MONTHYEARML0519400332005-07-12012 July 2005 SG Inspection Summary Report Draft RAI Project stage: Draft Other ML0527204702005-09-27027 September 2005 (TMI Unit 1), Additional Information - Cycle 15 Refueling Outage Steam Generator Inspection Summary Report Project stage: Other ML0530500112005-10-28028 October 2005 E-mail Regarding TMI-1 Fuel Cycle 15 Steam Generator Inspection Report Project stage: Other ML0601903902006-03-20020 March 2006 Review of Steam Generator Tube Inspection Report for Fall 2003 (1R15) Outage (Tac No. MC4619) Project stage: Approval 2005-07-12
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24228A1922024-07-29029 July 2024 Request for Additional Information Response Due Date Extension E-Mail String ML24192A3642024-06-21021 June 2024 State Rad Health Reply Email Re Draft Environmental Assessment for the Three Mile Island Unit 2 ML24011A2332024-01-11011 January 2024 Request for Additional Information - License Amendment Request (ML23058A064) (EPID L-2023-LLA-0026 - Three Mile Island, U2: Amendment Historic and Cultural Resources) ML24130A2692023-08-30030 August 2023 TMI-2 Consultation Invitation Letter PSA Reply ML24130A2652023-08-21021 August 2023 TMI-2 Consultation Invitation Letter Reply from CAP ML23187A0202023-06-29029 June 2023 TMI Unit 2 – RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23135A3992023-05-12012 May 2023 (External_Sender) Section 106 Consultation - NRC NHPA for Three Mile Island Unit 2 ML23159A1642023-05-11011 May 2023 Email TMI-2 Pol Am. 67 SE Minor Discrepancies ML23107A2232023-04-14014 April 2023 – Response Re State Consultation-TMI-2 Solutions - Draft EA Fonsi Criticality Exemption Request ML23094A1482023-03-30030 March 2023 TMI-2 TS 6.0 Draft Wording Agreement ML23090A2142023-03-30030 March 2023 Asnyder, NRC Email from Tdevik, Energysolutions, Three Mile Island, Unit 2 -Response Regarding MC&A TS Change, Modification ML23094A0602023-03-30030 March 2023 TMI-2 Response on Draft TS Wording ML23068A4682023-03-0909 March 2023 – Response Re State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23057A0062023-02-24024 February 2023 State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23051A0412023-02-15015 February 2023 Email from TMI-2 Solutions Regarding Commitment Date, Dated 02/15/2023 ML22364A1942022-12-30030 December 2022 Email Mitigation for Hydrogen Concerns Commitment, Dated December 30, 2022 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22321A0072022-11-16016 November 2022 Material Control and Accounting RAI Response Clarification Call Docket No 50-320 ML23069A1582022-09-22022 September 2022 – NRC Response TMI-2 Solutions Exemption Question ML22214A0482022-08-0101 August 2022 TMI-2 Response: License Amendment Request TMI-2 Solutions Physical Materials Security Plan - Revised Modified License Condition 2.C(2) ML22208A0492022-07-21021 July 2022 State Consultation Response: License Amendment Request TMI-2 Solutions Physical Materials Security Plan ML22199A2762022-07-18018 July 2022 E-mail from A. Snyder, NRC, to B. Werner, PDEP, Regarding State Consultation Proposed Conforming Amendment Related to Proposed Exemption Request from Certain Record Retention Requirements ML22199A2772022-07-15015 July 2022 E-mail Attachment: Federal Register Notice - Volume 87 ML22189A2032022-07-0808 July 2022 E-mail from A. Snyder, NRC, to B. Werner, PA Department of Environment Protection - Three Mile Island, Unit 2 - State Consultation - License Amendment Request TMI-2 Solutions Physical Materials Security Plan ML22189A2042022-06-28028 June 2022 NRC-2022-0131-0001_Content - Federal Register Vol. 87, No. 123 ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22131A1382022-05-10010 May 2022 E-mail from T. Devik, Energysolutions TMI-2, to A. Snyder, NRC, Physical Security Plan May 9 Submittal Typo Correction ML22125A0162022-05-0303 May 2022 Email from T Devik to a Snyder: Three Mile Island 2 - Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition - May 3, 2022 Response Courtesy Copy ML22125A0102022-05-0303 May 2022 Proposed Action- Proposed Fonsi for TMI-1 Exemption Request from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Notification of Commonwealth of Pennsylvania Response ML22125A0092022-05-0303 May 2022 Proposed Action- Proposed Fonsi for TMI-1 Exemption Request from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Notification of Commonwealth of Pennsylvania ML22125A0132022-04-28028 April 2022 Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition - Partial Response ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0212022-04-19019 April 2022 Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22102A3062022-03-31031 March 2022 Email from T. Divik, Energy Solutions, to A. Snyder Clarification of Security License Condition Amendment Request