Letter Sequence Other |
---|
|
|
MONTHYEARML0417505452004-06-21021 June 2004 RAI, Security Plan Sections 10-19 Project stage: RAI ML0417504462004-06-21021 June 2004 RAI, Security Plan Sections 10-19 Project stage: RAI ML0419700792004-06-25025 June 2004 RAI, Security Plan Sections 1-9 (TAC Nos. MC2938, MC2939, MC2943, MC2944, MC2977, and MC2978) Project stage: RAI ML0421000812004-07-0909 July 2004 RAI, Training and Qualification Plan (TAC Nos. MC2938, MC2939, MC2943, MC2944, MC2977, and MC2978) Project stage: RAI ML0422200552004-07-23023 July 2004 RAI Safeguards Contingency Plan and Section 9.4.1 Fo the Physical Security Plan Project stage: RAI ML0421001822004-07-23023 July 2004 RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2938, MC2939, MC2943, MC2944, MC2977 & MC2978) Project stage: RAI ML0422402262004-08-10010 August 2004 Response to Request for Additional Information Re Safeguards Contingency Plan and Security Plan Section 9.4.1 Project stage: Response to RAI ML0424003702004-08-23023 August 2004 Proposed ISFSI North Anna Power Station Units 1 & 2 and ISFSI Surry Power Station Units 1 & 2 and ISFSI Response to Request for Additional Information Safeguards Contingency Plan and Physical Security Plan Project stage: Response to RAI ML0425902042004-09-10010 September 2004 Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures Project stage: Other ML0428202182004-09-28028 September 2004 ISFSI Surry Power Station ISFSI, Confirmation of Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures (TAC No. MC2943 and MC2944) Project stage: Other ML0428005312004-10-0101 October 2004 Units 1, 2, 3 & ISFSI Response to Request for Additional Information Waterborne Threat and Other Plan Changes Project stage: Response to RAI ML0428803682004-10-12012 October 2004 Revision of Response to Request for Additional Information Waterborne Threat Project stage: Response to RAI ML0431200032004-10-29029 October 2004 Administrative Change to Facility Operating Licenses in Conjunction with the Commission Order EA-03-086 Regarding the Revised Design Basis Threat (Dbt); and Revisions To... Project stage: Other ML0435102182004-12-0909 December 2004 Proposed ISFSI North Anna Power Station Units 1 & 2 and ISFSI Surry Power Station Units 1 & 2 and ISFSI Review of Safety Evaluation Report (TAC Nos. MC2938, MC2939, MC2943, MC2944. MC2977. and MC2978) Project stage: Other 2004-06-25
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J 2024-02-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23081A5282023-04-26026 April 2023 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23046A1172023-02-0202 February 2023 002 Radiation Safety Baseline Inspection Information Request ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML22339A1582022-11-30030 November 2022 Requalification Inspection Notification Letter ML22258A2202022-09-13013 September 2022 FFD RFI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22223A1192022-08-14014 August 2022 RP Inspection Document Request Letter Final ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22067A1622022-03-0909 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21322A0992021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21256A0692021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Request for Confirmation of Information ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21196A1012021-07-15015 July 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000280/2021011 and 05000281/2021011) and Request for Information (RFI) ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21102A3122021-04-12012 April 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure ML21061A0292021-03-0101 March 2021 2021 Sur - POV Inspection Information Request ML21049A0212021-02-17017 February 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000338/2021012 and 05000339/2021012) and Request for Information (RFI) ML21049A2662021-02-16016 February 2021 NRR E-mail Capture - Surry, Units 1 and 2 - Final RAI Concerning the Leak-Before-Break (LBB) LAR ML21049A2672021-02-11011 February 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Draft RAI for the LBB LAR 2023-09-14
[Table view] |
Text
September 10, 2004 Mr. David A. Christian Dominion Nuclear Connecticut, Inc.
North Anna Power Station, Units 1 and 2 Surry Units 1 and 2 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT:
IMPLEMENTATION STATUS OF INDEPENDENT SPENT FUEL STORAGE INSTALLATION INTERIM COMPENSATORY MEASURES (TAC NO. MC2943 AND MC2944)
Dear Mr. Christian:
The Nuclear Regulatory Commission (NRC) issued Order (EA-02-104) to all holders of general and specific licenses of Independent Spent Fuel Storage Installations (ISFSIs) on October 16, 2002, requiring implementation of security-related interim compensatory measures (ICMs). Since October 16, 2002, the NRC has issued by Order the same ICMs to six additional facilities. Although the NRC did not require licensees to modify their ISFSI physical protection plans in response to these Orders, the NRC staff reviewed all licensee responses to these Orders and concluded that they were acceptable.
