3/4 3-21 Amendment No. 258

TABLE 3.3-3 (Continued)

TABLE NOTATION

  1. Trip function may be bypassed in this MODE below P-Il.
    1. Trip function may be bypassed in this MODE below P-12.
    • Applies to Functional Unit 8 items c and d.

I

      • The automatic actuation logic includes two redundant solenoid operated vent valves for each Main Steam Isolation Valve. One vent valve on any one Main Steam Isolation Valve may be isolated without affecting the function of the automatic actuation logic provided the remaining seven solenoid vent valves remain OPERABLE. The isolated MSIV vent valve shall be returned to OPERABLE status upon the first entry into MODE 5 following determination that the vent valve is inoperable. For any condition where more than one of the eight solenoid vent valves are inoperable, entry into ACTION 20 is required.

ACTION STATEMENTS ACTION 13 - With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> or, be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />; however, one channel may be bypassed for up to 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> for surveillance testing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.

ACTION 14 - With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed until performance of the next required CHANNEL FUNCTIONAL TEST, provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 15 - NOT USED ACTION 16 - With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is demonstrated by CHANNEL CHECK within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />; one additional channel may be bypassed for up to 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> for surveillance testing per Specification 4.3.2.1.1.

ACTION 17 - With less than the Minimum Channels OPERABLE, operation may continue provided the containment purge and exhaust valves are maintained closed.

ACTION 18 - With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.

SALEM - UNIT 2 3/4 3-122 Amendment No. 258

INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.1 The radiation monitoring instrumentation channels shown in Table 3.3-6 shall be OPERABLE with their alarm/trip setpoints within the specified limits.

APPLICABILITY: As shown in Table 3.3-6.

ACTION:

a. With a radiation monitoring channel alarm/trip setpoint exceeding the value shown in Table 3.3-6, adjust the setpoint to within the limit within 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> or declare the channel inoperable.
b. With one or more radiation monitoring channels inoperable, take the ACTION shown in Table 3.3-6.

C. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.1 Each radiation monitoring.instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations during the modes and at the frequencies shown in Table 4.3-3.

SALEM - UNIT 2 3/4 3-38 Amendment No. 258

INSTRUMENTATION MOVABLE INCORE DETECTORS LIMITING CONDITION FOR OPERATION 3.3.3.2 The movable incore detection system shall be OPERABLE with:

a. At least 75%* of the detector thimbles,
b. A minimum of 2 detector thimbles per core quadrant, and
c. Sufficient movable detectors, drive, and readout equipment to map these thimbles.

APPLICABILITY: When the movable incore detection system is used for:

a. Recalibration of the excore neutron flux detection system,
b. Monitoring the QUADRANT POWER TILT RATIO, or
c. Measurement of FNAH, FQ(Z) and Fy.

ACTION:

With the movable incore detection system inoperable, do not use the system for the above applicable monitoring or calibration functions. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4 . 3. 3 .2 The movable incore detection system shall be demonstrated OPERABLE at least once per 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> by normalizing each detector output to be used during its use when required for:

a. Recalibration of the excore neutron flux detectiun system, or
b. Monitoring the QUADRANT POWER TILT RATIO, or
c. Measurement of FAN, FQ(Z) and Fxy.
  • For Cycle 11, when the number of available movable detector thimbles is greater than 50% but less than 75% of the total, the movable incore system can be considered OPERABLE provided the FNAH, FQ(z) and Fxy uncertainties are appropriately adjusted.

Also there should be a minimum of four thimbles available per quadrant, where quadrant includes both horizontal-vertical and diagonally-bounded quadrants (eight individual quadrants in total).

SALEM - UNIT 2 3/4 3-42 Amendment No258

INSTRUMENTATION REMOTE SHUTDOWN INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.5 The remote shutdown monitoring instrumentation channels shown in Table 3.3-9 shall be OPERABLE with readouts displayed external to the control room.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

a. With the number of OPERABLE remote shutdown monitoring channels less than required by Table 3.3-9, restore the inoperable channel to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next i2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br />.

SURVEILLANCE REQUIREMENTS 4.3.3.5 Each remote shutdown monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-6.

SALEM - UNIT 2 3/4 3-43 Amendment No258

INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.7 The accident monitoring instrumentation channels shown in Table 3.3-11 shall be operable.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a. As shown in Table 3.3-11.

SURVEILLANCE REQUIREMENTS 4.3.3.7 Each accident monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-11.

SALEM - UNIT 2 3/4 3-50 Amendment No. 258

INSTRUMENTATION RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.8 The radioactive liquid effluent monitoring instrumentation channels shown in Table 3.3-12 shall be OPERABLE to ensure that the limits of ODCM Control 3.11.1.1 are not exceeded.

