U1R28 OCC Interactive Turnover
ML051940624
Person / Time
Site: Point Beach 
Issue date: 05/02/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051940624 (40)


Text

Comminted to Nucicar ETrZeII')

B EI1PE Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Sunday, May 2, 2004 Start Time:

1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer/ Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Line Supervisors Agenda

1. Safety Issue Discussion (SSC).
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule.

rnformeaton i inwarred was &*Wi/

in accordance vnth t reodomfi Intormavon ACX exPiwrt By~

1 f- -

I : v

ComnmJred to Nudlca, Ercclicnce

-F

_-EXRELLEflE Point Beach Nuclear Plant U1R28 Refueling Outage Safety Topics for week of May 2 - 8, 2004 Theme for the week This week's theme is Hand Protection. During the last week of April, there were a lot of minor hand injuries reported. Although we have come a long way in the last few years, we still have not eliminated hand injuries. It is time we hand protection to the next level.

Daily Safety Snippets Sunday

'It's difficult to grit when your finger gets snipped" Could you imagine doing your job without your hands? We tend to take it too much for granted that we have two hands at our command, immediately ready to do what we want them to. They not only perform amazing manual tasks, but they also make us money. Just ask anyone who has lost the use of his or her hands.

Monday "Concerning fingers, do not ignore: Cut one off and you'll grow no more" Limmerk 1999, While lowering a 20001b. flow diffuser from the high pressure turbine, a worker lost a substantial portion of one finger when the cribbing and jack used to support the diffuser failed and pinned the worker's hand between the diffuser and an I-beam used as part of the cribbing.

Tuesday "Safety gloves worn is a hand not torn" OEI 2632 Davis Besse, While performing a search, a security officer ran his hand between the front and back seat of a vehicle. A utility knife with the blade partially open cut the leather outer covering of the search glove, but the Kevlar liner gloves the officer had on protected his hand and prevented a serious injury.

Wednesday 7Where danger lingers, watch your fingers" Workers need to know accidents can happen In the strangest ways. Some accidents are simply bizarre. Others happen when no hazard is apparent. Doors were the source of more than 10,000 hand injuries a year in the US. Vending machines caused more than 100 lost-day hand injuries.

And 52 workers injured their hands while walking, according to the statistics.

Thursday

'Practice safety until it fits like a glove" Do you consider gloves as much a part of your normal PPE as your hardhat, safety glasses, and hearing protection? If not, maybe you should be. Always carry a pair of gloves with you when in the plant and use them when operating the valve or picking up scrap metal.

Friday "A finger tip - don't leave work without theml" On April 4, 2001, a contract employee at Braidwood Station suffered a fractured right hand when an electric hoist disengaged from a crane hook and fell on to the new fuel storage rack. The electric hoist was being used to drag test new spent fuel racks being Installed at the station. Workers attached a load cell and the electric hoist to the auxiliary hoist of the fuel building overhead crane, and then connected the electric hoist to a test gage. As the crane operator lowered the auxiliary hook, the test gage hung up on the fuel rack and caused the rigging to move laterally. The electric hoist became disengaged because the safety latch on the auxiliary hook was not used.

Saturdav

'It's no hand live... Proper gloves protect all five" OSHA 1910.138(a): General requirements. Employers shall select and require employees to use appropriate hand protection when employees' hands are exposed to hazards such as those from skin absorption of harmful substances; severe cuts or lacerations; severe abrasions; punctures; chemical burns; thermal bums; and harmful temperature extremes.

2

Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 28

.. Path N

Ip Picture Meets Outaae Radiation Performance nPKnMA..*

=VrIPfrkA

.A E-I' This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Meets:

<=75 Rem Actual Cum.

Exceeds:

<=71 Rem Dose:

48.126 Rem JDay 28 - May 1 l

Actual = 0.682 Cumulative = 48.126 Cumulative Forecast = 53.488 Daily dose and PCE goals reforecasted on 4/23.

Meets: <=18 Exceeds: <= 12 Actual PCE's:

6 0

0_

Stu Thomas I

Personnel Contamination Events Cummulative Dose Exposure 00 C.

00 0

E z

20 18 16 14 12 10 8

6 4

2 0

=_Mp

80 I

I

.II

.rI X,.................

~E 0 -

ActuAlW I

0

......ForwOst 0

aol 0

Actual

.Forecast

~

Goal 0 2 4 6 8 101214161820222426283032343638404244464850 0 2 4 6 8 1012141618202224262830323436384042

Committed to Nuclear Excellence i

Outage Status Report Plant:

Point Beach Unit I Day:

Sunday Today's Date / Time:

5/02104 1600 Outage Duration: Day 29 Of Refueling Outage Number U1R28 Safety Status '

Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Significant near misses 0

Total for this outage I

Summary:

Radiological Dose to date 48.126 Projected to date

  • 53.488 Outage Goal 575 R Difference

-5.362 Number of PCEs 6

Summary:

  • Reforecast on 4/23 Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary.

-;PlantStatus'-

Mode:

El Hot Standby (Mode 3) al Hot Shutdown (tMode 4)

El Cold Shutdown (mode S) 0 Refueling Shutdown (mode 6)

RCS:

Temperature:

80 Pressure:

Vented to Atmosphere RV Level:

Refueling Height Time to Boll:

27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br />

'-Shutdown Safety Assessment Protected Equipment:

-i MaJior Actvites Completed in La t24 Hoiurs Critical Path and NearCriticai Path Actiities (Net A4 Hours)

  • Continue U I Fuel Motion
  • FuelMotion449of4648 1510
  • Continue UI Reactor Vessel Head Inspection
  • IB RCP MotorWork
  • IP-15B SI Pump Review i;

-Si nifikani utstandi I ssues

i Date Issue Due Res onsibility 4/25/04 lB RCP Motor Oil 5/10/04 Rick Repshas 4/28/04 I1W-3B Shroud Fan Backdraft Damper FME 5/09/04 Terry Guay 5/2104 IP-15B SI Pump Seal Leak 5/3/04 Mike Pajewski

.l.

M or M iles

=

K.

Scheduled Actual Scheduled Actual Date Time Date Time Date l Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 On-Line 4/30/04 0100 4

Point Be:ach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

Mav 2. 2004 TIEIE:

1400(

KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

YELLOW YEILLOW\\V GREEN YELLOW CONTAINMENT:

SFP COOLING:

YELLOW GREEN PROTECTED EOUIPMENT:

COMMENTS:

RCS Time to Boil is 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> SFI Irime to B3oil is 22.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (rull core oll-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency Pl F-1.562 Revision 2 Ino/3002 Rfcircnces: NP 10.3.6 NP 10.2.1 5

Pa~ge5 of 9

Defined Critical Path I

~MAY 0

U ID DESCRIPTION OD RD Cal U SYS EQID TF MAY___

4 1 4. 6. 810112,14.16.18,20,221 0. 2.4 6. 8.1 i1 2,14,16.1,820,221 0.2. 4 6. 8.10i12,14,16,18.20.2 I

RPIC-030 EL MOTION AND INSERT 96 12 1 1 FH O-RP-001C 3

L MOTION AND INSERT SHUFFLE SHUFFLE 02MAY04 23:5925APR04 08:OOA 1

T-2618-H I Si IT-531 P-10B OPS REV0-1 2 2

1 1 SI IT.531 4

T.2618 I IT 531 P 1OB OPS REVO01 0012618- 02MAY04 13:5902MAY04 12:00 1

IT-531C REMOVE SUMP B SCREEN 6

6 1

1 SI O-IT-0531 0

IT-531 EMOVE SUMP B SCREEN S215919-02MAY04 17:5902MAY04 12:00 1

IT-531B LRPM RHRTOSUMP BTRAIN 10 10 1 1 Si O-IT-0531 0

IT 531BLRPM RHRTOSUMP BTRAINB B

02 Y04 18 :000 0215919- 03MAY04 03:59 g I 1

T-6929-H 1 125V IWP 00-037-02 EM 1 1 1 1 125V D72-16-08 3

T-69294ii 125V IWP 00-037.02 EM REVO-1 REVO-1 03MAY04 01:0010016929 -03MAY04 01:59 I

T-8770-H 1 CV CV-1296 MMV REVI-1 1

1 1 1

CV CV-01296 3

T-87704 1 CV CV 1296 MMV REV1.1 03MAY04 01:00E0018770- 03MAY04 01:59 0 EM0306110A IWP-037-02 REPL MOBS 16 16 1 0 125V D72-16-08 3

EM0306110p L MOBS 1MOB-009 - 019 IMOB-009 -019 03MAY04 02 0

2 03061 10 - 03MAY04 17:59 1

T-2618-R 1 SI IT-531 P-1OB OPS REV0-1 1 1 1 1

SI IT-531 0

T.2618-R1SI IT-531 P-10B OPS REVO-1 03MAY04 04:00E0012618- 03MAY04 04:59 1

OP7A-050 ALIGN AND START P-OOtOB 2

2 1

1 RH P-010B 0

Op7AO5oALUGN AND START P-oo01B AS OPERATING DHR LOOP AS OPERATING DHR LOOP 03MAY04 05:O0E3MAY04 06:59 1

RHBOIZ CLOSE RHR B LOOP WORK 0

0 1

1 RH MILESTONE 0

RHBOIZCLOSE RHR B LOOP WORK WINDOW WINDOW 03MAY04 07:00!03MAY04 06:59 1

T-0690-R 1 SI IT-531 OPS REV0-1 1 1 1 1

Si O-IT-0531 0

T.0690-R1_SI IT-531 OPS REVO-1 03MAY04 07:00E0010690- 03MAY04 07:59 1

RHAO1A START RHR A LOOP WORK 0

0 1

1 RH MILESTONE 0

RHAO1ASTART RHR A LOOP WORK 03MAY04 08:00103MAY04 07:59 1

T-0685-H 1 RH ICP-5.69A IC REVO-1 2

2 1

1 RH ICP-5.69A 0

T-0685.W RH ICP-5.69A IC REVO-1 03MAY04 08:00E 0010685- 03MAY04 09:59 1

T-2617-H I Si IT-531 P-10A OPS REVO-1 2

2 U

1 Si IT-531 1

T.2617-H St IT-531 P-10A OPS REVO-1 03MAY04 08:00E0012617- 03MAY04 09:59 1

IC0300939 RH-624 DIAGNOSTIC CHECK 10 10 1 1

RH RH-00624-0 0

IC0300939RH624 DIAGNOSTIC CHECK 03MAY04 1 0:000300939-03MAY04 19:59 1

IC5.69-624 ICP-05.069A TRAIN A 10 10 1 1

RH 1ICP-05.06 0

IC5.69.624CP-05.069A TRAIN A I

03MAY04 1 0:000300989-03MAY04 19:59 t

IT-531A LRPM RHR TO SUMP B TRAIN 10 10 1 1

Si O-IT-0531 1

IT.531LRPMRHR TOSUMP B TRAIN A A

03MAY04 10 000215919-03MAY04 19:59 Run Date 02MAY04 15:13l LT-16 DEFINED CRITICAL PATH l

Sheet I of 2 Q Prlmavera Systems, Inc.

FL-16 DEFINED CRITICAL PATH SET I

Defined Critical Path U

ID DESCRIPTION OD RD Cal U SYS EQID TF MAY Sys___

4.6*8.1 1l2,14,16.18l~l2 0,2

,6, 8,0l~i2.14,16,18,20,221 0, 2,4,6.8.l0112.14.16,18,2?0,22 1

T-6929-R 1 125V IWP O-037-02 EM 1

1 1 1 125V D72-16-08 3

T.6929 I 125V IWP 00-037-02 EM REVO-1 REVO-1 03MAY04 18:0030016929- 03MAY04 18:59 1 OP0300939 RH-624 PMT STROKE PER IT 1 1 1 1

RH RH-00624-O 0

OP030093 9RH-624 PMT STROKE PER IT 390 390 03MAY04 20:0010300939 - 03MAY04 20:59 1

T-2617-R I SI IT-531 P-10A OPS REVO-1 I

1 U I

SI O-1T-0531 I

T-26174RIIS IT-531 P-OA OPS REVO-1 03MAY04 20:0010012617. 03MAY04 20:59 1

T-0685-R 1 RH ICP-5.69A IC REVO-1 1 1 1 1

RH ICP-5.69A 0

T.068g5.RRH ICP-5.69A IC REV0 1 03MAY04 21:0010010685- 03MAY04 21: 59 I

RHAO1Z END RHR A LOOP WORK 0

0 1 1

RH MILESTONE 0

RHAOIZEND RHR A LOOP WORK WINDOW WINDOW 03MAY04 22:00103MAY04 21:59 1

SOP-B04B DE-ENERGIZE 1B-42 PER 4

4 1 1 480V B-42 0

SOP.BO4BDE-ENERGIZE 1B-42 PER 1 -SOP-480-B04 1-SOP480-04 03MAY04 22:00 04MAY_4 01:59 E-I *I EE

  • s *I 1

T-7590-H 1 480V MR 01-128 1B-42 BUS 2 2

1 1 480V MR 01-128 0

T-7590H4 480V MR 01-128 1842 BUS BRACING EM REVO-1 BRACING EM REVO-1 04MAY04 02:00M0017590. 04MAY04 03:59 1 EM0202527B IB-42 REMOVE BUCKETS MR 20 20 1 1 480V B-42 0

EM0202527B 113.42 REMOVE BUCKETS MR 01-128 MIU1R2 Co 01-i281M/L1R28 04MAY04 04:00 3

Run Date 02MAY04 15:131 LT-16 DEFINED CRITICAL PATH l

Sheot 2 of 2 O Pdimavera Systems, Inc.

I FL-I 6 DEFINED CRITICAL PATH SET l

Run Date 02MAY04 15:'51 Work Activity Risk Assignment Sheet 1 cf2 U l ACT WOl GRPI HPE EQUIPMENT Activity Call DUR START FINISH MAY ID STl RISK DescriptIon ID 21 O's 810 Sa21t 0*1 do M

I CE-1600-80 76 CE8 DR-Y ML-Y R-1 RX HEAD PENETRATION 26 U

6 02MAY04 02MAY04 I 7REACTOR VESSEL AND ASSEMBLY I

ORT3-Y R-M ADDITIONAL INSPECTION 08:OOA 17:59 0 13472 - 128CE l

4 I

U I

EM0215216 76 EM DR-Y ML-Y TG-01-G INSPECT GENERATOR U

11 29APR04 02MAY04 H

I ELECTRICAL GENERATOR ORT3-N R-M PHASE AND NEUTRAL 21:00A 23:59 D215216 128EM 1

EM0216638A 76 EM DR-N ML-N P-001 B-M P-1B RE-ASSEMBLY OF 1

80 01MAY04 05MAY04 IREACTOR COOLANT PUMP MOTOR ORT3-N R-M MOTOR 18:OOA 19:59 03017

- 128EM I

EM0215223 76 EM DR-N ML-N W-003A-M PERFORM MCE W-003A-M U

3 02MAY04 02MAY04 ONTAINMENT CONTROL ROD DRIVE SHROUD FAN MOTOR ORT3-N R-M (1352.3AM1B-01) 10:OOA 14:59 15223 - 128EM 2

EM0305106 76 EM DR-N ML-N D-205 MONTHLY NON-SAFETY U

4 03MAY04 03MAY04 D125V DC STATION BATTERY ORT3-N R-M 125V DC STATION 07:00 10:59 0305106 - B07A2 2

EM0305117 76 EM DR-N ML-N D-205 QUARTERLY NON-SAFETY U

4 03MAY04 03MAY04

[0125V DC STATION BATTERY ORT3-N R-M 125V DC STATION 07:00' 10:59 0305117 - B07A2 2

EM0305128 76 EM DR-N ML-N U2A-UV TEST U2 TRAIN A U

3 04MAY04 04MAY04 0TRAIN A 4.16 KV AND 480 V SWITCHGEAR RELAY TES ORT3-N R-M RELAYS UNDERVOLTAGE AND 12:00' 14:59 0305128 - B07A2 2

EM0305133 76 EM DR-N ML N U2B-UV TEST U2 TRAIN B U

3 04MAY04 04MAY04

[1rRAIN B 4.16 KV AND 480 V SWITCHGEAR RELAY TE ORT3-N R-M RELAYS UNDERVOLTAGE AND 15:00 17:59 0305133 - B07A2 8

IC0301005 76 ICS DR-Y ML-Y ICP-02.001 RP AND SG ANALOG TEST -

5 2

02MAY04 02MAY04 REACTOR PROTECTION AND SAFEGUARDS ANALOG ORT3-N R-M RED 09:00A 13:59 01005 - B07A2 I

IC4 39STK 76 ICS DR-Y ML-Y 1ICP-04.039-1 ICP 4.39-1 GOVERNOR 5

40 04MAY04 07MAY04 EU R

B I

N RBINE VALVE CAUBRATI ORT3-N R-M VALVE STROKE 06:00 12:59 0300976 - 1281C 2

IC0301006 76 ICS DR-N ML-N ICP-02.001 RP AND SG ANALOG TEST -

5 5

04MAY04 04MAY04

[OREACTOR PROTECTION AND SAFEGUARDS ANALOG ORT3-N R-M WHITE 07:00 11:59 0301006 - B07A2 I

MM0216627 76 MMV DR-N ML-N CV-01296 CV-1296 - INSTALL NEW Y

20 27APR04 05MAY04 I

AUXILIARY CHARGING UNE ISOLATION ORT3-N R-M TRIM PER MOD 02-027 08:OOA 08:59 216627 128MM I

MM0303680A 76 MMV DR-Y ML-Y MS-02005 1MS-2005 - PERFORM MOD 5

37 01MAY04 05MAY04 HX.1B SG HEADER SAFETY ORT3-N R-M FOR ROUNDED ENTRANCE I 1:00A 15:59 303680 128MM mm

-M

-~M I H 0

OP0301343 77 OP2 DR-N ML-N O-TS-082 TS-82, G-02 EMERGENCY 2

2 02MAY04 02MAY04 G-02 EMERGENCY DIESEL GENERATOR MONTHLY I ORT3-N R-M DIESEL 10:OOA 13:59 301343 - B07A2 G!4: a m

0 OP0301450 77 OP3 DR-N ML-N O-fT-0014.2 IT-14, FO TRANSFER 3

3 02MAY04 02MAY04

[10-02 EDW FUEL OIL TRANSFER SYSTEM PUMPSNALVES ORT3-N R-M SYSTEM PUMPS/

16:00' 18:59 0301450 - B07A2 0

OP0301451 77 OP3 DR-N ML-N O-IT-0100.2 IT-100, SEAT LKG TEST OF 3

3 02MAY04 02MAY04

[10-02 EDG SEAT LKG TEST OF DA COMP DISCH CHK VLVS ORT3-N R-M DA-200 AND 16:00-18:59 0301451 - B07A2 0

OP0301447 77 OP3 DR-N ML-N O-TS-09 TS-9, CONTROL ROOM HN/

3 24 03MAY04 06MAY04

[

S i

]CONTROL ROOM HEATINGVENTIL ORT3-N R-M SYSTEM CHECKS 16:00-18:59 0301447 - B07A2 NMC /WE I

LT-81 HUMAN ERROR RISKBARCHART PIR I

2 u FL-81 HUMAN ERROR POTENTIAL I

PB3NP U1 Refueling 28 OutageI O Primavera Systems, Inc.

I I

Run Date 02MAY04 15:15]

Work Activity Risk Assignment Sheet 2 Of 2 U

ACT WO GRP HPE I EQUIPMENT Activity Cal DUR START FINISH uo, ed MAY ID ST RISK Descriptlon ID 2181

6. 6 Q16 1

6 61 0.6t1do. 611 04k 2

OP0301632 77 OP3 DR-N ML-N O-PC-058 H2 SEAL OIL SYSTEM TEST 3

1 03MAY04 03MAY04

_HYDROGEN SEAL OIL SYSTEM

_ORT3-N R-M 18:00' 16:59 0301632 - B07A2 I

RP1C-03 OPS DR-N ML-N O-RP 001C FUEL MOTION AND INSERT 1

12 25APR04 02MAY04

=REFUEUNG ORT3-N R-M SHUFFLE 08:OOA 23:59 1280p I

IT-531B 77 OPS DR-N ML-N O-IT-0531 LRPM RHR TO SUMP B 1

10 02MAY04 03MAY04 UNIT 1 CONT SUMP B SUCTION UNE LEAK TEST (RFSD)

_ ORT3-N R-M TRAIN B 18:00 03:59 0215919 - 1280P I

Y04PREPS OPS DR-N ML-N Y04 PREPS FOR 1Y-04 OUTAGE 1

12 03MAY04 03MAY04 ORT3-N R M 00:00 11:59 1280P 0

0135AG01-A OPS DR-N ML-N ALIGN G-01 TO 1A-05 & 2A-05 1 1

03MAY04 03MAY04 0

ORT3-N R-M 01:00' 01:59 B07A2 0

013SAG01-B OPS DR-N ML-N RE-ALIGN G-02 TO 2A-05 1

1 03MAY04 03MAY04 D

ORT3-N R-M 13:00 13:59 B07A2 0

0135AG02-C OPS DR-N ML-N G-02 ALIGN G-02 TO IA-05 & 2A-05 1 1

03MAY04 03MAY04 ORT3-N R-L FOR 1B42 OUTAGE 21:00 21:59 I

SOP-B04B OPS DR-N ML-N B-42 DE-ENERGIZE 1842 PER 1

4 03MAY04 04MAY04 U

ORT3-N R-L 1-SOP-480-B04 22:00 01:59 1280P I

SOP-B41B OPS DR-N ML-N B-41 DE-ENERGIZE 1B-41 PER U

2 04MAY04 04MAY04 O

ORT3-N R-M 1-SOP-480-B02 14:00 15:59 1280P

=__

NMCI WE LT-81 HUMAN ERROR RISK BARCHART C rrnvr Strn,~PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL O Primavera Systerns, Inc..

after 02MAY04 12:00 U1R28 WORKING SCHEDULE after 02MAY04 12:00 U

ID RESPl WO EQID DESCRIPTION lRDl ES I

EF I

RISK I MF I MAY I SnST 2 M

41 3

I 4

I t

NRC-CALL-9 IADM MILESTONE O.D. CALL NRC TO I

02MAY04 02MAY04 DR.Y ML-Y 0_

NRC-CALL-9.D. CALL NRC Tl WITNESS CORE MAPPING WITNESS CORE I

21:00 21:59 ORT3-Y R-N

[I 1

T1lI

IAliS 2

1 AP0215132 APM 71 C-039 CALIBRATE THE MW 4 103MAY04 03MAY04 DR-N ML-N 104 _

AP0215132 LUBRATE THE MW TRANSDUCER T EH CONTRO TRANSDUCER TO EH 08:00 11:59 ORT3-N RN 021513 RBINE ELECTRO-HYDRAULI CONTROLP Cii *.,P-.s

!S S_

3 1

AP0215115 APR 76 A-01 CAL 1A-01 NON-TECH 1

30APR04 02MAY04 DR-N ML-N 24 P S115CAL 1401 NON-TECH S EC RCP RELAYS SPEC RCP RELAYS 08:OOA 12:59 ORT3-N R-N

.16 KV BUI SWiTCHGEAR02 S115 4

1 AP0215117 APR 76 A-01 IA-01 CALIBRATE 25 01MAY04 05MAY04 DR-N ML-N 0

1!iII71A-01 aAUBRATE TECH SPEC RELAYS TECH. SPEC RELAYS 15:00A 09:59 ORT3-N R-N 5

1 AP0215120 APR 76 B-03 IB-03 CALIBRATE TECH 8

03MAY04 03MAY04 DR-N ML-N 6

AP02151201

-03 CAUBRATE TECH SPEC RELA S SPEC RELAYS 08:00' 15:59 ORT3-N R-N 021512 80V SAFEGUARDS LOA CENTER 6

0 TRIP111 APR FS2-111 F52-111 PERFORM 5

04MAY04 04MAY04 DR-N ML-N 0

I TRI 111F52-11tP CONT. CKT. AND TRIP 12:00 16:59 ORT3-N R-N liz*

S I La i

01 L111SO APS F52-111 SWITCHING LINE III 4

03MAY04 03MAY04 DR-N ML-N 01 LlIIISOSOTCHING LINE 111I OUT 'PBNP YA ~D OUT PBNP YARD' 07:00-10:59 ORT3-N R-N 8

0 Li11OOS APS F52-1 l

LINE IIOUTOF 39 03MAY04 04MAY04 DR-NML-N 0

LII1100SU EI1 OUTOFSERVICE SERVICE 07:00 21:59 ORT3-N R-N I

9 0

F52111 APS F52-111 l

F52-111 PERFORM 10 03MAY04 04MAY04 DR-N ML-N 052 I F52-111 PERFdRM BREAKER M NTENANCE BREAKER 11:00 11:59 ORT3-N R-N 10 0

LIISI APS F52-111lWITCHING LINE 111 IN 4 04MAY04 04MAY04 DR-N ML-N 402 LIIISIS

  • PBNP YARD' 17:00-21:59 ORT3-N R-N l 1

1 BM0300100 BMS 77 l RE-PC46.1 VERIFYRTOAS 1

04MAY04 04MAY04 DR-NML-N 143 BM03001OoVE PYRTOASC CALCULATED BY PPCS 07:00' 07:59 ORT3-N R-N 030010 ALORIMETRIC 12 2

BM0300121 BMS 77 RE-PC 46.1 l VERIFY RTO AS I

04MAY04 04MAY04 DR-N ML-N 143 BMO300121VE IFY RTO AS C CALCULATED BY PPCS 07:00l 07:59 ORT3-N R-N 0300121 L

METRIC 1

S

e.

