& Millstone Power Station - Letter, Security Plan Provisions for Enhanced Owner Controlled Area Surveillance & Response (TAC Nos. MC2938, MC2939, MC2943, MC2944, MC2977 & MC2978.)
ML042680037
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 09/21/2004
From: Scott(Ois) Morris
NRC/NSIR/DNS
To: Christian D
Dominion Nuclear Connecticut
Morris S A NSIR/DNS 301-415-7083
References
TAC MC2938, TAC MC2939, TAC MC2943, TAC MC2944, TAC MC2977, TAC MC2978
Download: ML042680037 (7)


Text

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION September 21, 2004 Mr. David A. Christian Senior Vice President - Nuclear Operations And Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

SECURITY PLAN PROVISIONS FOR ENHANCED OWNER CONTROLLED AREA SURVEILLANCE AND RESPONSE (TAC NOS. MC2938, MC2939, MC2943, MC2944, MC2977, AND MC2978)

Dear Mr. Christian:

On May 14, 2004, the U. S. Nuclear Regulatory Commissions (NRC) staff completed an evaluation of lessons learned from the pilot expanded force-on-force exercises. As a result of this evaluation, surveillance and response in the owner controlled area (OCA) was identified as one aspect of security at nuclear power plant facilities that required further improvement. On August 13, 2004, the Commission directed the staff to work with industry toward voluntary implementation of enhanced OCA surveillance and response measures.

The NRC staff worked with the industrys Security Working Group and the Nuclear Energy Institute to develop appropriate provisions to be included in physical security plans. These provisions have been discussed with your staff for incorporation into your facilities physical security plan. Specific revised security plan language developed to achieve this objective is included as an enclosure to this letter.

Thank you for your cooperation in resolving this issue. Should you have further questions on this matter, please call Juan Peralta at (301) 415-6689 or me at (301) 415-7083.

Sincerely,

/RA/

Scott A. Morris, Chief Reactor Security Section Division of Nuclear Security Office of Nuclear Security and Incident Response

Enclosure:

As stated cc: See next page WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties NOTICE: Enclosure transmitted herewith contains Safeguards Information. When separated from Enclosure(s) this Cover Document is DECONTROLLED

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION September 21, 2004 Mr. David A. Christian Senior Vice President - Nuclear Operations And Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

SECURITY PLAN PROVISIONS FOR ENHANCED OWNER CONTROLLED AREA SURVEILLANCE AND RESPONSE (TAC NOS. MC2938, MC2939, MC2943, MC2944, MC2977, AND MC2978)

Dear Mr. Christian:

On May 14, 2004, the U. S. Nuclear Regulatory Commissions (NRC) staff completed an evaluation of lessons learned from the pilot expanded force-on-force exercises. As a result of this evaluation, surveillance and response in the owner controlled area (OCA) was identified as one aspect of security at nuclear power plant facilities that required further improvement. On August 13, 2004, the Commission directed the staff to work with industry toward voluntary implementation of enhanced OCA surveillance and response measures.

The NRC staff worked with the industrys Security Working Group and the Nuclear Energy Institute to develop appropriate provisions to be included in physical security plans. These provisions have been discussed with your staff for incorporation into your facilities physical security plan. Specific revised security plan language developed to achieve this objective is included as an enclosure to this letter.

Thank you for your cooperation in resolving this issue. Should you have further questions on this matter, please call Juan Peralta at (301) 415-6689 or me at (301) 415-7083.

Sincerely,

/RA/

Scott A. Morris, Chief Reactor Security Section Division of Nuclear Security Office of Nuclear Security and Incident Response

Enclosure:

As stated cc: See next page Docket Nos.: 50-336, 50-423, 50-338, 50-339, 50-280, and 50-281 DISTRIBUTION:

SPRT R/F RFretz DHuyck JCreed BBenney BVaidya ACRS OGC MBurrell DSpaulding RManili PPeduzzi MChernoff VNerses SMonarque DCollins MRoss-Lee CHolden EHackett GMatakas, RI VMcCree, RII ADAMS Accession Number: ML042680037 OFFICE SPRT/LA SPRT SPRT SPRT NAME CHawes JPeralta JNakoski SMorris DATE 9/20/04 9/20/04 9/20/04 9/20/04

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION OFFICIAL RECORD COPY

Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 Millstone Power Station, Unit Nos. 2 and 3 cc:

Mr. C. Lee Lintecum County Administrator Louisa County P. O. Box 160 Louisa, Virginia 23093 Ms. Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Building 475, 5th floor Rope Ferry Road Rt. 156 Waterford, Connecticut 06385 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23218 Old Dominion Electric Cooperative 4201 Dominion Blvd.

Glen Allen, Virginia 23060 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U. S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117 Mr. Jack M. Davis Site Vice President North Anna Power Station P. O. Box 402 Mineral, Virginia 23117-0402 Mr. Richard H. Blount, II Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Mr. Robert B. Stroube, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P. O. Box 2448 Richmond, Virginia 23218 Mr. William R. Matthews Vice President-Nuclear Operations Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, Virginia 23060-6711 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360

Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 Millstone Power Station, Unit Nos. 2 and 3 cc:

Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 Dr. Robert M. Hallisey, Director Radiation Control Program Commonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Steve Brennion Supt., Regulatory & Industry Affairs Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road, M/S 1 Plymouth, MA 02360-5508 Mr. Jack Alexander Manager, Reg. Relations and Quality Assurance Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5599 Mr. David F. Tarantino Nuclear Information Manager Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5599 Ms. Jane Perlov Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Mr. Stephen J. McGrail, Director Attn: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360

Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 Millstone Power Station, Unit Nos. 2 and 3 cc:

Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Stephen J. Bethay Director, Nuclear Assessment Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Danny L. Pace Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Senior Resident Inspector U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station 600 Rocky Hill Road Mail Stop 66 Plymouth, MA 02360-5508 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Jim Sniezek 5486 Nithsdale Drive Salisbury, MD 21801

Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 Millstone Power Station, Unit Nos. 2 and 3 cc:

Mr. Kennety L. Graesser 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. Ronald Toole 1282 Valley of Lakes Box R-10 Hazelton, PA 18202 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056 Mr. David A. Christian Sr. Vice President & Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 Millstone Power Station, Unit Nos. 2 and 3 cc:

Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.

Roper Ferry Road Waterford, CT 06385 Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.

Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711