APPLICABILITY: At all times.

ACTION:

a. Not Used
b. With less than the minimum number of radioactive liquid effluent monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-12. Exert best efforts to return the instrument to OPERABLE status within 30 days and, if unsuccessful, explain in the next annual radioactive effluent release report why the inoperability was not corrected in a timely manner.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.8 Each radioactive liquid effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, CHANNEL CALIBRATION, and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-12:

SALEM - UNIT 2 3/4 3-53 Amendment No 258

INSTRUMENTATION RADIOACTIVE GASEOUS EFFLUENT OXYGEN MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.9 The radioactive gaseous effluent oxygen monitoring instrumentation channels shown in Table 3;3-13 shall be OPERABLE with their alarm/trip setpoints set to ensure that the limits of Specification 3.11.2.5 are not exceeded.

APPLICABILITY: As shown in Table 3.3-13 ACTION:

a. With a radioactive gaseous effluent oxygen monitoring instrumentation channel alarm/trip setpoint less conservative than required by the above specification, declare the channel inoperable and take the action shown in Table 3.3-13.
b. With less than the minimum number of radioactive gaseous effluent oxygen monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-13. Exert best efforts to return the instrument to OPERABLE status within 30 days and, if unsuccessful, prepare and submit a special report pursuant to Specification 6.9.2 to explain why the inoperability was not corrected in a timely manner.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.9 Each radioactive gaseous effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, CHANNEL CALIBRATION, AND CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-13.

SALEM - UNIT 2 3/4 3-59 Amendment No. 258

INSTRUMENTATION POWER DISTRIBUTION MONITORING SYSTEM LIMITING CONDITION FOR OPERATION (Continued)

APPLICABILTY.- MODE 1, above 25% RATED THERMAL POWER (RTP)

ACTION:

With any of the operability criteria listed in 3.3.3.14.a, 3.3.3.14.b, or 3.3.3.14..c not met, either correct the deficient operability condition, or declare the PDMS inoperable and use the incore movable detector system, satisfying the OPERABILITY requirements listed in Specification 3.3.3.2, to obtain any required core power distribution measurements. Increase the measured core peaking factors using the values listed in the COLR for the PDMS inoperable condition.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.14.1 The operability criteria listed in 3.3.3.14.a, 3.3.3.14.b, and 3.3.3.14.c shall be verified to be satisfied prior to acceptance of the PDMS core power distribution measurement results.

4.3.3.14.2 Calibration of the PDMS is required:

a. At least once every 180 Effective Full Power Days when the minimum number and core coverage criteria as defined in 3.3.3.14.b.1 and 3.3.3.14.b.2 are satisfied, or
b. At least once every 31 Effective Full Power Days when only the minimum number criterion as defined in 3.3.3.14.b.3 is satisfied.

Salem - Unit 2 3/4 3-66 Amendment No. 258

REACTOR COOLANT SYSTEM 3/4.4.9 SPECIFIC ACTIVITY LIMITING CONDITION FOR OPERATION 3.4.9 The specific activity of the primary coolant shall be limited to:

a.
  • 1.0 pCi/gram DOSE EQUIVALENT 1-131, and
b.
  • 100/EpCi/gram.

APPLICABILITY: MODES 1, 2, 3, 4 and 5.

ACTION:

MODES 1, 2 and 3*

a. With the specific activity of the primary coolant > 1.0 pCi/gram DOSE EQUIVALENT 1-131 for more than 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> during one continuous time interval or exceeding the limit line shown on Figure 3.4-1, be in at least HOT STANDBY with Tavg < 500OF within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
b. With the specific activity of the primary coolant > 100/EpCi/gram, be in at least HOT STANDBY with Tavg < 500'F within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
c. LCO 3.0.4.c is applicable.

MODES 1, 2,.3, 4 and 5

a. With the specific activity of the primary coolant > 1.0 pCi/gram DOSE EQUIVALENT 1-131 or > 100/EpCi/gram, perform the sampling and analysis requirements of item 4a of Table 4.4-4 until the specific activity of the primary coolant is restored to within its limits.

SURVEILLANCE REQUIREMENTS 4.4.9 The specific activity of the primary coolant shall be determined to be within the limits by performance of the sampling and analysis program of Table 4.4-4.

  • With Tavg > 500 0 F.
  • SALEM -,UNIT 2 3/4 4-23 Amendment No. 258

REACTOR COOLANT SYSTEM OVERPRESSURE PROTECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.10.3 At least one of the following overpressure protection systems shall be OPERABLE:

a. Two Pressurizer Overpressure Protection System relief valves (POPS) with a lift setting of less than or equal to 375 psig, or
b. The Reactor Coolant System (RCS) depressurized with an RCS vent of greater than or equal to 3.14 square inches.

