SVPLTR 04-0088, Completion of Unresolved Safety Issue (USI) A-46 Commitments

From kanterella
(Redirected from ML050100195)
Jump to navigation Jump to search
Completion of Unresolved Safety Issue (USI) A-46 Commitments
ML050100195
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/29/2004
From: Bost D
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SVPLTR # 04-0088, USI A-46
Download: ML050100195 (1)


Text

Exelkn.

Exelon Generation Company, LLC www.exeloncorp.com Nuclear Dresden Nuclear Power Station u 6500 North Dresden Road Morris, IL 60450-9765 December 29, 2004 SVPLTR # 04-0088 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 Docket Nos. 50-237 and 50-249

Subject:

Completion of Unresolved Safety Issue (USI) A-46 Commitments

References:

(1) Letter from R. J. Hovey (EGC) to U. S. NRC, "Delay in Completion of Unresolved Safety Issue (USI) A-46 Commitment," dated July 17, 2003 (2) Letter from R. J. Hovey (EGC) to U. S. NRC, "Delay in Completion of Unresolved Safety Issue (USI) A-46 Commitment," dated November 6, 2003 In the referenced letters, Exelon Generation Company, LLC (EGC) notified the NRC of delays in completing actions related to USI A-46, "Seismic Qualification of Equipment in Operating Plants," for Dresden Nuclear Power Station (DNPS), Unit 3. The referenced letters identified a delay in completion of modifications affecting five 250 volt direct current motor control centers and an Automatic Depressurization System (ADS) auto blowdown relay replacement, until the next DNPS Unit 3 refueling outage, D3R18. That refueling outage was recently completed and all remaining SQUG work was completed. This letter documents our closure of this issue.

Should you have any questions concerning this letter, please contact Mr. Pedro Salas, Regulatory Assurance Manager, at (815) 416 - 2800.

Respectfully, Danny Bost Site Vice President Dresden Nuclear Power Station cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Dresden Nuclear Power Station Ac 5