Text
-
Constellation Energy PO. Box 63 Nine Mile Point Nuclear Station Lycoming, New York 13093 December 28, 2004 NMP1L 1907 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Nine Mile Point Units 1 and 2 Docket Nos. 50-220 and 50-4 10 License Nos. DPR-63 and NPF-69 Revised Response Date for Generic Letter 2003-01, Control Room Habitability (TAC Nos. MB9825 and MB9826)
Gentlemen:
On June 12, 2003, the NRC issued Generic Letter (GL) 2003-01, "Control Room Habitability," requesting all addressees to submit information demonstrating that the control rooms at their facilities comply with current licensing and design bases, and applicable regulatory requirements, and that suitable design, maintenance, and testing control measures are in place for maintaining this compliance. GL 2003-01 requested that the above information be forwarded within 180 days of the issuance date of the GL.
Alternatively, for addressees who could not meet this schedule, GL 2003-01 requested a 60-day response describing the addressee's proposed alternative course of action, the basis for acceptability, and the schedule for completion.
By letter dated August 11, 2003 (NMP1L 1752), Nine Mile Point Nuclear Station, LLC (NMPNS), provided the 60-day response to the GL for both Nine Mile Point Unit 1 (NMP1) and Unit 2 (NMP2). Attachment 2 to that letter provided a list of all regulatory commitments contained in the correspondence including a commitment to prepare and submit the responses to Items 1(a), l(b), 1(c), 2 and 3 of GL 2003-01 by December 31, 2004.
The purpose of this letter is to revise the submittal date for the NMPNS responses to Items 1(a), 1(b), 1(c), 2 and 3 of GL 2003-01 from December 31, 2004 to January 31, 2005. This extension is necessary to fully review and implement appropriate station actions based on the NMP2 tracer gas test results.
Very truly yours, William C. Holston Manager Engineering Services WCHljjd/jm 7