APPLICABILITY: When the temperature of one or more of the RCS cold legs is less than or equal to 312'F, except when the reactor vessel head is removed.

ACTION:

a. With one POPS inoperable in MODE 4 and the temperature of one or more of the RCS cold legs is less than or equal to 312 0 F, restore the inoperable POPS to OPERABLE status within 7 days or depressurize and vent the RCS through a 3.14 square inch vent(s) within the next 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br />; maintain the RCS in a vented condition until both POPSs have been restored to OPERABLE status.
b. With one POPS inoperable in MODES 5 or 6 with the Reactor Vessel Head installed, restore the inoperable POPS to OPERABLE status within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />, or complete depressurization and venting of the RCS through at least a 3.14 square inch vent(s) within the next 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br />; maintain the RCS in a vented condition until both POPSs have been restored to OPERABLE status.
c. With both POPSs inoperable, depressurize and vent the RCS through a 3.14 square inch vent(s) within 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br />; maintain the RCS in a vented condition until both POPSs have been restored to OPERABLE status.
d. In the event either the POPS or the RCS vent(s) are used to mitigate a RCS pressure transient, a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 30 days. The report shall describe the circumstances initiating the transient, the effect of the POPS or vent(s) on the transient and any corrective action necessary to prevent recurrence.
e. LCO 3.0.4.b is not applicable when entering MODE 4.

SURVEILLANCE REQUIREMENTS 4.4.10.3.1 Each POPS shall be demonstrated OPERABLE by:

SALEM - UNIT 2 3/4 4-31 Amendment No. 258

REACTOR.COOLANT SYSTEM 3.4.11 STRUCTURAL INTEGRITY ASME CODE CLASS 1, 2 and 3 COMPONENTS LIMITING CONDITION FOR OPERATION 3.4.11.1 The structural integrity of ASME Code Class 1, 2 and 3 components shall be maintained in accordance with Specification 4.4.11.1.

APPLICABILITY: ALL MODES.

ACTION:

a. With the structural integrity of any ASME Code Class 1 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature more than 50'F above the minimum temperature required by NDT considerations.
b. With the structural integrity of any ASME Code Class 2 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature above 200'F.
c. With the structural integrity of any ASME Code Class 3 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) from service.

SURVEILLANCE REQUIREMENTS 4.4.11.1 In addition to the requirements of Specification 4.0.5, each Reactor Coolant Pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975. In lieu of Position C.4.b(l) and C.4.b(2), a qualified in-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed flywheels may be conducted at 20 year intervals.

4.4.11.2 Augmented Inservice Inspection Program for Steam Generator Channel Heads -

The No' 21 Steam Generator channel head shall be ultrasonically inspected in a selected area during each of the first three refueling outages using the same ultrasonic inspection procedures and equipment used to generate the baseline data.

These inservice ultrasonic inspections shall verify that the cracks observed in the stainless steel cladding prior to operation have not propagated into the base material.

SALEM - UNIT 2 3/4 4-33 Amendment No. 258

EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - Tavg <350'F LIMITING CONDITION FOR OPERATION 3.5.3 As a minimum, one ECCS subsystem comprised of the following shall be OPERABLE:

a. One OPERABLE centrifugal charging pump and associated flow path capable of taking suction from the refueling water storage tank and transferring suction to the residual heat removal pump discharge piping and;
1. Discharging into each Reactor Coolant System (RCS) cold leg.
b. One OPERABLE residual heat removal pump and associated residual heat removal heat exchanger and flow path capable of taking suction from the refueling water storage tank on a safety injection signal and transferring suction to the containment sump during the recirculation phase of operation and;
1. Discharging into each RCS cold leg, and; upon manual initiation,
2. Discharging into two RCS hot legs.

APPLICABILITY: MODE 4.

ACTION:

a. With no ECCS subsystem OPERABLE because of the inoperability of either the centrifugal charging pump or the flow path from the refueling water storage tank, restore at least one ECCS subsystem to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in COLD SHUTDOWN within the next 20 hours0.833 days <br />0.119 weeks <br />0.0274 months <br />.
b. With no ECCS subsystem OPERABLE because of the inoperability of either the residual heat removal heat exchanger or residual heat removal pump, restore at least one ECCS subsystem to OPERABLE status or maintain the Reactor Coolant System Tavg lessthan 350'F by use of alternate heat removal methods.
c. In the event the ECCS is actuated and injects water into the Reactor Coolant System, -a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation cycles to date. The current value of the usage factor for each affected safety injection nozzle shall be provided in this Special Report whenever its value exceeds 0.70.
d. LCO 3.0.4.b is not applicable to ECCS high head subsystem
  1. A maximum of one safety injection pump or one centrifugal charging pump shall be OPERABLE in MODE 4 when the temperature of one or more of the RCS cold legs is less than or equal to 312'F, Mode 5, or Mode 6 when the head is on the reactor vessel.

