LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
- c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.
LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
- a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
- b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other (continued)
Wolf Creek - Unit 1 3.0-1 Amendment No. 423,155
LCO Applicability 3.0 3.0 LCO Applicability LCO 3.0.4 specified condition in the Applicability, and establishment of risk (continued) management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications; or
- c. When an allowance is stated in the individual value, parameter, or other Specification.
This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.
LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.15, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.
When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.
LCO 3.0.7 Test Exception LCO 3.1.8, allows specified Technical Specification (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Test Exception LCOs is optional. When a Test Exception LCO is desired to be met but is not met, the ACTIONS of the Test Exception LCO shall be met. When a Test Exception LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall be made in accordance with the other applicable Specifications.
Wolf Creek - Unit 1 3.0-2 Amendment No. 423, 155
SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.
Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
For Frequencies specified as "once," the above interval extension does not apply.
If a Completion Time requires periodic performance on a "once per ...
basis, the above Frequency extension applies to each performance after the initial performance.
Exceptions to this Specification are stated in the individual Specifications.
SR, 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed,-from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
(continued)
Wolf Creek - Unit 1 3.0-3 Amendment No. 42-3,143
SR Applicability 3.0 3.0 SR Applicability SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
Wolf Creek - Unit 1 3.0-4 Amendment No. 4-3, 155
SDM 3.1.1 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM)
LCO 3.1.1 SDM shall be within the limit provided in the COLR.
APPLICABILITY: MODE 2 with ken < 1.0, MODES 3, 4, and 5.
I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SDM not within limit. A.1 Initiate boration to restore 15 minutes SDM to within limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify SDM to be within limit. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Wolf Creek - Unit I 3.1-1 Amendment No. 423, 155
Core Reactivity 3.1.2 3.1 REACTIVITY CONTROL SYSTEMS 3.1.2 Core Reactivity LCO 3.1.2 The measured core reactivity shall be within +/- 1% Ak/k of predicted values.
APPLICABILITY: MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Measured core reactivity A.1 Re-evaluate core design 7 days not within limit. and safety analysis, and determine that the reactor core is acceptable for continued operation.
AND A.2 Establish appropriate 7 days operating restrictions and SRs.
B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
Wolf Creek - Unit I 3.1-2 Amendment No. 123
RTS Instrumentation 3.3.1 3.3 INSTRUMENTATION 3.3.1 ReactorTrip System (RTS) Instrumentation LCO 3.3.1 The RTS, instrumentation for each Function in Table 3.3.1-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.1-1.
ACTIONS NOTE--
Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Enter the Condition Immediately with one or more required referenced in Table channels or trains 3.3.1-1 for the channel(s) inoperable. or trains.
B. One Manual Reactor Trip B.1 Restore channel to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> channel inoperable. OPERABLE status.
OR B.2 Be in MODE 3. 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> (continued)
Wolf Creek - Unit I 3.3-1 Amendment No. 123
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. One channel or train C.1 Restore channel or train to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> I inoperable. OPERABLE status.
OR C.2.1 Initiate action to fully insert 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> rods.
AND C.2.2 Place Rod Control System 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> in a condition incapable of rod withdrawal.
(continued)
Wolf Creek - Unit 1 3.3-2 Amendment No. 423, 155
ESFAS Instrumentation 3.3.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME L. One or more required L.1 Verify interlock is in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> channel(s) inoperable. required state for existing unit condition.
OR L.2.1 Be in MODE 3. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> AND L.2.2 Be in MODE 4. 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> M. One channel inoperable. M.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> I AND M.2 Restore channel to During OPERABLE status. performance of next COT N. One train inoperable. NOTE One train may be bypassed for up.
to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for suirveillance testing provided the other train is OPERABLE.
N.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND N.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)
Wolf Creek - Unit 1 3.3-27 Amendment No. 123,132, 155
ESFAS Instrumentation 3.3.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
- 0. One or more channels 0.1 Declare associated Immediately inoperable. auxiliary feedwater pump(s) inoperable.
