April 8, 2005 Mr. Karl E. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISION TO EXCESS FLOW CHECK VALVE SURVEILLANCE TESTING FREQUENCY (TS-438) (TAC NO. MC4659)
Dear Mr. Singer:
By letter dated October 12, 2004, Tennessee Valley Authority (TVA) submitted a request for a Technical Specification change (TS-438) to revise the frequency of Surveillance Requirement 3.6.1.3.8 by testing a representative sample of excess flow check valves (EFCVs) every 24 months, so each EFCV is tested once every 120 months.
Based on our review of your submittal, the NRC staff finds that a response to the enclosed request for additional information is needed before we can complete the review.
This request was discussed with Mr. Tim Abney of your staff on March 31 and April 6, 2005, and it was agreed that a response would be provided within 30 days of the issuance of this letter.
If you have any questions, please contact me at (301) 415-4041.
Sincerely,
/RA/
Margaret H. Chernoff, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-259
Enclosure:
Request for Additional Information cc w/encl: See next page
Enclosure Request for Additional Information TS-438, Revision to Excess Flow Check Valve (EFCV) Surveillance Testing Frequency 1.0 Page E1-7 under Section B, "EFCV Failure rate" states that TVA will address crud build up and valve sticking by flushing lines and inspecting 100 percent of the EFCVs. The application does not address the time period between performance of the testing and startup of the plant. How will EFCV operability be maintained/assured during the time period between completion of the testing and startup of the plant?
2.0 For EFCV refueling testing it is not clear what action the licensee will take if an EFCV failure is identified within the "representative sample" or if a repeat EFCV failure is noted. For example, will another "representative sample" be tested?
3.0 The Radiological Dose Assessment of your submittal states that the leak flow rates and fluid pressure are taken from General Electric NEDO-21143-1, Radiological Accident Evaluation - The CONAC03 Code, dated December 1981. Please submit a copy of this report, or provide a reference to a prior submittal of this report.
ML050830519 NRR-088 OFFICE PDII-2/PM PDII-2/LA PDII-2/SC NAME MChernoff BClayton MMarshall DATE 04/ 06 /05 04/ 06 /05 04/ 08 /05
Mr. Karl W. Singer BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, General Manager Nuclear Engineering Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael D. Skaggs Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Kurt L. Krueger, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Jon R. Rupert, Vice President Browns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert G. Jones Browns Ferry Unit 1 Plant Restart Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Scott M. Shaeffer Browns Ferry Unit 1 Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.
Suite 23T85 Atlanta, GA 30303-8931 Mr. Fredrick C. Mashburn Senior Program Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Timothy E. Abney, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611