Subsequently, the NRC issued Orders (EA-03-086) dated April 29, 2003, to all power reactor licensees that required them to modify their physical security, safeguards contingency, and training and qualification plans mandated by 10 CFR 50.34(c), 50.34(d), and 73.55(b)(4)(ii) to provide protection against the revised Design Basis Threat (DBT). The Order further required that these revised power reactor security plans be submitted to the NRC by April 29, 2004.
Several licensees with ISFSIs included ISFSI-related security provisions in their revised power reactor security plans. However, the NRC does not intend to review ISFSI-related security provisions as part of its review of the revised power reactor security plans submitted in response to the April 29, 2003, Order. The NRC staff at this time, seeks to ensure that ISFSI-related security provisions implemented in response to the ICMs remain unchanged.
To achieve this aim, the NRC is requesting that those licensees who are in receipt of this letter respond in writing, within 10 days from the receipt of this letter, stating whether or not their implementation of ISFSI-related security provisions of the ISFSI ICM Orders have been modified or revised since responding to the ISFSI Orders described above. If no modifications or revisions which decrease the effectiveness of the implementation of ISFSI-related security provisions have been made, a statement to that effect will suffice as an adequate response to this letter. Where modifications or revisions which decrease the effectiveness of the ISFSI-related security provisions are proposed, provide detailed descriptions of those modifications or revisions. NRC review and approval of the proposed modifications or revisions would be required prior to implementation.
D. A. Christian If you have any questions concerning this request, please contact me at (301) 415-3498 or by e-mail at BKV@nrc.gov.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Bhalchandra K. Vaidya, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-338, 50-339, 50-280 and 50-281 cc: See next page
ML042590204 OFC NSIR NSIR NSIR NSIR SFPO OGC SFPO NSIR NAME PKelley MLayton SMorris JShea MRoss-Lee JGoldberg WBrach GTracy (DDorman for)
DATE 8/13/04 8/13/04 8/13/04 8/13/04 8/20/04 8/25/04 9/2/04 9/8/04 OFC SPRT/PM SPRT/SC NAME BVaidya JNakoski DATE 9/10/04 9/10/04 Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 cc:
Mr. C. Lee Lintecum Site Vice President County Administrator Surry Power Station Louisa County Virginia Electric and Power Company P. O. Box 160 5570 Hog Island Road Louisa, Virginia 23093 Surry, Virginia 23883-0315 Ms. Lillian M. Cuoco, Esq. Mr. Robert B. Stroube, M.D., M.P.H.
Senior Counsel State Health Commissioner Dominion Resources Services, Inc. Office of the Commissioner Building 475, 5th floor Virginia Department of Health Rope Ferry Road P. O. Box 2448 Rt. 156 Richmond, Virginia 23218 Waterford, Connecticut 06385 Mr. William R. Matthews Dr. W. T. Lough Vice President-Nuclear Operations Virginia State Corporation Virginia Electric and Power Company Commission Innsbrook Technical Center Division of Energy Regulation 5000 Dominion Boulevard P. O. Box 1197 Glen Allen, Virginia 23060-6711 Richmond, Virginia 23218 Senior Resident Inspector Old Dominion Electric Cooperative Surry Power Station 4201 Dominion Blvd. U. S. Nuclear Regulatory Commission Glen Allen, Virginia 23060 5850 Hog Island Road Surry, Virginia 23883 Office of the Attorney General Commonwealth of Virginia Chairman 900 East Main Street Board of Supervisors of Surry County Richmond, Virginia 23219 Surry County Courthouse Surry, Virginia 23683 Senior Resident Inspector North Anna Power Station Resident Inspector U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission 1024 Haley Drive Pilgrim Nuclear Power Station Mineral, Virginia 23117 Post Office Box 867 Plymouth, MA 02360 Mr. Jack M. Davis Site Vice President North Anna Power Station P. O. Box 402 Mineral, Virginia 23117-0402 Mr. Richard H. Blount, II
Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 cc:
Chairman, Board of Selectmen Supt., Regulatory & Industry Affairs 11 Lincoln Street Entergy Nuclear Operations, Inc.
