Text
b r
PPL Rev. 1 LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a.
MODE 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b.
MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
- c.
MODE 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, and 3.
(continued)
SUSQUEHANNA - UNIT 1 TS / 3.0-1 Amendment 1,)8, 219
I I
PPL Rev. 1 LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
I
- a.
When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
- b.
After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
- c.
When an allowance is stated in the individual value, parameter, or other Specification.
This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
I LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This Is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.
LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered.
Only the support system LCO ACTIONS are required to be entered.
This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this (continued)
SUSQUEHANNA - UNIT 1 TS /3.0-2 Amendment hi8, 219
I PPL Rev. 1 LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.6 program, the appropriate Conditions and Required Actions of the (continued)
LCO in which the loss of safety function exists are required to be entered. When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.
LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Special Operations LCOs is optional. When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met. When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
(continued)
SUSQUEHANNA - UNIT 1 TS /3.0-3 Amendment lA8,-219
PPL Rev. 1 SR Applicability 3.0 3.0 SR APPLICABILITY SR 3.0.3 declared not met, and the applicable Condition(s) must be entered.
(continued)
SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
SUSQUEHANNA - UNIT 1 TS /3.0-5 Amendment 148, 219
PPL Rev. 1 PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS K
11JI I
Jo Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more A.1 Restore required channel to 30 days Functions with one OPERABLE status.
required channel inoperable.
B.
Required Action and B.1 Initiate action in accordance with Immediately associated Specification 5.6.7.
Completion Time of Condition A not met.
C.
One or more C.1 Restore one required channel to 7 days Functions with two OPERABLE status.
required channels inoperable.
(continued)
SUSQUEHANNA-UNIT 1 TS /3.3-23 Amendment 148, 219
PPL Rev. 1 Remote Shutdown System 3.3.3.2 3.3 INSTRUMENTATION 32.3.2 Remote Shutdown System LCO 3.3.3.2 The Remote Shutdown System Function in Table 3.3.3.2-1 shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS NOTI Separate Condition entry is allowed for each Funi I
I CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Restore required Function to 30 days Functions inoperable.
OPERABLE status.
B.
Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
SUSQUEHANNA - UNIT 1 TS /3.3-26 Amendment 1J8, 219
i r
PPL Rev. 1 RCS Leakage Detection Instrumentation 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Leakage Detection Instrumentation LCO 3.4.6 The following RCS leakage detection instrumentation shall be OPERABLE:
- a.
Drywell floor drain sump monitoring system; and
- b.
One channel of either primary containment atmospheric particulate or atmospheric gaseous monitoring system.
APPLICABILITY:
MODES 1 and 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Drywell floor drain A.1 Restore drywell floor 30 days sump monitoring drain sump monitoring system inoperable.
system to OPERABLE status.
(continued)
SUSQUEHANNA - UNIT 1 TS /3.4-14 Amendment 148, 219
I PPL Rev. 1 RCS Leakage Detection Instrumentation 3.4.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B.
Required primary B.1 Analyze grab samples Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment of primary containment atmospheric monitoring atmosphere.
system inoperable.
AND B.2 Restore required 30 days primary containment atmospheric monitoring system to OPERABLE status.
C.
Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or AND B not met.
C.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D.
All required leakage D.1 Enter LCO 3.0.3.
Immediately detection systems inoperable.
I SUSQUEHANNA - UNIT 1 TS /3.4-15 Amendment 1-(8, 219
PPL Rev.1 RCS Specific Activity 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 RCS Specific Activity LCO 3.4.7 APPLICABILITY:
The specific activity of the reactor coolant shall be limited to DOSE EQUIVALENT 1-131 specific activity < 0.2 pCdgm.
Mode 1, MODES 2 and 3 with any main steam line not isolated.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
-NOTEDLY specific activity LCO 3.0.4.c is applicable.
> 0.2 pCVgm and a__
< 4.0 pCVgm DOSE EQUIVALENT 1-131.
A.1 Determine DOSE Once per4 hours EQUIVALENT 1-131 AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limits.
B.
Required Action and
- B.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion EQUIVALENT 1-131.
Time of Condition A not met.
AND OR B.2.1 Isolate all main steam 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Reactor Coolant lines.
specific activity> 4.0 OR pCi/gm Dose EQUIVALENT 1-1 31.
(continued)
I SUSQUEHANNA - UNIT 1 TS / 3.4-1 7 Amendment 1 *8 219
s t
PPL Rev. 1 RHR Shutdown Cooling System - Hot Shutdown 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown LCO 3.4.8 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
_~~
Id"M c o
- 1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
- 2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.
APPLICABILITY:
Mode 3, with reactor steam dome pressure less than the RHR cut in permissive pressure.