S Z-13 0

CE0306041 CEI 78 l INTAKE CRI INSPECT CRIB.

30 05APR04 05MAY04 DR-Y ML-Y 190 EO 604lINSPEdT CRIB. INSTALL UOYS AND P1S14 INSTALL BUOYS AND 10:OOA 16:59 ORT3-Y R-N 14 1

CEDIVINSP CE1 l 76 CW UNDERWATER 8

21APR04 03MAY04 DR-Y ML-Y E

NSPUNDE~tWATER INSPEON OF CIRC WATER I INSPECTION OF CIRC 09:OOA 15:59 ORT3-N R-N CW SYPTEM MULTI A NONUM S

I &

w II:

I

-!w 15 1 ICE44CGATR CE3 177 I ST-SISI IREM INSUL FOR FAC 11451 04APR04 111MAY041 DR-Y ML-Y 0~E CGATRRIVE WrSUL FOR FAC Pg 00. CTMT 44 FT: GEN AREA

_______jPROG - CTMT 44 FT j 16:OOA 11:59 ORT3-Y R-N Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION Sheet I of 31 6: Pumavera Sstems,Inc.

FL-03 Execution Publication Set

after 02MAY04 12:00 U1R28 WORKING SCH U

ID RESPl WO I EQID l

DESCRIPTION lRDl ES I

EF I

RISK MF C

S T

-I I

16 CE08TOHTI CE3 77 IST-SISI REO NSULATE - FAC PROG - TURB HALL 8 10 2 20APR04 I 03MAY04 DR-Y MI-V 20 15:0OA I16:59 ORT3-V R-N 17L' CE26TGATI CE3 77 IST-SISI REINSULATE - FACFI 10 28APR04 I 03MAY04 DR-Y ML-Y 357 PROG - TRB HALL 26 FT_

09:O0A 16:59 ORT3-Y R-N 18 Ii P

1 1274-TI 1 CE3 77~ PIPING EBl-I NDElSI -REPLAEli 30APR04 02MAY04 DR-Y MI-V T 293 INSUL-PIPING NEAR I_ 11:00A 23:59 ORT3-Y R.N 19 1 P1246-TI CE3 77 PIPING EB-NDEASI - REPLACE INSUL. SUPPORTS

_ 15 30APR04 03MAY04 I DR-Y MI-V 11 :OOA 03:59 ORT3-Y R-N a

20 1 CE44TGATRX CE3 77 IST SISI 20 1 CE4TGATRX CE3 77 ST-SI SI REM INSUL FOR FAC I 10 01MAY04 03MAY04 DR-Y ML I

PROG - TRB HALL 44 FT _

10:00A 16:59 ORT3-Y R-N C

21 11 CE30000TI CE3 76 TG-0i-T ENCAPSULATE INSULATION ON HP 10 01MAY04 03MAY04 DR-YML-Y I32 12:OOA 16:59 ORT3-Y R-N 22 1

CE214113TI CE3 76 MS-02719 INSTALL INSULATION 6

03MAY04 03MAY04 DR-Y ML-Y 34 FOR MS-2719 07:00 12:59 ORT3-Y R-N 23 1

CE214523TI CE3 87 HX-020B FW HEATER 4B-6 03MAY04 03MAY04 DR-Y ML-Y 234 REINSTALL SHELL 07:00 12:59 ORT3-Y R-N 24 1 CE310576TI CE3 76 RD-05975 INSTALL INSULATION 8

03MAY04 03MAY04 DR-Y ML-Y 0

FOR IRD-5975 07:00 14:59 ORT3-N R-N 25 1

CE44TOHTI CE3 77 IST-SISI REINSULATE - FAC 8

03MAY04 03MAY04 DR-Y MLY 0

PROG - TURB HALL 44 07:00 14:59 ORT3-Y R-N 26 1

CE214522TI CE3 77 HX-020A FW HEATER 4A -

10 03MAY04 03MAY04 DR-Y ML-Y 230 REINSTALL SHELL 07:00 16:59 ORT3-Y R-N 27 1

CE216332TI CE3 76 FD-00204B INSTALL INSULATION 10 03MAY04 03MAY04 DR-Y ML-Y 230 FOR 1FD-204B 07:00 16:59 ORT3-Y R-N 28 1

CE309512TI CE3 76 SW-02861 INSTALL INSULATION 8

03MAY04 04MAY04 DR-Y ML-Y 349 1SW-2861 17:00 00:59 ORT3-Y R-N 29 1

CE44POHTI CE3 77 IST-SISI REINSULATE-FAC 12 03MAY04 04MAY04 DR-Y ML-Y 0

PROG - PAB 44 FT 17:00 05:59 ORT3-Y R-N 30 1

P1133-TI CE3 77 PIPE RC 25 NDEflSI - REPLACE 16 03MAY04 04MAY04 DR-Y ML-Y 0

INSULATION - PZR 17:00 10:59 ORT3-Y R-N 31 1

CE303847TI CE3 78 MS-00006 INSTALL INSULATION 6

03MAY04 04MAY04 DR-Y ML -

138 FOR MS-6 22:00 07:59 ORT3-Y R-N FEDULE after 02MAY04 12:00 MAY Sun 2 IMon 3 TuQ4 I

21O012,1416.%820,2 01 214 6, 811011214,16 1820,22 0,

2.

4, 6,

8.

8,02,14 EO TOHT1REINSULATE - FAC PRO TURB HALL 8 FT OVERHD I

lSECONDARY INSERVIC INSPECTION E2 TGATPEINS¢ILATE - FAC PROl-TRB HALL 26 0,T GEN AREA I - q SECOCVDARY INSERVIC INSPECTION DSI - REPLACE INSUL PIPING NEAR FW-476BB3I

__A FW FROM C ONT ISOLATION VALVES TO FW HE DER 0303877 NDEIISI -8EPLACE INSUL. UPPORTS NEARFW-476BB FEED\\YA TER CONT ISOLVALVES TO STEAM GENERATO E4 TGATRXREM, INSUL FOR FAC ROG. TRB HALL,44 FT GEN AREA I

SECONDARY INSERVIC INSPECTION F3 C 000TIENCAP;ULATE INSULATON ON HP TURBIYE COVER HHIG HR G PRESSURE TUR8 NE0302153 CE214113 N TAL INSULATIOOk FOR MS-2719 021411 GLAND STEM HEADER SAFETY RELIEF CE214523T HEATER 4B - REINSTALL SHELL I SULATION I

021452 LP FEEDWATER HEATER 4B CE31 osi' N TALINSULATION FOR 1 RD-5975 I031 057 T-26 BLONDOWN TANK VINT RUPTURE CE44TOH TE - FAC PROG -TURB HALL 44 FT OVERHt I0303636SECONDARY INSERVICE I SPECTION CE214522 HEATER 4A - RENSTALL SHELL I SULATION IIL021452

-P FEIEDWATER HEATER 4A CE216332T N TALL INSULATON FOR 1FD-204B 02163 HX-21b HP FWV SB LS-639 UPPER IS I

NSTALLINSULATION 1 W2861 l030951

~

HX-53B H2 IDE SEAL OIL CE44POHTIREINSULATE -FAC PRO - PAB 44 FT d 030363 d.ISECLNNDARY INSE I

IP1133-NiEl$I-REPLACE INS LATION-PZR 030388 SPRAY LIN CE3038471NSTALL INSU TION FOR MS.

03038 I

PTURB CYL C II42s NTALINSULA I

030428 M

E2 TOHSRREM ~CAPP - FAC PRO

- TURB3 HALL 20, FT OVERHD ON Shoot 2 of 31

)et 32 1 1

CE304280TI CE3 76 SW-0001FA I INSTALL INSULATION FOR 1SW-1SA 10 04MAY04 04MAY04 DR-Y ML-Y 07:00 16:59 ORT3-Y R-N 0

z 1

33 1

CE26TOHSR CE4 77 1 5T-515 REMSCAFF - FAC 37101MAY04104MAY041 DR-Y ML-Y 40 Lz I

T-IPROG-TURB HALL 261 I 09:OOA 23:59 ORT3-Y R-N Run Date 02MAY0415:17l LT-03 STANDARD PUBLICATI C Prmavera Systems, Inc.

FL-03 Execution Publication c

after 02MAY04 12:00 l

U1R28 WORKING SCHEDULE I

after O2MA Y04 12:00 t

  1. lU ID lRESPl WO I EOID DESCRIPTION RD ES EF RISK l MF SunI 2

MAY Tue74 I

I -

a! ;; A C.I zLm IND a F-I.;

34 I

CE-RPI-SR CE4 76 RPI REMOVE SCAFFOLD I FOR RPI COIL ON RX 5

02MAY04 02MAY040 DR-ML-Y 1 12:001 16:59 1ORT3-Y R-N 1491CE4 35 1 CE934380SR CE4 76 HS-6011R-37 REMOVE 4

02MAY04 02MAY04 DR-Y ML-Y 207 SCAFFOLDING FOR 15:00 19:59 ORT3-Y R-N 36 1 CE309424SR CE4 76 CW-00138A REMOVE 4

02MAY04 02MAY04 DR-Y ML-Y 239 SCAFFOLDING FOR 18:00 21:59 ORT3-Y R-N 37 1

CE933444SI CE4 76 W-001C2-A BUILD SCAFFOLDING 8

03MAY04 03MAY04 DR-Y ML-Y 1

FOR W-1C2-A 06:00 13:59 ORT3-Y R-N 38 1

CE214048SR CE4 76 HS-CS-01 REMOVE 5

03MAY04 03MAY04 DR-Y ML.Y 60 SCAFFOLDING FOR 07:00 11:59 ORT3-Y R-N 39 1

CE212843SR CE4 76 P-028B-M REMOVE 10 03MAY04 03MAY04 DR-Y ML-Y 0

SCAFFOLDING FOR 07:00 16:59 ORT3-Y R-N 40 1

CE301979SI CE4 77 SC-lA BUILD SCAFFOLDING 10 03MAY04 03MAY04 0

FOR IA TUBE 08:00.

17:59 41 1

CE407589SI CE4 76 T-026 BUILD SCAFFOLDING 10 03MAY04 03MAY04 DR-Y ML-Y 39 REPAIR LEAK ON 08:00.

17:59 ORT3-Y R-N I

CE311887SR CE4 82 HX-021B REMOVE 6

03MAY04 03MAY04 DR-Y ML-Y 353 SCAFFOLDING FOR 15:00 20:59 ORT3-Y R-N 43 1

P1246-SR CE4 77 PIPING EB-NDEIlSI - REMOVE 6

03MAY04 03MAY04 DR-Y ML-Y 231 SCAFFOLDSUPPORTS 15:00 21:59 ORT3-Y R-N 44 1

CE301980SI CE4 77 SC-lB BUILD SCAFFOLD FOR 10 03MAY04 04MAY04 2

1B TUBE PLUGGING 18:00 07:59 45 1

CE-1600-50 CE4 76 R-1 REMOVE REMAINING 5

03MAY04 03MAY04 DR-Y ML-Y 120 SCAFFOLDING POST 19:00 23:59 ORT3-Y R-N 46 1

CE310576SR CE4 76 RD-05975 REMOVE 4

03MAY04 03MAY04 DR-Y ML-Y 99 SCAFFOLDING FOR 20:00 23:59 ORT3-N R-N 47 1

CE44TOHSR CE4 77 IST-SISI REM SCAFF - FAC 12 03MAY04 04MAY04 DR-Y ML-Y 445 PROG - TURB HALL 44 20:00.

08:59 ORT3-Y R-N 48 1

CE212694SI CE4 76 PIPING HB-BUILD SCAFFOLDING 8

03MAY04 04MAY04 DR-Y ML-Y 0

FOR IPIPING HB-19 23:00 07:59 ORT3-Y R-N 49 1

CE214041SR CE4 82 FD-02401 REMOVE 5

04MAY04 04MAY04 DR-Y ML-Y 345 SCAFFOLDING FOR 00:00 08:59 ORT3-Y R-N 50 1

CE214040SR CE4 82 FD-02400 REMOVE 8

04MAY04 04MAY04 DR-Y ML-Y 342 SCAFFOLDING FOR 00:00 11:59 ORT3-Y R-N CE9 992 CE pj=pEMOVE SCAFFOLD FOF RPI SYSTEM MULTI ANI I.

438 REMVE SCAFFOLDIN a8m

?PZR PORV HEADEI 0942 4S5P~OVE SCAFFOLDII 0309424=P-30A CWP DISC CE933444Si!I 9933444W CE214048S 0214W CE212843SR&

0212843I CE301979SS 0301979 CE407589SE 040758§ CE:

RPI COIL ON RX HEAD

)IOR NON-NUMBERED EQUIPMENT

FOR HS-601R-34A tSNUBBER IG FOR ICW-138A HARGE HEADER (ENT D SCAFFOLDING )OR W-1C2-A
CONTAINMENT COOLING Fi MOVE SCAFFOLDING FOR HS-CS-6 IICONDENSATt LINE GB-4 SNUI MOVE SCAFFOLDJNG FOR 1P-28B-i __STEAM GENERATOR Fl UILD SCAFFOLDIIiIG FOR IA TUBE CONDENSER (DEAER UILD SCAFFOLDING REPAIR LEAK I _

EBLOWDOWN TANK 11887SRFEEMOVeSCAFFOLDING F 031188t 1-HP FEEDWATER II 246.SNFAI -REMOVE SCAFFC 030387#X_,FEEDWATER C(

CE301980SIBUID SCAFFOLD FOF 0301979^

"l CEI6r00.50REMOVE REMAININC 021 3472!REACTOR VI CE310576SFIPVE SCAFFOL 031057(

T-2B BLOWD CE44TOHSIRM SCAFF - FAC F 0303 6

3

-m 215213 N DISCHARGE BER

~I ED PUMP MOI

'LUGGING XTING)

N BLOWDOWV R HX-021 B IEATER 5B

,LDSUPPORTS rJNT ISOL VALV I B TUBE PLU ONDENSER (C SCAFFOLDINt SSEL AND AS,

)ING FOR IRD-WN TANK VEI ROG - TURB H JECONDARY I I

CE2I126*1 IPU1ILD SCAFFOLDING FOR 1 Pi 021269.

=41 RVICE WATE CE214041S~a~OVES. FFLDINGFOF 021t041-HX-17BLP FW CF244S M

S N

FOF 021404i X

19B LF

  • CE44POMSI ESCAFF F 030363 SECONDAF 5 1 1I CE44POHSR I CE4 77 IST-SISI REMOVE SCAFF FOR FAC PROG - PAB 44 FT 4

04MAY04 04MAY04 DR-Y ML-Y 07:00 10:59 ORT3-Y R-N 216 Run Date 02MAY04 15:171 LT-03 STANDARD PUBLICATION Sheet 3 of 31 1 Prdmavera Systems, Inc.

I FL-03 Execution Publication Set I

afterO2MAY0412:00 UIR28 WORKING SCHEDULE afterO2MAY0412:00 U

ID RESP WO EOID DESCRIPTION RD ES EF RISK MF AY IST 4

2 3

T11 4 52 1

CE08TOHSR CE4 77 IST-SISI REMOVE SCAFF-FAC 32 04MAY04 05MAY04 DR-Y MLY 315 CE8TOS PROG - TURS HALL 8 07:00 18:59 ORT3-Y R-N 030363 53 1

P1133-SR CE4 77 PIPE RC 25 NDEI1SI - REMOVE 6

04MAY04 04MAY04 DR-Y ML-Y 225 P1133 SVEI1SI-R SCAFFOLD - PZR 11:00 16:59 ORT3-Y R-N 0303 30LiRMS 54 1

CESH94-SR CE4 PACKAGE 82 REMOVE 4

04MAY04 04MAY04 DR-Y ML-Y 123 CES 94-REMOV SCAFFOLDING FOR 13:00 16:59 ORT3-Y R-N 55 1

CE301979SR CE4 77 SC-1A REMOVE 5

04MAY04 04MAY04 334 CE 0197gS EM SCAFFOLDING FOR 1A 15:00 19:59 030197 56 1

CE937787SR CE4 82 FD-02543A REMOVE 5

04MAY04 04MAY04 DR-Y ML-Y 332 E9377875 SCAFFOLDING FOR 17:00' 21:59 ORT3-Y R-N 993778 57 0

CE0212330A CE5 76 WT REROUTE MEMCOR 11 29APR04 04MAY04 141 ZEO 12330AREROUTE MEMCOR Pi E PIPE 07:OOA 09:59 0212330 58 1

CE0407589 CE5 76 T-026 T-026 - REPAIR LEAK 30 30APR04 05MAY04 DR-Y ML-Y 0 E0 O7 589T-026 -:REPAIR LEAK 0 BLOWDOWN TAIK ON SLOWDOWN TANK 08:00A

.16:59 ORT3-Y R-N l 59 1

CE0407724 CE5 76 RC-00526B IRC.526B, REPAIR 6

03MAY04 03MAY04 DR-N ML-N 0

CE0407724C525B, REPAIR SWAGLOC FITTI G SWAGLOC FITTING 08:00-13:59 ORT3-N R-N l 040772 HX-1B SG CHANNELHEAD DpAIN 60 1

CE9929774 CE5 77 Z

INSTALLUMOD 40 03MAY04 07MAY04 DR-Y ML-Y 0

CE992977DNSTALLJMOO PLATFORMS PLATFORMS 09:00 08:59 ORT3-Y R-N 99297 7

61 0

CE0210986 CE6 77 SEC SEC SUPPORT MR 51 05APR04 11MAY04 DR-N ML-N 101 CEC i0986SECSQPPORTMR99-01 B

99-0118 II 07:OOA 09:59 ORT3-N R-N I 62 0

CE0210989 CE6 76 SEC SEC. INSTALL NEW 43 05APR04 10MAY04 DR-N ML-N I 109 CED ¶og98SEC, INSTALL NEW EQUPMR99-OWE I

E EQUIP MR 99-011*E 08:OOA 09:59 ORT3-N R-N l 63 0

CE0210990 CE6 75 SEC SEC REM ABANDONED 80 03MAY04 17MAY04 DR-N ML-NI 71 CE021099OVC REM ABANDOfEDEOUIPMR9 EQUIPMR99-O11F 08:00 07:59 ORT3-N R-N 021099 64 1 1 1 CE-1600-0 CE8l 76 R-1 RX HEAD 6 102MAY04 02MAY04 DR-Y ML-Y 0 C HEAD PENETRATION 26 ADDmONAL INSPECTION PENETRATION 26 08:OOA 17:59 ORT3-Y R-M REAPTOR VESSEL AND ASSEMBLY0213472 65 1

CE-1600-8 CE8 76 R-1 IREMOVE FRAMATOME 4 103MAY04 03MAY04 DR-Y ML-Y 0

CE46OI40.EMOVE FRAMATOME UNDERHI-UNDERHEAD 20:00 23:59 ORT3-Y R-N 021347iREACTOR VqSSEL AND AS 66 1

CH0300471 CH 77 CHEM-SAMPL SECONDARYGROSS 2

03MAY04 03MAY04 DR-N ML-N 150 CH0300471S ONDARY GROSS ACTIVITY ACTIVITY 07W00 08:59 ORT3-N R-N I 0300471 MISC CHEMISTRY SAMPLING 67 2

CH0300600 CH 77 CHEM-SAMPI SECONDARYGROSS 2

03MAY04 03MAY04 DR-N ML-N 150 CH0300600 ONDARY GROSi ACTM1TY ACTIVITY 07:00 08:59 ORT3-N R-N I 030060 MISC CHEMISTRY, SAMPLING Run Date 02MAY04 15:171 LT-03 STANDARD PUBLICATION Sheet4of31 O Primavera Systems, Incl FL-03 Execution Publication Set I

after 02MAY04 12:00 U1R28 WORKING SCHEDULE I after 02MAY04 12:00

  1. lu ID CH03D0429 RESP WO ST ECID IA A A DESCRIPTION RD I ES I

EF RISK "1 Sen 2 I

Mon 3

  • Tue 4

?*1 0i214,16A&820,22i 02,4.6.8,10ilZA4.1Si&J20,22102,24A,.1 Oil A461&1 61 CH 77

,HEM-SAMPI RCS GROSS ACTIVITY 6

03MAY04 03MAY04 DR-N ML-N SR 3.04.16.01 07:00-12:59 ORT3-N R-N 146 69 1

CH0300416 CH 77 HEM-SAMPI RCS FL TSR 3.4.5.3 8

03MAY04 03MAY04 DR-N ML-N 144 07:00-14:59 ORT3-N R-N 70 2

CH0300539 CH 77

'HEM-SAMPl RCS FL TSR 3.4.5.3 8

03MAY04 03MAY04 DR-N ML-N 144 07:00-14:59 ORT3-N R-N 71 0

CH0300197 CH 77 HEM-SAMP BAST BORON TSR 40 03MAY04 07MAY04 DR-N ML-N 112 3.5.1.2 07:00-14:59 ORT3-N R-N 72 1

CH0300387 CH 77 HEM-SAMP SGBDFO GAMMA SCAN 40 03MAY04 07MAY04 DR-N ML-N 112 07:00' 14:59 ORT3-N R-N 73 1

CH0300403 CH 77 HEM-SAMP RCS BORON SR 3.9.1.1 40 03MAY04 07MAY04 DR-N ML-N 112 07:00-14:59 ORT3-N R-N 74 1

CH0300442 CH 77 HEM-SAMP RE-229 ISOTOPIC 40 03MAY04 07MAY04 DR-N ML-N 112 07:00-14:59 ORT3-N R-N 75 2

CH0300483 CH 77 1-HEM-SAMPl RCS BORON SR 3.9.1.1 40 03MAY04 07MAY04 DR-N ML-N 112 07:00.

14:59 ORT3-N R-N 2

CH0300500 CH 77 RHEM-SAMPL RCS CL TSR 3.4.5.2 40 03MAY04 07MAY04 DR-N ML-N 112 07:00' 14:59 ORT3-N R-N 77 2

CH0300513 CH 77

HEM-SAMPL RCS DO TSR 3.4.5.1 40 03MAYo4 07MAY04 DR-N ML-N 112 07:00-14:59 ORT3-N R-N 78 2

CH0300526 CH 77 RHEM-SAMPL SGBDFO GAMMA SCAN 40 03MAY04 07MAY04 DR-N ML-N 112 07:00' 14:59 ORT3-N R-N 79 2

CH0300552 CH 77

,HEM-SAMPL RE-229 ISOTOPIC 40 03MAY04 07MAY04 DR-N ML-N 112 07:00-14:59 ORT3-N R-N 80 1

CH0300360 CH 77 HEM-SAMP RCS CL TSR 3.4.5.2 60 03MAY04 08MAY04 DR-N ML-N 214 07:00 11:59 ORT3-N R-N 81 1

CH0300373 CH 77 HEM-SAMP RCS DO TSR 3.4.5.1 60 03MAY04 08MAY04 DR-N ML-N 214 07:00 11:59 ORT3-N R-N a

S. 3 C

C 82 0o EE0302302 EEP 60 PAB VIBRATION ROUTE 4

03MAY04 03MAY04 DR-N ML-N 148 DATA - PAB 07:00-10:59 ORT3-N R-N CH0300429RC# GROSS ACTIVITY SR 3.04.16.01 0300429

_MISC CHEMISTRY SAMPLING 6R FL TSR 3.4.5.3 CH030041 tR¢ t TSR.. 5 030041iWMISC CHMISTRY SAMPLI CH0300539 FL TSR 3A.5J3 0300539 MISC CHEMISTRY SAMPLI CH0300197 7 BORON TSR 35.1.2 4IG 4IG 0300191 I CH03003875SBDFO GAMMA SCAN 030038 CH0300403R BORON SR 3.9.1.1 030040 CH0300442 2

ISOTOPI CR0300483Rq POO SR 3.9-1.1f 0300483;1 CH0300500R S CL TSR 3A.5.2 1

030050qi i

CH030051 3Rc S DO TSR 3.4.5.1' 0300513; CH030052BSC BDFO GAMMA SCAN 030052Z

=

CH030055 229 ISOTOPIC 0300 3

0 0

CH0300360RCS CLTSR 3.4.5.2 030031 CI-0300373~R O~TR3.4-5.1oi s

N EE03023 VI EE0302308VI1 03023011 IRATiON ROUTE DATA - PAS UPRIMARY AUXILIARY BUILDING:

IRATION ROUTE OATA. PAB-CA EPRIMARY AUXILIARY BUILDING:

TRUCTURE TRUCTURE 83 1 0 EE0302308 EEP 60 PAB VIBRATION ROUTE DATA - PAB-CA P-lB PERFORM LOCAL OIL FLUSHS AS 4

5 03MAY04 03MAY04 DR-N ML-N 07:00' 10:59 1 ORT3-N R-N 148 6

68 84 1

1 EM0407740X I EM 76 P-001B-M 29APR04 I 02MAY04 I DR-N ML-N 19:00A l 16:59 lORT3-N R-N EM0hT774n-1 B tERFORM LOCAI4 OIL FLUSHS AS 14ECESSARY IREACrOR COOLANT P9MP MOTOR04077A40 Run Date 02MAY04 15:17l LT-03 STANDARD PUBLICATION Sheet 5 of 31

© Prlmavera Systems. Inc.

