JAFP-05-0179, Enclosure 13, Calculation JAF-CALC-ELEC-02610 125VDC B Station Battery Sizing & Voltage Drop Revision 2, Appendix 4, Page 2 of 2, SBO
From kanterella
(Redirected from ML053390305)
Jump to navigation
Jump to search
ML053390305 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 05/16/2003 |
From: | Barton A Entergy Nuclear Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML053390088 | List: |
References | |
JAFP-05-0179 JAF-CALC-ELEC-02610, Rev 2 | |
Download: ML053390305 (1) | |
Similar Documents at FitzPatrick | |
---|---|
Category:Calculation
MONTHYEARJAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023
[Table view]Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis ML19301A5042019-08-13013 August 2019 JAF-CALC-NBI-00206 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-58A,B and 02-3STU-259A,B) ML19301A5052019-08-13013 August 2019 JAF-CALC-NBI-00205 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-57A,B and 02-3STU-258A,B) JAFP-13-0035, Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 232013-04-17017 April 2013 Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment #23 JAFP-10-0033, Attachment 2 to JAFP-10-0033, Calculation JAF-CALC-NBS-02052, Revision 42010-03-0505 March 2010 Attachment 2 to JAFP-10-0033, Calculation JAF-CALC-NBS-02052, Revision 4 JAFP-08-0131, Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C2008-12-0404 December 2008 Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C ML0835903392008-12-0404 December 2008 Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C JAFP-08-0131, Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report2008-12-0303 December 2008 Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report ML0821004572008-07-22022 July 2008 Calculation No. 0800846.302, Revision 0, Comparison of Instrument Nozzle (N16) and Beltline P-T Curves. JAFP-08-0067, Calculation No. 0800846.302, Revision 0, Comparison of Instrument Nozzle (N16) and Beltline P-T Curves.2008-07-22022 July 2008 Calculation No. 0800846.302, Revision 0, Comparison of Instrument Nozzle (N16) and Beltline P-T Curves. JAFP-08-0067, Calculation No. 0800846.301, Revision 0, 2 Instrument Nozzle Stress Analysis.2008-07-16016 July 2008 Calculation No. 0800846.301, Revision 0, 2 Instrument Nozzle Stress Analysis. ML0821004562008-02-26026 February 2008 Calculation No. FITZ-10Q-302, Revision 0, Revised Pressure-Temperature Curves. JAFP-08-0067, Calculation No. FITZ-10Q-302, Revision 0, Revised Pressure-Temperature Curves.2008-02-26026 February 2008 Calculation No. FITZ-10Q-302, Revision 0, Revised Pressure-Temperature Curves. JAFP-08-0067, Calculation No. FITZ-10Q-301, Revision 0, Evaluation of Adjusted Reference Temperatures and Reference Temperature Shifts.2008-02-15015 February 2008 Calculation No. FITZ-10Q-301, Revision 0, Evaluation of Adjusted Reference Temperatures and Reference Temperature Shifts. ML0821004552008-02-15015 February 2008 Calculation No. FITZ-10Q-301, Revision 0, Evaluation of Adjusted Reference Temperatures and Reference Temperature Shifts. JAFP-07-0125, ENT-FLU-002-R-005, Rev 0, James A. FitzPatrick, License Renewal Application - Amendment 14, Fluence Calculation, Non-Proprietary Version2007-10-31031 October 2007 ENT-FLU-002-R-005, Rev 0, James A. FitzPatrick, License Renewal Application - Amendment 14, Fluence