P. One or both train(s) P.1 Restore train(s) to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable. OPERABLE status.
OR P.2.1 Be in MODE 3. 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> AND P.2.2 Be in MODE 4. 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> SURVEILLANCE REQUIREMENTS NOTE Refer to Table 3.3.2-1 to determine which SRs apply for each ESFAS Function.
SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 Perform ACTUATION LOGIC TEST. 31 days on a STAGGERED TEST BASIS (continued)
Wolf Creek - Unit 1 3.3-28 Amendment No. 123
ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 5 of 5)
Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE(a)
- 7. Automatic Switchover to Containment Sump
- a. AutomaticActuation 1.2.3,4 2 trains C SR 3.32.2 NA Logic and Actuation SR 3.3.2.4 Relays SR 3.32.13 I
- b. Refueling Water 1,2,3,4 4 K SR 3.32.1 2 35.5% of Storage Tank (RWST) SR 3.3.2.5 Instrument span Level - Low Low SR 3.32.9 SR 3.3.2.10 Coincident with Refer to Function I (Safety Injection) for all Initiation functions and requirements.
Safety Injection 8.= ESFAS Interlocks
- a. ReactorTrip, P-4 1,2.3 2 per train, F SR 3.32.11 NA 2 trains
- b. Pressurizer Pressure, 112,3 3 L SR 3.32.5 s 1979 psig P-11 SR 3.32.9 (a) The Allowable Value defines the Umiting Safety System Settngs: See the Bases for the Trip Setpoints.
Wolf Creek - Unit 1 3.3-36 Amendment No. 423, 126,132
PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.
APPLICABILITY: MODES 1, 2 and 3.
ACTIONS IEuj Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required channel 30 days with one required channel to OPERABLE status.
B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.8.
met.
(continued)
Wolf Creek - Unit 1 3.3-37 Amendment No. 423, 155
PAM Instrumentation 3.3.3 Table 3.3.3-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITION REFERENCED FROM REQUIRED FUNCTION REQUIRED CHANNELS ACTION E.1
- 1. Neutron Flux 2 F
- 2. Reactor Coolant System (RCS) Hot Leg Temperature 2 F (Wide Range)
- 3. RCS Cold Leg Temperature (Wide Range) 2 F
- 4. RCS Pressure (Wide Range) 2 F
- 5. Reactor Vessel Water Level 2 G
- 6. Containment Normal Sump Water Level 2 F
- 7. Containment Pressure (Normal Range) 2 F
- 8. Steam Une Pressure 2per F steam generator
- 9. Containment Radiation Level (High Range) 2 G
- 10. Containment Hydrogen Concentration Level 2 F
- 11. Pressurizer Water Level 2 F
- 12. Steam Generator Water Level (Wide Range) 4 F
- 13. Steam Generator Water Level (Narrow Range) 2 per F steam generator
- 14. Core Exit Temperature- Quadrant I 2 (a) F
- 15. Core Exit Temperature - Quadrant 2 2 (a) F 16 Cor Exi .(a . .. . . . F.
- 16. Core Exit Temperature - Quadrant3 2(a) F
- 17. Core Exit Temperature -Quadrant 4 2 (a) F
- 18. Auxiliary Feedwater Flow Rate 4 F
- 19. Refueling Water Storage Tank Level 2 F (a) A channel consists of two core exit thermocouples (CETs).
Wolf Creek - Unit 1 3.3-40 Amendment No. 123
Remote Shutdown System 3.3.4 3.3 INSTRUMENTATION 3.3.4 Remote Shutdown System LCO 3.3.4 The Remote Shutdown System Functions in Table 3.3.4-1 and the required auxiliary shutdown panel (ASP) controls shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS NOTE Separate Condition entry is allowed for each Function and required ASP control.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required Function 30 days Functions inoperable. and required ASP controls to OPERABLE status.
OR One or more required ASP controls inoperable.
B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Wolf Creek - Unit 1 3.3-41 Amendment No. 423, 155
RCS Loops - MODE 5, Loops Not Filled 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 RCS Loops - MODE 5, Loops Not Filled LCO 3.4.8 Two residual heat removal (RHR) loops shall be OPERABLE and one RHR loop shall be in operation.
Put j rt %
- 1. All RHR pumps may be removed from operation for
- 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided:
- a. The core outlet temperature is maintained at least 10F below saturation temperature;
- b. No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and
- c. Reactor vessel water level is above the vessel flange.
- 2. One RHR loop may be inoperable for
- 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RHR loop is OPERABLE and in operation.
APPLICABILITY: MODE 5 with RCS loops not filled.
I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR loop inoperable. A.1 Initiate action to restore Immediately RHR loop to OPERABLE status.
(continued)
Wolf Creek - Unit 1 3.4-1 7 Amendment No. 1423, 431 145, 155
RCS Loops - MODE 5, Loops Not Filled 3.4.8 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Required RHR loops B.1 Suspend operations that Immediately inoperable. would cause introduction into the RCS, coolant with OR boron concentration less than required to meet the No RHR loop in operation SDM of LCO 3.1.1.
AND B.2 Initiate action to restore Immediately one RHR loop to OPERABLE status and operation.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify one RHR loop is in operation. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.8.2 Verify correct breaker alignment and indicated power 7 days are available to the required RHR pump that is not in operation.
Wolf Creek - Unit 1 3.4-1 8 Amendment No. 123, 131, 145
Pressurizer PORVs 3.4.11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.11 Pressurizer Power Operated Relief Valves (PORVs)
LCO 3.4.11 Each PORV and associated block valve shall be OPERABLE.
APPLICABILITY: MODES 1 and 2, MODE 3 with all RCS cold leg temperatures > 3680 F.
ACTIONS
-NOTE Separate Condition entry is allowed for each PORV. I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more PORVs A.1 Close and maintain power 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and capable of to associated block valve.
being manually cycled.
B. One PORV inoperable and B.1 Close associated block 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not capable of being valve.
manually cycled.
AND B.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valve.
AND B.3 Restore PORV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.
(continued)
Wolf Creek - Unit 1 3.4-23 Amendment No. 423, 155
Pressurizer PORVs 3.4.11 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. One block valve NOTE --
inoperable. Required Actions do not apply when block valve is inoperable solely as a result of complying with Required Actions B.2 or E.2.
C.1 Place associated PORV in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> manual control.
AND C.2 Restore block valve to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.
D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, B, AND or C not met.
D.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Two PORVs inoperable E.A Close associated block 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and not capable of being valves.
manually cycled.
AND E.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valves.
AND E.3 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND E.4 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)
Wolf Creek - Unit 1 3.4-24 Amendment No. 123
LTOP System 3.4.12 APPLICABILITY: MODE 3, with any RCS cold leg temperature < 3680 F, MODE 4, MODE 5, MODE 6 when the reactor vessel head is on.
ACTIONS
~~NOTE-LCO 3.0.4b. is not applicable when entering MODE 4 or MODE 3. I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more safety A.1 Initiate action to verify a Immediately injection pumps capable of maximum of zero safety injecting into the RCS. injection pumps are capable of injecting into the RCS.
B. Two centrifugal charging B.1 Initiate action to verify a Immediately pumps capable of injecting maximum of one into the RCS. centrifugal charging pump is capable of injecting into the RCS.
C. An accumulator not C.1 Isolate affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolated when the accumulator.
accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
(continued)
Wolf Creek - Unit 1 3.4-27 Amendment No. 14-3, 155
LTOP System 3.4.12 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Increase all RCS cold leg 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion temperatures to > 368 0F.
Time of Condition C not met. OR D.2 Depressurize affected 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
E. One required RCS relief E.1 Restore required RCS 7 days valve inoperable in MODE relief valve to OPERABLE 3 or MODE 4. status.
F. One required RCS relief F.1 Restore required RCS 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> valve inoperable in relief valve to OPERABLE MODE 5 or 6. status.