I FL-03 Execution Publication Set I

after 02MAY04 12:00 U1R28 WORKING SCHEDULE I

afterO2MAY04 12.00 U

ID RESPl WO EQID DESCRIPTION RD ES EF RISK MF MAY E

I R

E MA1Y17.141S.1 2n.2 0. 2.

6. 8,10 1214.16%20210. 2. 4.6. 8.104214,16 85111 rf.1l lT-1Ig gg 85 ji1 EM0215216 EM 76 TG-01-G INSPECT GENERATOR I 11 I 29APR04 I 02MAY04 I DR-Y ML-Y PHASE AND NEUTRAL 21:00A 23:59 ORT3-N R-M 2

86 1 EM0216164 EM 1 76 ISOL PHASE ISOL PHASE BUS DUCT 11 I 29APR04 02MAY04 I DR-Y ML-Y 0

_ __INSPECTION AND 21:OOA 23:59 ORT3-N R.N jz_0NSPECT GENERAT OR P ELECTRICAL 1616SOL PhASE BUS DUCT

_11SI SO PHASE 97 VOLTAGE RI HASE AND NEUTRAL GENERATOR0215216 NSPECTION AND,

)UCT0216164

GULATOR CABINET CTG-al TG VOLTAGE REGULATORI E 3000-01 (A52-01) 87 1 EM0216168 EM 76 E-02 1RMP 9375. VOLTAGE 20 01MAY04 03MAY04 DR-N ML-N REGULATOR CABINET 12:OOA 09:59 ORT3-N R-N 8

i ni n

88 o EM0301792 EM 76 A52-DHVR-3 BREAKER MAINTENANCE 3000-01 15 01MAY04 04MAY04 DR-N ML-N 12:OOA 08:59 ORT3-N R-N 0 EMI LEIREAIER MAINTENANC

-XCITATION Ei 4&

e u A~ I4A a

89 1 1 EM0216638A Z:i7P...,.viB RE-ASSEMBLYOI______

EM


A.1 AV n UUAw 76 P-001B-M IP-IB RE-ASSEMBLY OF 80 01MAY04 05MAY041 DR-N ML-N MOTOR 18:OOA 19:59 ORT3-N R-M I

n'Iii.-'--zj

90 1

EM0215223 EM 76 W-003A-M PERFORM MCE 3

02MAY04 02MAY04 DR-N ML-N 0

W-003A-M 10:OOA 14:59 ORT3-N R-M 91 1

EM0213080 EM 76 RPI-B 8 CO IRPI-B 8 CONN REPAIR I

02MAY04 02MAY04 DR-N ML-N 0

GROUND WIRE 12:00-12:59 ORT3-N R-N 92 1

EM0216165B EM 77 HX-001A REMOVE ECT POWER 2

02MAY04 02MAY04 DR-N ML-N 277 INSIDE CONTAINMENT 12:00-13:59 ORT3-N R-N 1

EM-BMFP-12 EM 76 P-028B-M P28B REMOVE MOTOR 6

02MAY04 02MAY04 DR-Y ML-Y 0

RIGGING EQUIPMENT 12:00 17:59 ORT3-N R-N 94 1

EM-8480H EM 76 R-1 CLEAN CONOSEAL 15 02MAY04 03MAY04 DR-N ML-N 0

PORTS 12:00 03:59 ORT3-N R-N 95 0

EM0305376 EM 77 GLOVES REPLACE RUBBER 10 02MAY04 03MAY04 DR-N ML-N 220 GLOVES AND 12:00' 12:59 ORT3-N R-N 96 1

EM0213081 EM 76 RPI-C 5 CO IRPI-C 5 CONN REPAIR 1 02MAY04 02MAY04 DR-N ML-N 0

GROUND WIRE 13:00 13:59 ORT3-N R-N 97 1

EM0213082 EM 76 RPI-E 3 CO 1RPI-E 3 CONN REPAIR 4 02MAY04 02MAY04 DR-N ML-N 0

GROUND WIRE 14:00 17:59 ORT3-N R-N 98 1

EM0215227 EM 76 W-003A W-3A INSPECT AND 12 02MAY04 03MAY04 DR-N ML-N 134 MAINTAIN FAN AND 15:00 03:59 ORT3-N R-N 99 1

EM0302252 EM 76 RPI-D10 IRPI-D10 CONN REPAIR I 02MAY04 02MAY04 DR-N ML-N 154 GROUND WIRE 19:00 19:59 ORT3-N R-N 100 1 EM0304859 EM 76 N-07 IN-07 SOCKET BROKEN 8

02MAY04 03MAY04 DR-Y ML-Y 4

20:00' 03:59 ORT-N R-N 101 1 EM0306911 EM 76 TG-01-VARM ITG-1-VARM READS 8

02MAY04 03MAY04 DR-N ML-N 0

HIGH 'REPLACE 20:00' 03:59 ORT3-N R-N EM EMC EM-EM-EM.

EMC EMC EMC EM 021 0.5223PERFORM MCE W-003A.

PCONTAINMENT CONTROL 30801RPl48 CONN REPAIR IRPI CONNEtTORS @ POSITI 165BREM9VE ECT POWER iRSTEAM GENERATOR02161t

MFp.128BREMOVE MOTOR STEkM GENERATOR I 40 NCN SEAL PORI lEREACT II376REPLA)CE RUBBER GLO T

A (1B52-3AI1B-01)

ZOD DRIVE SHROUD FAN MOTORO;

ROUND WIRE PN B80213080 NISIDE CONTAINMENT RIGGING EQUIPMENT EED PUMP MOTC(R0312035

.R VESSEL AND ASSEMBLY021413, FES AND BLANKOTS RUiRRFR rGLtOVFE ANn RI AN l-n1 yl0811RPI C' CONN REPAIR gROUND WIRE i

RPICONNkCTORS @ POSIION C50213081l 13082LRPI-E:3 CONN REPAIR ROUND WIRE RPI,ONNECTORS r IOSMON E30213082 15

,W-3A I AND MAI AIN FAN AND MOTOR 22kEC O

NTA INMENT CONTROL ROD DRIVE SHR M03022521 RI-D10 CONN REP R GROUND WIRF 030225;TRPI INSTRUMENTA ON @ POSMOt DI010l EM03048591 h-07 SOCKET BR KEN 030485PR1MA Y SAMPLE VALV4 LOCAL CONTROl I

I EMO306911ITG1VARM READS HIGH 'REPLACE METER' 0306911 1TTG-01 lTURBINE GENERATOR OUTPUT VA EM0306110 REPL MOBS 1MOB-009 -019 930611 NPP W

TO 1C-04 SAFEG 115223 ETS0305376 DUD FAN

.STATION IMETER JARDS BUS A 102 0 l EM0306110A I EM 76 D72-16-08 IWP-037-02 REPL MOBS 1MOB-009-019 16 03MAY04 03MAY04 DR-N ML-Y 02:00 17:59 ORT3-N R-N 0

Run Date 02MAY04 15:17l LT-03 STANDARD PUBLICATION Sheet 6 of 31 C Prmavera Systems, Inc.

I FL-03 Execution Publication Set l

afterO2MAY0412:00 U1R28 WORKING SCHEDULE I

after 02MAY04 12:00

  1. EU ID RESPl WO EQID DESCRIPTION RD ES EF I

RISK I MF MAY STSu I2 Mon 3 Tue 4 sri I

01ol121416.11a20,2210 12.14.6. 8.8 021oii4,16i1a2022i D 24681014,1 103 I I EM0216164D EM 76 ISOL PHASE POST-MAINTENANCE MEGGER OF ISOPHASE 3

03MAY04 03MAY04 DR-Y ML-Y 03:00 05:59 ORT3-N R-N 0

104 1

EM0216539 EM 76 TG-01-VARM REMOVE TEMPORARY 2

03MAY04 03MAY04 DR-N ML-N 89 METERING T-MOD 04:00 05:59 ORT3-N R-N 105 1 EM-8480G EM 76 R-1 CLEAN CONOSEAL 15 03MAY04 03MAY04 DR-N ML-N 184 PARTS 04:00-20:59 ORT3-N R-N 106 0 EM0305274 EM 76 D 305 QUARTERLY SWING 4

03MAY04 03MAY04 DR-N ML-Y 542 STATION BATTERY 05:00-09:59 ORT3-N R-N 107 2 EM0305106 EM 76 D-205 MONTHLY NON-SAFETY 4

03MAY04 03MAY04 DR-N ML-N 0

125V DC STATION 07:00-10:59 ORT3-N R-M 108 2 EM0305117 EM 76 D-205 QUARTERLY 4

03MAY04 03MAY04 DR-N ML-N 541 NON-SAFETY 125V DC 07:00' 10:59 ORT3-N R-M 109 1 EM0212805 EM 76 TE-00125 ITE-125 REPLACE 6

03MAY04 03MAY04 DR-N ML-N 195 FLEXIBLE CONDUIT 07:00-12:59 ORT3-N R-N 110 1 EM0400344 EM 76 P-028A-M IP-28A-M PUMP END 10 03MAY04 03MAY04 DR-Y ML-Y 10 MOTOR BEARING 07:00-16:59 ORT3-Y R-N U

2 EM0305124 EM 76 W-039-M LUBRICATE FAN 1 03MAY04 03MAY04 DR-N ML-N 224 MOTOR 08:00' 08:59 ORT3-N R-N 112 2 EM0305121 EM 77 TG-01 TG-01 GROUNDING 2

03MAY04 03MAY04 DR-N ML-N 223 STRAPS 08:00-09:59 ORT3-N R-N 113 1 EM0302132B EM 76 LO-00291 P-059B - RETERM 4

03MAY04 03MAY04 DR-Y ML-Y 221

_ AIRSIDE SEAL OIL B/U 08:00-11:59 ORT3-Y R-N 114 0

EM0301795 EM 76 652-DB25-0 BREAKER 24 03MAY04 05MAY04 DR-N ML-N 201 MAINTENANCE PER 08:00-13:59 ORT3-N R-N 115 1 EM0306574 EM 76 MOB-004 MOB-004 BREAKER 8

03MAY04 04MAY04 DR-N ML-N 2

MAINTENANCE 16:00 00:59 ORT3-N R-N 116 1 EM0306575 EM 76 MOB-008 MOB-008 BREAKER 8

03MAY04 04MAY04 DR-N ML-N 2

MAINTENANCE 16:00 00:59 ORT3-N R-N 117 1 EM0306576 EM 76 MOB-049 MOB -049 BREAKER 8

03MAY04 04MAY04 DR-N ML-N 2

MAINTENANCE 16:00 00:59 ORT3-N R-N 118 1

EM0306596 EM 76 MOB-121 1MOB-121 REPLACE 8

03MAY04 04MAY04 DR-N ML-N 0

AND TEST BREAKER 16:00 00:59 ORT3-N R-N 119 1 EM9929766 EM 76 MOB-121 1MOB-121 REPLACE 8

03MAY04 04MAY04 DR-N ML-N 0

MOUNTING SCREWS 16:00 00:59 ORT3-N R-N EM0216164DP1OSTM imo2ir,539REMO'y 021 653d11TG.

EM.8480GCLEAN 0214134U"~

EN10305274QUAR~

0305274I' EMO305106MC 0305`104111 EM03051 17Q1J 0305117-E

  • EM10212:805ITI 02`12B0;W EM04003441 P, I

0400344w EM03051 2 0305124 EM10303121T 03051211

  • EM0302132' 030213I EM0301795B I

03017r9a JNTENANCE MEGGER OF ISOPHAS PHASE DUCT E TEMPORARY MWTERING T-MOD 01 TURBINE GENtRATOR OUTPUT CONOSEAL PARTS

_EREACTOR VESSE rERLY SWING ST1TION BATTERY ISWING STATION BATTERY NTHLY NON-SAFETY 125V DC STA7

  • 125V DC STATION BATTERY ARTERLY NON-SAFETY 125V DC SI Ei125V DC STATION BATTERY 4125 REPLACE FLEXIBLE CONDUn E1 P-1B RCP tEAL WATER INJE 28A-M PUMP ENC MOTOR BEARINC STEAM GENERATOR FE JBRICATE FAN MbTOR Z-26 LUBE OIL CC(NDTONER VAPC 3-01 GROUNDING STRAPS ITURBINE GENERATOR (GENERIC:

059B - RETERM AIRSIDE SEAL OIL I vTURBINE OIL'PRESSURE REDO REAKER MAINTENANCE PER RMP I E BUS12-052 IARMETER

- AND ASSEMI ION ATION CTION TEMPE LEAKING ED PUMP MO' R EXTRACTOF SEE COMPON I1U PUMP MOT(

CING 301 AND i

.M 306S74MOB404 BREAKER MAI?

0306574U_

.PWRTO 1M

'M03065T5MOB-0J8 BREAKER MAII 030657 UUPWRTO 1IF

.M0306576MOB -049 BREAKER MAl 030657iU4 PWRTO U1 EMO3065961MOB <21 REPLACE AND 030659dPWR TO C

M99297661MOB-121 REPLACE MOU 992976. §_WPWR TO C-(
M0306577Y044-04 BREAKER REPU l030657 PWR TO TENANCE B-8. IMOB-4 TENANCE AEA/CHA/DM)

NTENANCE CONT VENT I TEST BREAKE I U1 TRAIN B lNING SCREW 1 U1TRAINB ZCEMENT C-1811182 LGS 1201 1 EM0306577 EM 76 Y-04-04 Y-04-04 BREAKER REPLACEMENT 10 03MAY04 04MAY04 DR-N ML-N 16:00-02:59 ORT3-N R-N 0

Run Date 02MAY0415:17l LT-03 STANDARD PUBLICATION Sheet 7 of 31

© Plmavera Systems, Inc.

I FL-03 Execution Publication Set I -

after 02MAY04 12:00 U1R28 WORKING SCHEDULE after 02MAY04 12:00 ul RESPl WO EQID DESCRIPTION RD ES EF RISK MF I MAY ST

_V 0.10 1416.1181202A 0 2,4 B. 8. Oil 214.161 20,22i 2 t4. 6. 81 Oil Z14.i ST DE C I T O XR EF RIS 3F 121 I

EM0306578 EM 76 YV04-01 Y-04-01 BREAKER REPLACEMENT 10 03MAY04 04MAY04 DR-N ML-N 16:00-02:59 ORT3-N R-N a

122 1

EM0306579 EM 76 Y-04-12 Y-04-12 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 16:00-02:59 ORT3-N R-N 123 1 EM0405920 EM 76 Y-04-13 Y-04-13 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 16:00 02:59 ORT3-N R-N 124 1 EM9908111 EM 76 Y-04-M1 Y-04-M1 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 16:00-02:59 ORT3-N R-N 125 1 EM9908112 EM 76 Y-04-05 Y-04-05 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 16:00-02:59 ORT3-N R-N 126 1 EM9908113 EM 76 Y-04-06 Y-04-06 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 16:00-02:59 ORT3-N R-N 127 1 EM9908114 EM 76 Y-04-07 Y-04-07 BREAKER 10 03MAY04 04MAY04 DR-N ML-N O

REPLACEMENT 16:00' 02:59 ORT3-N R-N 128 1 EM99081 15 EM 76 Y-04-08 Y-04-08 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 16:00-02:59 ORT3-N R-N 420 1 EM9908116 EM 76 Y-04-09 YV04-09 BREAKER 10 03MAY04 04MAY04 DR-N ML-N O

({>

REPLACEMENT 16:00-02:59 ORT3-N R-N 130 1 EM9908117 EM 76 Y-04-10 Y404-10 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 16:00-02:59 ORT3-N R-N 131 1

EM9908118 EM 76 Y404-11 YV04-11 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 16:00' 02:59 ORT3-N R-N 132 1 EM-BMFP-15 EM 76 P-028B-M P28B REINSTALL OIL 6

03MAY04 03MAY04 DR-Y ML-Y 0

LINES AND MOTOR 17:00 23:59 ORT3-N R-N 133 1

EM0215241 EM 76 4111E02 RMP 9308. DS-II 24 03MAY04 05MAY04 DR-N ML-N 0

BREAKER 18:00' 23:59 ORT3-N R-N 134 0

EM0306110B EM 76 D72-16-08 IWP-037-02 EM PMT I

03MAY04 03MAY04 DR-N MLY 0

FOR MOBS 1MOB-009 -

19:00 19:59 ORT3-N R-N 135 1

EM0213072 EM 76 CS-02188-S 1CS-2188-S CONDUIT 4

03MAY04 03MAY04 DR-N ML-N 0

BROKE 20:00' 23:59 ORT3-N R-N 136 1

EM0215217 EM 76 T-001 TEST HEATER 10 03MAY04 04MAY04 DR-Y ML-Y 0

INSULATION 20:00' 05:59 ORT3-N R-N 137 0 EM0215134 EM 77 COM GAI-TRONICS TEST 15 03MAY04 04MAY04 DR-N ML-N 517 321:00-12:59 ORT3-N R-N M0306578Y.04-01 BREAKER REPU 030657U0 PWR TO M0306579YV4-1X BREAKER REPU 030657 PWR TO

'M0405920Y13 BREAKER REPL 040592(1 PWR TO

'M99081 1 1Y4j BREAKR REPL 99081111PPWR TO

'M990811 2 Y05 BREAKER REPU 990811 eIPWR TO

'M9908113Y 04-05 BREAKER REPU 99081:

""PWR TO

'M9908114Y-07" BREAKER REPU 990811 4

P PWR TO

'M9908115Y-04-08 BREAKER REPU 990811

_PWR TO

-M990116Y404-.0 BREAKER REPU 990811

=

PWR TO

'M9908117Y-0 4-10 BREAKER REPU 9908117D LV PWR TO

'M9908118 04-11 BREAKERREPUL 990811 1

PW R TO EM.BMFP45P 28B REINSTALL OIL Ut 031203!1IISTEAM GENE EM021 5241RMP'9308, DS41 BREAI 021524124 EM03O6110WP-O37-02 EM PMT F 030611(PWR TO 1C-04 SAF EM02130721 S'2188-S CONOL 021307ZV_1P-28B SGFP EM0215217TEST HEATER INSU 0215217 PRE EM02151 4Al-TRONICS T 02151 EM0306117A!0 REPL 030611 CEMENT 2C-20 BUS VO CEMENT 1C-75 TURBIN CEMENT PPCS-105 PPC WCEMENT 1Y-04 YELLOV

,CEMENT 1C-1 171118 CC CEMENT 1C-128 ROS R CEMENT 1C-125 CVCS CEMENT 1C-130 NUCLE

,CEMENT 10C-130 NIS RA

,CEMENT IMOB4 AND1 CEMENT IC-166 SAFEG IES AND MOTC RATOR FEED

ER MAINTENA 9

,m OR MOBS IMO

-GUARDS BUI IT BROKE MINI RECIRC I LATION RESIS 3SURIZER TA tT mCOM SY MOB-020 1030

_PWR TC 1381 0 1 EM0306117A EM 76 D72-21-08 IWP-037-07 REPL 1MOB-020 10301051 16 03MAY04 104MAY04 DR-N 21:00 12:59 ML-YORT3-N 0

Run Date 02MAY0415:17(

LT-03 STANDARD PUBLICATION I

Sheet 8 of 31 C Pnmavera Systems. Inc.

I FL-03 Execution Publication Set I

after 02MAY04 12:00 U1R28 WORKING SCHEDULE after O2MAY04 12:00 U

ID RESPl WO EQlD DESCRIPTION lRDl ES I

EF RISK I MF

-- MAY I -ST Iu o

u l

l l

.l Oi

.112,14A sj B.2Q,22 0. 2. 4. 6.8.1 OilZ14.161 2021 0. 2,4. 6.f 11Z41 139 1

EM0213480 EM 76 480V 480V REMOVE TM 8

04MAY04 04MAY04 DR-Y MLY-521 EM021>4to180V REMOA TM POWER T POWER TO RV HEAD 00:00 08:59 ORT3-Y R-N 021 484 140 1

EM0312035A EM 76 P-028B-M 1P-28B-M PERFORM 4

04MAY04 04MAY04 DR-Y ML-Y 0

EM0312035A1PPA PERFORM POST POST MCE TEST 01:00' 04:59 ORT3-N R-N 0t1203_STEA$A GENERATO 141 0

EM03052W EM 76 125V STATION TECH SPEC 6

04MAY04 04MAY04 DR-N ML-N 517 EM0305204ST lON TECH S BATTERIES WEEKLY 07:00' 12:59 ORT3-N R-N 03052 125VSY 142 0 EM TRNB07A EM TRAINING EM OJTITPE TRAINING, 24 04MAY04 06MAY04 DR-N ML-N 120 EMTRNB07E OJTITE TRAI 2 EM'S 07:00' 14:59 ORT3-N R-N 143 0 EM9925005 EM 76 A52-DHVR-3 3000-1 1X02-1AO1 CELL 1

04MAY04 04MAY04 DR-N ML-N 63 EM99250053

.1 1X02-IAO SWITCH INSPECTION 08:00 08:59 ORT3-N R-N 992500 4.16 KVI3000 144 0

EM0304872 EM 76 A52-DHVR-1 IP-025A BREAKER 24 04MAY04 06MAY04 DR-N ML-N 0

EM03048 P-025A BREA MAINTENANCE 1200-40 09:00 14:59 ORT3-N R-N 03W87 145 2

EM0305128 EM 76 U2A-UV REL TEST U2 TRAIN A 3

04MAY04 04MAY04 DR-N ML-N 0

EM03C ;28TEST U2 UNDERVOLTAGE AND 12:00' 14:59 ORT3-N R-M 03 120TRAI 146 0 EM0306114B EM 76 D72.17-03 IWP-037-01 SUPPLY 3

04MAY04 04MAY04 DR-N ML-N 0

EM03C 6114BWP-37 TEMP POWER TO 13:00 15:59 ORT3-N R-N 0 06114_PW 0

EM0306117B EM 76 D72-21-08 IWP-037-07 EM PMT 2

04MAY04 04MAY04 DR-N ML-N 0

EM0 06117 'YP43 FOR MOBS I MOB-020 /

14:00 15:59 ORT3-N R-N 7

W3061 IiP 148 2 EM0305133 EM 76 U2B-UV REL TEST U2 TRAIN B 3

04MAY04 04MAY04 DR-N ML-N 33 I

E 0305133TEST UNDERVOLTAGE AND 15:00' 17:59 ORT3-N R-M 03051331 149 1 EM0400047 EM 76 B52-7D 1B52-7D PERFORM BKR 1 04MAY04 04MAY04 DR-N ML-N 0

M04000471B5 SWAP IN U1R28 16:00 16:59 ORT3-N R-N I

0400047iP 150 I

EM0215202 EM 76 P-001A-M P-iA-M PERFORM OIL 10 04MAY04 05MAY04 DR-N ML-N 0

M021520

.1 CHANGE 16:00' 02:59 ORT3-N R-N 021520ZW 151 0

EM0306114A EM 76 D72-17-03 IWP-037-01 REPLACE 16 04MAY04 05MAY04 DR-N ML-N 0

M03061140,W MOBS 100-109 17:00 08:59 ORT3-N R-N 030611W

-; -I.[ss -5 U 3 1

1 152 1 EM0304520 EMV 76 MS-02020-M MS-2020-M OIL 10 02MAY04 02MAY04 DR-N ML-N 0 5-20-OIL LEAKING FROM GA KET.

LEAKING FROM 09:OOA 22:59 ORT3-N R-N HX-1A SG HEA :ER P-29 AFP ST4AM SUPPLY MOV MOTOR 153 1 EM0306896 EMV 76 MS-02020-M 1 MS-2020-M INSPECT 10 02MAY04 02MAY04 DR-N ML-N 0 MS 020-INSPECTARMATURE ARMATURE 09:OOA 22:59 ORT3-N R-N HX-1A SG HEA DER P-29 AFP STIAM SUPPLY MOV MOTOR I

154 1 B42TRN-1 EMV B-42 EM JIT TRAINING FOR 4

03MAY04 03MAY04 4

842TR -1EM JIT TRAIN1NG FOR 1B42 BOLED FAULTS (

1B-42 BOLTED FAULTS 11:00' 14:59 155 1 EM0215186 EMV 76 Sl-00871A-SI-871A-0 ACTUATOR 30 03MAY04 04MAY04 DR-N ML-N 0

EM0215 86 SI-871A-ACTUATOR REBUILD SWAP)

REBUILD (SWAP) 11:00' 16:59 ORT3-N R-N 0215 8

_I P

156 1 842TRN-2 EMV B-42 EM JIT TRAINING FOR 4

03MAY04 03MAY04 5

B42TRN-2EMJITTRAININGFO t42BOLTE 1B-42 BOLTED FAULTS 19:00' 22:59 Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION Sheot 9 of 31 C Pnmavera Systems, Inc.

