SAFEGUARDS INFORMATION Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation Energy Group July 27, 2004 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 Response to Request for Additional Information Re: Training and Qualification Plan (TAC Nos. MC2900 and MC2901)
REFERENCES:
(a)
Letter from Mr. G. Vanderheyden (CCNPP) to Document Control Desk (NRC), dated April 29, 2004, "Supplemental Response to the April 29, 2003 Orders to Calvert Cliffs Nuclear Power Plant, Inc."
(b)
Letter from Mr. B. Benney (NRC) to Mr. G. Vanderheyden (CCNPP) dated July 9, 2004, "Calvert Cliffs Nuclear Power Plant, Units I and 2 -
Request for Additional Information Re: Training and Qualification Plan (TAC Nos. MC2900 and MC2901)"
In reference (a) we submitted our revised physical security plan, safeguards contingency plan, and guard training and qualification plan, including an implementation schedule, for Calvert Cliffs Nuclear Power Plant, Units I and 2, in response to the April 29, 2003 Orders revising the design basis threat. This letter is in response to the questions posed in Reference (b).
In Reference (b) the Nuclear Regulatory Commission staff requested a response to the request for additional information within ten working days from the date of receipt. We received Reference (b) on July 13, 2004.
This letter is not subject to protective requirements.
The enclosure contains Safeguards Information and is therefore subject to Safeguards Information protection according to 10 CFR 73.21. Upon separation from the Enclosure, this letter is DECONTROLLED.
SAFEGUARDS INFORMATION 1,(0,5
SAFEGUARDS INFORMATION Document Control Desk July 27, 2004 Page 2 Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, STATE OF MARYLAND COUNTY OF CALVERT
- TO WIT:
I, Kevin J. Nietmann, being duly sworn, state that I am Plant General Manager - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this response on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/or consultants.
Such information has been reviewddihlfl~to~ance with company practice and I believe it to be reliable.
Suo before me, a Notary Public in and for the State of Maryland and County of thisiZ:
j day of ZLOM 2004.
WITNESS my Hand and Notarial Seal:
My Commission Expires:
Notary Public V-is -1&I Date KJN/ALS/bjd
Enclosure:
As stated cc:
(Without Enclosure)
J. Petro, Esquire M. Wetterhahn, Esquire Director, Project Directorate I-1, NRC R. V. Guzman, NRC H. J. Miller, NRC Resident Inspector, NRC R. I. McLean, DNR B. J. Benney, NRC SAFEGUARDS INFORMATION-