ML050390182

From kanterella
Jump to navigation Jump to search
Detroit Edison - Fermi 2 Automated Record Management Distribution Control List 01/31/05 Licensing Document Transmittal Fermi 2 Technical Requirements Manual - Vol I Revision 73 Dated 1/31/05
ML050390182
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/31/2005
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
00935, cb1461
Download: ML050390182 (12)


Text

. N T I I DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 01/31/05 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvi Date Sec Status TMTRM TRM VOL I 73 11 IR 01/31/05 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cbl461

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 73 dated 1/31/05 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 72 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Title Page Rev 72 12/08/04 Title Page Rev 73 1/31/05 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-M through LEP- 4 Rev 72 12/08/04 LEP- I through LEP- 4 Rev 73 1/31/05 Table of Contents Page TRM-ii Rev 70 Page TRM-ii Rev 73 3.7 Plant Systems Page TRM 3.7-a Rev 31 Page TRM 3.7-a Rev 73 Page TRM 3.7-4 Rev 31 Page TRM 3.7-4 Rev 73 3.8 Electrical Power Systems Page TRM 3.8-3 Rev 60 Page TRM 3.8-3 Rev 73 BASES B3.7 Plant Systems Page TRM B3.7.3-1 Rev 31 Page TRM B3.7.3-1 Rev 73 END

fermi 2 Technical Requirements

  • Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM l File: 1754 I DSN: TRM VOL I l Rev: 73 Date 1/31/05 Recipient

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 31 TRM 3.3-33 Revision 31 TRM iv Revision 34 TRM 3.3-34 Revision 31 TRM v Revision 70 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12. Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 .Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-.7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 66 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-1 REV 73 1/31/05

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revisibn 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 73 TRM 3.12-27 Revision 31 TRM .3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 73 1/31/05

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-5 Revision 31 TRM B3.4.7-1 Revision 31 TRM 5.0-6 Revision 31 TRM B3.5-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.6.1-1 Revision 31 TRM 5.0-8 Revision 31 TRM B3.6.2-1 Revision 67 TRM 5.0-9 Revision 31 TRM B3.6.3-1 Revision 68 TRM B1.0-1 Revision 31 TRM B3.6.4-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.5-1 Revision 31 TRM B3.0-1 Revision 63 TRM B3.6.6-1 Revision 70 TRM B3.0-2 Revision 63 TRM.B3.6.7-1 Revision 31 TRM B3.0-2a Revision 72 TRMEB3.6.8-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.7.1-1 Revision 31 TRM B3.0-2c Revision 72 TRM B3.7.2-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.7.3-1 Revision 73 TRM B3.0-4 Revision 31 TRE B3.7.4-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.4-2 Revision 31 TRM B3.0-6 Revision 72 TRM B3.7.5-1 Revision 31 TRM B3.0-7 Revision 72 TRM B3.7.6-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.7-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.9-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.9-2 Revision 31 TRM B3.3.2-1 Revision 31 TRM B3.8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.3-1 Revision 67 TRM B3.8.3-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3.8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3.10-1 Revision 31 TRM B3.3.6-5 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.2-1 Revision 44 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.5-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM B3.4.6-1 Revision 31 TRM Vol. I LEP-3 REV 73 1/31/05

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 11, Revision 0 Page Revision Notation Page 1 0 0

2 0 3 0 4 0 5 0 6 -0 7 0 8 0 9 0 10 .0 11 0 12 0 13 0 14 0 15 0 16 17 0

-18 - .

19 0

  • 20 0 21 0 22 0 TRM Vol. I LEP-4 REV 73 1/31/05

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I Table of Contents (Cont'd)

Section and Title Page TR 3.4.2 Safety Relief Valve (SRV) Position Indication .... TRM 3.4-2 TR 3.4.3 Reactor Coolant System (RCS) Leakage Detection System ........................................... TRM 3.4-3 TR 3.4.4 Reactor Pressure Vessel-Water Level - Cold Shutdown ......................................... TRM 3.4-4 TR 3.4.5 Chemistry ........................................ TRM 3.4-5 TR 3.4.6 Structural Integrity .............................. TRM 3.4-9 TR 3.4.7 Recirculation Pump MG Set Scoop Tube ............. TRM 3.4-10 TR 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLANT (RCIC) SYSTEM (Blank) ............. TRM 3.5-1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber .............................. TRM 3.6-1 TR 3.6.2 Primary Containment Hydrogen Recombiners (Blank) . TRM 3.6-2 TR 3.6.3 Primary Containment Isolation Valves (PCIVs) ..... TRM 3.6-3 TR 3.6.4 Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication ...................... TRM 3.6-27 TR 3.6.5 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication .............................. TRM 3.6-29 TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS) (Blank) ............... TRM 3.6-32 TR 3.6.7 Secondary Containment Isolation Valves (SCIVs) ... TRM 3.6-33 TR 3.6.8 Drywell Spray .................................. TRM 3.6-34 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature ..... TRM 3.7-1 TR 3.7.2 Control Room Emergency Filtration (CREF) System .. TRM 3.7-2 TR 3.7.3 (Blank) ......................................... TRM 3.7-4 TR 3.7.4 Shore Barrier Protection .......................... TRM 3.7-5 TR 3.7.5 Sealed Source Contamination ...................... TRM 3.7-9 TR -3.7.6 Main Turbine Bypass System ....................... TRM 3.7-11 TR 3.7.7 Appendix R Alternative Shutdown Auxiliary Systems TRM 3.7-12 TR 3.7.8 (Blank) ........................................ TRM 3.7-19 TR 3.7.9 Snubbers ......................................... TRM 3.7-20 TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.1 AC Circuits Inside Primary Containment ........... TRM 3.8-1 TR 3.8.2 (Blank) .......................................... TRM 3.8-2 TR 3.8.3 AC Sources ...................................... TRM 3.8-3 TR 3.8.4 Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TRM 3.8-5 TR 3.8.5 Primary Containment Penetration Conductor Overcurrent Protection Devices ................... TRM 3.8-12 TR 3.8.6 Standby Liquid Control (SLC) System Associated Isolation Devices ................................ TRM 3.8-16 (continued)

TRM VOL I TRM-ii REV 73 01/05

SECTION 3.7 DETAILED INDEX OF SECTION Page TR 3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature ...... TRM 3.7-1 (TRLCO, ACTION, TRSR)

TR 3.7.2 Control Room Emergency Filtration (CREF) System ... TRM 3.7-2 (Tables TR3.7.2-1 and TR 3.7.2-2)

Table TR3.7.2-1 CREF System Duct Work ............................. TRM 3.7-2 (Technical Specification 3.7.3, specifically SR 3.7.3.3, duct work)

Table TR3.7.2-2 CREF System Duct Work Leak Testing Requirements ... TRM 3.7-3 (Technical Specification 3.7.3, specifically SR 3.7.3.6, duct work and associated leak testing requirements)

TR 3.7.3 Control Center Air Temperature .................... TRM 3.7-4 (TRLOC, ACTION) (Intentionally Left Blank)

TR 3.7.4 Shore Barrier Protection .......................... TRM 3.7-5 (TRLCO, ACTION, TRSR)

Table TR3.7.4-1 Shore Barrier Survey Points ... .................... TRM 3.7-7 (TR 3.7.4 applicability)

TR 3.7.5 Sealed Source Contamination ... .................... TRM 3.7-9 (TRLCO, ACTION, TRSR)

TR 3.7.6 Main Turbine Bypass System ... ...................... TRM 3.7-11 (Table TR3.7.6-1 only)

Table TR3.7.6-1 Main Turbine Bypass System ........................ TRM 3.3-11 (Technical Specification 3.7.6 response time)

TR 3.7.7 Appendix R Alternative Shutdown Auxiliary Systems . .......................................... TRM 3.7-12 (TRLCO, ACTION, TRSR)

Table TR3.7.7-1 Appendix R Alternative Shutdown Control Circuits .. TRM 3.7-15 (TR 3.7.7 applicability)

(continued)

TRM Vol. I ITRM 3.7-a REV 73 01/05

Control Center Air Temperature TR 3.7.3 TR 3.7 PLANT SYSTEMS THIS PAGE INTENTIONALLY LEFT BLANK TRM Vol. I TRM 3.7-4 Rev 73 01/05

AC Sources TR 3.8.3 TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.

APPLICABILITY: MODES 1, 2, 3, 4, and 5, During movement of recently irradiated fuel assemblies in the secondary containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. TRSR 3.8.3.1 not met. A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).

TRSR 3.8.3.2 not met.

OR TRSR 3.8.3.3 not met.

OR TRSR 3.8.3.4 not met.

TRM Vol. I TRM 3.8-3 REV 73 01/05

Control Center Air Temperature TR B3.7.3 TR B3.7 PLANT SYSTEMS THIS PAGE INTENTIONALLY LEFT BLANK TRM Vol. 3I TRM B3.7.3-1 REV 73 01/05