FL-03 Execution Publication Set

after 02MAY04 12:00 U1R28 WORKING SCHEDULE after 02MAY04 12:00

  1. U ID RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY ST I

_4l_4

~~~tl I 11;4 t:^tsjw_^^X-I_ e I 157 1 EM0202527B EMV 76 B-42 1B-42 REMOVE 20 104MAY04 04MAY04 DR-N ML-N 0

EI0202527B1 4 2 MOVE BUCK BUCKETS MR 04:00 23:59 ORT3-N R-N 1 020252 158 0

EPRADIO_2 EP EPMP 2.1G OUARTERLY EP RADIO 3

04MAY04 04MAY04 DR-N ML-N 139 _

EPRADIO.

UARTERLY E CHECK 09:00 11:59 ORT3-N R-N 159 1 EP0301910 EPI 77 UJ-CONTAIN INSPECT CTMT AND 19 128APR04 04MAY04 DR-Y ML-Y 91 _p ol091 NSPEqT CTMT AND FE W

R PENETRATIONS U

FEEDWATER 08:00A 15:59 ORT3-Y R-N I

lUUN 160 1 NG44CFC1EV EPI 77 IST-SISI ENG EVAL FOR FAC 1

29APR04 03MAY04 DR-Y MLY 74 qr. CFC1EVENGIEVAL FOR FACPOG CTMT 44FT GEN AREA PROG - CTMT 44FT 08:OOA 07:59 ORT3-Y R-N M

!ECONDARY INSEAVICE INSPECTIO 0301897 161 1

EP0301901 EPI 76 RH VT-2 ASME Xi 8

02MAY04 03MAY04 DR-N ML-N 18 E 0301901

-ASME IX PERIOD C PRESSURE TErT - RH PERIODIC PRESSURE 18:00 01:59 ORT3-Y R-N 0301901 RH SYSTE MMULTI ANDWOR NON-NUMBERED EQUIPMENT 162 1 NG44TFCIEV EPI 77 IST-SISI ENG EVAL FOR FAC 1

03MAY04 03MAY04 DR-Y ML-Y 0

N 44TFC1ECENG E'AL FOR FAC PR

-TURB HALL PROG - TURB HALL44 1

16:00 16:59 ORT3.Y R-N 03018971SECOINDARY INSERVIC INSPECTION I

EP VNCC EPP 1 76 SERVICE OBTAIN NAMEPLATE 2

27APR04 03MAY04 DR-Y MI-V 0 P NCCOBTAIN'NAMEPLATE DAM (EQ) FROM CFO S DATA (EC) FROMCFCS 16:00A 14:59 ORT3-YR-N l MISC EOLIPMENT REPAIR SERVICEO400 164 1

EP0302115A EPTl 76 SC-G1B SC-1B-INSTALLCOND 3

03MAY04 03MAY04 DR-Y ML-Y 0

EP0302115 lB -INSTALLCONDTUBESHIELD (1B)

TUBE SHIELDS (1B) 07:00' 09:59 ORT3-Y R-N I 030211 CONDENSER (DEAERATING) 165 1 NG-SC1A-TP EPT 77 SC-1A MAIN COND TUBE 3

04MAY04 04MAY04 DR-Y ML-Y 0

I NG-SCIA-TM^ IN COND TUB PLUGGING (1A) 07:00 09:59 ORT3-Y R-N 030197 CONDENSE 166 1

NG-SC1B-TP EPT 77 SC-iB MAINCONDTUBE 3

04MAY04 04MAY04 DR-YML-Y 0

I NG.SCIB-PMAINCOND PLUGGING (IB) 10:00 12:59 ORT3.Y R-N I 03019 CONDE 167 0 l FG0300155 FG1 77 MISC REMOVE VEGETATION 40 103MAY04 07MAY04 DR-Y ML-Y 112 FG030015^

OVE VEGETATION IN ISOLATION ONES IN ISOLATION ZONES 07:00 14:59 ORT3-Y R-N 030015 168 1 FG213064P FG1 76 MS-0OO1OA PAINT VALVE IMS-1OA 4

03MAY04 03MAY04 DR-Y ML-Y 0

I FG213064pPAI0ITVALVE IMS-10 18:00' 21:59 ORT3-Y R-N 023064{HP TURB STEA SUPPLY INL 169 I

FG216557P FGI 76 FD-00282C PAINT 1FD-282C 8

03MAY04 04MAY04 DR-Y ML-Y 0

FG218552PPAINT IFD-282 22:00*

05:59 ORT3-Y R-N 0216557 HX-2C MSR LS-25 170 1 FG214082P FG1 76 HX-021A PAINT FD-2410 24 103MAY04 04MAY04 DR-Y ML-Y 356 I FG21408'pPAINT FD-2410 22:00' 23:59 ORT3-N R-N 021408 171 1

FG212642P FG1I 76 FD-00225A PAINTFD-225A VALVE 4 1 04MAY04 04MAY04 DR-Y ML-Y 0 I FG212642F'I FD-225A VA 06:00 09:59 ORT3.Y R-N I I

021284

-HX-17A LPF Run Date 02MAY04 15:171 LT-03 STANDARD PUBLICATION Shoot 10 of 31 O Pimavera Systems, Inc.

I FL-03 Execution Publication Set I

after 02MAY04 12:00 U1R28 WORKING SCHEDULE I

after 02MAY04 12:00 I

ID RESP wo ST EQID DESCRIPTION RD ES EF RISK MF MAY Mnn 3 Tue 4 __

.4n 1214.16,11120,22 10.2.4. 8.8.10012A4.19iF 17211 FG0212803 FG1 76 CPP-51 1CPP-51 REMOVE PAINT 12 04MAY04 04MAY041 DR-Y ML-Y 06:00 17:59 ORT3-Y R-N 0

173 1 FG302663P FG1 76 FS-02852 PAINT PIPING FOR 22 04MAY04 05MAY04 DR-Y ML-Y 0

1FS-2852 06:00' 16:59 ORT3-Y R-N 174 1 FG0212694 FG1 76 PIPING HB-IPIPING HB-19 72 04MAY04 07MAY04 DR-Y ML-Y 0

REPAINT 08:00' 07:59 ORT3-Y R-N E m

    • i l l 3 175 0 HP0301846 HP 77 HP RMS MONTHLY RMS 27 01MAY04 05MAY04 DR-Y ML-Y 209 OPERATIONAL TEST 07:OOA 16:59 ORT3-Y R-N 176 2 ICRPIC-250 IC O-RP-001C RETRIEVE Z-16 2

03MAY04 03MAY04 DR-Y ML-Y 244 CONSTANTS/REPIC 00:00 01:59 ORT3-Y R-N 177 1

IC0407662 IC 76 VNPSE-0001 VNPSE-13 REPAIR AIR 3

03MAY04 03MAY04 DR-Y ML-Y 6

LEAK 13:00 15:59 ORT3-N R-N 178 1 IC0212595 IC 76 VNPSE-0321 IVNPSE-3213 MINOR 8

03MAY04 03MAY04 DR-N ML-N 0

AIR LEAKS 13:00 21:59 ORT3-Y R-N E3:-i:

.E 179 1 ICLS3579 IC1 76 LS-03579 DISASSEMBLE. CLEAN 30 19APR04 06MAY04 I DR-Y ML-Y I 45 AND INSPECT LEVEL 11:00A 0859 ORT3-Y R-N II III I

I I

I II FG02128031CP-51 REMOVE F 0212800L FG02663FOR 030266 FG0212694 IPING HB.19 F 021269_

Hp0101846ONTIfLY RMS OPERAT ONAL TEST I

ICRP1q-25ORETRIEVE Z-N I

ICO' 0:

I CO 16 CONSTANTSIREPLC BATT 07662VNPSE-13 REPAIR AIR LEAK 0766XVNPSE,3245 SUP FAN DI I259IVNPSE-32 MINOR AIR LEJ 1259 6AIBU1C PUI PCHARGE AIR cKS GE EXHAUST Id

_ASS4MBLE, CLEAN EVE.INSTRU DINPC urn 180 I ICLS3580 ICi 76 LS-03580 DISASSEMBLE, CLEAN 30 19APR04 06MAY04 I DR-Y ML-Y AND INSPECT LEVEL _

11:00A 08:59 1ORT3-Y R-N S,

ASSiMBLE, CLEAN A4D INSPECT LEVEL INSTRU 45 I -.

u m

I l

IC58 DISASSgMBLE, CLEAN AND INSPECT LEVE; INSTRU t - ~ _ _

1811 1 ICLS3581 ICi 76 LS-03581 DISASSEMBLE. CLEAN AND INSPECT LEVEL 30 19APR04 06MAY04 DR-Y ML-Y 11:00A 08:59 ORT3-Y R-N 45 182 I

ICLS3582 ICI 76 LS-03582 DISASSEMBLE, CLEAN AND INSPECT LEVEL 30 19APR04 06MAY04 DR-Y ML-Y 11:00A 08:59 ORT3-Y R-N 4

183 1

IC5.47-1 IC1 76 ICP-05.047 SECONDARY LEVEL 75 19APR04 09MAY04 DR-Y ML-Y CONTROLLERS AND 1 1:OOA 09:59 ORT3-Y R-N 184 1

IC0302099 ICI 76 LC-02514 LC-2514 REFURBISH 75 19APR04 1 OMAY04 DR-Y ML-Y 11 :OOA 09:59 ORT3-Y R-N 185 1 IC0305085 IC1 76 LS-02376 1 LS-2376 SMALL 75 19APR04 10MAY04 DR-Y ML-Y STEAM LEAK ON LVL 11 :OOA 09:59 ORT3-Y R-N 186 1 IC5.75 ICI 76 ICP-05.075 NI AUXILIARY 20 28APR04 04MAY04 DR-Y ML-Y CHANNELS - INSPECT 09:OOA 09:59 ORT3-Y R-N 187 1 IC5.53 ICI 76 ICP-05.053 ICP 5.53 SECONDARY 60 02MAY04 08MAY04 DR-Y ML-Y HIGH PRESSURE 08:OOA 16:59 ORT3-Y R-N 4_

ISASSdMBLE, CLEAN A D INSPECT LEVEL INSTRU O

7.SECONDARY LEVEL C OLLERS AND SWIT__

O

-2514 REFURBISH B,

LS-2376 SMALL STEAM 6K ON LVL. SW:I O IC5 I AUXILlA4Y CHANNELS - I SPECT

_NIS AULX I LIA

~J~ 3 SECONDARY HIGHESURE I.

I Ti -

9 I

Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION Sheet 11 of 31 O Pnmavera Systems, Inc.

I FL-03 Execution Publication Set

after 02MA Y04 12:00 T

UlR286 WORKING SCHEDULE after 02MA Y(04 12:00 U

ID RESPI WO I EQID I

DESCRIPTION IRD1 ES I

EF I

RISK IMFMA 1881 1 1 C0408037 IC1 10 N-0004 N-41 REPLACE NV 8

02MAY04 03MAY04 DR-V ML-Y 5 C B 037.41 REPLACE HV POWE SUPPLY POWER SUPPLY 12:00 08:59 ORT3-Y R-N 08~ji O

037 189 1

1C0400553E ICI 76 SERVICE SERVICE MAINT 4

03MAY04 03MAY04 DR-V MI-V 4

IC0400553 EVCE MAINT SUOiPORT EQ VERIF CONT FAN SUPPORT EO VERIF -

07:00 10:59 ORT3-Y R-N 040055 MISC EOUIPMgNT REPAIR/SERV CE 190 1

1C0400553C ICI 76 SERVICE SERVICE MAINT 10 103MAY04 04MAY04 DR-V MI-V 70

IC0400553CsECE MAINT SUPPORT EQ VERIF-LOOP AREA SUPPORT EO VERIF -

07:00 08:59 ORT3-Y R-N 040055U IM IISC EQUIPM 191 1

1C0302663 ICI 76 FS-02852 I FS-2852 FLOW SW 8

03MAY04 03MAY04 OR-V MI-V 22 1C030266 FS-2852 FLOW SWI SET UP AND C LL SET UP AND CAL 09:00' 16:59 ORT3-Y R-N 03026 P-30OBCWP SEAL WAT R FLOW SWIT 192 0 1C0300680 ICI 77 Z-107G REPLACE MEMBRANE 1

04MAY04 04MAY04 DR-V MI-V 262 I006(

LACE MEMBF 07:00' 07:59 ORT3-Y R-N 030068(

RTABLE EXP 193 0

1C030D687 ICI 77 Z-1 07D EXPLOSIVE DETECTOR 6

04MAY04 04MAY04 OR-V MI-V IC0300687E LOSIVE DT CLEANING 07:00' 12:59 ORT3-Y R-N 03006 AE 531 194 1 1C0306002 1C2 76 S-06050A I S-6050A IOPS CH-1 301 29APR04 106MAY04 OR-V MI-V 01CO 60021S54050A IOP'S CH-1 OVE ISPEED UIGHT OVERSPEED LIGHT 08:OOA 0 1:59 ORT3-V R-N 19 1 C0407990 1C2 76 PC-00431J PC-431J STATUS LIGHT 3 02MAY04 02MAY04 DR-V MI-V 113 CO407990'C.431J STATUS UI HT 19:00' 21:59 ORT3-N R-N 040T99(CT-1 PZR PRESS LOW PRESS REAd~TOR TRIP BISTABLE 196 1

1C0408033 IC2 71 LC.0046ZA1 LC-462A/3 STATUS 4

02MAY04 02MAY04 DR-Y MI-V 149 C040)B033LC!462A STATUSI IGHT ASSEMBLY:

ILIGHT ASSEMBLY 19:00' 22:59 ORT3-N R-N 040803i"HX-IA SG LOW-LOWIHIGH LEV`IL BISTABLE 197 1

1C0303647 1C2 76 MMS ICP-06.037 CAL STEAM 30 02MAY04 05MAY04 DR-V MI-V 52 C030l3r,7CP-6.037 CAL ST M PLT INDICAT0hS.

PIT INDICATORS 19:00' 02:59 ORT3-Y R-N 030354i7f I

I I

198 1

ICIO.32A IC2 76 ICP-40.032 ICP 10.32 CONT H2 4 103MAY04 03MAY04 DR-VYMI-V 0

IC10.32AqC!J10 3 2 CONT H2 RT ~S & PRESS S

'RTD'S & PRESS SW' 1 8:00' 21:59 ORT3-Y R-N I03008913"CONTAINMENT YDROGEN 199 1

IC4.34 1C2 76 ICP-04.034 CONTAINMENT 9 103MAY04 104MAY04 DR-N MI-V 0

liC-44CONTAIRMENT IYROGENA HYDROGEN 22:00' 19:59 ORT3-N R-N 030Do4 I.Imm SL 20 1

1C0300795 IC5 76 I&C MISC VISUAL INSPECTION 16 25APR04I 03MAY04 DR-V MI-V 1 1 SUALNSPECTION OF EA RACKS I

OF RELAY RACKS 09:OOA 16:59 ORT3-Y R-N MISC )CWORK ACTIT ES 0300795 20 1

1C5.50 IC5 76 ICP-05.050 ICP 5.50 SECONDARY 40 28APR04 07MAY04 DR-V MI-V 31 0SE GEARYMIPRESSURE MIDRANGE PRESSURE 09:OOA 07:59 ORT3-Y R-N 202 1

1C5.72 IC5 76 RDC-LOGIC 11CP 5.72 SLAVE 12 29APR04 03MAY04 DR-V MI-V 66 1C5.2 SLAVE CYCLER AN: PULSER CYCLER AND PULSER 08:OOA 12:59 ORT3-Y R-N ROD DRIVE:CONTROL LOGIC CIRCUIT CABI 203 1 IC4.29-4 ICS 76 ICP-04.029 ROD INSERTION LIMIT 2

01MAY04 02MAY04 DR-V MI-V 26 AO INSERTION UIMIT (RIL) CAL (ICP-04.029-4)

(RIL) CAL 08:OOA 13:59 ORT3-Y R-N RDINSERTION LIMIT CON-010300843 2041 11 1C0302917 IC5 76 C-108 1C-108 CORRECT 2

01MAY04 02MAY04 DR-V MI-V 146 1C-108 tORRECT WIRING ILAISEUNG WIRINGILABELING 09:OOA 13:59 ORT3-V R-N ROD INSE"TON LIMIT PANE10302917 Run Date 02MAY04 15:171 LT-03 STANDARD PUBLICATION Shoot 12 of 31 C PriMavera Systems, Inc.

FL-03 Execution Publication SetI

afterO2MAY04 12:00 I

U1R28 WORKING SCHEDULE I

after 02MAY04 12:00

  1. Ul ID lRESP WOl EQID DESCRIPTION RD ES l

EF RISK MF L e

1 I VS ;

1, c MAY I1 mrnnI Tun 4 2051 1 IC0408031 lC5 76 RT-118 RT-11B REPLACE RELAY 5 IO1MAY04102MAY04 DR-Y ML-Y 13:OOA 16:59 ORT3-Y R-N 0

206 2 IC0301005 IC5 76 ICP-02.001 RP AND SG ANALOG 2

02MAY04 02MAY04 DR-Y ML-Y 15 TEST - RED 09:00A 13:59 ORT3-N R-M 207 1

IC5.18-1A IC5 76 ICP-05.018 ICP 5.18 MANUAL BIAS 1

02MAY04 02MAY04 DR-Y ML-Y 114 ADJUSTMENT 12:00 12:59 ORT3-N R-N 208 1

IC0408031A IC5 76 RT-11B RT-11 B RELAY 4

02MAY04 02MAY04 DR-Y ML-Y 13 REPLACEMENT PMT 17:00 20:59 ORT3-Y R-N 209 1

IC2.15A ICS 76 ICP-02.015 ICP 2.15 RP 4

03MAY04 03MAY04 DR-Y ML-Y 4

PERMISSIVE/NI LOGIC 06:00 09:59 ORT3-N R-N 210 1

IC9950758 IC5 76 N-00040 N-40 ECAD CABLE 8

03MAY04 03MAY04 DR-Y ML-Y 3

TESTING 06:00-13:59 ORT3-Y R-N 211 2

IC0306031 IC5 76 LT-03586A 2LT-3586A CHANGE 8

03MAY04 03MAY04 DR-Y ML-Y 144 MOUNTING BOLTS 07:00' 14:59 ORT3-Y R-N 212 2 IC0310221 IC5 76 VBI-06100 2VBI-6100 CHANNEL #7 8

03MAY04 03MAY04 DR-Y ML-Y 144 VIBRATION 07:00-14:59 ORT3-Y R-N M

1 IC9950759 IC5 76 N-00041 N-41 ECAD CABLE 3

04MAY04 04MAY04 DR-Y ML-Y 0

r TESTING 06:00' 08:59 ORT3-Y R-N 214 1

IC4.39STK IC5 76 1ICP-04.03 ICP 4.39-1 GOVERNOR 40 04MAY04 07MAY04 DR-Y ML-Y 0

VALVE STROKE 06:00-12:59 ORT3-N R-M 215 2 IC0301006 IC5 76 ICP-02.001 RP AND SG ANALOG 5

04MAY04 04MAY04 DR-N ML-N 0

TEST - WHITE 07:00-11:59 ORT3-N R-M 216 2 IC0400536 IC5 76 LC-00473E 2LC-473E REINSTALL 5

04MAY04 04MAY04 258 MODULE 07:00 11:59 217 1

IC4.32B IC5 76 1ICP-04.03 P29 LOW SUCTION 2

04MAY04 04MAY04 DR-N ML-Y 287 PRESS TRIP CAL 09:00' 10:59 ORT3-N R-N 218 1

IC9950760 IC5 76 N-00042 N-42 ECAD CABLE 3

04MAY04 04MAY04 DR-N ML-Y 0

TESTING 09:00 11:59 ORT3-N R-N 219 1

IC9950761 IC5 76 N-00043 N-43 ECAD CABLE 3

04MAY04 04MAY04 DR-N ML-Y 0

TESTING 12:00 14:59 ORT3-N R-N IP j CS.

lCO 216.16,20.2210.2.4.6. j,1011214.16,120,2210. 2.4.6,1 8Q3T-11B REPLACE RELAY

_TRAIN 8 REACTOR TRI RELAY0408031 ND SG ANALbG TEST - RED WREACTOR:PROTECTION AN SAFEGUARDS AJALOG 1AlCP 5.18 MANUAL BIAS Al JUSTMENT ROD SPEED CONTROL03008 56 08031pRT-1J RELAY REPLA EMENT PMT 408031tTRAIN B REACTO TRIP RELAY IC2.15 CPL.15 RP PERMISSIVEtNI LOGIC PRE-0300807 -

REACTOR PROTECTION SYSTEM IC9950758N4 ECAD CABLE TE;nNG 995075 NI FISSION CHANNEL IC03060312L -3586A CHANGE MiOUNTING BOLT, 0306031k PUMPBAY LEVEL TRANSM IC312212 1M100 CHANNELR#7 VIBRATION 0310221 G-01 TG VIBRATION INDI IC9950759N41 995075w IC4.39STK5CP 0300976<

IC0301006PP 0301006P IC0400536,2 040053U IC4.32B 03009T4 IC995076C s995076C I5 1 C995 995 II 169 161MS-2016 POST MAINTEN ANCE DIAGNOSTIC

_HX-1A SG HDR TMOSPHERIC ST*AM DUMP CONTI 9AMS 2016 H.-1A ATM STM D MP VALVE STROCE

_SECONDARY Pl ANT CONTROL VALVES0300869 Om 1

'RIT TEST

.OGIC TTER ATOR ECAD CABLE' NI POWER RAI

.39-1 GOVERN

-1~w AND SG ANAL WREACTOR

-473E REINST, 2HX-1B S(

'29 LOW SUCT AFW SYSTI hI42 ECAD CAI WNI POWEF b761N 43 ECAC

)761iNI PC

99507624 E 9950762_

220 I

IC9950762 IC5 76 N-M4 N-44 ECAD CABLE TESTING 3

04MAY04 05MAY04 DR-N MLY 15:00 06:59 ORT3-N R-N 0

221 1

IC0406916 ICV 76 MS-02016 1MS-2016 POST 4

02MAY04 02MAY04 DR-Y ML-Y 0 C MAINTENANCE 01:00A 21:59 ORT3-Y R-N 222 1 IC5.49A ICV 76 ICP-05.049 MS-2016 HXtIAATM 4

02MAY04 02MAY04 DR VML-Y 0 C5.

STMDUMPVALVE 01:OOA 21:59 ORT3YR-N Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION O Prmavera Systems. Inc.

I FL-03 Execution Publication Set 1L0406916 Sheet 13 of 31 I

after O2MAY04 12:00 U1R28 WORKING SCHEDULE after 02MAY04 12:00 U

ID RESP WO I EQID DESCRIPTION RD ES EF RISK MF M MAY T., 4 ST 1Zl l2,4.16 la20,221 0.I2,@4.I6 I8,1OI124.lr6Ia2O,22i O 24.68,0lZ4.6 ST 4

111krl:2 1

e 223 1 1IC0300945 ICV 76 SC-00955-0 SC-955 DIAGNOSTIC 8

02MAY04 03MAY04 DR-Y ML-Y 0 ;

5C.955 DIAGNOSTIC CHE K CHECK 10:OOA 08:59 ORT3-N R-N YC HOT LEG SAMPLE ISOLATION ERATOR03 224 1 IC0300993 ICV 76 SC-00955-S SC-955-S REPLACE 8 02MAY04 03MAY04 DR-Y ML.Y 0 C SC-955-REPLACE SO, NOID VALVE SOLENOID VALVE 10:OOA 08:59 ORT3-N R-N

?C HOT LEG SAMPLE ISOLATION S LENOID0300 225 1 IC5.49B ICV 76 ICP-05.049 MS-2015 HX-1B ATM 5

02MAY04 03MAY04 DR-Y ML-Y 12 IC5.49BMS-20l HX-1 ATM STM DUMP VALVE STROKE STM DUMP VALVE 23:00 03:59 ORT3-Y R-N 0300861SECO ARY PLANT CONTROL VALVES 226 1 IC0304451 ICV 76 CC-00761B-1CC-761B-O CK IA SY 1 03MAY04 03MAY04 DR-Y ML-Y 195 IC03014511CC-761B-O K IA SY FOR FOIOEIGN MATL FOR FOREIGN MATL 00:00 00:59 ORT3-Y R-N 030445111P-1B RCP HERMAL BARRIER COOLING RETU N OPERATO 227 1 IC0304452 ICV 76 CC-00761A-1CC-7S6A-O CK IA SY I

03MAY04 03MAY04 DR-Y ML-Y 195 1C030445 ICC-761A-0 K IA SY FOR FOREIGN MATL FOR FOREIGN MATL 00:00 00:59 ORT3-Y R-N 030445il P-1A RCP HERMAL BARRIER COOLING RETU N OPERATO 228 1 IC0300939 ICV 76 RH-00624-O RH-624 DIAGNOSTIC 10 03MAY04 03MAY04 DR-N ML-N 0

IC03009 9RH-624 DIAGNO$TIC CHECK CHECK 10:00 19:59 ORT3-N R-N 03009 HX-1IA RHR HX Ol TLET CONTRO 229 1 IC5.69-624 ICV 76 11CP-05.06 ICP-05.069A TRAIN A 10 03MAY04 03MAY04 DR-N ML-N 0

IC5.69-6: jCP-05.069A TRAIN A 10:00 19:59 ORT3-N R-N 03009 TkAIN A RHR HEA EXCHANGER' 230 0 IC0213035 ICV 76 IA-01249 IA-1249 AIR LEAKS 4

03MAY04 03MAY04 DR-Y ML-Y 0

IC0213035fA-1249 AIR LEAKS 19:00-22:59 ORT3-Y R-N 02130358_1CV-133 RHR O LETDOWN I m1 I 1C0300941 ICV 76 RH-00626-O RH-626 DIAGNOSTIC 4

03MAY04 03MAY04 DR-Y ML-Y 0

jC0300941RHr626 DIAGNOSTI CHECK CHECK 19:00 22:S9 ORT3-Y R-N 03009411HX-1 iAB RHR HX BYPASS FL 232 1 IC5.10-133 ICV 76 ICP-05.010 CV-133 LTDN VALVE 4

04MAY04 04MAY04 DR-N ML-Y 12 IC5.1q.133CV.133 LTDN ALVE STROKI STROKE 00:00 03:59 ORT3-Y R-N 030_8523WALVE; MISCELLAN r i m zm ;1

~el I; -

