05000302/LER-2004-003, Re Reactor Trip and Emergency Feedwater Actuation Caused by 230 Kilovolt Switchyard/Transmission Faults
| ML043100532 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/29/2004 |
| From: | Franke J Progress Energy Florida |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F1004-06 LER 04-003-00 | |
| Download: ML043100532 (9) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 3022004003R00 - NRC Website | |
text
0 Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating Ucense No. DPR-72 Ref: 10 CFR 50.73 October 29, 2004 3F1 004-06 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
LICENSEE EVENT REPORT 50-302/2004-003-00
Dear Sir:
Please find enclosed Licensee Event Report (LER) 50-302/2004-003-00. The LER discusses a reactor trip from 97% Rated Thermal Power and an emergency feedwater system actuation on September 6, 2004. This report is being submitted pursuant to 1 OCFR50.73(a)(2)(iv)(A).
No new regulatory commitments are made in this letter.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
,Plant General Manager Crystal River Nuclear Plant JAF/dwh Enclosure xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 0630/2007 (6-2004)
, t NFRIC digits/characters for each block) may not conduct or sponsor, and a person is not required to respond to, the Information collection.
- 3. PAGE CRYSTAL RIVER UNIT 3 05000302 1 OF 8
- 4. TITLE Reactor Trip And Emergency Feedwater Actuation Caused By 230 Kilovolt Switchyard/Transmission Faults
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED SEUNTA RVFACILrTY NAME 00CKET NUMBER MONTH DAY YEAR YEAR SEQUENTIAL REV MONTH DAY YEAR N/A 05000 FACILITY NAME DOCKET NUMBER 09 06 2004 2004 - 003 -
00 10 29 2004 N/A 05000
- 9. OPEMATING MODE 11.THIS REPORT IS SUBMITTED PURSUANTTO THE REOUIREMENTS OFI 1CFR§: (Checkall thatapply)
El 20.2201(b)
El 20.2203(a)(3)(i) al 50.73(a)(2)(i)(C) 0 50.73(a)(2)(vii) 1 E 20.2201(d) 0 20.2203(a)(3)(ii)
[l 50.73(a)(2)(ii)(A) a3 50.73(a)(2)(viii)(A)
El 20.2203(a)(1)
D 20.2203(a)(4) al 50.73(a)(2)(ii)(B)
El 50.73(a)(2)(viii)(B) a 20.2203(a)(2)(i)
El 50.36(c)(1)(i)(A)
El 50.73(a)(2)(iii) 0 50.73(a)(2)(ix)(A)
- 10. POWER LEVEL 0 20.2203(a)(2)(ii)
El 50.36(c)(1)(ii)(A) i0 50.73(a)(2)(iv)(A)
E 50.73(a)(2)(x)
El 20.2203(a)(2)(iii)
El 50.36(c)(2)
[I 50.73(a)(2)(v)(A)
D 73.71(a)(4)
El 20.2203(a)(2)(iv)
El 50.46(a)(3)(ii) al 50.73(a)(2)(v)(B) 0 73.71(a)(5) 97%
El 20.2203(a)(2)(v)
El 50.73(a)(2)(i)(A) a 50.73(a)(2)(v)(C)
D OTHER El 20.2203(a)(2)(vi)
El 50.73(a)(2)(i)(B) a 50.73(a)(2)(v)(D)
Specify in Abstract below or in (If more space is required, use additional copies of (If more space Is required, use additional copies of (If more space is required, use additional copies of (If more space Is required, use additional copies of (if more space Is required, use additional copies of (If more space is required, use additional copies of (If more space is required, use additional copies of NRC Form 366A)
ATTACHMENT 2 LIST OF COMMITMENTS The following table identifies those actions committed to by PEF in this document. Any other actions discussed in the submittal represent intended or planned actions by PEF. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Supervisor, Licensing & Regulatory Programs of any questions regarding this document or any associated regulatory commitments.
RESPONSE
COMMITMENT
DUE DATE SECTION No regulatory commitments are being made in this submittal.