ML22094A1812022-03-22022 March 2022 Licensee High Confidence Dates for Submittals ML22108A1022022-03-18018 March 2022 Email from A. Snyder, NRC to G. Van Noordennen, Energy Solutions, Clarification Request - September 21, 2021 Supplement- TMI-2 Physical Security Plan LAR ML22090A0142022-03-17017 March 2022 TMI, Unit 1 - Commonwealth of PA Response to Request for Consultation on the Proposed Revision to the License and the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Sp ML22070A1202022-03-10010 March 2022 E-mail from S. Acker, PADEP, to A. Snyder, NRC - Three Mile Island Unit 1, State Consultation - License Amendment Request TMI-1 in Support of the ISFSI Only Security Plan License Amendment Request ML22068A1792022-03-0909 March 2022 Email from a Snyder to Acker State Consultation- License Amendment Request TMI-1 in Support of the ISFSI Only Emergency Plan and Emergency Action Level Scheme ML22068A1672022-03-0909 March 2022 Email from a Snyder to Acker State Consultation - License Amendment Request TMI-1 in Support of the ISFSI Only Security Plan License ML22068A1462022-03-0909 March 2022 Email from a Snyder to Acker Three Mile Island Unit 1, State Consultation- License Amendment Request TMI-1 in Support of the ISFSI Only Tech Spec License Amendment Request ML22090A0232022-03-0909 March 2022 Email from A. Snyder, NRC to Craig Smith, Constellation Energy Generation, License Amendment Request - Proposed ISFSI-Only Technical Specifications, Dated March 9, 2022 ML22047A2392022-02-16016 February 2022 E-mail from D. Kenney to A. Snyder Dated 2/16/2022 TMI Unit 1 Typo Correction to February 8, 2022 Submittal ML22038A9352022-02-0707 February 2022 TMI-2 Pdms LAR Email Dated 2/7/2022 from T. Smith, NRC to G. Van Noordennen ML22034A6702022-02-0303 February 2022 LTR-22-0020 Eric Epstein, E-mail Follow-up on Decommissioning and Tax Question from December 8, 2021 on TMI Cleanup Funding, Docket Id NRC-2021-0230 - Region I Response ML22343A1612021-11-0909 November 2021 SHPO Email 11-9-2021 Alowery to Gvannoordennen and Hpell ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21230A3812021-08-18018 August 2021 TMI-1 ISFSI-Only Security Plan License Amendment Request 2024-07-29
[Table view] |
Text
From: Nadiyah Morgan To: David.Distel@exeloncorp.com Date: 10/28/05 3:43PM
Subject:
Fwd: TMI-1 Cycle 15 SG Inspection Report RAI Response (TAC MC4619)
- David, I've attached the list of questions from Emmett Murphy.
Thank you, Nadiyah Morgan Project Engineer US NRC (301) 415-1016 CC: John Boska; Peter Tam; Richard Laufer From: Emmett Murphy To: Nadiyah Morgan Date: 10/27/05 5:20PM
Subject:
Fwd: TMI-1 Cycle 15 SG Inspection Report RAI Response (TAC MC4619)
I am forwarding the licensee response that I got from Peter. I have three questions about this response I would like to discuss by phone with the licensee. Those questions are as follows:
- 1. Response to NRC Question 1 - It is stated in the second paragraph that structural integrity requirements for the CM analyses included an axial tensile load of 1340 lbf. The staff notes that the structural acceptance criteria for ID IGA in the free span in the kinetic expansions are based on a maximum MSLB axial load of 3140 lbf. In addition, maximum SBLOCA loads at TMI-1 are 2097 lbf. The staff is currently completing a review of the T-H analysis supporting the 1340 lbf load which was used to evaluate accident leakage at TMI-1. Assuming this is approved, the staff agrees that use of this load is appropriate for evaluating MSLB leakage, the staff does not believe this load is appropriate for structural integrity evaluations.
- 2. Response to NRC Question 1 - It is stated in the Table that for ID volumetric indications located in the expanded tubing a depth value of 80% through wall was the assumed leakage threshold. What is the justification for this value being higher from the 67% through wall threshold value used for the ID IGA flaws in the kinetic expansions in the upper tubesheet?
- 3. Response to NRC Question 1 - It is stated in the Table that a +Point voltage of 2 volts was used as the leakage threshold for axial and circumferential ID indications. What is the basis for this threshold value? Is it a lower bound of voltage data for cracks which are 100% through wall?
CC: Peter Tam Mail Envelope Properties (43627F53.D60 : 10 : 700)
Subject:
Fwd: TMI-1 Cycle 15 SG Inspection Report RAI Response (TAC MC4619)
Creation Date: 10/28/05 3:43PM From: Nadiyah Morgan
Created By: NSM@nrc.gov Recipients exeloncorp.com David.Distel (David.Distel@exeloncorp.com nrc.gov owf4_po.OWFN_DO JPB1 CC (John Boska)
PST CC (Peter Tam)
RJL CC (Richard Laufer)
Post Office Route exeloncorp.com owf4_po.OWFN_DO nrc.gov Files Size Date & Time MESSAGE 740 10/28/05 03:43PM Mail Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard