Requalification Program Inspection - Limerick Generating Station
ML052240375
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/12/2005
From: Conte R
Division of Reactor Safety I
To: Crane C
Exelon Generation Co, Exelon Nuclear
Shared Package
ML042440463 List:
References
Download: ML052240375 (3)


Text

August 12, 2005 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way KSA 3-E Kennett Square, PA 19348

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - LIMERICK GENERATING STATION

Dear Mr. Crane:

In a telephone conversation on August 10, 2005, Mr. Stephen Barr, Region I Senior Operations Engineer and Mr. David Malinowski, Licensed Operator Requalification Training Lead, made arrangements for the NRC to inspect the licensed operator requalification program at the Limerick Generating Station facility. The inspection is planned for the weeks of October 10 and 17, 2005, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, the sample plan, and the written and operating tests scheduled for the first week of the inspection, to the NRC by September 30, 2005. Mr. Malinowski has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at SLF@NRC.GOV, and to the

Mr. Christopher M. Crane 2 Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0101), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information, unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. S. Barr at (610) 337-5316.

Sincerely,

/RA/

Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85 cc w/encl:

Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk J. Johnsrud, National Energy Committee Chairman, Board of Supervisors of Limerick Township R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear D. Allard, Director, Dept. of Environmental Protection, Bureau of Radiation Protection (SLO)

J. White, Director - Training S. Glenn, INPO

Mr. Christopher M. Crane 3 Distribution w/encl: (via E-mail)

S. Collins, RA M. Dapas, DRA A. Blough, DRS R. Crlenjak, DRS M. Gamberoni, DRS S. Barr, DRS C. Bixler, DRS S. Lee, RI OEDO D. Roberts, NRR T. Tate, PM, NRR G. Wunder, PM, NRR (Backup)

M. Shanbaky, DRP A. Burritt, DRP S. Hansell, DRP - Senior Resident Inspector C. Colantoni, DRP - Resident Inspector T. Haverkamp - Resident OA Region I Docket Room (with concurrences)

ROPreports@nrc.gov E:\Filenet\ML052240375.wpd ADAMS PKG: ML042440463 SISP Review Complete: RJC After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB STBarr/STB RJConte/RJC DATE 08/11/05 08/11/05 08/12/05 OFFICIAL RECORD COPY