BYRON 2005-0011, Letter Transmitting Byron Station, Units 1 and 2 - Revised Plant Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
(Redirected from ML050330285)
Jump to navigation Jump to search
Letter Transmitting Byron Station, Units 1 and 2 - Revised Plant Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations.
ML050330285
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/01/2005
From: Kuczynski S
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
1.06.5110, BYRON 2005-0011, RIS-04-010
Download: ML050330285 (3)


Text

February 1, 2005 LTR: BYRON 2005-0011 File: 1.06.5110 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Revised Byron Station Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations

References:

(1) NRC Regulatory Issue Summary (RIS) 2004-10, Preparation and Scheduling of Operator Licensing Examinations, dated June 14, 2004 (2) Letter from Michael P. Gallagher (Exelon Generation Company, LLC/AmerGen Energy Company, LLC) to U. S. NRC, Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations, dated July 14, 2004 In Reference 1, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations. Attachments 1 through 10 of Reference 2 provided the responses to RIS 2004-10 for Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) plants. Attachment 2 of Reference 2 provided the operator licensing examination information for Byron Station on NRC Form 536.

The current Byron Station operator licensing class was suspended to include additional Senior Reactor Operator candidates; therefore, candidates are being added to the Generic Fundamentals examination schedule in 2005 and the examination preparation and initial operator license examinations are being rescheduled to 2006. Attachment 1 provides a revised Byron Station NRC Form 536 reflecting the revised operator licensing examination data.

February 1, 2005 U. S. Nuclear Regulatory Commission Page 2 Should you have any questions related to this matter, please contact Ernest W. Topping, Initial License Training Group Lead, at 815-406-3134.

Sincerely, Original signed by Stephen E. Kuczynski Site Vice President Byron Nuclear Generating Station SEK\MR\rah : Revised Byron Station NRC Form 536 cc: Regional Administrator - NRC Region III w/ attachment NRC Senior Resident Inspector - Byron Station w/ attachment

NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2006 (5-2003)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING comments regarding burden estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, EXAMINATION DATA and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131),

Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Byron Station, Units 1 and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR OPERATORS 0 1 8 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 10 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 06/19/06 11/05/07 N/A ALTERNATE DATE N/A 06/26/06 11/12/07 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 3 0 0 0 0 0 18 0 CANDIDATES