G. Two required RCS relief G.1 Depressurize RCS and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> valves inoperable. establish RCS vent of 2 2.0 square inches.
OR Required Action and associated Completion Time of Condition A, B, D, E, or F not met.
OR LTOP System inoperable for any reason other than Condition A, B, C, D, E, or F.
Wolf Creek - Unit I 3.4-28 Amendment No. 123
RCS Leakage Detection Instrumentation 3.4.15 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 The following RCS leakage detection instrumentation shall be OPERABLE:
- a. The containment sump level and flow monitoring system;
- b. One containment atmosphere particulate radioactivity monitor, and
- c. One containment air cooler condensate monitoring system or one containment atmosphere (gaseous) radioactivity monitor.
APPLICABILITY: MODES 1, 2,3, and 4.
ACTIONS I CONDITION REQUIRED ACTION COMPLETION TIME A. Required containment A.1 N NOTE sump level and flow Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> monitoring system after establishment of inoperable. steady state operation.
Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.2 Restore required 30 days containment sump level and flow monitoring system to OPERABLE status.
(continued)
Wolf Creek - Unit 1 3.4-37 Amendment No. 423, 155
RCS Leakage Detection Instrumentation 3.4.15 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Required containment B.1 .1 Analyze samples of the Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> atmosphere particulate containment atmosphere.
radioactivity monitor inoperable. OR B.1.2 -NOTE Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.
Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.2 Restore required 30 days containment atmosphere particulate radioactivity monitor to OPERABLE status.
(continued)
Wolf Creek - Unit 1 .3.4-38 Amendment No. 123
RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity LCO 3.4.16 The specific activity of the reactor coolant shall be within limits.
APPLICABILITY: MODES 1 and 2, MODE 3 with RCS average temperature (Tav,) Ž 500 0F.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT 1-131 NOTE
> 1.0 iLCi/gm. LCO 3.0.4c. is applicable. I A.1 Verify DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131 within the acceptable region of Figure 3.4.16-1.
AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to' within limit.
B. Gross specific activity of B.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> the reactor coolant Tnvg < 500 0F.
> 100/ }( ctCi/gm.
(continued)
Wolf Creek - Unit 1 3.4-41 Amendment No. 423, 155
RCS Specific Activity 3.4.16 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Tar < 500 0 F.
Time of Condition A not met.
OR DOSE EQUIVALENT 1-131 in the unacceptable region of Figure 3.4.16-1.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.16.1 Verify reactor coolant gross specific activity 7 days
- 100! EP Ci/gm.
SR 3.4.16.2 -- NOTE Only required to be performed in MODE 1.
Verify reactor coolant DOSE EQUIVALENT 1-131 14 days specific activity 5 1.0 piCVgm.
AND Between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a THERMAL POWER change of 2 15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period (continued)
Wolf Creek - Unit 1 3.4-42 Amendment No. 123
ECCS - Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.5 Verify each ECCS automatic valve in the flow path 18 months that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.5.2.6 Verify each ECCS pump starts automatically on an 18 months actual or simulated actuation signal.
SR 3.5.2.7 Verify, for each ECCS throttle valve listed below, 18 months each mechanical position stop is in the correct position.
Valve Number EM-V0095 EM-V0107 EM-V0089 EM-V0096 EM-V0108 EM-V0090 EM-V0097 EM-V0109 EM-V0091 EM-V0098 EM-VO110 EM-V0092 SR 3.5.2.8 Verify, by visual inspection, each ECCS train 18 months containment sump suction inlet is not restricted by debris and the suction inlet trash racks and screens show no evidence of structural distress or abnormal corrosion.
Wolf Creek - Unit 1 3.5-5 Amendment No. 123
ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS -Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.
NOTE-An RHR subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
APPLICABILITY: MODE 4.
ACTIONS kI %9T
]MtU 1 E-LCO 3.0.4b. is not applicable to ECCS centrifugal charging pump subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS residual A.1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable. subsystem to OPERABLE status.