233 1 MM0214055 MM1 76 HX-015A HX-15A. MOTOR 28 26APR04 04MAY04 DR-Y ML-Y 0 M 14055HX-15A, MOTOR COOU GCOILINTERNtINSPECTION COOLING COIL 02:OOA 23:59 ORT3-N R-N 234 1 MM9924975A MMI 76 HS-1 HS-1. REBUILD & TEST 20 26APR04 04MAY04 DR-Y ML-Y 0 MM y2X9S-1i REBUILD& TES SNUBBER (SHO*)

SNUBBER (SHOP) 06:OOA 09:59 ORT3-N R-N


_HX-IA SG MA I

235 1

MM0408036 MM1 71 P-015B 1P-15B.

36 02MAY04 04MAY04 DR-N ML-N O UM 6Q9361P15B, REPAIR/REP E SEAL REPAIR/REPLACE SEAL 13:00-00:59 ORT3-N R-N I

,0408036 236 1

MM0407674 MM1 76 VNCRD 1VNCRD, WELD 8

02MAY04 03MAY04 DR-Y ML-Y 0

M 04076741VNtRD. WELD REP JR DUCT ON E

REPAIR DUCT 18:00-01:59 ORT3-N R-N 0407674_

VNCRD S STEM MULTI ANqlOR NONNUMBEIED EQUIPMEI 237 1 MM0214187A MMI 76 C-2 INSPECT UPPER 20 03MAY04 04MAY04 DR-Y ML-Y 0

MM0214 CT UP 'ER HATCH HATCH 00:00-21:59 ORT3-N R-N 02141871 238 1

MM0305397 MM1 76 W-001CI W-ICI REPLACE 36 03MAY04 06MAY04 DR-Y ML-Y 19 MM0305397W-1 1 REPLACE SPR)NG ISOLATORS SPRING ISOLATORS 06:00-08:59 ORT3-N R-N I

030539t 239 1

MM9933444 MM1 76 W-001C2-A W-1C2-A REPLACE 100 03MAY04 07MAY04 DR-Y ML-Y 0

MM9933444w-C2-A REPLACE BACKDRAFT DAM ER BACKDRAFT DAMPER 07:00 19:59 ORT3-N R-N 99 3

240 1 MM9934376A MM1 76 HS-15 HS-15. REBUILD&

30 04MAY04 07MAY04 DR-Y ML-Y 0

1 MM993437tH 5 REBU TEST SNUBBER (SHOP) 10:00 06:59 ORT3-N R-N

]

99S437 Run Date 02MAY04 15:17l LT-03 STANDARD PUBLICATION Sheot 14 of 31 C Primavera Systems, In.

FL-03 Execution Publication Set

after 02MAY04 12:00 U1R28 WORKING SCHEDULE after O2MA Y04 12:00

  1. Ul ID RESP f

WO EQID I

DESCRIPTION lRDl ES IEF RISK l

2 MAY SDT

-I*-i

~211,S0~

j gi 21 1Z' 16,1a202210,2 4 6 8 1011214,161a2 2,210 2

2 4. 6.8.1011214.14 F

RISK MFI 241 1 MM-8857A1 MMI 82 HX-015B HX-15B, PERFORMSW 6 04MAY04 05MAY04 DR-YML-Y 0

MM-81 7AlHX 158. I LEAK CHECK &

12:00 06:59 ORT3-N R-N 0214064_-

Urz :21Sl ut2e~~~l

_1!

2421 1 MM03D4995 MM2 76 P-028B P-028B - OVERHAUL MAIN FEED PUMP 82 30APR04 I 09MAY04 DR-Y ML-Y 15:OOA 16:59 ORT3-N R-N 0 ~m&d04995P.0284 - OVERHAUL_"

EE

-E 243 1 MM0407390 MM2 76 P4028B3 1P-28B INSPECT 6

01MAY04 02MAY04 DR-Y ML-Y 153 SPEED INCREASER 09:00A 17:59 ORT3-N R-N 244 1 MM0214082A MM2 76 HX-021A HX-21A, CLOSE HP 6

02MAY04 02MAY04 DR-Y ML-Y 0

FEEDWATER HEATER 00:OOA 17:59 ORT3-N R-N 245 1 MM0304206 MM2 76 FD-00249A FD-00249A - INLET 3

02MAY04 02MAY04 DR-Y ML-Y 53 PLUGGED 09:OOA 14:59 ORT3-N R-N 246 1 MM0301107 MM2 77 Z-027-1 LUBRICATE AND 2

02MAY04 02MAY04 DR-Y ML-Y 0

MAINTAIN SCREEN 12:00 13:59 ORT3-N R-N 247 0

MM0407967 MM2 74 K-026 K-26, AIR LINE LEAK 5

02MAY04 03MAY04 0

13:00 06:59 248 2 MM0301163 MM2 77 Z-027-1 LUBRICATE AND 2

02MAY04 02MAY04 DR-Y ML-Y 558 MAINTAIN SCREEN 14:00 15:59 ORT3-N R-N 2491 1 MM0214121 MM2 76 P-025A-M P-025A - CHANGE OIL 4

02MAY04 02MAY04 DR-Y ML-Y 0

IN MOTOR 18:00 21:59 ORT3-N R-N 250 1 MM0214123 MM2 76 P-025B-M P-25B - CHANGE OIL IN 4

02MAY04 03MAY04 DR-Y ML-Y 0

MOTOR 22:00 01:59 ORT3-N R-N 251 0

MM0310384 MM2 76 HX-055B-1 HX-55B-1, HXIOPEN, 6

03MAY04 03MAY04 DR-N ML-N 0

CLOSE AND CLEAN 05:00 10:59 ORT3-N R-N 252 0

MM0310394 MM2 76 HX-055B-2 HX-55B-2, HXIOPEN.

6 03MAY04 03MAY04 DR-N ML-N 0

CLOSE AND CLEAN 05:00 10:59 ORT3-N R-N 253 1

MM0213996 MM2 77 W-041B LUBRICATE VAPOR 1

03MAY04 03MAY04 DR-Y ML-Y 10 EXTRACTOR 07:00 07:59 ORT3-N R-N 254 0

MM0304233 MM2 77 Z-675 WIRE ROPE 4

03MAY04 03MAY04 DR-Y ML-Y 541 INSPECTION 07:00 10:59 ORT3-N R-N 255 1 MM0301118 MM2 77 ELECT PENE INSPECT AND 6

03MAY04 03MAY04 DR-Y ML-Y 0

MAINTAIN ELECTRICAL 07:00 12:59 ORT3-N R-N 256 0

MM0201756 MM2 76 G-501 CHECK FREEZE POINT 1

03MAY04 03MAY04 DR-Y ML-Y 543 OF COOLANT 08:00 08:59 ORT3-N R-N 257 2 MM0301171 MM2 77 ELECT PENEl INSPECT AND 6

03MAY04 04MAY04 DR-Y ML-Y 262 MAINTAIN ELECTRICAL 13:00 07:59 ORT3-N R-N AMC~

AMC 103 P 28d INSPECT SPEEDI STEAM GENERATOR U4Q8HX-21A. CLOSE HP F HP FEEDWATER HEA 2249A - INLEt PLUGGED WHX-19A LP FWH 3A LG-253 gQ o$LUBRICATE AND MAINT MTRAVELING WATER SCREE)

-2,AR UINE LEAK,

30ju3LUBRICATE AND MAINT RTRAVECING WATER SCRR 10214121P021A - CHANGE OILl 0214121_CONDENSATE F MM0214123P-25B - CHANGE 0214113MCONDENS

MM0310384HX-551 0310389 IMM0310394HX-55 0310394 MM0213996LU 021399UT

,MM0304233W1 0304233 MM030111 N 0301118 MM0201756C 0201754 MM0 mo:0.

M N FEED PUMP INCREASER EED PUMPO40730l EDWATER HEATER 5A ER 5A0214082 LOWER ISOLATIPN UN SCREEN 10301107 lAIEBA CHARGING, COMPRESSOR 407967 UN SCREEN

EN0301163 IN MOTOR IUMP MOTOR OIL IN MOTOR ATE PUMP MOTO6 3-1, HXIOPEN, CLOSE AND CLEAN
  • G-02 EMER DIESEL GENERATOF COOLANT HX 3-2, HXIOPEN, CiOSE AND CLEAN
  • G-02 EMER DI1SEL GENERATOF COOLANT HX 3RICATE VAPOR EXTRACTOR

,76 GEN BEARING; OIL DRAIN TANK APOR EXTRI tE ROPE INSPECtION NTRAINING BLDq RM 140 OVERH 0 CRANE PECT AND MAINTAIN ELECTRICAL UNIT 1 ELEdTRICAL PENETR TIONS HECK FREEZE PqINT OF COOLAN1 G-05 GT GENERATOR AUXILIARY P WER SUPPLI Di 17IINSPECT AND MAINTAIN ELElTRICAL 011711 N

ITr2ELECTR A0305791 ALOSE WATERBOXES AF TER INSPECTI 0305791 CONDENSI 258 1

MM0305791A MM2 76 SC-lB CLOSE WATERBOXES1 6 103MAY04 04MAY04 DR-Y ML-Y AFTER INSPECTION 16:00 10:59 ORT3-N R-N 16 Run Date 02MAY04 15:1F LT-03 STANDARD PUBLICATION l

Sheet 15 of 31 O Pdmavera Systems, In7 FL-03 Execution Publication Set 7

after 02MAY04 12:00 U1R28 WORKING SCHEDULE after O2MA Y04 12:00 U

ID RESPl WO I EQID DESCRIPTION RD I ES EF RISK MF I

MAY ST

.iii6a2220246810iZ41l2,20246l,~ll,~

259 1 MM0301121 MM2 77 TG-01 GREASE GOVERNOR 1

03MAY04 03MAY04 DR-Y MI-0 MM030112 1GREASE GOVERNOR EDESTAL ANC PEDESTAL AND HP 18:00.

18:59 ORT3-N R-N 030112141TURBINE GENERAT R (GENERIC; 260 2 MM0301176 MM2 77 TG-01 GREASE GOVERNOR 1

03MAY04 03MAY04 DR-Y ML-Y 269 MM030117RIASE GOVERNO PEDESTAL A PEDESTAL AND HP 19:00 19:59 ORT3-N R-N 0301176IT RBINE GENERA OR (GENERIC 261 0

MM0309475 MM2 77 SERVICE STORAGE LOCKER 6

04MAY04 04MAY04 DR-Y ML-Y 517 MM0309475ST )RAGE LOCK INSPECTION 07:00 12:59 ORT3-N R-N 030947 MISC E 262 0 MM0201221 MM2 77 PBF-9148 GREASE PUMPS PER 8

04MAY04 04MAY04 DR-V MI-V 515 MM0201221G SE PUMPS PBF-9148 07:00 14:59 ORT3-N R-N _

0201221!

QUA 263 0 MM0201305 MM2 77 WELDING-EQ INSPECT FIRE 8

04MAY04 04MAY04 DR-Y ML-Y 515 MPECT FIRE EX EXTINGUISHERS 07:00 14:59 ORT3-N R-N 020130 264 1 MM0305771 MM2 78 HX-020A.

IHX-20A PLUG TUBES-10 04MAY04 04MAY04 DR-V ML-Y 0

PLG CONTINGENCY WO 07:00.

16:59 ORT3-N R-N 0305771 L

265 0 MMJTRNB07A MM2 TRAINING MM OJT1TPE TRAINING. 24 04MAY04 06MAY04 DR-Y ML-Y 239 MMTRNB07AMH OJTITPE TRA

_2 MM'S 0700 08:59 ORT3-N R-N 266 2 MM0301159 MM2 76 P-O11A CHANGE OIL. FLUSH 6

04MAY04 04MAY04 DR-N ML-N 0

MM03011 S HE OILF BEARINGS AND CLEAN 08:00 13:59 ORT3-N R-N 030115 9_COMP m1 4 :I I

I D

II I_

267 1 MM0213109 MMV 76 CS-00038C ICS-00038C BODY TO 10 19APR04 04MAY04 DR-Y MLY 30 MC 2131091CS-0Q038C BODY TO B ETLEAK SG BONNET LEAK 09:OOA 08:59 ORT3-N R-N I

S DHX-18A/B SG 268 1 MM0216627 MMV 76 CV-01296 CV-1296 - INSTALL NEW 20 27APR04 05MAY04 DR-N ML-N 0 M 16627CV-12r6 - INSTALL NE PER MOD 02-027 TRIM PER MOD 02-027 08:OOA 08:59 ORT3-N R-M 269 1 MM0407621 MMV 76 CV-00296 1CV-296, BODY TO 12 27APR04 04MAY04 DR-Y MLY 0 M 076211CV-216, BODY TO BO NET LEAK BONNET LEAK 21:OOA 21:59 ORT3-N R-N I

270 1 MM0214023 MMV 76 AF-00104 AF-104 - INSP 1 7

01MAY04 02MAY04 DR-Y ML-0 MM CF104

- INSP I MAINTAI CHECK VALVE dER RMP9158 MAINTAIN CHECK I 1:00A 19:59 ORT3-N R-N P;r38B AFP DISCHA GE TO 1HX-IB S CHECK0214023 271 1

MM0303680A MMV 76 MS-02005 1MS-2005-PERFORM 37 01MAY04 05MAY04 DR-Y ML-Y 0 M O

IMS-2005 - PERFORM OD FOR ROUNDED ENTRANCE MOD FOR ROUNDED I 11:00A 15:59 ORT3-N R-M 272 1 MM0407600 MMV 76 MS-00282 1MS-282. VALVE 12 01MAY04 04MAY04 DR-Y ML-Y 0 M OT6001MS-202, VALVE LEAK BY LEAKS BY 20:OOA 21:59 ORT3-N R-N 273 1 MM0214110 MMV 76 MS-02018 MS-2018 - OPEN &

50 02MAY04 04MAY04 DR-Y ML-Y 0 MM 4 1 (QMS.2018..OPEN& INSP'CTVALVE.RMP9309-1 INSPECT VALVE -

14:00 20:59 ORT3-N R-N L_

274 1 MM0400526 MMV 76 RC-00537 RC-537 - REPLACE 3

03MAY04 03MAY04 DR-N ML-N 0

MM0400526R 537-REPLACE EJEUEF VALVE RELIEF VALVE 07:00 09:59 ORT3-N R-N 040052 RC-500J/K REACTOR VESSEL LT 47/447A THER 275 1 MM0407601 MMV 76 M540478 1MS-478 REPACK 12 03MAY04 04MAY04 DR-Y MLY 15 MM04076011 T547 REPACKVALVE VALVE 07 :00 09:59 ORT3-N R-N 0407601 SG H 276 1 MM0400525 MMV 76 RC-00523A RC-523A - REPLACE 3

03MAY04 03MAY04 DR-N ML-N 0

MM040052

-523A - REPLAC4 REUEFVALVE RELIEF VALVE 08:00 10:59 ORT3-N R-N 040052 R-1 RV LEVEL INDICATOR OVER RESSURE PR Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION Sheet 16 of 31 C Pnlmavera Systems, Inc.

FL-03 Execution Publication Set

after 02MAY04 12:00 U1R28 WORKING SCHEDULE after O2MA Y04 12:00

  1. U ID RES WO EOID DESCRIPTION RD ES EF RISK MF MAY ST l

,l1i2,4,,6.ia20,2210. 2.4. 6. 8.l~il14.lr6la2O.22 0. 2.84,6. 8.1011214.161

,'Ii~^ls~'EW^,:,1~~i.j~224^*_- 12L 277 1 MM0400527 MMV 76 RC-00545D RC-545D - REPLACE 3

03MAY04 03MAY04 DR-N ML-N 0 _

MM040052 C-545D - REPLACE REUEF VALVE RELIEF VALVE 09:00 11:59 ORT3-N R-N 040052 HX-iA SG COLD LEG CHANNE HEAD VENT O 278 1

MM0400528 MMV 76 RC-00546D RC-546D - REPLACE 3

03MAY04 03MAY04 DR-N ML-N 0

MM04005 8RC-546D - REPLACE REUEF VAL E RELIEF VALVE 10:00 12:59 ORT3-N R-N 04005 dHX-1B SG HpT LEG CHANNE HEAD VENT 0 279 1 MM0400529 MMV 76 RC-00547D RC-547D - REPLACE 3

03MAY04 03MAY04 DR-N ML-N 0

MM0400 9RC-547D. REPLACE REUEF VA RELIEF VALVE 11:00 13:59 ORT3-N R-N 0400 29_HX-1A SG hOT LEG CHANN LHEAD VENT 280 1

MM0400530 MMV 76 RC-00548D RC-548D - REPLACE 3

03MAY04 03MAY04 DR-N ML-N 0

MM04C 3530RC-548D - REpLACE REUEF V. LVE RELIEF VALVE 12:00 14:59 ORT3-N R-N 04C )530MHX-1B Sq COLD LEG CHAI NELHEAD VE 281 1

MM0214141 MMV 76 SC-00991 SC-991 - REPLACE 3

03MAY04 03MAY04 DR-Y ML-Y 22 MM0214141SC-91 -REPLACE W TH PRETESTE WITH PRETESTED 19:00-21:59 ORT3-N R-N 0214141l MCPP-28B PZR Li UID SMPL PIF 282 1 MM0407697A MMV 76 WG-01788-O IWG-1788-O AIR LEAK, 10 03MAY04 04MAY04 0

MM040T69 W,178" AIR LEA REPLACE DI REPLACE DIAPHRAGM 19:00 19:59 040769 7

6 283 1 MM0407698A MMV 76 WG-01789-0 IWG-1789-O AIR LEAK.

10 03MAY04 04MAY04 0

MM04O7698 W G178" AIR LEA REPLACE D REPLACE DIAPHRAGM 19:00 19:59 0407696t 284 1 MM0407597 MMV 76 MS-00228 1MS-228 REPACK 12 03MAY04 04MAY04 DR-Y ML-Y 43 MM04075971 MS-228 REPACK VP LVE VALVE 19:00 21:59 ORT3-N R-N 0407597 285 1

MM0303382 MMV 76 SC-00953 SC-953 - CONT 20 03MAY04 05MAY04 DR-Y ML-Y 0

MM0303387*i95 COT ISOU lON VALVE c

ISOLATION VALVE 19:00' 20:59 ORT3-N R-N 03033 8

t 286 1

MM0214109 MMV 76 MS-02017-0 MS-2017 - INSP /

30 03MAY04 06MAY04 DR-Y ML-Y 0

MM0214109MS'2017 - INSP I MAI TAIN OPERAT I

MAINTAIN OPERATOR- -

19:00 21:59 ORT3-N R-N 02141 87 1

MM0407661 MMV 76 VNPSE-0324 VNPSE-3245. REPLACE 6 03MAY04 04MAY04 DR-Y ML-Y 0

MM040766IVNPSE 3245 REP CE MILLER S MILLER SLIDE VALVE 20:00 01:59 ORT3-N R-N 0407661 W-2AB U C PURGE SU N

zm I-288 1 NG44CFC1ND NDE 77 IST-SISI NDE FOR FAC PROG -

26 26APR04 05MAY04 DR-Y ML-Y 49 CFCINCNDEFOR FAC PROG CONTAINMENT 4 FT GEN AREA CONTAINMENT 44 FT 08:00A 12:59 ORT3-Y R-N l Y 34P:19VISA1 INPIIO 289 1 EP0301909 NDE 77 U1-CONTAIN VISUAL INSPECTION 76 30APR04 11MAY04 DR-Y ML-V I

3E 01gogVISUALINSPECTION OF TMTUNERPLATE OF CTMT LINER PLATE 08:OOA 12:59 ORT3-Y R-N l

290 1 ND0304672B NDE 76 HS-601R-73 HS-601R-73, PERFORM 1

02MAY04 02MAY04 DRYML-Y M

278 DO 94672BHS641R-73, PERFORM AS LEFT VT-3 ONSNUBBER AS LEFT VT-3 ON 12:00 12:59 ORT3-Y R-N lPZR SRV R4LIEF LINE SNUBEER (FORMER HS-17)0304672 291 1

ND9934380B NDE 76 HS-601R-37 HS-601R-37A PERFORM 1

02MAY04 02MAY04 DR-Y ML-Y 213 N09 380BHS-601RR-37A PERFOR4I AS-LEFT VT-3 ON SNUBBER AS-LEFT VT-3 ON 12:00 12:59 ORT3-Y R-N PZR PORV IAIEADER SNUBBEF 9934380 292 1 EP0301951 NDE 77 CV-00295 CV-295 - CHECK VALVE 3

03MAY04 03MAY04 DR-Y ML-Y 0

EP3001951CV-295 - CH CK VALVE CLOgURE RADIOGRA CLOSURE 01:00-03:59 ORT3-Y R-N 0301951_1 HX-2 EGEN HX CHARGING TO LOOP A LD LEG CHE 293 1 EP0301953 NDE 77 CV-00304A CV-304A - CHECK 3

03MAY04 03MAY04 DR-Y ML-Y 0

EP0301953CV-304A - C 4ECK VALVE CLOSURE RADIOGRA HY VALVE CLOSURE 01:00 03:59 ORT3-Y R-N o00195:1P-1A P CP SEAL WATER INJECTION CHECI(

294 1 EP0301954 NDE 77 CV-00304B CV-304B - CHECK 3

03MAY04 03MAY04 DR-Y ML-Y 0

PO301954CV-304

- CHECK VALVE CLOSURE RADIC SRAPHY VALVE CLOSURE 04:00-06:59 ORT3-Y R-N

' 03019541P 18 RCP SEAL WATER INJECTION C ECK Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION Sheet 17 of 31 C Primavera Systems. Inc.

FL-03 Execution Publication Set I

after 02MAY04 12:00 U1R28 WORKING SCHEDULE afterO2MAY04 12:00 U

ID ES WO EOID DESCRIPTION RD ES EF RISK MF I MAY Pi ST I

.10il2A4,16,la,20,22 0, 2.4,6,8li~4laaO2 0...

8 1101Z14 295 1

EPO3O1955 NDE 77 CV-00383 CV-383 - CHECK VALVE 3

03MAY04 03MAY04 DR-Y MLY 64 _P0301 95SCV 383 CHECK VALVE CLOSURE RADIOG RAPHY CLOSURE 04:00 06:59 ORT3-Y R-N

  • 0301955RC LOOP B COLD LEG AUX CHARGINC LINE CHECK 296 1 NG44TFC1ND NDE 77 IST-SISI NDE FOR FAC PROG -

9 03MAY04 03MAY04 DR-Y ML-Y 0

NG44TFC1NLE FOR FAC PROG(. TRB HALL 44 F GEN AREA TRB HALL 44 FT GEN 07:00-15:59 ORT3-Y R-N 0301S97ESECO NDARY INSERVICE INSPECTION 290 OOO2flP7O001.4 N4 M

zCEIA,,EC]DA 070Mk5 R3NRN:

0O i3HL 297 1 NM0407660A NMS 77 FE-02804A FE-2804A - CAL CHECK 2

04MAY04 04MAY04 DR-Y MLY 98 _

NMo407650 2804A - CAL C OF UT TRANSDUCERS 07:00 08:59 ORT3-Y R-N I

_.0766

  • A1CONT 280 OP0301239 OP0 77 O-PC,021.4 WEEKLY l5 l04MAY04104MAY04 lDR-N ML-N 1 518 _1 OP03,01230 EKLY MISCEL l

_MISCELLANEOIUS DAl l 07:001 11:59 lORT3-N R-N l 0301239y =PWEEKLY 299 O

lP0215356 OPI 77 O-PC-MIDS OPERATIONS MID 28 30APRo4 06MAY04 DR-N ML-N 148 DPt ¶53s6OPERATIONS MID SHIFT WEEKLY ROUTINE SHIFT WEEKLY 00:OOA 06:59 ORT3-N R-N l 300 0

OP0301324 OPI 77 O-PC-010.2 SW PUMP SHIFTING 2

04MAY04 04MAY04 DR-N ML-N 167 OP03013245WPUMPSH FTINGANDCI AND CW PUMP BUMPS 00:00-01:59 ORT3-N R-N P0301324WMONTHLY SW PUMP SHA 0,Oj 2

OP0301601 OPI 77 O-TS-034 TS-34. U2C ACCIDENT 2

04MAY04 04MAY04 DR-N ML-N 167 OP0301601TS34, U2C ACCIDENTFAN CDIIFAN COOLER UNITS I

I00:00 01:59 1ORT3-N R-N I-030,1601MUNIT 2 CCNT ACCIDENT 302 0 OP0301343 OP2 77 O-TS-082 TS-82. G-02 2

02MAY04 02MAY04 DR-N ML-N I 1 343TS-82, G-02 EMERGENC DIESEL EMERGENCY DIESEL 10:OOA 13.59 ORT3-N R-M G-02 EMERGENCY DIESEL ENERATOR MONTHLY0301343 303 1 OP0301546 OP2 77 TS-ECCS-00 SAFEGUARDSYSTEMS I 03MAY04 03MAY04 DR-N ML-N 174 O

0P030154 EGUARD SYST4MS VALVE AND OCK VALVE AND LOCK 08:00 08:59 ORT3-N R-N 030154 SAFEGUARD SYSTEMS VALVE AN LOCK CHECK 304 0 OP0215479 OP2 76 0-IT-0011 IT-11. P-12AB SPENT 2

03MAY04 03MAY04 DR-NML-N 173 OP0215479

-11,P-12AtB SPENT FUEL POOL FUEL POOL 08:00 09:59 ORT3-N R-N I 021547 P-12A/B SPENT RUEL POOL COOL NG PUMPS 305 0 OP0301374 OP2 77 TS-SW-001 SWVALVEPOSTON 2

03MAY04 03MAY04 DR-N ML-N 173 OP0301374 VALVE POSmITN VERIFICATION VERIFICATION 08:00 09:59 ORT3-N R-N 0301374 ISERVICE WATEN FLOW PATH VALVE POSITION 306 0 OP0301376 OP2 77 O-PC-008.2 MONTHLY AFW PUMP 1

04MAY04 04MAY04 DR-N ML-N 167 OP030137 ONTHLYAFW DISCHARGE PIPING 08:00 08:59 ORT3-N R.N 1671 030137 MONTHLY A 307 0 OP0301378 OP2 77 TS-AFW-002 F SYSTEM VALVE AN I