SALEM - UNIT 2 3/4 5-7 Amendment No. 258

PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated manual activation switches in the control room and flow paths shall be OPERABLE with:

a. Two feedwater pumps, each capable of being powered from separate vital busses, and
b. One feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

a. With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in HOT SHUTDOWN within the following 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
b. With two auxiliary feedwater pumps inoperable be in at least HOT STANDBY within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in HOT SHUTDOWN within the following 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
c. With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.
d. LCO 3.0.4.b is not applicable.

SURVEILLANCE REQUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

a. At least once per 31 days by:
1. Verifying that each non-automatic valve in the flow path that is not locked, sealed or otherwise secured in position, is in its correct position.
2. Verify the manual maintenance valves in the flow path to each steam generator are locked open.

SALEM - UNIT 2 3/4 7-5 Amendment No. 258

PLANT SYSTEMS 3/4.7.8 SEALED SOURCE CONTAMINATION LIMITING CONDITION FOR OPERATION 3.7.8 Each sealed source containing radioactive material either in excess of 100 microcuries of beta and/or gamma emitting material or 5 microcuries of alpha emitting material shall be free of greater than or equal to 0.005 microcuries of removable contamination.

APPLICABILITY: At all times.

ACTION:

a. With a sealed source having removable contamination in excess of the above limits, immediately withdraw the sealed source from use and:
1. Either decontaminate and repair the sealed source, or
2. Dkspose of the sealed source in accordance with Commission Regulations.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.8.1 Test Requirements - Each sealed source shall be tested for leakage and/or contamination by:

a. The licensee, or
b. Other persons specifically authorized.by the Commission or an Agreement State.

The test method shall have a detection sensitivity of at least 0.005 microcuries per test sample.

4.7.8.2 Test Frequencies - Each category of sealed sources (excluding startup sources and fission detectors previously subjected to core flux) shall be tested at the frequency described below.

a. Sources in use - At least once per six months for all sealed sources containing radioactive materials:

SALEM - UNIT 2' 3/4 7-1211 Amendment No. 258

PLANT SYSTEMS 3/4.7.11 FUEL STORAGE POOL BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.7.11 The fuel storage pool boron concentration shall be Ž 800 ppm APPLICABILITY: When fuel assemblies are stored in the fuel storage pool and a fuel storage pool verification has not been performed since the last movement of fuel assemblies in the fuel storage pool.

ACTION:

With fuel storage pool boron concentration not within limit:

a. Immediately suspend movement of fuel assemblies in the fuel storage pool and
b. Initiate action to:
1. immediately restore fuel storage pool boron concentration to within limit or
2. immediately perform a fuel storage pool verification.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.11 Verify the fuel storage pool boron concentration is within limit every 7 days.

Salem - Unit 2 3/4 7-30 Amendment No.258

PLANT SYSTEMS 3/4.7.12 FUEL ASSEMBLY STORAGE IN THE SPENT FUEL POOL LIMITING CONDITION FOR OPERATION 3.7.12 The combination of initial enrichment, burnup, and Integral Fuel Burnable Absorber (IFBA) of each fuel assembly stored in Region 1 or Region 2, shall be within the acceptable limits described in the surveillance requirements below.

APPLICABILITY: When any fuel assembly is stored in Region 1 or Region 2 of the, spent fuel storage pool.

ACTION:

If the requirements of the LCO are not met:

a. Immediately verify the fuel storage boron concentration meets the requirements of TS 3.7.11 and
b. Immediately initiate action to move the non-complying fuel assembly to a location that complies with the surveillance requirements.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.12.1 Prior to storing fuel assemblies in Region 1, verify by administrative means that the fuel assemblies meet one of the following storage constraints:

a. Unirradiated fuel assemblies with a maximum enrichment of 4.25 wt% U-235 have unrestricted storage.
b. Unirradiated fuel assemblies with enrichments greater than 4.25 wt% U-235 and less than or equal to 5.0 wt% U-235, that do not contain IFBA pins, may only be stored in the peripheral cells facing the concrete wall.
c. Unirradiated fuel assemblies with enrichments (E) greater than 4.25 wt% U-235 and less than or equal to 5.0 wt% U-235, which contain a minimum number of IFBA pins have unrestricted storage. This minimum number of IFBA pins shall have an equivalent reactivity hold-down which is greater than or equal to the reactivity hold-down associated with N IFBA pins, at a nominal 2.35 mg B-10/linear inch loading (l.5x), determined by the equation below:

N = 42.67 (E - 4.25)

Salem - Unit 2 3/4 7-31 Amendment No.258

ELECTRICAL POWER SYSTEMS ACTION (Continued)

e. With two or more of the above required diesel generators inoperable, demonstrate the OPERABILITY of two independent A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> thereafter; restore at least two of the inoperable diesel generators to OPERABLE status within 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />. Restore three diesel generators to OPERABLE status within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> from time of initial loss or be in least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.
f. With one of the above required fuel transfer pumps inoperable, either restore it to OPERABLE status within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.
g. With one of the above required fuel storage tanks inoperable, either restore it to OPERABLE status within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> or be in at least HOT STANDBY within the next 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in COLD SHUTDOWN within the following 30 hours1.25 days <br />0.179 weeks <br />0.0411 months <br />.
h. LCO 3.0.4.b is not applicable to DGs.

SALEM - UNIT 2 3/4 8-2a Amendment No.258

REFUELING OPERATIONS 3/4.9.12 FUEL HANDLING AREA VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.9.12 The Fuel Handling Area Ventilation System shall be OPERABLE with:

a. Two exhaust fans and one supply fan OPERABLE and operating, and
b. Capable of maintaining slightly negative pressure in the Fuel Handling Building.

APPLICABILITY: During movement of irradiated fuel within the Fuel Handling Building ACTION:

a. With no Fuel Handling Area Ventilation System OPERABLE, suspend all operations involving movement of fuel within the storage pool until the Fuel Handling Area Ventilation System is restored to OPERABLE status.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.9,12 The above required ventilation system shall be demonstrated OPERABLE:

a. At least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> by verifying that the Fuel Handling Building is maintained at a slightly negative pressure with respect to atmospheric pressure.
b. At least once per 31 days by verifying both exhaust fans and one supply fan start and operate for at least 15 minutes, if not operating already.
c. At least once per 18 months by verifying a system flowrate of 19,490 cfm

+/- 10% during system operation.

SALEM - UNIT 2 3/4 9-13 Amendment No.258

RADIOACTIVE EFFLUENTS LIQUID HOLDUP TANKS*

LIMITING CONDITION FOR OPERATION 3.11.1.4 The quantity of radioactive material contained in each outdoor temporary tank shall be limited to less than or equal to 10 curies, excluding tritium and dissolved or entrained noble gases.

APPLICABILITY: At all times.

ACTION:

a. With the quantity of radioactive material in any of the above listed tanks exceeding the above limit, immediately suspend all additions of radioactive material to the tank and within 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> reduce the tank contents to within the limit.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.1.4 The quantity of radioactive material contained in each outdoor temporary tank shall be determined to be within the above limit by analyzing a representative sample of the tank's contents at least once per 7 days when radioactive materials are being added to the tank.

Tanks included in this Specification are those outdoor temporary tanks that are not surrounded by liners, dikes, or walls capable of holding the tank contents and that do not have tank overflows and surrounding area drains connected to the liquid radwaste treatment system.

SALEM - UNIT 2 3/4 11-7 Amendment No 2 58

RADIOACTIVE EFFLUENTS EXPLOSIVE GAS MIXTURE LIMITING CONDITION FOR OPERATION 3.11.2.5 The concentration of oxygen in the waste gas holdup system shall be limited to less than or equal to 2% by volume.

APPLICABILITY: At all times.

  • ACTION:
a. With the concentration of oxygen in the waste gas holdup system greater than 2%- by volume but less than or equal 4% by volume, reduce the oxygen concentration to the above limits within 48 hours2 days <br />0.286 weeks <br />0.0658 months <br />.
b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volume immediately suspend all additions of waste gases to the system and reduce the concentration of oxygen to less than or equal to 2%

by volume without delay.

c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.11.2.5 The concentrations of hydrogen and oxygen in the waste gas holdup system shall be determined to be within the above limits by continuously monitoring the waste gases in the waste gas holdup system with the oxygen monitor required OPERABLE by Table 3.3-13. If hydrogen is not measured, the concentration of hydrogen shall be assumed to exceed 4% by volume.

  • Not applicable to-portions of the Waste Gas System removed from service for maintenance provided that, the portions removed for maintenance are isolated, and purged of hydrogen to less than 4% by volume.

SALEM - UNIT 2 3/4 11-15 Amendment No. 258