ACTIONS k lrFrr I
lI Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
I CONDITION REQUIRED ACTION COMPLETION TIME A.
One or two required A.1 Initiate action to restore Immediately RHR shutdown cooling RHR shutdown cooling subsystems subsystem(s) to inoperable.
OPERABLE status.
AND (continued)
SUSQUEHANNA - UNIT 1 TS 1 3.4-19 Amendment 1/8, 219
PPL Rev. 1 ECCS - Operating 3.5.1 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS-Operating 3.5 3.5.1 LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six safety/relief valves shall be OPERABLE.
APPLICABILITY:
MODE 1, MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome pressure S 150 psig.
ACTIONS KITI rut I I I- -
1
_, An, LCO 3.0.4.b is not applicable to HPCI.
CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure ECCS 7 days injection/spray subsystem injection/spray subsystem to inoperable for reasons other OPERABLE status.
than Condition B.
B. One LPCI pump in one or B.1 Restore LPCI pump(s) to 7 days both LPCI subsystems OPERABLE status.
C. Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or Condition B AND not met.
C.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
SUSQUEHANNA - UNIT 1 TS / 3.5-1 Amendment 17¢8, 219
I e
PPL Rev. 1 RCIC System 3.5.3 3.5 3.5.3 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.
APPLICABILITY:
ACTIONS MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.
-NOTEE-------------------------------------------
LCO 3.0.4.b is not applicable to RCIC.
CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System inoperable.
A.1 Verify by administrative means Immediately High Pressure Coolant Injection System is OPERABLE.
AND A.2 Restore RCIC System to 14 days OPERABLE status B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AND B.2 Reduce reactor steam dome 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> pressure to < 150 psig.
SUSQUEHANNA - UNIT 1 TS /3.5-12 Amendment 1&;8 219
1 I
PPL Rev. 1 Primary Containment Hydrogen Recombiners 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Primary Containment Hydrogen Recombiners LCO 3.6.3.1 APPLICABILITY:
Two drywell and two suppression chamber hydrogen recombiners shall be OPERABLE.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One drywell or one A.1 Restore the inoperable 30 days suppression chamber hydrogen recombiners to hydrogen recombiner OPERABLE status.
inoperable OR One drywell and one suppression chamber hydrogen recombiner inoperable.
B. Two drywell or two B.1 Verify by administrative means 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> suppression chamber that the alternate hydrogen hydrogen recombiners control function is maintained.
AND OR AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter Any three or more hydrogen B.2 Restore recombiners to ensure 7 days recombiners inoperable.
that at least one drywell and one suppression chamber hydrogen recombiner are OPERABLE.
(continued)
I SUSQUEHANNA - UNIT 1 TS /3.6-30 Amendment 1/8, 219
r PPL Rev. 1 Drywell Air Flow System 3.6.3.2 3.6 CONTAINMENT SYSTEMS Drywell Air Flow System 3.6.3.2 LCO 3.6.3.2 Three required drywell cooling fan pairs shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required drywell cooling A.1 Restore required drywell 30 days fan in one or more pairs cooling fan to OPERABLE inoperable.
status.
B. Two required drywell cooling B.1 Verify by administrative means 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fans in one or more pairs that the alternate hydrogen inoperable.
control function is maintained.
AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND thereafter B.2 Restore one required drywell 7 days cooling fan in each required pair to OPERABLE status.
C. Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time not met.
SUSQUEHANNA - UNIT 1 TS / 3.6-32 Amendment @~8, 219
e PPL Rev. 2 AC Sources - Operating 3.8.1 3.8 Electrical Power Systems 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:
- a. Two qualified circuits between the offsite transmission network and the onsite Class 1 E AC Electrical Power Distribution System; and
- b. Four diesel generators (DGs).
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS
- -jj c;
I
- 1.
LCO 3.0.4.b is not applicable to DGs.
- 2.
When an OPERABLE diesel generator is placed in an inoperable status solely for the purpose of alignment of DG E to or from the Class 1 E distribution system, entry Into associated Conditions and Required Actions may be delayed for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, provided both offsite circuits are OPERABLE and capable of supplying the affected 4.16 kV ESS Bus.
CONDITION REQUIRED ACTION COMPLETION TIME A. One offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required feature(s) with 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery no offsite power available of no offsite power to one inoperable when the redundant 4.16 kV ESS bus required feature(s) are inoperable.
concurrent with inoperability of redundant required feature(s).
AND
___(c o n tin u e d )
I SUSQUEHANNA - UNIT 1 TS /3.8-1 Amendment 1/8/ 219
PPL Rev. 1 LCO Applicability 3.0 3.0 LIMITING CONDITIONS FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a.