04MAY04 04MAY04 DR-N ML-N 167 OP030137 SYSTEM VA LOCK CHECKS 08:00 08:59 ORT3-N R-N l 030137 F SYSTEM V 308 0 OP0301331 OP2 77 O-PC-DAYS OPERATIONS DAY 42 04MAY04 09MAY04 DR-N ML-N 126 OP0301331 PERATONSD SHIFT WEEKLY 08:00 14:59 ORT3-N R-N lPERATIONS DA SHIFT WEEKLY tOUTINE0301331 309 0 l OP0215624 OP3 77 O-PC-043.3 CLEAN SERVICE 7

22APR04 02MAY04 I DR-N ML-N 606 _

15624CLEAN SERVICE WATE STRAINERS I

WATER STRAINERS 16:OOA 18:59 ORT3-N R-N SEIICE WATER S TAINERS0215624I Run Date 02MAY04 15:17l LT.03 STANDARD PUBLICATION Sheet 18 of 31 0 Primavera Systems, Inc.

FL-03 Execution Publication Set

after O2MAY04 12:00 U1R28 WORKING SCHEDULE afterO2MAY0412:00

  1. I U l ID lRESP WO EOID DESCRIPTION RD ES EF RISK MF MAY I I I

lel

- I I

a 310 0

OP0215550 OP3 76 O-PC-SWING OPS SWING SHIFT 21 28APR04 04MAY04 DR-N ML-N 161 1555NP s =

=

=

WEEKLY ROUTINE 16:OOA 22:59 ORT3-N R-N 311 0

OP0301404 OP3 77 P-118 MONTHLY 1

02MAY04 02MAY04 DR-N ML-N 181 P0 O14o 4 !&ONTSLY OPERATIONA CHECK OF PUMB OPERATIONAL CHECK 16:00 16:59 ORT3-N R-N 0

1404NSUBSPIL SEEPAGE SU P PUMP 312 0 OP0301450 OP3 77 O-IT-0014.

IT-14. fO TRANSFER 3

02MAY04 02MAY04 DR-N ML-N 4 OP0 0145T-14. PO TRANSFER SY TEM PUMPSI SYSTEM PUMPSI 16:00.

18:59 ORT3-N R-M 0

145MG-62 EDG FUEL OIL RANSFER SYSTEIM PUMPSVALVE 313 0 OP0301451 OP3 77 O-IT-0100.

IT-100, SEAT LKG TEST 3 02MAY04 02MAY04 DR-N ML-N 4

P0 O1451TA100SEAT LKG TEST F DA-200 AND OF DA-200 AND 16:00 18:59 ORT3-N R-M 0 1451_G-02 EDG SEAT LKG TEST OF DA COMP DISCH CHK VL S 314 2 U2GNDRO1O OP3 O-PC-021.3 DRAIN U2 MAIN I

02MAY04 02MAY04 DR-Y MLY 0 U2 NDR01ODRAIN U2 MAIN ELEC RICAL GENERATOR PER PC 21.3 ELECTRICAL 18:00 18:59 ORT3-Y R-N II 315 2

OP0301629 OP3 77 O-PC-025 PURIFY RWST I

03MAY04 03MAY04 DR-N ML-N 174 P0301629PURIFY RWST 16:00 16:59 ORT3-N R-N 0301624IRECIRCULATION OR Pl RIFICATION 0 316 2 OP0301632 OP3 77 O-PC-058 H2 SEAL OIL SYSTEM 1

03MAY04 03MAY04 DR-N ML-N 174 P030163t 2 SEAL OIL SYSTEM TE ST TEST 16:00 18:59 ORT3-N R-M 0301633HYDR)OGEN SEAL OIL E YSTEM 317 0 OP0301445 OP3 77 O-PC-009.1 MONTHLY SHIFTING OF 6 03MAY04 03MAY04 DR-N ML-N 169 P0 301445MONTHLY SHIFTING OF U COMPRESSO IIA COMPRESSORS/

16:00 21:59 ORT3-N R-N 030144 _MONTHLY SHI NG OF IA CO B48 0 OP0301447 OP3 77 O-TS-009 TS-9. CONTROL ROOM 24 03MAY04 06MAY04 DR-N ML-N 151 PO30 1447TS-. C NTROL ROOM SYSTEM C H/V SYSTEM CHECKS 16:00 18:59 ORT3-N R-M 030144 I K 319 0 OP0308219 OP3 77 O-PC-045.1 BLOWDOWNAIR I

04MAY04 04MAY04 DR-N ML-N 167

)PO30 11 2

RECEIVERS 16:00 16:59 ORT3-N R-N

[ 03082190P 320 0 OP0301387 OP3 77 O-PC-001.4 PAB VENTILATION 32 04MAY04 08MAY04 DR-N ML-N 136 kPo3O3S7PAO CHECKS 16:00 19 59 ORT3-N R-N 030138 321 RP1C-030 OPS O-RP-OOIC FUEL MOTION AND 12 25APR04 02MAY04 DR-N ML-N 0 P1.I3OFUEL M)TON AND INSE SHUFFLE INSERT SHUFFLE 08 OOA 23:59 ORT3-N R-M U

REFUELING 322 1

OP0205513 OPS 82 B52-433E CW-00003 PERFORM 1

02MAY04 02MAY04 DR-N ML-N 0

P0 5513CW-0 003 PERFORM PM STROKE PMT STROKE 12:00 12:59 ORT3-N R-N PWR TO 1CW.3 SEAL WELL ET MOV 0205513 323 1 OP0300992 OPS 76 SC-00966C-PMT STROKE SC-966C 1 02MAY04 02MAY04 DR-N ML-N 22 P0 ogg2PMT StROKE SC-966C P R IT 60 PER IT 60 12:00 12:59 ORT3-N R-N RC HOT LE9 SAMPLE SOLEN ID0300992 324 1

EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4

02MAY04 02MAY04 DR-Y ML-Y 222 0

4AOPERANG SUPPORT F INITIAL RCS WALKDOWN OF INITIAL RCS 12:00 15:59 ORT3-N R-N REACT6R COOLANT SY TEM (RCS) PRESgURE TEST - IN/04 03494 325 1 IT-320AX OPS 77 O-IT-0320A CV-294 LIFT TEST 4

02MAY04 02MAY04 DR-N ML-N 0 T-3 V-294 LIFT TEST (SEAL R mTURN)

(SEAL RETURN) 12:00 15:59 ORT3-N R-N RCP SEAL RET PIPE PENETR THERMAL RE.IEF CHECK TEO 15909 326 1

O-RT-034B OPS 77 O-RT-034 POST LURT OF 4

02MAY04 02MAY04 DR-N ML-N 53 OST ULRT OF NORMAL CHARGING NORMAL CHARGING 12:00-15:59 ORT3-N R-N NORMAL CHARGING LINE (P-26)0215972 327 1 IT-531C OPS 77 O-IT-0531 REMOVE SUMP B 6

02MAY04 02MAY04 DR-N ML-N 0T-5 rtREMOVE UMP B SCREEN SCREEN 12:00 17:59 ORT3-N R-N UNIT 1 CONT SUMP B SUCTION LINE LEAK TEST (RFSD)0 15919 Run Date 02MAY0415:17l LT-03 STANDARD PUBLICATION Shoot19of31 C Pdrmavera Systems, Inc.

FL-03 Execution Publication Set Shoot_19_of_31

after O2MA Y04 12:00 U1R28 WORKING SCHEDULE afterO2MAY0412:00 U

I RES WO EQID DESCRIPTION RD ES EF RISK MF MAY bE I

Mo 3.

Tu. 4 I

Pi STRII N HAL SW UNUP II

.0111.82,2024'"M21,682021 3281 1 CLIOCO10 OPS CL-10C TURBINE HALL SW VALVE LINEUPS 6

02MAY04 02MAY041 DR-N ML-N 15:00 21:59 ORT3-N R-N 301 CL1 329 1 OP0215162 OPS 82 AF-04006-O AF-4006-O MOV PMT 2

02MAY04 02MAY04 DR-N ML-N 229 STROKE PER IT-290 16:00 17:59 ORT3-N R-N 330 1 0P0306893 OPS 82 MS-02082-M IMS-2082-M PMT 2

02MAY04 02MAY04 DR-N ML-N 196 STROKE PER IT-OA 16:00 17:59 ORT3.N R-N 331 1

O-RT-027 OPS 77 O-RT-027 LLRT SEAL 4

02MAY04 02MAY04 DR-N ML-N 41 RTRNIEXCESS 16:00 20:59 ORT3-N R-N 332 1 IT-531B OPS 77 O-IT-0531 LRPM RHR TO SUMP B 10 02MAY04 03MAY04 DR-N ML-N 0

TRAIN B 18:00 03:59 ORT3-N R-M 333 2 AC-376-A OPS ENTER TURBINE 0

02MAY04 02MAY04 80 OVERSPEED TLCO 19:00 18:59 334 1 O-RT-030 OPS 77 O-RT-030 LLRT RCDT VENT 4

02MAY04 02MAY04 DR-Y MLY 247 HEADER 20:00 23:59 ORT3-N R-N 335 1 O-RT-032B OPS 77 O-RT-032 OST LLRT OF N2 TO S 4

02MAY04 02MAY04 DR-N ML-N 239 ACC CONTINGENCY 20:00 23:59 ORT3-N R-N IS 1

OP9C-070 OPS OP-9C SECURE 1

03MAY04 03MAY04 DR-N ML-N 0

CONTAINMENT PURGE 00:00 00:59 ORT3-N R-N 337 1 OP0306896 OPS 76 MS-02020-M I MS-2020-M PMT 2

03MAY04 03MAY04 DR-N ML-N 189 STROKE PER IT-8A 00:00 01:59 ORT3-N R-N 338 1 RF-400 OPS 77 O-RF-400 REFUELING CAVITY 3

03MAY04 03MAY04 DR-N ML-N 270 SKIMMER PUMP FILTE 00:00 02:59 ORT3-N R-N 339 1 PT-FP-001 OPS 77 PT-FP-001 TESTCONTAINMENT 8

03MAY04 03MAY04 DR-N ML-N 316 FIRE DETECTORS 00:00 07:59 ORT3-N R-N 340 1

SOP-B04A OPS 8-42 PREPARATION FOR 8

03MAY04 03MAY04 DR-N ML-N 13 I B-42 OUTAGE 00:00 07:59 ORT3-N R-N 341 1

RF-070 OPS 77 O-RF-070 RF-70. CTMT FIRE 8

03MAY04 03MAY04 DR-N ML-N 7

HOSE SURVEILLANCE 00:00 08:59 ORT3-N R-N 342 1 RF-340B OPS 77 O-RF-340B CLEAN/CHANGE 8

03MAY04 03MAY04 DR-N ML-N 116 HOTWELL &

00:00 08:59 ORT3-N R-N 343 1

Y04PREPS OPS Y-04 PREPS FOR 1Y-04 12 03MAY04 03MAY04 DR-N ML-N 0

OUTAGE 00:00 11:59 ORT3-N R-M 344 0

0135AG01-A O0S G-1 ALIGN C-01 TO IA-05 & I 03MAY04 03MAY04 DR-N ML-N1 0

2A405 01:00 01:59 ORT3-N R-M OPO 0:

OI'0 a:

0:

C01 OTURBINE HALL SW VALV N*IOTURBINE HALL 1 5162AF400b-O MOV PMT STI I516XU1P-.gAFP SUCTION F 06893IMS-2082M PMT STROI 368901P-2 AFP OVERSPEEE T 027LLRT SWAL RTRNIEXCES I59669MREACTOR COOIJ ITrS31BLRPM RHR TO SUMP I 021591IUNIT I

AC-3764AENTER TURBINE OV O.RT-03OLLRT RCDT VENT I 021596$MRCDT TO VEI O-RT-032BPOST LLRT OF N2 021597cNITROGEN T OP9d.070SECURE CO?

OP030 P8961 MS.2020-M I 030689qHX-1A SG RIe.40REFUEUNG 021p943=REFUEL PTFPp.001TEST CONTA 021600_

L SOP-O4APREPARATIC RF-070RF-70, CTMT 0216935t RF440BCLEANICHAF 0215940 r

Y04PIREPSPREPS FOR' 0135AG01MAUGN G-01

'OP7A-0501.UG?

I U

.LINEUPS 6ERVICE WATER VALVE LINEUPS tOKE PER IT-290 ROM SERVICE W1TER OPERATOR

E PER IT-SA TRIP MOTOR S LETDOWN
  • NT PUMP SEAL RFTURN (P-1i1)

ITRAIN B rONT SUMP B SUbTION LINE LEAK ERSPEED TLCO 3,7.6.

EADER IT HEADER (P-12d) 0 SI ACC CONTIYGENCY THE SI ACCUMULATORS (P-14C)

TAINMENT PURGi FOR IWP 00-037

,MT STROKE PER'IT-8A HEADER P-29 AFR STEAM SUPPLY AVITY SKIMMER 'UMP FILTER NG CAVITY SKIMtER PUMP FILTEF NMENT FIRE DETECTORS NIT 1 CONTAINMINT FIRE DETECT N FOR 1B-42 OUTKGE FIRE HOSE SURVEILLANCE FIRE HOSE AND OIRE STATION SU; GE HOTWELL &

B ATERBOX GAUG GAUGE GLASS CHANGEOUT Y.04 OUTAGE TO 1A-05 & 2A-05' I AND START P-0010B AS OPERATII TEST(RFSD) 7 2&-07 OV MOTOR F REPLACEME OR TEST (REF IFVEILLANCE T G GLASSES G DHR LOOP 345 I

0P7A-050 OPS P-010B ALIGN AND START P-0010B AS 2

03MAY04 03MAY04 DR-N ML-N 05:00 1 06:59 1 ORT3-N R-N 0

l l

Run Date 02MAY04 15:17l LT-03 STANDARD PUBLICATION l

Sheet 20 of 31

© Prmavera Systems, Inc.

I FL-03 Execution Publication Set

after 02MAY04 12:00 U1R28 WORKING SCHEDULE I

afterO2MAY0412:00

  1. lUl ID lRESPl WO I EQID I

DESCRIPTION RD ES EF I

RISK MF MAY IST I_

I_

.4_

10 1416.18

2.
6.

01184_20,2210 2,4. R,810i1214,1 C=_*

z

_1 z

"l 11 34611 IT-700 IOPS 77 0-IT-0700 REACTOR COOLANT GAS VENT VALVES 4

03MAY04 I 03MAY04 DR-N ML-N 05:00.

09:59 ORT3-N R-N 51 347 1 O-RT-068B OPS 77 O-RT-068 POST LRT ON P-1A 4

03MAY04 03MAY04 DR-N ML-N 184 CCW LINES 05:00 09:59 ORT3-N R-N 348 1 OP0309955 OPS 82 G-06 PMT OF 1G-06 ROD 2

03MAY04 03MAY04 DR-N ML-N 65 DRIVE MG SET IAW 01 07:00 08:59 ORT3-N R-N 349 1 OP0300945 OPS 76 SC-00955-0 SC-955 PMT STROKE 1

03MAY04 03MAY04 DR-Y ML-Y 0

PER IT 330 10:00 10:59 ORT3-N R-N 350 1

IT-531A OPS 77 O-IT-0531 LRPM RHR TO SUMP B 10 03MAY04 03MAY04 DR-N ML-N 0

TRAIN A 10:00 19:59 ORT3-N R-N 351 1

O-RT-035B OPS CPP-28A LURT HOT LEG SAMPLE 4 03MAY04 03MAY04 DR-N ML-N 197 LINE -POST ORT 11:00 14:59 ORT3-N R-N 352 1

OP9C-080 OPS OP-9C SECURE CONT PURGE I

03MAY04 03MAY04 0

FOR IY-04 OUTAGE 12:00 12:59 353 1

Y04BRIEF OPS Y-04 IPTE BRIEF TO I

03MAY04 03MAY04 0

DE-ENERGIZE 1Y-04 12:00 12:59 UA 0

0135AG01-B OPS G-01 RE-ALIGN 0-02 TO 1

03MAY04 03MAY04 DR-N ML-N 7

2A-05 13:00 13:59 ORT3-N R-M 355 0 TRAIN-CE OPS REDUCED INVENTORY 2

03MAY04 03MAY04 155 JIT. CREW E 15:00 16:59 356 1

C B10B010 OPS CL-10B CONTAINMENT SW 10 03MAY04 04MAY04 DR-N ML-N 3

VALVE 16:00 02:59 ORT3-N R-N 357 1

OP0300939 OPS 76 RH-00624-0 RH-624 PMT STROKE 1

03MAY04 03MAY04 DR-N ML-N 0

PER IT 390 20:00 20:59 ORT3-N R-N 358 0 OPS-037-02 OPS 76 D72-16-08 IWP-037-02 OPS PMT & 1 03MAY04 03MAY04 DR-N ML-N 0

LIGNMENT POST MOD 20:00 20:59 ORT3-N R-N 359 1

IT-531D OPS 77 O-IT-0531 INSTALL SUMP B 4

03MAY04 03MAY04 DR-N ML-N 0

SCREEN 20:00 23:59 ORT3-N R-N 360 1

B42IPTE OPS 842 IPTE BRIEF TO 1

03MAY04 03MAY04 0

DE-ENERGIZE IB-42 21:00 21:59 361 0

0135AG02-C OPS G-02 ALIGN G-02 TO 1A-05 & 1 03MAY04 03MAY04 DR-N ML-N 0

2A-05 FOR 18-42 21:00 21:59 ORT3-N R-L 0

TRAIN-Ca OPS REDUCED INVENTORY 2

03MAY04 03MAY04 149 JrTT. CREW B 21:00.

22:59 IT.700REAC 0215924--

O.R1T.06588POST 0216001I" OP030995~1 I

030995;j OP03009

03009, 021594 O-RT-0:

0P9(

  • Y04E
  • 0135i tOR COOLANT GAS VENT VALVES INUNIT I REACTOR COOLANT GAS I LLRT ON P-1A COW UNES (CONTIh (

CCW TO AND FIOM P-1A (P-15P; /

T OF 1G-06 ROD DRIVE MG SET IAI ROD CONTROL MG SET sSC-955 PMT STqOKE PER IT 330 dRC HOT LEG SAMPLE ISOLATIO PM RHR TO SUMP B TRAIN A LNIT 1 CONT SUMI SBLLRT HOT LEV, SAMPLE LINE - F l_HOT LEG SAMPLE LINE

-080SECURE CONT PURGE FOR 1Y 4 IERPTE BRIEF TO DE-ENERGIZE 1 (G01FRE.ALIGN cW02 TO 2A-05 RAIN-CEREDUCED INVENTORY J CL1OBOIOCONTA;NMENT SW VAL 1U1_SERVIC 4 OP0300939RH624 PMT STROME 030093S§HX-11A RHR HX t OPS.037.OeŽP-037-02 OPS PMr 030511Ct!PWR TO 1C04 SI IT-.531sDINSTALL SUMP BS 0215919_UNIT 1 CONTI B42IPTE PTE BRIEF TO DE 0I35AG02.eALUGN G-02 TO 1A 4 TRAIN-COREDUCED INVENY(

0157-01 OFILL & VENT RCD.

ENT VALVES GENCY) 7)

0131 OPERATOR B SUCTION LI

)ST ORT 04 OUTAGE r-04 CREW E WATER IN CC E PER IT 390 JTLET CONTR

& AUGNMEN FEGUARDS BI REEN IUMP B SUCT ENERGIZE 1B.

35 & 2A-05 FOI

)RYJITT, CRE T PUMPS IAW 3631 I 0157-010 OPS 01-57 FILL & VENT RCDT PUMPS IAW Of 57 2

03MAY04 I 03MAY04 DR-N ML-N 22:00 23:59 ORT3-N R-N 38 Run Date 02MAY04 15:17T LT-03 STANDARD PUBLICATION l

Sheet 21 of 31 0 Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after 02MAY04 12:00 I

U1R28 WORKING SCHEDULE after 02MAY04 12:00 U

ID RESP WO I EQID I

DESCRIPTION RDl ES EF I

RISK M

MF I MAY

  • I I

P P

r 36411 SOP-B04B OPS B-42 DE-ENERGIZE 1B-42 PER 1-SOP-48G-804 4 1 03MAY04 I 04MAY04 I DR-N ML-N 22:00 1 01:59 ORT3-N R-L 0

365 1 O-RT-052A OPS 77 O-RT-052 PRE LLRT HX-1B 4

04MAY04 04MAY04 0

SAMPLE LINE 00:00 03:59 366 1 OP0407661 OPS 76 VNPSE-0324 VNPSE-3245. PMT 2

04MAY04 04MAY04 0

STROKE PER IT 360 02:00 03:59 367 1 CL14AOIO OPS CL-14A TURBINE EHC VALVE 4

04MAY04 04MAY04 DR-N ML-N 0

LINEUPS 02:00 05:59 ORT3-N R-N 368 1 O-RT-040 OPS 77 O-RT-040 LLRT P-1B SEAL 4

04MAY04 04MAY04 DR-N ML-N 0

SUPPLY 02:00 05:59 ORT3-N R-N 369 1 OP13A100 OPS TG-01-T EHC OIL SYS 4

04MAY04 04MAY04 DR-N ML-N 0

RESTORATION 02:00 05:59 ORT3-N R-N 370 1 SOP-B41A OPS B-41 PREPS FOR 12 04MAY04 04MAY04 DR-Y ML-Y 0

DE-ENERGIZING 1B-41 02:00 13:59 ORT3-N R-N 371 1

OP9C-085 OPS OP-9C RESTORE CONT I

04MAY04 04MAY04 DR-N ML-N 127 PURGE 04:00 04:59 ORT3-N R-N U2 2

01-17B-2 OPS01-17A RESTART U-2 LDGS 2

04MAY04 04MAY04 DR-N ML-N 523 CA 04:00 05:59 ORT3-N R-N 373 1 O-RT-039 OPS 77 O-RT-039 LLRT P-1A SEAL 4

04MAY04 04MAY04 DR-N ML-N 0

SUPPLY 06:00 09:59 ORT3-N R-N 374 2 AC-377-1A OPS P-011A ENTER TSAC 3.7.7.A 0

04MAY04 04MAY04 DR-N ML-N 523 FOR 2P-11A 07:00 05:59 ORT3-N R-N 375 2 AC-381E-5A OPS G-01 ENTER TSAC 3.8.1.E 0

04MAY04 0

FOR A TRAIN DIG OOS 13:00 376 1 B411PTE OPS B-41 IPTE BRIEF TO I

04MAY04 04MAY04 0

DE-ENERGIZE IB-41 13:00 13:59 377 0

TRAIN-CC OPS REDUCED INVENTORY 2

04MAY04 04MAY04 133 JITT, CREW C 13:00 14:59 1

SOP-B41B OPS B-41 DE-ENERGIZE 1 B-41 2

04MAY04 04MAY04 DR-N ML-N 0

PER 1-SOP-480-B02 14:00 15:59 ORT3-N R-M 379 2

OP0301159 OPS 76 P-011A 2P.1 1A PMT RUN I

04MAY04 04MAY04 DR-N ML-N 0

15:00 15:59 ORT3-N R-N 380 AC-377-IZ OPS P-01IA EXIT TSAC 3.7.7.A FOR 0

04MAY04 04MAY04 DR-N ML-N 514 2P-1 1A 16:00 15:59 ORT3-N R-N SOP-BO4BDE-ENERGIZE 1I O-RT-05 ZRELLRT HX 021 P987tB STEP OP940766-VNPSE-3 2 044066INW-2A/E CI14A010TIURBINEI TUR O.RT.040LLRT P-1 E 6215977_SEA OP,13A10CEHC OILS I

IELE SdP.B4iAPREPS FC I

'OP9C-085RESTO 01-17B-2RESTA O-RT.039LLR 021597^

AC-377-1.PEN AC-381 Ba TR, I

o IC

-42 PER 1 -SO lB SAMPLE U M GENERATO

5. PMTSTRO UIC PURGE HC VALVE UN 3INE EH-C VAL SEAL SUPPL

-IWJECTION T

(S RESTORAT

,TRO HYDRA R DE-ENERGIZ IE CONTPUR tT U-2 LDGS P-1A SEAL S ISEAL INJEC TER TSAC 31.7 E-5A ENTER IIPTEIPTE BRI JN-CCREDUCE P4B41 DE-ENE

~03011592P-111 03011591COh ACJ377-1ZEXI1

)PS-037.07IwP 0306117iIPV 3811 0 OPS-037-07 I OPS 76 D72-21-08 tWP-037-07 OPS PMT &

ALIGNMENT POST MOC 1

04MAY04 04MAY041 DR-N ML-N 16:00 16:59 ORT3-N R-N 0

Run Date 02MAY0415:171 LT-03 STANDARD PUBLICATION Shoot 22 of 31 O Primavera Systems, Inc l

FL-03 Execution Publication Set I

after 02MAY04 12:00 I

U1R28 WORKING SCHEDULE after 02MAY04 12:00 U l I

RES EQID DESCRIPTION RD ES EF RISK MF Sun 2 MAY TI A

S n

382 0

TRAIN-CD OPS REDUCED INVENTORY 2

004MAY04 04MAY04 130 TRAIN-C LRE JTTT. CREW D 16:00-17:59 383 0

G02-ALIGN2 OPS G-02

-02 ALIGNED TO 1A-05 22 04MAY04 05MAY04 DR N ML N 0

02-AUGNZ-o

& 2A-05 FOR IWP 16:00 13:59 ORT3-N R-N 384 1 SOP-B41C OPS B-41 RE-ENERGIZE 1 B-41 2

04MAY04 04MAY04 DR-N ML-N 0

SOP-B41CR PER 1-SOP-480-B02 17:00 19:59 ORT3-N R-N 385 1 SWT01Z PPG MILESTONE CLOSE TURBINE 0 102MAY04 02MAY04 DR N ML N 0 SW01ZCLOSE TURBINE SERVICE WATER WORK WINDOW SERVICE WATER 15:00 14:59 ORT3-N R-N ITURBINE BUILDING SERVI EWATER 386 1 FUELMOVE4 PPG MILESTONE REACTOR REFUELED.

0 02MAY04 DR-N ML-N 601 FUELMO\\fE4 REACTOR RE FUELED 23:59 ORT3-N R-N

  • SAFETY MC NITOR PLANT OPIRATING STATE ILESTONE 387 1 RPIB-071 PPG O-RP-001B RELAXCLOSUREPOST 1

03MAY04 03MAY04 DR-N ML-N 64 RP1B-71RELAX CLOS URE POST CORE SHUFFLE CORE SHUFFLE 00:00 00:59 ORT3-N R-N lWESTABLISH CONTAINMENT CLOSURE FOR CO E OFFLOAD 388 1

CSB11Z PPG P-025B-M END CONDENSATE 0

