Letter Sequence Request |
---|
|
|
MONTHYEARML0314001372003-05-16016 May 2003 Current Active Action List Project stage: Other RS-04-148, Amergen/Exelon Nuclear, Summary of Teleconference Regarding Implementation of Revised Emergency Action Levels2004-10-0101 October 2004 Amergen/Exelon Nuclear, Summary of Teleconference Regarding Implementation of Revised Emergency Action Levels Project stage: Request ML0429402292004-10-26026 October 2004 Untis 2 & 3, LaSalle Units 1& 2, Limerick Units 1 & 2, Oyster Creek, Peach Bottom Units 2 & 3, Quad Cities Units 1 & 2, Three Mile Island - Staff Comments on Summary of Conference Call Project stage: Other ML0534003042005-12-0202 December 2005 12/2/05 Waterford Steam Electric Station, #3 - Order Approving the Transfer of the Facility Operating License and Materials License No. NPF-38 from Entergy Louisiana, Inc. to Entergy Louisiana, Llc. (Tac. MC7974) Project stage: Other ML0603903012006-02-0909 February 2006 GSI Letter RAI Response to GL 2004-02 (TAC Nos. MC4676 and 4677) Project stage: RAI ML13059A1812013-02-28028 February 2013 Licensee Slides for 2/28/13 Meeting Via Conference Call with Luminant Generation Company, LLC, Project stage: Meeting 2004-10-26
[Table View] |
Amergen/Exelon Nuclear, Summary of Teleconference Regarding Implementation of Revised Emergency Action LevelsML042790113 |
Person / Time |
---|
Site: |
Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle |
---|
Issue date: |
10/01/2004 |
---|
From: |
Jury K AmerGen Energy Co, Exelon Nuclear |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
2130-04-20227, 5928-04-20230, RIS-03-018, RS-04-148 |
Download: ML042790113 (4) |
|
|
---|
Category:Letter type:RS
MONTHYEARRS-24-092, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS2024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-04-0202 April 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-016, Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations2024-03-14014 March 2024 Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations RS-24-022, Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-03-0808 March 2024 Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-017, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS2024-02-23023 February 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-24-005, Additional Information Supporting Request for Partial Site Release2024-02-0808 February 2024 Additional Information Supporting Request for Partial Site Release RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval 2024-09-09
[Table view] |
Text
LLC 4300 Warren 6o ;55 RS-04-148 5928-04-20230 21340400227 October 1, 2004 U . S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos . NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos . NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF-85 NRC Docket Numbers 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License Number DPR-16 NRC Docket Number 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos . DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
October 1, 2004 U. S . Nuclear Regulatory Commission Page 2 Three Mile Island Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289
Subject:
Summary of Teleconference Regarding Implementation of Revised Emergency Action Levels The purpose of this letter is to summarize a teleconference conducted on September 9, 2004, between Messrs. Douglas Pickett and Gregory Casto of the NRC and Mr. Allan Haeger other members of Exelon Generation Company, LLC (EGC) . EGC and AmerGen Energy Company, LLC are the licensees for the facilities listed in this letter .
EGC requested the teleconference in order to inform the NRC of its plans to revise its current facility emergency plans to adopt emergency action levels (EALs) in accordance with Nuclear Energy Institute (NEI) document NEI 99-01, Revision 4, "Methodology for Development of Emergency Action Levels," and to confirm its understanding of the guidance in Regulatory Issues Summary (RIS) 2003-18, "Use of NEI 99-01,
'Methodology for Development of Emergency Action Levels,"' regarding the need for prior NRC approval in accordance with 10 CFR 50.54, "Conditions of licenses,"
paragraph (q) .
During the teleconference, EGC stated the following regarding the proposed revision to the EALs .
EGC's current EALs are based on NEI NESP-007, "Methodology for Development of Emergency Action Levels," with some additional EALs. EGC's revised EALs will be based entirely on NEI 99-01 Revision 4, and the current EALs will be replaced in their entirety.
RIS 2003-18 states that licensees with EALs based on NESP-007 may adopt EALs based on NEI 99-01, Revision 4 without prior NRC approval, in accordance with 10 CFR 50.54(q) .
0 EGC will document the basis for concluding that the revised EALs do not represent a decrease in effectiveness by comparing the revised EALs to those in NEI 99-01 Revision 4 only, and not against the current EGC EALs . As such, the documentation will not include the basis for eliminating current EALs that are additions beyond those in NESP-007 .
The NRC personnel on the teleconference agreed that EGC's understanding of the above items was consistent with regulatory guidance.
EGC then presented some examples of situations in which the EALs in NEI 99-01, Revision 4 could not be exactly duplicated at some EGC facilities, and described its proposed approach for these situations . In all of these cases EGC will thoroughly document the basis for determining that the proposed EAL did not constitute a decrease in effectiveness compared to the NEI 99-01 Revision 4 EALs . The EGC examples included situations in the following categories .
October 1, 2004 U. S . Nuclear Regulatory Commission Page 3 EALs in NEI 9901, Revision 4 sometimes specify thresholds based on several equivalent types of instrumentation, each of which is specific to a reactor type .
EGC will adopt the EAL threshold based on the appropriate instrumentation for the reactor type and will not adopt thresholds based on other types of instrumentation . EGC stated that it considered this a "difference" from the NEI 99-01 Revision 4 EALs that did not decease effectiveness. The NRC personnel on the teleconference agreed with this assessment .
EALs in 99-01, Revision 4 sometimes specify thresholds based on instrumentation that may not be available for certain facilities, particularly in the shutdown condition . EGC stated that, for these situations, it will attempt to find an equivalent method for monitoring the threshold. If such an equivalent could not be found, this will be considered a "deviation" from the NEI 99-01, Revision 4 EALs . The NRC personnel on the teleconference agreed with this assessment and stated that a deviation from NEI-99-01, Revision 4 did not necessarily constitute a decrease in effectiveness, but that situations like this must be evaluated carefully to assure that the EAL entry conditions can be fully monitored. If the intent of the EAL cannot be met, a potential decrease in effectiveness exists, and NRC approval is required . The NRC stated that it has encouraged other licensees to seek alternate methods of monitoring for entry conditions .
EALs in NEI 99-01, Revision 4 sometimes specify thresholds that are explicitly stated to be only applicable at certain facilities, such as thresholds that depend on the use of critical safety function status trees. EGC stated that, for these situations, if a threshold were not applicable, then as long as the EAL entry conditions can be monitored adequately, it will not consider this a "difference" or "deviation" from NEI 9901, Revision 4. The NRC personnel on the teleconference agreed with this assessment .
EGC provided one example of an EAL (EAL CS2) in which the NEI 99-01, Revision 4 basis description appears to imply the need for additional time-based information in the EAL threshold . EGC stated that it will evaluate this and any similar situations to determine if the basis information should be placed in the EAL. EGC does not expect that the decision of whether or not to amend the EAL will result in a "deviation" or a decrease in effectiveness . The NRC did not disagree with this assessment .
The NRC encouraged EGC to verify that its current EAL scheme is consistent with NESP-007 . This ensures that the adoption of the NEI 99-01, Revision 4 EALs does not constitute a change in the EAL scheme, as discussed in RIS 2003-18.
EGC stated that it will document the results of the teleconference in writing . The NRC stated that it would review the EGC summary and respond in writing .
October 1, 2004 U . S. Nuclear Regulatory Commission Page 4 K you have any questions concerning this letter, phase contact Mr. Allan Haeger at (630) 657-2807 .
Respectfully, Keith R. Jury Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC