E-mail, Ennis, NRR, to Reddy, NRR, Et. Al., VY EPU License Condition
ML052900365
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/14/2005
From: Richard Ennis
Office of Nuclear Reactor Regulation
To: Steve Jones, Reddy D, Tatum J
Office of Nuclear Reactor Regulation
References
Download: ML052900365 (4)


Text

I Rick Ennis - Entergy proposed change to license condition 31 --- Page Page 1111 Rick Ennis Entergy proposed change to license condition 3.L From: Rick Ennis To: Devender Reddy; James Tatum; Steve Jones Date: 10/14/05 12:46PM

Subject:

Entergy proposed change to license condition 3.L Steve/Jim/Devender, The letter we sent Entergy on 10/12/05 included the following wording for license condition 3.L, "Transient Testing:"

"During the extended power uprate (EPU) power ascension test program and prior to exceeding 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> of plant operation at the nominal full EPU reactor power level, with feedwater and condensate flow rates stabilized at approximately the EPU full power level, Entergy Nuclear Operations, Inc. shall confirm (1) through performance of transient testing that the loss of one condensate pump will not result in a complete loss of reactor feedwater and (2) through performance of additional transient testing, or analysis of the results of the testing conducted in (1) above, that the loss of one reactor feedwater pump will not result in a reactor trip."

Entergy plans to respond to the 10/12/05 letter by COB on Monday 10/17. The attached email provides their proposed changes to the license condition. Since you're not available today, Entergy would like to discusss the proposed changes with SPLB on Monday morning. Please let me know if you can support a call at 8:30 am.

thanks, Rick 301-415-1420 CC: Catherine Haney; Cornelius Holden; Darrell Roberts; James Lyons; John Hannon; Tad Marsh; Thomas Martin

I O:tempEGW)00001.TMP Page I I I c:tempGW}0OO01 .TMP Page 1I Mail Envelope Properties (434FE101.E4A:11: 372)

Subject:

Entergy proposed change to license condition 3.L Creation Date: 10114/05 12:46PM From: Rick Ennis Created By: RXE~nrc.gov Recipients Action Date & Time OWGWPOO2.HQGWDOO1 Delivered 10/14/05 12:47 PM SRJ (Steve Jones)

TWGWPOO1.HQGWDOOI Delivered 10/14/05 12:47 PM DKR2 (Devender Reddy) owf2_o.OWFNDO Delivered 10/14/05 12:47PM JETI (James Tatum) owf4po.OWFNDO Delivered 10/14/05 12:47PM CFH CC (Cornelius Holden)

DJR CC (Darrell Roberts)

JEL CC (James Lyons)

JNH CC (John Hannon)

LBM CC (Tad Marsh)

RXE BC (Rick Ennis) Opened 10/14/05 12:47PM owf5po.OWFNDO Delivered 10/14/05 12:47 PM CXH CC (Catherine Haney) twf4_po.TWFNDO Delivered 10/14/05 12:47 PM TOM2 CC (Thomas Martin)

Post Office Delivered Route OWGWPO02.HQGWDO01 10/14/05 12:47 PM TWGWPO01.HQGWDO01 10/14/05 12:47 PM owf2_po.WFNDO 10/14/05 12:47 PM o'Nf4_po.OWFNDO 10/14/05 12:47 PM owvf5_po.OWFNDO 10/14/05 12:47 PM twvf4po.TWFNDO 10/14/05 12:47 PM Files Size Date & Time MESSAGE 1873 10/14/05 12:46PM Mail Options

I c:\temp\GW)0001.TMP Page 21 Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: High Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened

only discussion, only for discussion, Page 1I IRick - DRAFT for Rick Ennis - DRAFT Page 1 1 From: "Daflucas, Ronda" <rdafluc@entergy.com>

To: "Rick Ennis" <RXE~nrc.gov>

Date: 10/14/05 12:33PM

Subject:

DRAFT for discussion, only Rick -

Following is a DRAFT proposed rewrite of "L: Transient testing" for discussion purposes:

During the [EPUJ...[ENO] shall: (1) confirm through performance of transient testing that the loss of one condensate pump will not result in a complete loss of reactor feedwater. (2) Within 30 days at nominal full-power operation following successful performance of the test in (1) above, through performance of additional transient testing, or analysis of the results of the testing conducted in (1) above, confirm that the loss of one reactor feedwater pump will not result in a reactor trip.