-istopher Long - IPEC status report for June 12 2006 Page 1 From:

"McMullin Kathleen M" <KMcMull@entergy.com>

To:

r WON. " Baranski, James" <james.baranski@semo.state.ny.us>,"

Eddy, Paul" <pauLeddy@dps.state.ny.us>, " Greeley, Dan" <greeleyd@co.rockland.ny.us>, " Gross, Steve - Orange PIO" <sgross@co.orange.ny.us>," Sutton, Tony" <awsl @westchestergov.com>,

<AStiebeling@pcbes.org>, "Albanese, Raymond" <rlal @westchestergov.com>, "Alfredo Vidal"

<avidal@thevidalgroup.com>, <awsl @weschestergov.com>, "B. Gore" <bgore@urbanomics.com>,

<bakerna@co.rockland.ny.us>, "Barry, Terrence" <TBarry@entergy.com>, "Benjamin, Liz"

<BenjamlL@co.rockland.ny.us>, "Bentley, Robyn M" <rbentle@entergy.com>,

<ken.bergmann @semo.state.ny.us>, "Bernie McGarry" <rncgarry@senate.state.ny.us>, "Blizard, Andrea J" <ablizar@entergy.com>, <jeanbordewich@schumer.senate.gov>, <schumer@valstar.net>,

<jpbl @nrc.gov>, "Bowman, Greg " <GBowr90@pr.*t~er!.g.b.,@nrc.gov>,

<JBridges@troopers.state.ny.us>, "Chief Tubbs "Chs Schwarz" 9'--Adiq-

<cschwar@entergy.com>, <ewc@ nrc.gov>, "Comiotes, Jim" <JComiot ergy.com>, "Conroy, Patric W" <PConroy@entergy.com>, <lindac@yorktownny.org>, "Cox, Mark R" <mcox90@entergy.com>,

<Gcrawford@urbanomics.com>, "Curran, ickcuarran@mahouse.gov>, "Dacimo, Fred R."

<FDacimo@entergy.com>, "David Brand a

1, "David Greene" E_ "4*

<dgreene@ urbanomics.com>, "David Weinraub" <DWeinraub@ biwlobby.com>, "DeGasperis, Edward M" <edegasp @ entergy.com>, "DiRocco, Anthony J" <ADirocc @ entergy.com>,

<Donald.Maurer@semo.state ny.us> "Dowling, Adele"<amd2@westchestergov.com>,

<Bamey.Drew@lafarge-naa.comc borah" <DFayl @entergy.com>, C Xei',,

"Feathers" <jdf@fcwc-law.com>,

I.,

er.feroe@mail.house.gov>,

<galefs;@assembly.state.ny.us>, "Geri Shapi r

v pi-6

<Emily.Gibbons@mail.house.gov>, "Giguere, Kthleen

<-KGlguer en' ergy.com>, "Gottlieb, Laurence"

<LGottli@entergy.com>, "Greene, Dominick" <dgreene@co.orange.ny.us>,

<gac7@westchestergov.com>, "GrosJean, Alain G" <AGrosje@entergy.com>, <grtroes@nppd.com>,

<Frank.Guiao@ lafarge-na.com>, "Harry Giannoulis" <harry@ theparksidegroup.com>, "Hinrichs, Gary H"

<ghinric@entergy.com>, "Hipschman, Thomas " <thips90@ entergy.com>, "lnzirillo, Frank"

<finziri@entergy.com>, "Ira Promisel" <ipromise @troopers.state.ny.us>, "Jack Spath"

<jps @ nyserda.org>, <dejl @ nrc.gov>, <jefft@townofcortlandt.com>, "Jensen, Chris"

<jensenc@co.rockland.ny.us>, "JES" <JES1 @westchestergov.com>, "Jim Cunningham"

<jim-cunningham @ nyc.bm.com>, "Jim Wright" <wrlght@senate.state.ny.us>, "John Cordo" <JLC@fcwc-law.com>, "Jones, T. R." <tjones2@entergy.com>, "Kansler, Michael R" <MKansle@entergy.com>,

"Kathleen Wood" <kathleen.wood@chamber.state.ny.us>, <Pat.keegan@mail.house.gov>, "Kems, Matthew To <M er g.om>, <MKopy@troopers.state.ny.us>, <kevin.kraus@semo.state.ny.us>,

"L. Leach"*

."Leach, Don M" <DLeach@entergy.com>,

<lelbell @ senate.state.ny.us>, "Leon, Pete" <Pete.Leon @ mail.house.gov>, <DCL@ nrc.gov>, "Longo, Nick" <longon@co.rockland.ny.us>, "Mark Serrano" <serrano@proactivecom.com>, "Martin Brennan"

<Martin_Brennan@schumer.senate.gov>, "Marvin Randolph" <mrandolph@urbanomics.com>, "Mayer, Donald M" <DMayerl @entergy.com>, "McCann, John (ENNE Ucensing Director)"

<jmccanl @ entergy.com>, "McCannell, Chris" <Chdis.mccannell @ mail.house.gov>, "McConaghy, Ryan"

<ryanrMcConaghy@ schumer.senate.gov>, "McGillicuddy, Maura" <MMcQjI!@e oIm>, "McKay, Mike" <mike.mckay@mail.house.gov>, "McMahon, Bob - Putman Coun tyin lr

=%r"--

6 "McMullin, Kathleen M" <KMcMull@entergy.com>, <millera@assembly.sta-e.ny.us>,

<MillerC@ co.rockland.ny.us>, "Mitchell, Frank J" <FMitche @entergy.com>, "Neil Sheehan"

<nas@nrc.gov>, <rand@schildasset.com>, <jdn@nrc.gov>, <Joseph.o'brien@mall.house.gov>,

<bolivelra@amnucins.com>, <doneill@bghc-law.com>, "Pat Brown" <PBrown@bmwlobby.com>, "Paul Steidler" <paul@effectivecomm.org>, "Paul Tonko" <tonkop@assembly.state.ny.us>, "Paulson, Adam"

<adam.paulson@mail.house.gov>, <alp@nyserda.org>, "Phillips, Frank M." <fphilli@entergy.com>,

<pjk3@westchestergov.com>, "Poquette, Thomas" <thomas.poquette@ lafarge-na.com>

Date:

06/12/2006 5:42:07 PM

Subject:

IPEC status report for June 12 2006 Indian Point Energy Center Status Report Information in, this record was deleted In. ccordance with the Freedom of Informatloft Act, exemptions FOIA.

).*oo6

hristopher Long - IPEC status report for June 12 2006 page 21

.hristopher Long - IPEC status report for June 122006 Page 211 June 12, 2006 Operational Status IP2 is currently at 100% reactor power; the unit has been on line for 25 days and Unit 3 is operating at 100% reactor power and has been on-line for 251 days.

Groundwater Investigation MW-42 Well - Updated sample results Monitoring Well -42, located near the Unit 1 spent fuel pool and north curtain drain system is a multi-level well from which samples have been obtained at various depths by the NRC, DEC and Entergy. Entergy's results are shown in the table below. The results show isotopes characteristic of North curtain drain water. No radioactivity has been detected in any off-site monitoring location.

Date Depth H-3 Sr-90 Cs-1 37 Co-60 Ni-63 March 22/23 49 ft 2630 51.9 102,000 194

-iristopher Long - !PEC status report for June 12 2006 NA 78 ft 1280.

ND 4460 208 NA April 7 49 ft 3980 73.7 53,100 67.2 5120 78 ft 792 ND 1980 ND 36.6 Note: Some data corrected from previous reports Page 3 I Monitoring Well Results Date ID Location

hristopher Long-/PEC status report for June 12 2006

_Page 4 1i H-3 Sr-90 4/26/2006 U3-D4 Unit 3 turbine building 575 ND 4/11/2006 MW-51 Southeast edge of monitoring area ND pending 3/31/2006 MW-52 Northeast edge of monitoring area ND pending Note: MDA for tritium is 500 pCi/L IP2 Spent Fuel Pool Liner Inspection Entergy has begun the second phase of the spent fuel pool liner inspection. Previously, the accessible areas of the pool above the fuel racks were inspected and six suspect areas coated with epoxy. Last week, Entergy began the inspection of the walls adjacent to the fuel racks.

There is a narrow gap between the wall and the racks which makes camera movement difficult.

Unit 1 Containment Spray Sump

-iristopher Long - IPEC status report for June 12 2006ý Page 5 ]

-iritoper Lng-IPECstaus rpor forJun 12206 age 5]I Entergy has pumped down the Unit 1 containment spray pump which is located in the old superheater structure. The sump tested positive for Sr-90 and the 14,000 gallons of water will be processed through a dimineralizer before being discharged through the plant's routine discharge path. A visual and video inspection of the sump will be conducted.

IP2 Spent Fuel Pool Leak Collection Box The volume of water collected from the IP2 SFP leak collection system continued to drop from the May readings as shown on the table below. No short lived isotopes have been found in the leak collection.system.

Tritium concentrations have also dropped Date Volume (ml) 4/5/06 105 4/14/06 674 4/21/06 403 4/26/06 7

5/3/06 46 5/10/06 1008 5/15/06 1263 5/24/06 1386 5/31/06

hristopher Long - IPEC status report for June 12 2006P Page 6 ]

901 617/06 431 Educational Outreach Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.

hristopher Long - TEXT.htm Page 1 1 hristopher Long - TEXT.htm Page 1 I Indian Point Energy Center Status Report June 12,2006 Operational Status IP2 is currently at 100% reactor power; the unit has been on line for 25 days and Unit 3 is operating at 100% reactor power and has been on-line for 251 days.

Groundwater Investigation 6

MW-42 Well - Updated sample results Monitoring Well - 42, located near the Unit 1 spent fuel pool and north curtain drain system is a multi-level well from which samples have been obtained at various depths by the NRC, DEC and Entergy. Entergy's results are shown in the table below. The results show isotopes characteristic of North curtain drain water. No radioactivity has been detected in any off-site monitoring location.

)ate Depth H-3 Sr-90 Cs-137 Co-60 Ni-63 March 22/23 49 ft 2630 51.9 102,000 194 NA 78ft 1280 ND 4460 208 NA April 7 49 ft 3980 73.7 53,100 67.2 5120

hristopoer-Long -TEXT.htm Page 2"1 hristopher Long - TEXT.htm Pac~e 21 78 ft 792 ND 1980 ND N

36.

Note: Some data corrected from previous reports Monitoring Well Results Date ID Location H-3 Sr-90 4126/2006 U3-D4 Unit 3 turbine building 575 ND V11/2006 MW-51 Southeast edge of monitoring area ND pending 131/2006 MW-52 Northeast edge of monitoring area ND pending Note: MDA for trtium is 500 pCi/L IP2 Spent Fuel Pool Liner Inspection Entergy has begun the second phase of the spent fuel pool liner inspection. Previously, the accessible areas of the pool above the fuel racks were inspected and six suspect areas coated with epoxy. Last week, Entergy began the inspection of the walls adjacent to the fuel racks. There is a narrow gap between the wall and the racks which makes camera movement difficult.

Unit 1 Containment Spray Sump Entergy has pumped down the Unit 1 containment spray pump which is located in the old superheater structure. The sump tested positive for Sr-90 and the 14,000 gallons of water will be processed through a dimineralizer before being discharged through the plant's routine discharge path. A visual and video inspection of the sump will be

hristopher 1ong,- TEXT.htm Page 31 conducted.

IP2 Spent Fuel Pool Leak Collection Box The volume of water collected from the IP2 SFP leak collection system continued to drop from the May readings as shown on the table below. No short lived isotopes have been found in the leak collection system. Tritium concentrations have also dropped Date Volume (ml) 4/5/06 105 4/14/06 674 4121/06 403 4/26/06 7

5/3/06 46 5/10/06 1008 5/15/06 1263 5/24/06 1386 5/31/06 901 6/7/06 431

hristopher Logg - 1 E:X khtm Page 41 hrisophe Lon ILX I.htmPage 41 Educational Outreach Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.