MODE 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b.
MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
- c.
MODE 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation In accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, and 3.
(continued)
SUSQUEHANNA - UNIT 2 TS I3.0-1 Amendment ldl, 195
PPL Rev. 1 LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
I
- a.
When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
- b.
After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability'of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
- c.
When an allowance is stated in the individual value, parameter, or other Specification.
This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
I LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.
LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered.
Only the support system LCO ACTIONS are required to be entered.
This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP).
If a loss of safety function is determined to exist by this (continued)
SUSQUEHANNA - UNIT 2 TS /3.0-2 Amendment -i1, 195
e PPL Rev. 1 LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.6 program, the appropriate Conditions and Required Actions of the (continued)
LCO in which the loss of safety function exists are required to be entered. When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.
LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Special Operations LCOs is optional. When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met. When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
SUSQUEHANNA - UNIT 2 TS / 3.0-3 Amendment -161, 195
PPL Rev. 1 SR Applicability 3.0 3.0 SR APPLICABILITY SR 3.0.3 declared not met' and the applicable Condition(s) must be entered.
(continued)
SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCOs Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry Into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
SUSQUEHANNA - UNIT 2 T S / 3.0-5 Amendment 1;1, 195
PPL Rev. 1 PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS IJt t-Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required channel to 30 days with one required OPERABLE status.
channel inoperable.
B. Required Action and B.1 Initiate action in accordance with Immediately associated Completion Specification 5.6.7.
Time of Condition A not met.
C. One or more Functions C.1 Restore one required channel to 7 days with two required OPERABLE status.
channels inoperable.
(continued)
SUSQUEHANNA - UNIT 2 TS / 3.3-23 Amendment 1IX1, 195
I PPL Rev. 1 Remote Shutdown System 3.3.3.2 3.3 INSTRUMENTATION 3.3.3.2 Remote Shutdown System LCO 3.3.3.2 The Remote Shutdown System Function in Table 3.3.3.2-1 shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS c-Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Restore required Function to 30 days required Functions OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
SUSQUEHANNA - UNIT 2 TS / 3.3-27 Amendment 4,1, 195
PPL Rev. 1 RCS Leakage Detection Instrumentation 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Leakage Detection Instrumentation LCO 3.4.6 The following RCS leakage detection instrumentation shall be OPERABLE:
- a.
Drywell floor drain sump monitoring system; and
- b.
One channel of either primary containment atmospheric particulate or atmospheric gaseous monitoring system.
APPLICABILITY:
MODES I and 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Drywell floor drain A.1 Restore drywell floor 30 days sump monitoring drain sump monitoring system inoperable.
system to OPERABLE status.
- 1 (continued)
SUSQUEHANNA - UNIT 2 TS /3.4-14 Amendment 1#1, 195
PPL Rev. 1 RCS Leakage Detection Instrumentation 3.4.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B.
Required primary B.1 Analyze grab samples Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment of primary containment atmospheric monitoring atmosphere.
system inoperable.
AND B.2 Restore required 30 days primary containment atmospheric monitoring system to OPERABLE status.
C.
Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or AND B not met.
C.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D.
All required leakage D.1 Enter LCO 3.0.3.
Immediately detection systems inoperable.
'I SUSQUEHANNA - UNIT 2 TS /3.4-15 Amendment 1F/, I 195
k PPL Rev. 1 RCS Specific Activity 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 RCS Specific Activity LCO 3.4.7 APPLICABILITY:
The specific activity of the reactor coolant shall be limited to DOSE EQUIVALENT 1-131 specific activity < 0.2,pCVgm.
Mode 1, MODES 2 and 3 with any main steam line not isolated.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Reactor coolant specific
NOTE-------
activity > 0.2 pCVgm and LCO 3.0.4.c is applicable.
< 4.0 pCVgm DOSE EQUIVALENT 1-131.
A.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131 AND A.2 Restore DOSE EQUIVALENT 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 1-131 to within limits.
B.
Required Action and B.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion EQUIVALENT 1-131.
Time of Condition A not met.
AND OR B.2.1 Isolate all main steam lines.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Reactor Coolant specific OR activity > 4.0 pCVgm Dose EQUIVALENT 1-131.
(continued)
I SUSQUEHANNA - UNIT 2 TS / 3.4-17 Amendment 421, 195
PPL Rev. 1 RHR Shutdown Cooling System - Hot Shutdown 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown LCO 3.4.8 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
---a-------NOTES---
a
- 1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
- 2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.
APPLICABILITY:
Mode 3, with reactor steam dome pressure less than the RHR cut in permissive pressure.
