Response to Request for Additional Information September 27, 2004 Telephone Conversation Regarding Ccnpp Revised Security Plans; Design Basis Threat Order EA-03-086
ML042780285
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/30/2004
From: Nietmann K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
EA-03-086, TAC MC2900, TAC MC2901
Download: ML042780285 (3)


Text

Kevin J. Nietmann SAFEGUARDS INFORMATION 1650 Calvert Cliffs Parkway Plant General Manager Lusby, Maryland 20657 410.495.4101 410.495.4787 Fax Constellation Energy Calvert Cliffs Nuclear Power Plant September 30, 2004 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 Response to Request for Additional Information Re: September 27, 2004 Telephone Conversation Regarding CCNPP Revised Security Plans; Design Basis Threat Order EA-03-086

REFERENCES:

(a) Letter from Mr. G. Vanderheyden (CCNPP) to Document Control Desk (NRC), dated April 29, 2004, Supplemental Response to the April 29, 2003 Orders to Calvert Cliffs Nuclear Power Plant, Inc.

(b) Letter from Mr. G. Vanderheyden (CCNPP) to Document Control Desk (NRC), dated September 2, 2004, Amended Supplemental Response to the April 29, 2003 Orders to Calvert Cliffs Nuclear Power Plant, Inc. Re:

Design Basis Threat Order EA-03-086 (c) Letter from Mr. G. Vanderheyden (CCNPP) to Document Control Desk (NRC), dated September 15, 2004, Response to Request for Additional Information Re: September 13, 2004 Telephone Conversation Regarding CCNPP Physical Security Plan and Safeguards Contingency Plan; Design Basis Threat Order EA-03-086 (d) Letter from Mr. S. A. Morris (NRC) to Mr. G. Vanderheyden (CCNPP),

dated September 21, 2004, Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response (TAC Nos. MC2900 and MC2901)

The Nuclear Regulatory Commission ("NRC") issued an Order dated April 29, 2003, requiring compliance with Revised Design Basis Threat ("Order EA-03-086") for the Calvert Cliffs Nuclear Power Plant ("CCNPP"), Units I and 2. By letter dated April 29, 2004 (Reference a), CCNPP submitted its Supplemental Response to Order EA-03-086. Our Supplemental Response (Reference a) included, as Attachment A, revisions to the CCNPP Physical Security Plan, Safeguards Contingency Plan, and the Training and Qualification Plan as required by Order EA-03-086.

This cover letter is not subject to protective requirements. The enclosure is subject to safeguards information protection according to 10 CFR 73.21. Upon separation from the enclosure, this cover letter is to be considered DECONTROLLED.

SAFEGUARDS INFORMATION

Document Control Desk September 30, 2004 Page 2 Subsequent to the submittal of our Supplemental Response, we received several Requests for Additional Information (RAls) from the NRC. We responded to those RAls within the time frames specified. To facilitate your review of our revised plans, we submitted an Amendment to our Supplemental Response (Reference b). Subsequent to the submittal of our Amended Supplemental Response, we received an additional RAI via telephone conversation with Mr. Brian Benney of your staff. We responded to that RAI via letter dated September 15, 2004 (Reference c).

In a telephone conversation on September 27, 2004, we discussed the security provisions identified in Reference (d) with Mr. Benney. As a result of that discussion, Sections 6.1.2, 9.7, 10.5, and 13 of our Physical Security Plan; Table I "Critical Task Matrix" of our Training and Qualification Plan; and Section 7 of our Safeguards Contingency Plan have been changed.

Therefore, we have enclosed a CD-ROM containing our plans, incorporating all RAIs received. All other information, provided in our previous responses (References a, b, and c) remains unchanged.

Document Control Desk September 30, 2004 Page 3 Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, STATE OF MARYLAND

TO WIT:

COUNTY OF CALVERT I, Kevin J. Nietmann, being duly sworn, state that I am Plant General Manager - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPPI), and that I am duly authorized to execute and file this response on behalf of CCNPPI. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPPI employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

Subscribed and sworn before me, a Notary Public in and for the State of Maryland and County of d v~eL i .this 3 day of D , 2004.

WITNESS my Hand and Notarial Seal:

Notary Public My Commission Expires:

Date KJN/ALS/bjd cc: (fithout Enclosure)

J. M. Petro, Esquire Resident Inspector, NRC M. J. Wetterhahn, Esquire R. I. McLean, DNR R. V. Guzman, NRC J. E. Dyer, NRC S. J. Collins, NRC R. P. Zimmerman, NRC