Calculation, Non-Proprietary Version ML0636303602004-09-0909 September 2004 JAFNPP - Site Audit Requests - Offsite Dose Calculation Model (DVP-01.02, Rev 9) JAFP-05-0179, Enclosure 13, Calculation JAF-CALC-ELEC-02610 125VDC B Station Battery Sizing & Voltage Drop Revision 2, Appendix 4, Page 2 of 2, SBO2003-05-16016 May 2003 Enclosure 13, Calculation JAF-CALC-ELEC-02610 125VDC B Station Battery Sizing & Voltage Drop Revision 2, Appendix 4, Page 2 of 2, SBO 2023-08-31 Category:Drawing MONTHYEARML0700304172006-12-28028 December 2006
[Table view]Drawing Detail - Bulkhead and Refueling Bellows. ML0621402782006-07-31031 July 2006 Drawing LRA-FM-29A-0, Flow Diagram Main Steam System 29. Sheet 1 ML0621402052006-07-17017 July 2006 Drawing LRA-FM-18B-0, Flow Diagram Drywell Inerting C.A.D. Purge and Containment Differential Pressurization System 27. Sheet 1 ML0621402172006-04-18018 April 2006 Drawing LRA-FM-19A-0, Flow Diagram Fuel Pool Cooling and Cleanup System 19. Sheet 1 ML0621402852006-04-13013 April 2006 Drawing LRA-FM-38A-0, Flow Diagram Vacuum Priming and Air Removal System 38. Sheet 1 ML0621402312006-04-12012 April 2006 Drawing LRA-FM-23A-0, Flow Diagram Core Spray System 14. Sheet 1 ML0621402292006-04-12012 April 2006 Drawing LRA-FM-22A-0, Flow Diagram Reactor Core Isolation Cooling System 13. ML0621402192006-04-12012 April 2006 Drawing LRA-FM-20A-0, Flow Diagram Residual Heat Removal System 10. Sheet 1 ML0621402752006-04-12012 April 2006 Drawing LRA-FM-27B-0, Flow Diagram Control Rod Drive System 03. Sheet 1 ML0621403082006-04-12012 April 2006 Drawing LRA-FM-47A-0, Flow Diagram Nuclear Boiler Vessel Instruments System 02-3. ML0621403242006-04-12012 April 2006 Drawing LRA-FM-94A-0, Flow Diagram Air Start-Up Lines Emergency Diesel Generators System 93. Sheet 1 ML0621403132006-03-27027 March 2006 Drawing LRA-FM-48A-0, Flow Diagram Standby Gas Treatment System 01-125. ML0621401722006-03-22022 March 2006 Drawing LRA-FB-48A-0, Flow Diagram Fire Protection Water Piping System 76. ML0621401742006-03-22022 March 2006 Drawing LRA-FB-49A-0, Flow Diagram Fire Protection Water Piping System 76. Sheet 1 ML0621403162006-03-20020 March 2006 Drawing LRA-FM-93A-0, Flow Diagram Fuel Oil Lines Emergency Diesel Generators System 93. ML0621402252006-03-17017 March 2006 Drawing LRA-FM-20B-0, Flow Diagram Residual Heat Removal System 10. ML0621402012006-03-17017 March 2006 Drawing LRA-FM-18A-0, Flow Diagram Drywell Inerting C.A.D. and Purge System 27. Sheet 1 ML0621401602006-03-10010 March 2006 Drawing LRA-FB-45A-0, Flow Diagram Control and Relay Rooms Heating and Ventilation System 70. ML0621401642006-03-10010 March 2006 Drawing LRA-FB-45C-0, Flow Diagram Administration & Control Room Heating Ventilation & Air Conditioning System 72. Sheet 1 ML0621402272006-03-0606 March 2006 Drawing LRA-FM-21A-0, Flow Diagram Standby Liquid Control System 11. ML0621403022006-03-0303 March 2006 Drawing LRA-FM-46B-0, Flow Diagram Emergency Service Water System 46 & 15. Sheet 1 ML0621402102006-03-0303 March 2006 Drawing LRA-FM-18C-0, Flow Diagram NUREG 0578 Implementation and Post Accident Sampling System 27. ML0621401982006-03-0303 March 2006 Drawing LRA-FM-17A-0, Flow Diagram Radwaste System 20. Sheet 1 ML0621401922006-03-0303 March 2006 Drawing LRA-FM-15B-0, Flow Diagram Reactor Bldg Cooling Water System 15. ML0621403192006-02-15015 February 2006 Drawing LRA-FM-93C-0, Flow Diagram Engine Cooling & Lubrication Oil Emergency Diesel Generators System 93. ML0621401952006-02-0303 February 2006 Drawing LRA-FM-16A-0, Flow Diagram Off Gas System 01-107. Sheet 1 ML0621402302006-01-25025 January 2006 Drawing LRA-FM-22B-0, Flow Diagram RCIC Turbine Lube Oil System 13. Sheet 1 ML0621401542006-01-23023 January 2006 Drawing LRA-FB-35E-0, Flow Diagram Control Room Area Service and Chilled Water System 70. ML0621401342006-01-20020 January 2006 Drawing LRA-FB-8A-0, Flow Diagram Reactor Building Vent & Cooling System 66. Sheet 1 ML0621403142005-12-21021 December 2005 Drawing LRA-FM-49A-0, Flow Diagram Drywell/Torus Leak-Rate-Analyzer System 16-1. Sheet 1 ML0621402992005-12-21021 December 2005 Drawing LRA-FM-46A-0, Flow Diagram Service Water System 46. Sheet 1 ML0621401502005-12-21021 December 2005 Drawing LRA-FB-16C-0, Flow Diagram Emergency Generator Bldg Ventilation and Heating System 92. Sheet 1 ML0621401862005-12-0707 December 2005 Drawing LRA-FB-56A-0, Flow Diagram CO2 and Foam Fire Extinguishing System. ML0621402672005-11-28028 November 2005 Drawing LRA-FM-26A-0, Flow Diagram Reactor Water Recirculation System 02-2. ML0621402882005-11-0404 November 2005 Drawing LRA-FM-39C-0, Flow Diagram Instrument Air Reactor Bldg & Drywell System 39. Sheet 1 ML0621401372005-10-21021 October 2005 Drawing LRA-FB-10H-0, Flow Diagram Reactor Building Service Water Cooling System 66. Sheet 1 ML0621402802005-10-21021 October 2005 Drawing LRA-FM-33D-0, Flow Diagram Condensate System 33. Sheet 1 ML0621402842005-10-20020 October 2005 Drawing LRA-FM-34A-0, Flow Diagram Feedwater System 34. Sheet 1 ML0621402742005-10-20020 October 2005 Drawing LRA-FM-27A-0, Flow Diagram Control Rod Drive System 03. Sheet 1 ML0621402872005-10-17017 October 2005 Drawing LRA-FM-39B-0, Flow Diagram Service Air System 39. Sheet 1 ML0621403062005-10-17017 October 2005 Drawing LRA-FM-46C-0, Flow Diagram Service Water System 46. Sheet 1 ML0621401802005-10-11011 October 2005 Drawing LRA-FB-49B-0, Flow Diagram Fire Protection Water Piping System 76. Sheet 1 ML0621402892005-08-18018 August 2005 Drawing LRA-FM-44A-0, Flow Diagram Nuclear Equipment Drains System 44. Sheet 1 ML0621402132005-08-16016 August 2005 Drawing LRA-FM-18D-0, Flow Diagram Containment Hydrogen and Oxygen Sampling System 27. ML0621401882005-08-0505 August 2005 Drawing LRA-FB-60A-0, Ventilation RCIC Area & Safety Related Pump Rooms. ML0621401402005-08-0404 August 2005 Drawing LRA-FB-16A-0, Flow Diagram Turbine Area Heating, Ventilation & Cooling System 67. Sheet 1 ML0621401672005-08-0101 August 2005 Drawing LRA-FB-45E-0, Flow Diagram Screenhouse Ventilation and Cooling System 73. ML0621401442005-07-15015 July 2005 Drawing LRA-FB-16B-0, Flow Diagram Pipe and Cable Tunnel Heating, Ventilation and Cooling Systems 67 and 69. ML0621402322005-07-0606 July 2005 Drawing LRA-FM-24A-0, Flow Diagram Reactor Water Cleanup System 12. ML0621402542005-06-29029 June 2005 Drawing LRA-FM-25B-0, Flow Diagram High Pressure Coolant Injection Lube Oil System 23. 2006-07-31 Category:Graphics incl Charts and Tables MONTHYEARML23095A3722023-04-0505 April 2023
[Table view]2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) JAFP-16-0110, Correction to 2014 Annual Radioactive Effluent Release Report2016-06-29029 June 2016 Correction to 2014 Annual Radioactive Effluent Release Report JAFP-16-0060, James a Fitzpatrick - Extension to Commitments Made in Response to March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3, Emergency Communication and Staffing Assessments2016-04-14014 April 2016 James a Fitzpatrick - Extension to Commitments Made in Response to March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3, Emergency Communication and Staffing Assessments ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15238B5372015-09-0404 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15229A0232015-08-13013 August 2015 Tables 1 and 2 JAFP-15-0017, J.A. Fitzpatrick - Response to Regulatory Issue Summary 2014-132015-02-0202 February 2015 J.A. Fitzpatrick - Response to Regulatory Issue Summary 2014-13 JAFP-14-0145, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-19019 December 2014 Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident JAFP-10-0088, Submittal of Corrections to the 2004, 2005, 2006, 2007, and 2008 Annual Radioactive Effluent Release Reports2010-07-15015 July 2010 Submittal of Corrections to the 2004, 2005, 2006, 2007, and 2008 Annual Radioactive Effluent Release Reports ENOC-08-00040, Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses2008-07-28028 July 2008 Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses ML0732400092007-11-19019 November 2007 JAFNPP SEIS Web Reference - NOAA 2004b - Thunderstorms and Wind Events ENOC-07-00036, Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses2007-10-31031 October 2007 Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0733004352007-08-17017 August 2007 Comments from JAFNPP Regarding Safety Evaluation Report with Open Items ML0705804642007-05-25025 May 2007 Audit Summary for the JAFNPP LRA Safety Site Audits ML0701603912007-01-16016 January 2007 JAFNPP - SEIS Web Reference - Great Lakes: Lake Ontario ML0710004712006-03-0909 March 2006 Great Lakes Atlas Fact Sheet #1 ML0701602092005-12-31031 December 2005 JAFNPP - SEIS Web Reference - Schaner 2005, Pelagic Planktivores, NYSDEC Lake Ontario Annual Report 2005 ML0701603982005-12-31031 December 2005 JAFNPP - SEIS Web Reference - Mnr Fish Stocking Summary 2005 ML0535703362005-12-0505 December 2005 Geographical, Environmental and Siting Information Minority and Low Income Data, Pilgrim and FitzPatrick Sites from 2000 Census ML0529001372005-10-17017 October 2005 Transformer Data - for Information Only Press Release-I-05-039, NRC Begins Special Inspection at James A. Fitzpatrick Nuclear Plant2005-07-0707 July 2005 Press Release-I-05-039: NRC Begins Special Inspection at James A. Fitzpatrick Nuclear Plant ML0701602162004-12-31031 December 2004 JAFNPP - SEIS Web Reference - O'Gorman Et Al 2005 JAFP-04-0190, In-Vessel Visual Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)2004-12-15015 December 2004 In-Vessel Visual Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) JAFP-05-0179, Enclosure 13, Calculation JAF-CALC-ELEC-02610 125VDC B Station Battery Sizing & Voltage Drop Revision 2, Appendix 4, Page 2 of 2, SBO2003-05-16016 May 2003 Enclosure 13, Calculation JAF-CALC-ELEC-02610 125VDC B Station Battery Sizing & Voltage Drop Revision 2, Appendix 4, Page 2 of 2, SBO ML0701602221999-10-31031 October 1999 JAFNPP - SEIS Web Reference - Boyd and Biberhofer 1999 2023-04-05 |