03MAY04 03MAY04 DR-N ML-N 133 CSBI1ZEND CO IDENSATE PUMP-5B WORK PUMP-25B WORK 03:00 02:59 ORT3-N R-N ICONDE SATE PUMP P-251 389 1 RHB01Z PPG MILESTONE CLOSE RHR 8 LOOP 0

03MAY04 03MAY04 DR-N ML-N 0

RHB01ZCL DSE RHR B LOOPWORK WINDOW C3 WORKWINDOW 07:00 06:59 ORT3-N R-N II D RHR B LOOP WbRK 390 1 480VAOIA PPG B-03 START 480V BUS 0

03MAY04 03MAY04 DR-N ML-N 198 480VAOIAS TART 480V BUS R4LATED ENERGt2 ED WORK RELATED ENERGIZED 08:00 07:59 ORT3-N R-N IE EGINNING OF A TRAIN BUS WORK V1NDOW 391 1

RHA01A

-PPG MILESTONE START RHR A LOOP 0

03MAY04 03MAY04 DR-N ML-N a

0 RHA01As rART RHR A LOOP WORK WORK 08:00 07:59 ORT3-N R-N I TART RHR A LOO( WORK 392 1 VNCCB52Z PPG MILESTONE END CONTAINMENT 0 103MAY04 03MAY04 DR-N ML-N 0

CCB5ZENDCONTAINMENTFAN OOLERSDW FAN COOLERS D WORK 16:00 15:59 ORT3-N R-N lEND CONTAINMENT FAN COOLERS 0 393 1 CVX01Z PPG MILESTONE END CVCS HIGH 0

03MAY04 03MAY04 DR-N ML-N 132 CVX01END CVCS HIGH RESSURE LET PRESSURE LETDOWN 21:00 20:59 ORT3-N R-N lEND CHARGING AKEUP/BLEN 394 1 RHAOIZ PPG MILESTONE END RHR A LOOP 0

03MAY04 03MAY04 DR-N ML-N 0

RHA01ZEND RHR A LOO WORK WIN WORKWINDOW 22:00 21:59 ORT3-N R-N lENDRHRALO P WORK 395 1 CVX04Z PPG MILESTONE END CVCS SEAL 0

04MAY04 04MAY04 DR-N ML-N 31 CVX0 ZENDCVCSS INJECTION WORK 10:00 09:59 ORT3-N R-N IEND CVCSS 396 1 AC-375C-2A PPG MILESTONE TSAC 3.7.5.C P-038A 0

04MAY04 04MAY04 DR-N ML-N 0

AC-375C-2ATS OOS TO UNIT 2 17:00 16:59 ORT3-N R-N I IP l

397 1 AFA11A PPG MILESTONE START ELECTRIC 0

04MAY04 04MAY04 DR-N ML-N 0

AFA1iST DRIVEN TRAIN A AUX 17:00 16:59 ORT3-N R-N l 398 1 CVX02Z PPG MILESTONE END CVCS LOW 0

04MAY04 04MAY04 DR-N ML-N 9

CVX02ZE PRESSURE LETDOWN 17:00 16:59 ORT3-N R-N IE 399 1 CVX05Z PPG MILESTONE END CVCS EXCESS I 0 l04MAY04 104MAY04 DR-N ML-N 208 CVX0sMN LTDN &SEAL RTN 17:00 l

16:59 ORT3-N R-N ID Run Date 02MAY04 15:171 LT-03 STANDARD PUBLICATION Sheet 23 of 31 O Pnimavera Systems, Inc=

FL-03 Execution Publication Set I

after O2MAY04 12:00 I

U1R28 WORKING SCHEDULE after O2MA Y04 12:00 U l RES WO EQID DESCRIPTON RD ES EF RISK MF Sun 2 Mon 3 Tue 4 400 1 RHX99Z PPG MILESTONE I 125V IWP 00-037 ArB 0

04MAY04 04MAY04 DR-N ML-N 0

RHX99ZI 1 TRAIN INTERFERANCE 17:00 16:59 ORT3-N R-N 401 1

AC-375C-2H PPG

SUMMARY

TSAC 3.7.5.C P-038A 169- 04MAY04 11MAY04 DR-N ML-N 0

AC.375C-2HrS 00O TO UNIT 2 17:00 17:59 ORT3-NR-N P-038A ELECTRIC DRIVEN AUX -EE PUMPN 1

RPIC-180 PRE RP-1C COREMAPPING l2 03MAY04 103MAY04 DR-N ML-N 0

RPid-i1OCORE MAPP ZG 00:00 01:59 ORT3-N R-N ECORE MA PING 403 1

RP1C-010B RP O-RP-001C DEPOST REFUEL l5 03MAY04 I 03MAY04 DR-Y ML-Y 0

RPIC-010BDEPOST REF JEL BARRIERS BARRIERS 00:00 04:59 ORT3.Y R-N RPSH094-R RP1 PACKAGE94 REMOVESHIELDING l6 04MAY04 04MAY04 DR-Y ML-Y I

0 RPSHI094 OVE SHIELDI FOR A S/G MANWAY 07:00-12:59 ORT3-Y R-N

-~

I.

405 SDGSI-19l SDS CONT ENGINEERING 43 08APR04 10MAY04 DR-YMI-V 37 S SI-191ENGItEERING WALK W

SUMP INTR4SION ISSUES WALKDOWN - SUMP 08:OOA 09:59 ORT3-Y R-N I 406 1 SECCW03 SEC 82 B52-433E SECURITY OFFICER I1 02MAY04 02MAY04 DR-N ML-N 1

EC 3SECURIY OFFICER REQ 1RED FOR CW-SC3 STROKE REQUIRED FOR 1200 1259 ORT3-N R-N PWR TO 1CW-3 SEAL WELL ET MOV0205,13 407 0 SECB42COMP SEC D-24 SECURITY TO 2

03MAY04 03MAY04 DR-N ML-N 0

SECB42COMPSECURITY TO EST BUSH COMPEI ESTABLISH 2000 21:59 ORT3-N R-N M

m BATTERY 4081 SP-EVAL1 SP 76 R-1 REVIEW / EVALUATE 22 02MAY04 03MAY04 DR-Y ML-Y 0

Sp.EVALIREVIEWI EVALUA UNDERHEAD INSPECTION RESU=,

UNDERHEAD 1900 1759 ORT3-Y R-N 0213472 R1-SREAbTOR VESSEL A ASSEMBLY 409 1 SP-EVAL3 SP 76 R-1 DECISION POINT TO I1 03MAY04 03MAY04 DR-Y ML-Y 0

SP.EVALPEOISION POINT TO EIEASE FRA I

RELEASE FRAMATOME 19:00 19:59 ORT3-Y R-N l 0213472REACTOR VESSEL NDASSEMBI an Il-e-I

,l I

410 1 TGSUPPORT TGG TG-01-T PROVIDE CRANE.

107 13APR04 10MAY04 DR-Y ML-Y 200 CGS PPORTPROfDE CRANE. RIG ER, AND TOOLR(5M SUPPORT RIGGER, AND 09:OOA 13:59 ORT3-Y R-N I 411 1 TGO302140 TGG 76 PIPINGCRO CROSSUNDERPIPING 16 20APR04 04MAY04 DR-Y ML-Y 0 tGO 02140CROSSUNDER PIPING ISPECTION I REPAIRS(PT2)

INSPECTION I 11:00A 14:59 ORT3-Y R-N IT 412 1 TGHX22AASY TGG 76 HX-022A MSRATUBESIDE 2

26APR04 03MAY04 DR-Y ML-Y 54 G1 22AASNAMSIATUBESIDER SSEMBL' REASSEMBLY 11:00A 08:59 ORT3-Y R-N I I

,OISTURE SEPAIATOR REHEATER0214083 4131 1 TG0302130 TGG 76 LO-00258 ILO-258-OVERHAUL 10 27APR04 04MAY04 DR-V MI-V 13 TGO 02130LO-258 OVERHAUL S L OIL REUEF VALVE SEAL OIL RELIEF 07:OOA 11:59 ORT3-YR-N I I

P59A1B Run Date 02MAY04 15:17l LT-03 STANDARD PUBLICATION l

Sheet 24 of 31 O Pnmavera Systems, Inc.

I FL-03 Execution Publication Set

I afterO2MAY0412:00 I

U1R28 WORKING SCHEDULE I

after 02MAY04 12:00

.I U

ID RESP wo ST EQID DESCRIPTION RD ES EF RISK MF MAY Siin 2 Mon 3 ue 41Al MIII ;1:II r.10214161a2S,

.1 rG+22CASYMSR, C TU1BESIDE R4SSEMBLY 414 1 TGHX22CASY TGG 76 HX-022C MSR C TUBESIDE REASSEMBLY 3

28APR04 03MAY04 I DR-Y ML-Y 08:00A 09:59 ORT3-Y R-N 53 I

AAF

  • ^

P

-MnlI5T1lRF:

5qFPRATOIR RFHEAT [FUi2¶4U85

+

I R-4'51 1 lTGHX228ASYlTGG 76 HX-022B MSR B TUBESIDE REASSEMBLY 4

28APRO4 03MAY04 I DR-Y ML-Y 14:00A 10:59 ORT3-Y R-N 52 rG4C2BAS`IMSF B TUBESIDE

-S SSEMBLY I

EMOISTURE SEr.'ARATOR REHEA LD AFTER BELLOWS REPLACEMEI

-I-i

+-4-+

+

4-+

4 4-

8.

rr.Q14Q1n2LP1 -:REMOVE SCAFFC 416 TG9949102B TGG 76 TG-01-T1 LP1 REMOVE SCAFFOLD AFTER 30 29APR04 04MAY04 DR-Y ML-Y 16:OOA 16:59 ORT3-Y R-N 0

I-IU 1-t

+-4-+

+

i-I-I I-4171 TG0302262 TGG 76 HG-00055 1HG-55 REPLACE HYDROGEN 9

29APR04 j04MAY04 OR.Y ML-Y 17:00A 02:59 ORT3-Y R-N 82 II 5

rGOIC022621HG.59 REPLACE HYD ~)EN REGULATOP.

-m I-

.r(-_rn 1(

i i.

418l 1 TG-30770 TGG 76 TG-O1-T INSTALL AND TIGHTENd 4 HP UPPER HALF BLADE 29APR04 03MAY04 DR-Y ML.Y 18:00A j 10:59 ORT3-Y R-N l

2 rG4 77niNSTAL.LIAN TIGHTENIL'PER HALF BLADE RINGS V

I Ml(141. PPF5-RqI 1l2F TI IRRINFnin~ifl

  • I.

i-+

I 4-4191 1ITGHX22DASYITGG 76 HX-022D MSR D TUBESIDE REASSEMBLY 4

30APR04 03MAY04 I DR-Y ML-Y 11:00A 10:59 ORT3-Y R-N 76 rGo422oDASNMS D TUBESIDE RE 420 1 TG0303847 TGG 76 MS-00006 MS-6 -VALVE LEAKING 5

BY. REPLACE VALVE 30APR04 03MAY04 DR-Y ML-Y 15:OOA 11:59 ORT3-Y R-N 0 rGolo3847MS VALVE LEAKING I

421 1

TG-HX52-PT TGG 82 HX-052 HX-052 - PRESS TEST 4

03MAY04 03MAY04 DR-Y ML-Y 131 GEN EXCITER COOLER 07:00 10:59 ORT3-Y R-N 4E I

TG0302136B TGG 76 P-037A P-037A - REASSEMBLE 4

03MAY04 03MAY04 DR-Y ML-Y 82 cn ZERO SPEED 07:00 10:59 ORT3-Y R-N 423 1

TG-30690 TGG 76 TG-01-T HAND CLEAN HP CYL 6

03MAY04 03MAY04 DR-Y ML-Y 0

HORIZONTAL JOINT 07:00 12:59 ORT3-Y R-N 424 1

TG0302141 TGG 76 RO-02711 RO-2711 - INTERSTAGE 7

03MAY04 03MAY04 DR-Y ML-Y 0

ORIFICE INSPECTION 07:00' 13:59 ORT3-Y R-N 425 1 TG0302115B TGG 76 SC-1B COND FINAL INTERNAL 2

03MAY04 03MAY04 DR-Y ML-Y 4

INSP (1B) 10:00 11:59 ORT3-Y R-N 426 1 TG-30870 TGG 76 TG-01-T INSTALL HP OUTER 15 03MAY04 04MAY04 DR-Y ML-Y 0

CYL COVER & BOLTING 13:00 07:59 ORT3-Y R-N 427 1 TG0302142 TGG 76 RO-02712 RO-2712 - INTERSTAGE 7

03MAY04 04MAY04 DR-Y ML-Y 0

ORIFICE INSPECTION 14:00 12:59 ORT3-Y R-N 428 1 TG-8376B TGG 76 HX-023A HX-023A - CLOSE 10 03MAY04 04MAY04 DR-Y ML-Y 0

TURBINE LUBE OIL 18:00-17:59 ORT3-Y R-N 429 1 TG0403278 TGG 10 Z-008 GAS LEAK DOWN 20 03MAY04 05MAY04 DR-Y ML-Y 0

STREAM OF TEST 18:00' 17:59 ORT3-Y R-N 430 1

TG-30875 TGG 76 TG-01-T PRESTRESS HR 48 04MAY04 06-MAY04 DR-Y ML-Y 0

TURBINE CASING 08:00 15:59 ORT3-Y R-N TG-HX52.P1flX 0302113U TGO302136BP 03021360 TG.30690H 030215U TGO30214IRC 0302141E TG030211!

03021' TG 0:

TG SSEMBLY.

RMOISTURE SEPARATOR REHEA IL, REPLACE VALVE UQHP TURB CYI: HTG STEAM SUF

.052 - PRESS TEST GEN EXCITER C NTG-01 TG E-01 EXCITER COOLEI 37A - REASSEMBLE ZERO SPEED j ETURBINE LUBg OIL PUMP (SHAF ND CLEAN HP CYL HORIZONTAL Jt OHIGH PRESSURE TURBINE

-2711 - INTERSTA6E ORIFICE INSPI 9MTG-01 HP TURBINE INTRASI BCOND FINAL INTERNAL INSP (1B)

MCONDENSER'(DEAERATING) 30Q 8T0 NSTALL H1I OUTER CYL COR

)302142RO-2712 - INTERSTAGE ORIF

  • ER0214084 IT

_LF HYDROGEN I 53

'ER0214086 PLY YS-2744 E

OOLER 6SEMBLY r DRIVEN) tINT

.CTION AGE DRAIN 01 ER & BOLTINC IGH PRESSUR ICE INSPECTIC

_TG-01 Hi IINE LUBE OIL M13014--

l TG.8376BH!;RjA

_-CLOSE TURI 02139 AK N

TGO403278GAS. AK DOW T

I-

!AM OF TEST!

nflAfl 7

I.

II I

TG-3087HP 030215i TGO 02143R0-2720 0 0214110-431 I

TG0302143 I TGG 76 RO-02720 RO-2720 - INTERSTAGE1 7 104MAY04 105MAY04 DR-Y ML-Y ORIFICE INSPECTION I 13:00 11:59 ORT3-Y R-N 0

Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION Sheet 25 of 31 C Pimavera Systems Inc.I FL-03 Execution Publication Set

afterO2MAY0412:00 U1R28 WORKING SCHEDULE after O2MA Y04 12:00

  1. U ID RESPl WO [ EQID D

PTION RD ES EF RISK MF MAY IT lp14,16.Ia20,22I0,2,4,6 8.l0il2l4,1I&a20.Z 0.

,24,46,8,10llZl46 432 1 TG03021 14B TGG 76 SC-1A COND FINAL INTERNAL 2 04MAY04 04MAY04 DR-Y ML-Y 10 rG03021 14BC INSP (IA) 17:00 19:59 ORT3-Y R-N 030211 433 1

TG0213965 TGG 76 MS-02729 INSTALL X-UNDER LINE 5 04MAY04 04MAY04 DR-Y ML-Y 5

TG0213965N FLUSHING FIXTURE 17:00' 21:59 ORT3-Y R-N 021396 -

434 1

TG0302114 TOG 76 SC-1A SC-lA-CONDENSER 10 04MAY04 05MAY04 DR-Y ML-Y 503 TG0302114S INTERNAL INSPECTION 17:00 03:59 ORT3-Y R-N 030211 435 1

CL-2B WCC CL 28 MODE 6 TO MODES r227-25APR04 11 MAY04 DR-N ML-N 0

L.

ODE 6 TO MODE 5 CHECKU ST CHECKLIST 08:OOA 22:59 lORT3-N R-N l 436 1 T-2075-R WCC P-029 1 AF P-29 UNCOUPLE 1

02MAY04 02MAY04 359 -20

-R1 AF P-2t UNCOUPLE MM IEVO-1 MM REVO-1 12:00 12:59 1 AF P-29 UOCOUPLE MM RE0-1 0012075 437 1 T-2746-R WCC P-025A I CS P-25A MM REVO-1 1

02MAY04 02MAY04 98 27R1 CS P-25A MM REVO-1 12:00 12:59 1 CS P-25A MM REVO-10012746 438 1

T-3310-R WCC P-001A-M 1 RC P-A-M RMP 1

02MAY04 02MAY04 62 T-33

-R1RCP-1*-MRMP9002-1IE REVI-1 9002-1 EM REVI-1 12:00 12:59 1 RC P-IA-M RMP 9002-1 EM EV1-10013310 439 1 T-6601-R WCC RC 1 RC SG PRIMARY 1

02MAY04 02MAY04 263.66 R1 RC SG PRIMARY MANWA YS EPT REV01 MANWAYS EPT REVO-1 12:00 12:59 1 RC SG PRPMARY MANWAYS EPT REVO-1 001 6401 440 1 T-7438-H WCC O-IT-0531 I SI IT-531 OPS REVI-1 I

02MAY04 02MAY04 19 1

7 441 SI IT.53,1 OPS REV1-1 12:00 12:59 1 SI IT-531 OPS REVI-t 00174t 8 441 1

T-7521-R WCC MS-00231 1 MS MS-231 EM 1

02MAY04 02MAY04 335

-.R1 MS MS-231 EM REVO-1 REVO-1 12:00 12:59 I MS MS-23I EM REV0-1 0017 I21 II 442 1 T-7969-R WCC CV LID I CV CV LID SYSNCT l 102MAY04 02MAY04 61 T.79 R1 CV CV 1JD SYSNCT MMV REVO.1-1 MMVREV0.111 12:00 12:59 1 CVCVL/DSYSNCTMMVR

.1-10017969 443 1 T-8439-H WCC RC-526B I RC RC-526B MM l

102MAY04 02MAY041 DR-N ML-N 19 44 441 RC RC-b26B MM REV01 REVO-1 12:00 l

12:59 ORT3-N R.N l RC RC-52$B MM REVO-1 001 1439 444 1 T-8443-R WCC FS-2852 1 SW FS-2852 MM I 102MAY04 02MAY04 l 18 RI1 SW FS-2852 MM REVI-1 REVI-1 12:00 12:59 1 SW FS-28S2 MM REVI-1 0011143 445 0 T-8692-R WCC 8KV-H02 0 SOP-13.8KV-H02 ATT. 1 02MAY04 02MAY04 DR-Y ML-Y 612 R0 SOP-13:8KV-H02 ATT. E ElM REV0.1 E EM REVO-1 12:00 12:59 ORT3-Y R-N 0 SOP-13.8IV-H02ATT. E EM EVO-10018692 446 1 T-8698-R WCC T-026 1 MS T-26 RUPTURE 1

02MAY04 02MAY04 154 T-86 -RI MS T-26 RUPTURE DISC M REVO-1 DISC MM REVO-1 12:00 12:59 1 MS T-26 RlJPTURE DISC MV REV0-1 0018698 447 0

T-8775-R WCC IA-1258 0 IA IA-1258 MM REVO-2 1 02MAY04 02MAY04 80-870 b IA IA-1I58 MM REVO-2 12:00 12:59 0 IA IA.1258,MM REVD-20018 5

448 1

T.9892.R WCC W-001A1 I VNCC W-1A1I1A2 EM I

02MAY04 02MAY04 DR-Y ML-Y 123.-98 1 VNCC W-IA1/IA2 EM REV0-1 REVO-1 12:00 12:59 ORT3-Y R-N 1 VNCC W-1A11A2 EM REV-10009892 449 1 T-0509-R WCC W-1A1/1A2 1 VNCC W-IAI/1A2 MM 2

02MAY04 02MAY04 122.-05

.1 VNCC W1AIIIA2 MM R 0-1 REVO-1 12:00 13:59 1 VNCC WL1A1IIA2 MM REV 10010509 Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION I

Sheet 26 of 31

© Prdmavera Systems, Inc.

I FL-03 Execution Publication Set

afterO2MAY04 12:00 U1R28 WORKING SCHEDULE after 02MAY04 12:00

  1. U ID lRESP WO EQID DESCRIPTION I RD I ES I

EF I

RISK Il F IlMAY I un2

~-MAY3-u I

T 1t,100 14,116'1,02L,

4.

,31O 1,61,02i0

'.6

,0J1.

=

=

{i@~~~~~121

iP *__*

I451I1 T-2604-R IWCC SC-966C 1 SC SC-966C MMV REVO-1 2

02MAY04 02MAY04 12:00 13:59 21 451 1

T-2618-H WCC IT-531 1 SI IT-531 P-10B OPS 2

02MAY04 02MAY04 4

REVO-1 12:00 13:59 452 1

T-5948-H WCC T-23 1 FD T-23 MMV REV1-1 2

02MAY04 02MAY04 12:00 13:59 453 1

T-8024-H WCC IWP 1 480V IWP 01-128-E-FN 2 02MAY04 02MAY04 (01-39) EM REVO-2 12:00 13:59 454 1

T-8378-R WCC P-2A 1 CV P-2A MM REVO-1 2

02MAY04 02MAY04 DR-N ML-N 163 12:00 13:59 ORT3-N R-N 455 1 T-0510-R WCC W-1B111B2 1 VNCC W-1B1i1B2 MM 3

02MAY04 02MAY04 70 REVO-1 12:00 14:59 456 1 T-1762-H WCC SC-953 I SC SC-953 MMV 3

02MAY04 02MAY04 28 REVO-1 12:00 14:59 457 1

T-8606-R WCC TURBINE I SW TURBINE OPS 3

02MAY04 02MAY04 0

REV1-1 12:00 14:59 I

T-2659-R WCC P-029 1 AF P-29 MM REV0-1 4

02MAY04 02MAY04 0

12:00 15:59 459 1

T-8024-R WCC IWP 1 480V IWP 01-128 E-FN 1 02MAY04 02MAY04 610 (01-39) EM REV0-2 14:00 14:59 460 1 T-88O8-R WCC P-28B I CS P-28B EM 1

02MAY04 02MAY04 DR-Y ML-Y 171 REVO03-1 18:00 18:59 ORT3-N R-N 461 1

T-1273-R WCC HX-21A 1 CS HX-21A MM 3

02MAY04 02MAY04 181 REVO-1 18:00 20:59 462 1

T-3790-R WCC S-6050A 1 IOPS S-6050A IC 1

02MAY04 02MAY04 78 REVO-1 19:00 19:59 463 1

T-8806-H WCC S-6050A 1 IOPS S-6050A IC I

02MAY04 02MAY04 0

REV1-1 19:00-19:59 464 1

T-8804-R WCC AF-104 1 AF AF-104 MMV 1

02MAY04 02MAY04 106 REVI-1 20:00 20:59 465 1

T-1271-R WCC P-025A 1 CS P-25A OIL MM 02MAY04 02MAY04 81 REVO-1 22:00 22:59 466 1

T-7992-R WCC MS-2016 1 MS MS-2016 MMV 2

02MAY04 02MAY04 137 REVO-1 22:00 23:59 T-26 T-26 7-59 T-80 r-83l

.05 K17 r 6 r6l r O 14-R1 SC SC-?66C MMV REV0-1 Ml SC SC-966C MMV REV0-1 '

l8-H1 SI IT-53~t P-1B OPS REV i

St IT-531'P-108 OPS REV 8H1 FD T-23 MMV REV1 4 Ml FDT-23 bIMV REV1-1 0015 i4411 480V IP 01 -1 28*E-FN (O Ut 480V IWP 01-128'E-FN (01 iRI CV P-2A MM REV0.1 ri CV P-2A 4M REVO-1 00183 iRs1 VNCC V1-IB1IB2 MM RE

_1 VNCC W-1B1/1B2 MM R

[2 SC SC-453 MM REV0-1

!1i SC SC-053 MM REV0-1 It SW TURBINE OPS REV1-1 SW TURBINE OPS REVi-k1 AF P-24 MM REV01 I AF P-g MM REVO-1 001 I4.1 480V IWP 01 -128E-FN (01 Ii 480V IWP 01-128-E-FN (0 8805I CS P-28B EM REV0O 001880"1 qS P-28B EM REVO 4273-1SHX-21A MM REV 001l;j1i 1 CS HX-21A MM T-3790-R_1pPS S-6050A IC RI 001379cU1 'IOPS S-6050A IC I T-88064-1 IOPS S-6050A IC RI 0018801:IOPS S-6050A IC I T.88044I;AF AF-104 MMV R 00188041 AFAF-104 MMV T.1271 I CS P-25A OIL I 0011281.1 CSP-25A OIL T-79924RIMS MS2016 M 0017992 1 MS MS-2011 T.2815-RiMS MS-2020 001201i1 MS MS-202t 012604 I

)-I 10012618 148

-39) EM REVO-2

39) EM REV0-200t8024 rO 10010510 4011762 0018606 I

659

-39) EM REVO-2

-39) EM REVO-20018024 3-1 EV-1 O-1 I

1V-1 J-1 EVO-1 1o.1 MEV1-1 1

4V1-1L REV1-1 MREVO-1 MMV REVO-1 M REVO-1 EM REVO-1 467

'I' T-2815-R wCC MS-2020 1 MS MS-2020 EM REVO-1 1

02MAY04 102MAY04 23:00 23:59 0

_____________ L _________________________ i.......I.

.1 ___________

Run Date 02MAY04 15:171 LT-03 STANDARD PUBLICATION Sheet 27 of 31 O Pnmavera Systems, Inc.

l FL-03 Execution Publication Set S

after O2MAY04 12:00 U1R28 WORKING SCHEDULE after 02MAY04 12:00

  1. ID RESF WO I EQID DESCRIPTION RD ES EF RISK MF Sun_2_

__Mon 3

ITue 4

I IST I 101214,16,1p82022I0.2.4.6, 8.10i1Z14.1612o.2210.2.46 1 j