B. Required ECCS B.1 Restore required ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> centrifugal charging pump CCP subsystem to (CCP) subsystem OPERABLE status.
C. Required Action and C.1 Be in MODE 5. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time of Condition B not met.
Wolf Creek - Unit I 3.5-6 Amendment No. 423, 155
Spray Additive System 3.6.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.7.2 Verify spray additive tank solution volume is 2 4340 184 days gal and
- 4540 gal.
SR 3.6.7.3 Verify spray additive tank solution concentration is 184 days 2 28% and
- 31% by weight.
SR 3.6.7.4 Verify each spray additive automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.6.7.5 Verify spray additive flow rate from each solution's 5 years flow path.
Wolf Creek - Unit 1 3.6-21 Amendment No. 123
Hydrogen Recombiners 3.6.8 3.6 CONTAINMENT SYSTEMS 3.6.8 Hydrogen Recombiners LCO 3.6.8 Two hydrogen recombiners shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. -One hydrogen recombiner A.1 Restore hydrogen 30 days inoperable. recombiner to OPERABLE I status.
B. Two hydrogen B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> recombiners inoperable. means that the hydrogen control function is AND maintained.
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Restore one hydrogen 7 days recombiner to OPERABLE status.
(continued)
Wolf Creek - Unit 1 3.6-22 Amendment No. 143, 155
ARVs 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Atmospheric Relief Valves (ARVs)
LCO 3.7.4 Four ARV lines shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ARV line inoperable A.1 Restore required ARV line 7 days for reasons other than to OPERABLE status. I excessive leakage.
B. Two ARV lines inoperable B.1 Restore all but one 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for reasons other than required ARV line to excessive leakage. OPERABLE status.
C. Three or more ARV lines C.1 Restore all but two ARV 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable for reasons lines to OPERABLE other than excessive status.
leakage.
(continued)
Wolf Creek - Unit 1 3.7-9 Amendment No. 123, 427, 155
ARVs 3.7.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. With one or more of the D.1 Initiate action to close the Immediately I ARVs inoperable because associated block valve(s).
of excessive seat leakage.
AND D.2 Restore ARV(s) to 30 days OPERABLE staus.
E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.4.1 Verify one complete cycle of each ARV. In accordance with the Inservice Testing Program SR 3.7.4.2 Verify one complete cycle of each ARV block valve. 18 months Wolf Creek - Unit 1 3.7-10 Amendment No. 123,127,155
AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS KlT-r IM L-j I C_
LCO 3.0.4b. is not applicable when entering MODE 1.
CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW pump OPERABLE status.
inoperable. AND 10 days from discovery of failure to meet the LCO B. One AFW train inoperable B.1 Restore AFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for reasons other than OPERABLE status.
Condition A. AND 10 days from discovery of failure to meet the LCO (continued)
Wolf Creek - Unit 1 3.7-1 1 Amendment No. 1423,155
AFW System 3.7.5 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and CA1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A or B AND not met.
C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR Two AFW trains inoperable.
D. Three AFW trains D.1 -NOTE inoperable. LCO 3.0.3 and all other LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.
Initiate action to restore Immediately one AFW train to OPERABLE status.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 NOTE Not required to be performed for the AFW flow control valves until the system is placed in standby or THERMAL POWER is > 10% RTP.
Verify each AFW manual, power operated, and 31 days automatic valve in each water flow path, and in both steam supply'flow paths to the steam turbine driven pump, that is not locked, sealed, or otherwise secured in position, is in the correct position.
(continued)
Wolf Creek - Unit 1 3.7-1 2 Amendment No. 123, 155 l
AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:
- a. Two qualified circuits between the offsite transmission network and the onsite Class I E AC Electrical Power Distribution System; and
- b. Two diesel generators (DGs) capable of supplying the onsite Class I E power distribution subsystem(s); and
- c. Load shedder and emergency load sequencers for Train A and Train B.
APPLICABILITY: MODES 1, 2,3, and 4.
ACTIONS
-NOTE-LCO 3.0.4b. is not applicable to DGs.
