Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML0510505802005-04-15015 April 2005 Technical Specifications Change 427, Response to Request for Additional Information Regarding Deletion of the Low Pressure Coolant Injection Motor-Generator Sets Project stage: Response to RAI ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other 2005-04-19
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
April 15, 2005 TVA-BFN-TS-427 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket No. 50-259 Tennessee Valley Authority )
BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 1 - TECHNICAL SPECIFICATIONS (TS) CHANGE 427 - RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING DELETION OF THE LOW PRESSURE COOLANT INJECTION MOTOR-GENERATOR SETS (TAC NO. MC3822)
This letter provides TVAs responses to the NRC request for additional information (Reference 1) regarding proposed Technical Specification (TS) 427.
On July 8, 2004 (Reference 2), TVA requested a TS change (TS 427) to incorporate the necessary TS revisions for the removal of the requirement to maintain an automatic transfer capability for the power supply to the Low Pressure Coolant Injection (LPCI) inboard injection and recirculation pump discharge valves. NRC requested additional information to support the review of the submittal. The NRC requests and TVAs responses are enclosed.
TVA has determined that the additional information provided does not affect the no significant hazards considerations associated with the proposed amendment and TS changes. The proposed amendment and TS changes still qualify for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9).
U.S. Nuclear Regulatory Commission Page 2 April 15, 2005 If you have any questions about this submittal, please contact me at (256) 729-2636.
Sincerely, Original signed by:
T.E. Abney Manager of Licensing and Industry Affairs
References:
- 1. NRC letter, M.H. Chernoff to K.E. Singer, dated March 28, 2005, Browns Ferry Nuclear Plant, Unit 1 -
Request for Additional Information Regarding Technical Specification Change Request (TS-427) Deletion of Low Pressure Coolant Injection Motor-Generator Sets (TAC No. MC3822).
- 2. TVA letter, T.E. Abney to NRC, dated July 8, 2004, Browns Ferry Nuclear Plant (BFN) - Unit 1 - Technical Specifications (TS) Change 427 - Deletion of the Low Pressure Coolant Injection Motor-Generator Sets.
U.S. Nuclear Regulatory Commission Page 3 April 15, 2005 Enclosure cc (Enclosure):
State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 Margaret Chernoff,Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
U.S. Nuclear Regulatory Commission Page 4 April 15, 2005 Enclosure cc (Enclosure):
A. S. Bhatnagar, LP 6A-C J. C. Fornicola, LP 6A-C D. F. Helms, BR 4T-C R. F. Marks, PAB 1C-BFN R. G. Jones, NAB 1A-BFN K. L. Krueger, POB 2C-BFN J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, PAB 1E-BFN E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA - K S:lic/submit/TS/TS 427 PRNM LPCI MG SETS formal rai.doc
RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION BROWNS FERRY NUCLEAR PLANT, UNIT 1 TECHNICAL SPECIFICATION CHANGE REQUEST (TS 427)
DELETION OF LPCI MOTOR-GENERATOR SETS NRC REQUEST
- 1. Table 2 on page E1-16 of Enclosure 1 to the ATechnical Specifications (TS) Change Request@, provides the number of Emergency Core Cooling Systems (ECCS) (such as High Pressure Coolant Injection, Automatic Depressurization System (ADS), Low Pressure Core Spray (LPCS) and Low Pressure Coolant Injection (LPCI) actually available before the proposed change, and the number of systems available after the proposed change for the Recirculation Suction Line Break Loss of Coolant Accident (LOCA) concurrent with a single-failure. It is not clear how the number of ECCS available (such as 1LPCS, 3LPCI) before the change, and after the change have been determined for each single-failure case. Please discuss how the number of ECCS available have been determined.
TVA RESPONSE The ECCS equipment available following the postulated pipe break and single failure were determined by performing a detailed single failure analysis based on the physical configuration of the ECCS. The analysis started with the identification of ECCS equipment available prior to the postulated break. Then, each of the postulated break locations was evaluated. (Note: Break location plays a part in the analysis because, the recirculation pump discharge pipe break results in the direct loss of a LPCI loop, whereas recirculation pump suction pipe breaks do not result in the direct loss of any ECCS pump capability). A loss of offsite power was also postulated to occur.
One active single failure within the plant is postulated to occur concurrent with the pipe break. The single failure was determined based on ensuring that it results in the largest amount of equipment being lost. (For example, if two LPCI pumps (one loop) were lost as a result of the break location, a Diesel E1-1
Generator supplying power to another pump in the opposite (unbroken) recirculation loop was selected as the single failure. This resulted in the largest amount of equipment lost due to the single failure). This analytical approach resulted in the identification of the minimum equipment remaining available for postulated break mitigation.
NRC REQUEST
- 2. Table 3 on page E1-17 of Enclosure 1 to the ATechnical Specifications (TS) Change Request@, provides the number of ECCS (such as ADS, 1LPCS, 1LPCI) actually available before the proposed change, and the number of systems available after the proposed change for the Recirculation Discharge Line Break LOCA concurrent with a single-failure. It is not clear how the number of ECCS available before the change, and after the change have been determined for each single-failure case. Please discuss how the number of ECCS available have been determined.
TVA RESPONSE Same as the response to NRC Request 1, above.
NRC REQUEST
- 3. Please confirm that the implementation of the subject TS change will not adversely impact the loading of the emergency diesel generator sets under LOCA and Loss Of Offsite Power (LOOP) operating conditions.
TVA RESPONSE The loads from RMOV Boards 1D and 1E will be relocated to RMOV Boards 1A and 1B respectively. Figures 1 and 4 of TS 427 show that the normal and alternate feeds to RMOV Boards 1A and 1B are the same as RMOV Boards 1D and 1E, respectively. Therefore, the design change will not impact the loading of the diesel generators.
E1-2