~~~~~ki a*] l;4ul-t w_ __ei:

468 I

T-71t9-H wCC TG-01-G I TU TG-01-G EM REV4-1 I

03MAY04 03MAY041 DR-YML-Y 00:00 00:59 ORT3-Y R-N 0

469 1

T-7149-H WCC 1F52-122 1 345KV 1F52-122APS 1

03MAY04 03MAY04 DR-N ML-N 2

REV3-1 00:00 00:59 ORT3-Y R-N 470 1 T-0721-H WCC Z-024A 1 FH Z-24A RP-1B OPS 2

03MAY04 03MAY04 63 REVO-1 00:00 01:59 471 1

T-2084-H WCC RVLI I RC RVLI RELIEFS 4

03MAY04 03MAY04 3

MMV REVO-1 00:00 03:59 472 1

T-2083-H WCC PRT 1 RC PRT MMV REVO-1 5

03MAY04 03MAY04 4

00:00 04:59 473 1

CL-2E WCC CL 2E MODE 3 TO MODE 2 399- 03MAY04 19MAY04 DR-N ML-N 0

CHECKLIST 00:00 14:59 ORT3-N R-N 474 1

CL-2F WCC CL 2F MODE 2 TO MODE 1 420- 03MAY04 20MAY04 DR-N ML-N 0

CHECKLIST 00:00 11:59 ORT3-N R-N 475 1

T-6929-H WCC D72-16-08 I 125V IWP 00-037-02 1

03MAY04 03MAY04 0

EM REVO-1 01:00 01:59 47I 1 T-6939-H WCC D72-21-08 I 125V IWP 00-037-07 1

03MAY04 03MAY04 19 EM REVO-1 01:00 01:59 477 1 T-7108-R WCC TG-01-G 1 TU TG-01-G EM I

03MAY04 03MAY04 DR-Y ML-Y 0

REV3-1 01:00 01:59 ORT3-Y R-N 478 1 T-8770-H WCC CV-01296 1 CV CV-1296 MMV 1

03MAY04 03MAY04 0

REVI-1 01:00 01:59 479 1 T-2726-H WCC VNPSE-3213 I VNPSE VNPSE-3213 2

03MAY04 03MAY04 10 IC REVO-1

.01:00 02:59 480 1 T-1840-R WCC W-3A/B 1 VNCRD W-3A/B MM I

03MAY04 03MAY04 268 REVO-1 02:00 02:59 481 1

T-2706-R WCC P-025B 1 CS P-25B OIL MM

1. 03MAY04 03MAY04 0

REVO-1 02:00 02:59 482 1 T-8809-R WCC TG-01-T 1 TU TG-01-T REV8.1-1 1

03MAY04 03MAY04 0

02:00 02:59 483 0 T-7689-H WCC G-02 0 DG G-2 HX-55B112 MM 3 03MAY04 03MAY04 0

REVO-1 02:00 04:59 484 1

T-2618-R WCC IT-531 I SI IT-531 P-10B OPS I

03MAY04 03MAY04 0

REVO-1 04:00 04:59 T.71p29.Ii U TG T-714 -

1 345KV 1 FS' 001114911 345KV IF!

T-07~14i1 FHl Z-24A R 0010-721E1 FH Z-24.

T-20&84Hl RC RVU RE 001F084Ml RC R T-20q3-HI RC PRT MPI 00*083~I RC C~..2EMODE 3 TO A~

CL-2FMODE 2TO A T-4929-HI 125V IWP 001692911 125V IW T-6939-H 1I25V IWP 0(41693911 125V CW T.~.I TU TG-01 0O1710611TU TG-0 T-87704-11 CV CV-1 21 00,1877li CV CV-1 T-3T264Hl VNPSE VI 0012726=1 VNPSE Y-1840 1 VNCRD' OO1184tUIVNCRI T-.27O6 CS P-25 l3,A809.R!TU TG-0 O018801 iTU TG T-I7689-H0 DG G-21I 001T68M0 DG T26 8-Rqi T

  • 001261EI St r
  • T-7150-H1 34 00171SCI1:

EM REV4-1 EM REV4-1 122 APS REV3-1:

2-122 APS REV3-1

-1 B OPS REVO-1 l RP-1B OPS REV0-1 JEFS MMV REV0l1 LI RELIEFS MMV lEV0-1 I REVO-1 I

RT MMV REVO-1.

DDE 2 CHECKUST

~ODE I CHECKLI*

0-037-02 EM REV0-1

'00-037-02 EM REVO-1 0-037-07 EM REVb-1

'00-037-07 EM RFVO-1

EMREV341

-G EM REV3-1 5MMV REV1-1 96 MMV REV1-1 PSE-3213 IC REVO-1 VNPSE-3213 IC REV0-1 1-3A/B MM REVO-1 W-3AIB MM REV0-1 OIL MM REVO-1:

8 OIL MM REV0-4

-T REV8.1-1 I1-T REV8.1-1 X-55B112 MM RE'0.1

-2 HX-55B112 Mq REV0-1 31 P-10B OPS REV0-1

.531 P-10B OPS REVO-1 KV 1 F52-122 APS REV2-1 15KV 1F52-1Z AF9S REV2-1 4851 1 T-7150-H WCC 1F52-122 1 345KV 1F52-122 APS REV2-Z 1

03MAY04 03MAY04 06:00 06:59 a

Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION I

Sheet 28 of 31 O Primavera Systems. Inc.

I FL-03 Execution Publication Set I

after O2MA Y04 12:00 I

U1R28 WORKING SCHEDULE I

after O2MA Y04 12:00

  1. U ID

[RESP WO I EQID DESCRIPTION RD ES EF RISK MF MAY I I IST I

2 I

I4100214 164%20,22 0.2. 16 81 4

202 0. 6.8jj10jj2.14.

i5 mt]Pi I;l@

rh, 486 jI T-0690-R lWCC 0-IT-0531 1 SI IT-531 OPS REV0-1 1

03MAY04 I 03MAY04 1 07:00 07:59 0

487 1 T-7109-R WCC TG-01-G 1 TI TG-01-G EM 1

03MAY04 03MAY04 DR-Y ML-Y 86 REV4-1 07:00 07:59 ORT3-Y R-N 488 1 T-7147-R WCC 1F52-122 1 345KV 1F52-122APS 1

03MAY04 03MAY04 109 REV1-1 07:00 07:59 489 1 T-7783-H WCC TG-01-G 1 TU TG-01-G EM 1

03MAY04 03MAY04 86 REV4.1-1 07:00 07:59 490 1 T-8166-H WCC P-288 1 CS P-28B MM REV2-1 1

03MAY04 03MAY04 DR-Y ML-Y 0

07:00 07:59 ORT3-Y R-N 491 0 T-8731-R WCC K-26 0 EBA K-26 MM REVO-1 1

03MAY04 03MAY04 510 07:00 07:59 492 1

T-0467-H WCC RH-626 1 RH RH-626 IC REVO-i 2

03MAY04 03MAY04 8

08:00 09:59 493 1 T-0685-H WCC ICP-5.69A I RH ICP-5.69A IC 2

03MAY04 03MAY04 0

REVO-1 08:00 09:59 44 1

T-2617-H WCC IT-531 1 SI IT-531 P-10A OPS 2

03MAY04 03MAY04 0

REVO-1 08:00 09:59 495 1 T-5950-H WCC SI-00871A 1 SI SI-871A EM REVO-1 3

03MAY04 03MAY04 DR.Y ML-Y 0

08:00 10:59 ORT3-Y R-N 496 1 T-0475-R WCC SC-955 1 SC SC-955 IC REVO-1 1

03MAY04 03MAY04 1

09:00 09:59 497 1 T-2607-R WCC SC-955-S 1 SC SC-955-S IC I

03MAY04 03MAY04 0

REVO-1 09:00 09:59 498 1 T-2084-R WCC RVLI I RC RVLI RELIEFS I

03MAY04 03MAY04 105 MMV REVO-1 11:00 11:59 499 0 T-7689-R WCC G-02 0 DG G-2 HX-55B112 MM 2 03MAY04 03MAY04 0

REVO-1 11:00 12:59 500 1 T-8439-R WCC RC-526B 1 RC RC-5265 MM I

03MAY04 03MAY04 196 REVO-1 14:00 14:59 501 1

T-2622-H WCC Y-04 I Y Y-4 EM REVO-1 2

03MAY04 03MAY04 0

14:00 15:59 502 1 T-2095-R. WCC ICP-5.77 1 VNCC ICP-5.77 IC 1

03MAY04 03MAY04 0

REVO-1 15:00 15:59 II I

I I

I I

I I

I I

II II I

I II I

T.0690;1.RI IT-531 OPS REVO-1 001069dU1 St rT-531 OPS REV0-1 T.7109-RYI TUG-01 EM RE94-1 0017109[i1 TU TG-01-G EM RPV4-1 T.7147 R 35KV 1F524122 APS REV1-1 0017147X1 345KV 1FS2-122 APS REVI-1 T-7783-H U TG-01 -G EM RE1/4.1.1 001778311 TU TG-01-G EM RV4.1-1 T.8166-H1 CS P-28B MM REV2-1 00181611 CS P-28B MM RE02-1 T-8731R 0_ BA K-26 MM REVq.1 001873110 EBA K-26 MM REVO-1 T-0467411 RH RH-626 IC REV0-1 00104675 1 RH RH-626 IC IEV0-1 T-0685s1 IRH ICP-5.69A IC R.EV0.1 001068w1 RH ICP-5.69A IC REVO-1 T-2617-H1 SI IT -531 P-10A OlS REVO-1 001261 1 SI IT-531 P.104 OPS REVO-1 T.5950-HIS1-871A EM REVO-1 001595q 1 SI SI-871A EM REVO-1 T-0475 SC SC-955 IC R£V0.1 001047 1 SC SC-955 IC R EVO-1 T026071 SC SC-955-S IC REV0-1 001260711 S SC-955-S 16 REVO-1 T-208 IpRC RVU RELIEFS MMV REV0.1 0012 841 RC RVLI RELIEFS MW REVO T-768 4;VG G-2 HX-55B112 MM REVO-1 0017 8943 DG G-2 HX-55B1/2 MM REVI 843941 RC RC-5?6B MM REVO-1 01843SX1 RC RC-526B MM REVO-1 I2622-Hi Y Y.4 EMA REVO-1

?01262231 Y Y-4'EM REVO-1 T.2095.FR VNCC ICP-5.77 IC REVO.'

001209U1 VNCO ICP.5.77 IC REV(

T.8697.VNCC 4Q WID IC REVO.1 001869711 VNCq EQ WID IC REVO 1r 5031 1 T-8697-R wCC EQ WID 1 VNCC EQ WID IC REVO-1 1

03MAY04 I 03MAY04 15:00 15:59

.1 I

0 Run Date 02MAY04 15:17 LT-03 STANDARD PUBLICATION Sheet 29 of 31 O Pnmavera Systems, Inc.

I FL-03 Execution Publication Set I

after 02MAY04 12:00 U1R28 WORKING SCHEDULE after 02MAY04 12:00

  1. lU ID RESP WO DESCRIPTION RD ES EF RISK MF I MAY I

I ST l e,10t1 24.1 6,1`2002.4 0, 2.w4, 6, 8

1l 1

.618,Q2 2.14. B.6 8 11012,14,1al 5041 1 T-2083-R wCC PRT 1 RC PRT MMV REVO-1 3

03MAY04 03MAY04 15:00 17:59 137 505 1 T-8620-R WCC 5-YR 1 CW 5-YR DIVER CE 1

03MAY04 03MAY04 DR-N ML-N 115 REV2-1 16:00 16:59 ORT3-N R-N 506 0 T-1678-H WCC IA-1249 0 IA IA-1249 IC REVO-1 2

03MAY04 03MAY04 0

17:00 18:59 507 1

T-6929-R WCC D72-16-08 1 125V IWP 00-037-02 1

03MAY04 03MAY04 0

EM REVO-1 18:00 18:59 508 1 T-2617-R WCC O-IT-0531 1 Si IT-531 P-10A OPS I

03MAY04 03MAY04 1

REVO-1 20:00 20:59 509 1 T-0685-R WCC ICP-5.69A 1 RH ICP-5.69A IC 1

03MAY04 03MAY04 0

REVOC1 21:00 21:59 510 1 T-8771-H WCC CV-1296 1 CV CV-1296 MMV I

03MAY04 03MAY04 42 REV2-1 21:00 21:59 511 1

T-2726rR WCC VNPSE-3213 1 VNPSE VNPSE-3213 1

03MAY04 03MAY04 19 IC REVO-1 22:00 22:59 52 1 T-0467-R WCC RH-626 1 RH RH-626 IC REVO-1 1

03MAY04 03MAY04 111 23:00 23:59 513 0 T-1678-R WCC IA-1249 0 IA IA-1249 IC REVO-1 1

03MAY04 03MAY04 0

23:00 23:59 514 1 T-3782-R WCC CS-2188-S I CS CS-2188-S EM I

04MAY04 04MAY04 129 REVO-1 00:00 00:59 515 1 T-7048-H WCC P-28B I CS P-28B EM REV2-1 I

04MAY04 04MAY04 DR-Y ML-Y 0

00:00 00:59 ORT3-N R-N 516 1 T-7438-R WCC O-IT-0531 1 Si iT-531 OPS REVI-1 1

04MAY04 04MAY04 37 00:00 00:59 517 1 T-7449-R WCC W-003A 1 VNCRD W-3A OPS 1

04MAY04 04MAY04 226 REVO-1 00:00 00:59 518 1 T-8824-R WCC P-0158 1 SI P-15B MM REVO-1 3

04MAY04 04MAY04 89 01:00 03:59 519 1 T-7590-H WCC MR 01-128 1 480V MR 01-128 1B-42 2 04MAY04 04MAY04 0

BUS BRACING EM 02:00 03:59 520 1 T-2622-R WCC Y-04 1 Y Y-4 EM REVO-1 I

04MAY04 04MAY04 0

03:00 03:59

-2083-Rt RC PRT MMV REVO-1 0012081 RC PRT MMV REVO-T-8620-RI CW 5YR DIVER CE RE 2-1 001 862011 CW,-YR DIVER CE R

-1 T-1 678-H0 IA IA-1249 IC REVO-1 001167EU0 IA IA-1249 IC REVI I T-6929-RI12$V IWP 00-037-02 M REVO-1 001692911 1Z5V IWP 00-037-0 EM REVO-1 T-2617T 1SI IT-531 P-10A 0 S REVO-1 00126171M SIl T-531 P-10A PS REVO-1 T.0685-Il RH ICP-5.69A I REVO-1 0010685pi RH ICP-5.69A REVO-1 T-8771-4 1 CV CV-1296 M REV2-1 001877111 CV CV-1296 M AV REV2-1 T-27264RiVNPSE VNPSE 3213 IC REV0-O 001272911 VNPSE VNP E-3213 IC REV T-0467-RI RH RH-626 I REVO-1 001046711 RH RH-626 C REVO-1 T-167p-R:0 IA IA-1249 IC REVO-1 001167910 IA IA-1249 I REVO-1 T-3782-RI. CS CS-2181 S EM REVO-1 001 78j1 CS CS-21 8-S EM REV0-T-7Y484-CS P-288 E REV2-1 001704911 CS P-28B M REV2-1 T.74S85Si IT-531 O S REVI-1 001743Z1 SI IT-531 PS REV1-1 T-7449-R1 VNCRD W-A OPS REVO-1 0017445D1 VNCRD U 3A OPS REVO T-4824I Si P.1 5B M REVO-1 0018824=

TL7590.H1t_80V MR 01-128 1B-428 001759U1 480V R 01-128 IB-

T-2622R1 Y Y-4 E REVO-1

.0012621 Y Y-4 EM REVO-1 I T-7043R1 CS 8A-M EM REV(

001704Wi1 CS 28A-M EM RE 521 1 T-7043-R wCC P-028A-M I CS P-28A-M EM REVO-1 1

04MAY04 04MAY04 DR-Y ML-Y 04:00 04:59 ORT3-Y R-N 0

Run Date 02MAY04 15:17l LT-03 STANDARD PUBLICATION l

Sheet 30 of 31

© Pnimavera Systems, Inc.

FL-03 Execution Publication Set

after 02MAY04 12:00 afterO2MAYO4 12:00 afterO02MAY04 12:00 I

U1R28 WORKING SCHEDULE afterO02MA Y04 12:00

  1. U ID RESPl WO j EQID I

DESCRIPTION RD ES EF RISK I

FS T-7047-H P-028A-M 1

.6.CP-OiA2.4.M 4A2O24 04M0AY0 D2R-4L 6 EM RE 15221 1 T-7047-H wcC P-028A-M 1 CS P-28A-M EM REVI-1 I

04MAY04 04MAY04 I )RT-Y MR-V 04:00 04:59 ORT3-Y R-N 0

523 1 T-7941-H WCC MS-02084 1 MS MS-2084 REVO-1 3

04MAY04 04MAY04 24 04:00 06:59 524 1 T-7048-R WCC P.28B 1 CS P-28B EM REV2.1 3

04MAY04 04MAY04 DR-Y ML-Y 122 05:00 08:59 ORT3-N R-N 525 2 T-7690-H WCC P-011A 2CC P-IA MM REVO-1 1

04MAY04 04MAY04 0

07:00 07:59 526 1 T-9779-R WCC PZR I RC PZR HTRS EM 1

04MAY04 04MAY04 DR-Y ML-Y 225 REVO-1 07:00 07:59 ORT3-Y R-N 527 1 T-6123-R WCC CV-00275 1 CV CV-275 MMV 3

04MAY04 04MAY04 0

REVO-1 07:00 09:59 528 1 T-7047-R WCC_

P-028A-M 1 CS P-28A-M EM 1

04MAY04 04MAY04 DR-Y ML-Y 122 REV1-1 09:00 09:59 ORT3-Y R-N 529 1 T-1832-R WCC HX-15B 1 VNCC HX-15B MM 2

04MAY04 04MAY04 0

REVI-1 10:00 11:59 530 1 T-2078-R WCC CW SYSTEM 1 CW CW SYSTEM EPT 1

04MAY04 04MAY04 97 REVO-1 13:00 13:59 531 1

T-6939-R WCC D72-21-08 1 125V rWP 00-037-07 1

04MAY04 04MAY04 0

EM REVO-1 13:00 13:59 532 2 T-7690-R WCC P-011A 2CCP-I1AMMREVO-1 1

04MAY04 04MAY04 0

14:00 14:59 533 1 0135AG02-A WCC G-02 IWP-037-01 ALIGN G02 1

04MAY04 04MAY04 DR-N ML-N 0

TO 1A05 & 2A05 PER 16:00 16:59 ORT3-N R-N 534 1 T-0683-R WCC ICP-5.16 1 CV ICP-5.16 IC REVO-1 I

04MAY04 04MAY04 0

16:00 16:59 535 1 T-6919-H WCC D72-17-03 1 125V IWP 00-037-01 1

04MAY04 04MAY04 13 EM REVO-1 17:00 17:59 536 1 T-5950-R WCC SI-00871A 1 SI SI-871A EM REVO-1 3

04MAY04 04MAY04 DR-Y ML-Y 0

17:00 19:59 ORT3-Y R-N

-T.7047-H 1 CS P 0017047i1 CS T.7941HI MSM 0017941_1 T-7048 1 CS 001704 T-76904 I

001769CI2 I

T-9779-RI 000977901 T-6123 C

1 001612 IT 7047-R 0017047 T-1832J I~T-:

oc 7

28A-M EM REV1

~-8A-M EM R 5-2084 REVO-1 Is MS-2084 R 8B EM REV2.

I CS P-28B EM P-.1A MM R CCP-11AMM CPZR HTRS E RC PZR HTRS CV-275 MMV I CVCV-275 CS P-28A-M E 1 CS P-28A-N

> VNCC HX-.1 I VNCC H 078-1CW CV 1202s51 CW

  1. 9394 1125V I 16939I1 125V rt60eC P-135AG02,CP 0016919D1l ITI0683I4*C) 00106834I1 T-691940-1 001691 21 T-5950-R1 t 10015955i T-6930 4I 0016931D 5371 1 T-6930-H wCC D72-16-07 1 125V IWP 00-037-03 EM REVO-1 3

04MAY04 I 04MAY04 17:00 19:59 0

I

_I_

I II___

Run Date 02MAY0415:171 LT-03 STANDARD PUBLICATION Sheet 31 of 31 O Primavera Systems, Inc.

I FL-03 Execution Publication Set I