CONDITION REQUIRED ACTION COMPLETION TIME A. One offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. OPERABLE offsite circuit.
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 - N NOTE In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.
(continued)
Wolf Creek - Unit 1 3.8-1 Amendment No. 423, 155
AC Sources - Operating 3.8.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) Declare required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from with no offsite power discovery of no available inoperable when offsite power to one its redundant required train concurrent feature(s) is inoperable. with inoperability of redundant required AND feature(s)
A.3 Restore offsite circuit to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.
AND 6 days from discovery of failure to meet LCO B. One DG inoperable. B.1 Perform SR 3.8.1.1 for the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> offsite circuit(s).
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND B.2 -OTE- N-In MODES 1, 2, and 3, the turbine driven auxiliary feedwater pump is considered a required redundant feature.
Declare required feature(s) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from supported by the discovery of inoperable DG inoperable Condition B when its required concurrent with redundant feature(s) is inoperability of inoperable. redundant required feature(s)
AND (continued)
Wolf Creek - Unit 1 3.8-2 Amendment No. 123
Boron Concentration 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Boron Concentration LCO 3.9.1 Boron concentrations of all filled portions of the Reactor Coolant System and the refueling canal, that have direct access to the reactor vessel, shall be maintained within the limit specified in the COLR.
APPLICABILITY: MODE 6.
I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Boron concentration not A.1 Suspend CORE Immediately within limit. ALTERATIONS.
AND A.2 Suspend positive reactivity Immediately additions.
AND A.3 Initiate action to restore Immediately boron concentration to within limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.1.1 Verify boron concentration is within the limit specified 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in the COLR.
Wolf Creek - Unit 1 3.9-1 Amendment No. -23, 155
Unborated Water Source Isolation Valves 3.9.2 3.9 REFUELING OPERATIONS 3.9.2 Unborated Water Source Isolation Valves LCO 3.9.2 Each valve used to isolate unborated water sources, BG-V01 78 and BG-V0601, shall be secured in the closed position.
APPLICABILITY: MODE 6.
ACTIONS Ivt 1J I f:-
Separate Condition entry is allowed for each unborated water source isolation valve.
CONDITION REQUIRED ACTION COMPLETION TIME A. N NOTE A.1 Suspend CORE Immediately Required Action A.3 must ALTERATIONS.
be completed whenever Condition A is entered. AND A.2 Initiate actions to secure Immediately One or more valves not valve in closed position.
secured in closed position.
AND A.3 Perform SR 3.9.1.1. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.2.1 Verify each valve that isolates unborated water 31 days sources, BG-V0178 and BG-V0601, is secured in the closed position.
Wolf Creek - Unit 1 3.9-2 Amendment No. 123
RHR and Coolant Circulation - Low Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Residual Heat Removal (RHR) and Coolant Circulation - Low Water Level LCO 3.9.6 Two RHR loops shall be OPERABLE, and one RHR loop shall be in operation.
APPLICABILITY: MODE 6 with the water level < 23 ft above the top of reactor vessel flange.
I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Less than the required A.1 Initiate action to restore Immediately number of RHR loops required RHR loops to OPERABLE. OPERABLE status.
OR A.2 Initiate action to establish Immediately 2 23 ft of water above the top of reactor vessel flange.
B. No RHR loop in operation. B.1 Suspend operations that Immediately would cause introduction into the'RCS, coolant with boron concentration less than required to meet the boron concentration of LCO 3.9.1.
AND (continued)
Wolf Creek - Unit 1 3.9-9 Amendment No. 1423,145,155
RHR and Coolant Circulation - Low Water Level 3.9.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Initiate action to restore Immediately one RHR loop to operation.
AND B.3 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment atmosphere to outside atmosphere.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify one RHR loop is in operation and circulating 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> reactor coolant at a flow rate of 2 1000 gpm.
SR 3.9.6.2 Verify correct breaker alignment and indicated power 7 days available to the required RHR pump that is not in operation.
Wolf Creek - Unit I 3.9-1 0 Amendment No. 123