Reporting Requirements for Gauges Damaged at Temporary Job Sites
ML051030412
Person / Time
Issue date: 04/18/2005
From: Chris Miller
NRC/NMSS/IMNS
To:
McIntosh A
References
RIS-05-006
Download: ML051030412 (4)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS

WASHINGTON, D.C. 20555 April 18, 2005 NRC REGULATORY ISSUE SUMMARY 2005-06 REPORTING REQUIREMENTS FOR GAUGES DAMAGED AT

TEMPORARY JOB SITES

ADDRESSEES

All material licensees possessing portable gauges, regulated under 10 CFR Part 30.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)

to inform licensees who use portable gauges, containing byproduct material, of the reporting requirement associated with gauges damaged at temporary job sites. No specific action nor written response is required.

BACKGROUND

During the course of an inspection of a gauge licensee in August 2003, an NRC inspector found that gauges containing byproduct material had been damaged during licensed operations, but the damaged gauges were not reported to NRC. The inspector determined that, in three separate incidents, three different gauges had been damaged such that the gauges ability to sufficiently shield the radiation sources was compromised. In the first two incidents, the gauges locking mechanisms on the handle were damaged, and in the third incident, the index rod was broken approximately 1 inch above the base of the unit. Each of these incidents created the possibility that the source could inadvertently become unshielded.

In the fall of 1992, NRCs Office of Enforcement requested that the Office of Nuclear Material Safety and Safeguards (NMSS) clarify the conditions under which licensees should report damaged nuclear gauges. NMSS conducted a detailed analysis of the reporting requirements in 10 CFR Parts 20 and 30 that resulted in the publication of Health Physics Position 322 (HPPOS-322), in 1993. HPPOS-322 explained that reporting damaged gauges depended on one of several factors: 1) the extent of the damage; 2) the level of radiation in an unrestricted area; or 3) actual doses, to individuals, resulting from the damaged gauge.

SUMMARY OF ISSUE

So that licensees are informed of the requirements for reporting damaged gauges, staff is republishing the specific conditions under which reporting is necessary. Therefore, in accordance with HPPOS-322, reporting the occurrence of damaged gauges is necessary when any one of the following conditions is met:

  • The protective housing (i.e., shielding) is damaged such that the source is not fully shielded, or cannot be moved into the shielded position, in accordance with 10 CFR

30.50, Reporting requirements;

  • The source is left exposed in an unrestricted area such that the radiation levels exceed

10 times the limit of 2 mrem in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (i.e., 20 mrem in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) in accordance with 10 CFR 20.2203, Reports of exposures, radiation levels, and concentrations of radioactive material exceeding the constraints or limits; and 10 CFR 20.405, Reports of over- exposures and excessive levels and concentrations 1 .

  • The incident results in doses in excess of limits in Part 20 or in the license, in accordance with 10 CFR 20.2203 and 10 CFR 20.405 [ See Footnote 1.]

In addition, the NRC staff has become aware that there appears to be some confusion among licensees regarding the first item above, which explains the circumstances, in accordance with

10 CFR 30.50, that require the reporting of defective equipment. To reduce this confusion, licensees are hereby informed that they must file a telephone report within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of any incident that involves disabled equipment, or equipment that fails to function as designed:

1. When, in accordance with 10 CFR 30.50(b)(2)(i), the equipment is required by regulation or license condition to prevent releases exceeding regulatory limits, to prevent exposures to radiation and radioactive materials exceeding regulatory limits, or to mitigate the consequences of an accident;

2. When, in accordance with 10 CFR 30.50(b)(2)(ii), the equipment is required to be available and operable when it is disabled or fails to function; and

3. When, in accordance with 10 CFR 30.50(b)(2)(iii), no redundant2 equipment is available and operable to perform the required safety function.

1 The regulations in 10 CFR 20.405 refer to dose limits in a calendar quarter. Dose limits in a calendar quarter were eliminated with the revision of Part 20, which became effective on January 1, 1994. As a substitute, licensees should refer to the annual dose limits as stated in

10 CFR 20.1201(a)(1) (i)(ii) and (a)(2)(i)(ii).

2 In this context, redundant means similar equipment with safety features equivalent to the safety features of the disabled equipment. Licensees are also required to file a written report within 30 days of the telephone report. For details that must be included in both the telephone and written reports, licensees should review

10 CFR 30.50(c)(1) and 10 CFR 30.50©)(2).

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register because this RIS is informational, and does not represent a departure from current regulatory requirements.

SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT

NRC has determined that this action is not subject to the Small Business Regulatory Enforcement Fairness Act of 1996.

PAPERWORK REDUCTION ACT STATEMENT

This RIS does not contain information collections and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

This RIS requires no specific action nor written response. If you have any questions about this RIS, please contact the technical contact listed below, or the appropriate regional office.

CONTACT

Please direct any questions about this matter to the technical contact listed below.

/RA/ Thomas H. Essig for Charles L. Miller, Director Division of Industrial and Medical Nuclear Safety Office of Nuclear Material Safety and Safeguards

Technical Contact:

Angela R. McIntosh, NMSS

301-415-5030

E-mail: arm@nrc.gov Attachment: List of Recently Issued NMSS Generic Communications Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.

ML051030412 OFFICE MSIB Tech Editor MSIB

NAME AMcIntosh* EKraus via fax* SWastler*

DATE 3/01/05 3/01/05 3/04/05 OFFICE MSIB OGC IMNS

NAME RCorreia* STreby* NLO CMiller (THE for)

DATE 3/04/05 3/25/05 4/7/05

Attachment 1 Recently Issued NMSS Generic Communications Date GC No. Subject

Addressees

04/07/05 IN-05-010 Changes to 10 CFR Part 71 All 10 CFR Part 71 licensees and Packages certificate holders.

Results of HEMYC All holders of operating licenses

04/01/05 IN-05-007 Electrical Raceway Fire for nuclear power reactors, except Barrier System Full Scale those who have permanently Fire Testing ceased operations and have certified that fuel has been permanently removed from the reactor vessel, and fuel facilities licensees.

02/28/05 RIS-05-003 10 CFR Part 40 All persons possessing aircraft Exemptions for Uranium counterweights containing Contained in Aircraft uranium under the exemption in Counterweights - Storage 10 CFR 40.13(c)(5).

and Repair

03/10/05 IN-05-005 Improving Material Control All licensees authorized to and Accountability Interface possess a critical mass of special with Criticality Safety nuclear material.

Activities at Fuel Cycle Facilities

02/11/05 BL-05-011 Material Control and All holders of operating licenses Accounting at Reactors and for nuclear power reactors, Wet Spent Fuel Storage decommissioning nuclear power Facilities reactor sites storing spent fuel in a pool, and wet spent fuel storage sites. Note that this bulletin relates to material control and accounting (MC&A) programs and is, therefore, being withheld from public disclosure in accordance with 10 CFR 2.390.

Note: NRC generic communications may be found on the NRC public website, http://www.nrc.gov, under Electronic Reading Room/Document Collections.