ACTIONS K I611
NUI1j I
C J I I I
Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or two required A.1 Initiate action to restore Immediately RHR shutdown cooling RHR shutdown cooling subsystems subsystem(s) to inoperable.
OPERABLE status.
AND (continued)
SUSQUEHANNA - UNIT 2 TS /3.4-19 Amendment 1,X1, 195
r PPL Rev. 1 ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS-Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six safety/relief valves shall be OPERABLE.
APPLICABILITY:
MODE 1, MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome pressure < 150 psig.
ACTIONS
. sr%~r-ru I
c:------
rev LCO 3.0.4.b is not applicable to HPCI.
CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure ECCS 7 days injection/spray subsystem injection/spray subsystem to inoperable for reasons other OPERABLE status.
than Condition B.
B. One LPCI pump in one or B.1 Restore LPCI pump(s) to 7 days both LPCI subsystems OPERABLE status.
C. Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or Condition B AND not met.
C.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
SUSQUEHANNA - UNIT 2 TS /3.5-1 Amendment 1¢1, 195
PPL Rev. 1 RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.
APPLICABILITY:
MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.
ACTIONS
-- - ------------ ---------- -----------------NCr LCO 3.0.4.b is not applicable to RCIC.
CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System inoperable.
A.1 Verify by administrative means Immediately High Pressure Coolant Injection System is OPERABLE.
AND A.2 Restore RCIC System to 14 days OPERABLE status B.
Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AND B.2 Reduce reactor steam dome 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> pressure to < 150 psig.
SUSQUEHANNA - UNIT 2 TS / 3.5-12 Amendment y/51 195
I PPL Rev. 1 Primary Containment Hydrogen Recombiners 3.6.3.1 CONTAINMENT SYSTEMS Primary Containment Hydrogen Recombiners 3.6 3.6.3.1 LCO 3.6.3.1 Two drywell and two suppression chamber hydrogen recombiners shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME It1 A. One drywell or one suppression chamber hydrogen recombiner inoperable OR One drywell and one suppression chamber hydrogen recombiner inoperable.
A.1 Restore the inoperable hydrogen recombiners to OPERABLE status.
30 days I
1 1
B. Two drywell or two suppression chamber hydrogen recombiners inoperable.
OR Any three or more hydrogen recombiners inoperable.
B.1 Verify by administrative means that the alternate hydrogen control function is maintained.
AND B.2 Restore recombiners to ensure that at least one drywell and one suppression chamber hydrogen recombiner are OPERABLE.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter 7 days (continued)
SUSQUEHANNA - UNIT 2 TS / 3.6-30 Amendment 1X01, 195
PPL Rev. 1 Drywell Air Flow System 3.6.3.2 3.6 CONTAINMENT SYSTEMS Drywell Air Flow System 3.6.3.2 LCO 3.6.3.2 Three required drywell cooling fan pairs shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required drywell cooling A.1 Restore required drywell 30 days fan in one or more pairs cooling fan to OPERABLE inoperable.
status.
B. Two required drywell cooling B.1 Verify by administrative means 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fans in one or more pairs that the alternate hydrogen inoperable.
control function is maintained.
AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND thereafter B.2 Restore one required drywell 7 days cooling fan in each required pair to OPERABLE status.
C. Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time not met.
I SUSQUEHANNA - UNIT 2 TS I 3.6-32 Amendment 141, 195
'_ _- --;7-PPL Rev. 2 AC Sources-Operating 3.8.1 3.8 3.8.1 LCO 3.8.1 ELECTRICAL POWER SYSTEMS AC Sources-Operating The following AC electrical power sources shall be OPERABLE:
- a. Two qualified circuits between the offsite transmission network and the onsite Class 1 E AC Electrical Power Distribution System; and
- b. Four diesel generators (DGs).
- c. Two qualified circuits between the offsite transmission network and the Unit I onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.7, Distribution Systems -
Operating; and
- d. The DG(s) capable of supplying the Unit 1 onsite Class 1 E electrical power distribution subsystem(s) required by LCO 3.8.7.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS
a--------------------------------NOTES--
- 1.
LCO 3.0.4.b is not applicable to DGs.
- 2.
When an OPERABLE diesel generator is placed in an inoperable status solely for the purpose of alignment of DG E to or from the Class 1 E distribution system, entry Into associated Conditions and Required Actions may be delayed for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, provided both offsite circuits are OPERABLE and capable of supplying the affected 4.16 kV ESS Bus.
I I
I CONDITION REQUIRED ACTION COMPLETION TIME A.
One offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AND thereafter (continued)
SUSQUEHANNA - UNIT 2 TS /3.8-1 Amendment 1A1 195