Plymouth, MA 02360 Pilgrim Nuclear Power Station 600 Rocky Hill Road, M/S 1 Chairman, Duxbury Board of Selectmen Plymouth, MA 02360-5508 Town Hall 878 Tremont Street Mr. Jack Alexander Duxbury, MA 02332 Manager, Reg. Relations and Quality Assurance Office of the Commissioner Pilgrim Nuclear Power Station Massachusetts Department of 600 Rocky Hill Road Environmental Protection Plymouth, MA 02360-5599 One Winter Street Boston, MA 02108 Mr. David F. Tarantino Nuclear Information Manager Office of the Attorney General Pilgrim Nuclear Power Station One Ashburton Place 600 Rocky Hill Road 20th Floor Plymouth, MA 02360-5599 Boston, MA 02108 Ms. Jane Perlov Dr. Robert M. Hallisey, Director Secretary of Public Safety Radiation Control Program Executive Office of Public Safety Commonwealth of Massachusetts One Ashburton Place Executive Offices of Health and Boston, MA 02108 Human Services 174 Portland Street Mr. Stephen J. McGrail, Director Boston, MA 02114 Attn: James Muckerheide Massachusetts Emergency Management Regional Administrator, Region I Agency U. S. Nuclear Regulatory Commission 400 Worcester Road 475 Allendale Road Framingham, MA 01702-5399 King of Prussia, PA 19406-1415 Chairman Mr. John M. Fulton Nuclear Matters Committee Assistant General Counsel Town Hall Entergy Nuclear Operations, Inc. 11 Lincoln Street 440 Hamilton Avenue Plymouth, MA 02360 White Plains, NY 10601 Mr. Steve Brennion
Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 cc:
Mr. William D. Meinert Vice President, Operations Support Nuclear Engineer Entergy Nuclear Operations, Inc.
Massachusetts Municipal Wholesale 440 Hamilton Avenue Electric Company White Plains, NY 10601 P.O. Box 426 Ludlow, MA 01056-0426 Mr. John F. McCann Director, Nuclear Safety Assurance Mr. Gary J. Taylor Entergy Nuclear Operations, Inc.
Chief Executive Officer 440 Hamilton Avenue Entergy Operations White Plains, NY 10601 1340 Echelon Parkway Jackson, MS 39213 Ms. Charlene D. Faison Manager, Licensing Mr. John T. Herron Entergy Nuclear Operations, Inc.
Sr. VP and Chief Operating Officer 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Mr. Stephen J. Bethay Entergy Nuclear Operations, Inc.
Director, Nuclear Assessment 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 Pilgrim Nuclear Power Station 600 Rocky Hill Road Senior Resident Inspector Plymouth, MA 02360-5508 U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Mr. Bryan S. Ford 600 Rocky Hill Road Manager, Licensing Mail Stop 66 Entergy Nuclear Operations, Inc. Plymouth, MA 02360-5508 Pilgrim Nuclear Power Station 600 Rocky Hill Road Ms. Stacey Lousteau Plymouth, MA 02360-5508 Treasury Department Entergy Services, Inc.
Mr. Danny L. Pace 639 Loyola Avenue Vice President, Engineering New Orleans, LA 70113 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue Jim Sniezek White Plains, NY 10601 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Brian OGrady
Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 cc:
Mr. Kennety L. Graesser Co-Chair 38832 N. Ashley Drive Nuclear Energy Advisory Council Lake Villa, IL 60046 9 Susan Terrace Waterford, CT 06385 Mr. Ronald Toole 1282 Valley of Lakes Ms. Nancy Burton Box R-10 147 Cross Highway Hazelton, PA 18202 Redding Ridge, CT 00870 Edward L. Wilds, Jr., Ph.D. Mr. G. D. Hicks Director, Division of Radiation Director - Nuclear Station Safety and Department of Environmental Licensing Protection Dominion Nuclear Connecticut, Inc.
79 Elm Street Rope Ferry Road Hartford, CT 06106-5127 Waterford, CT 06385 First Selectmen Mr. Evan W. Woollacott Town of Waterford Co-Chair 15 Rope Ferry Road Nuclear Energy Advisory Council Waterford, CT 06385 128 Terrys Plain Road Simsbury, CT 06070 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Mr. William D. Meinert Dominion Nuclear Connecticut, Inc. Nuclear Engineer Rope Ferry Road Massachusetts Municipal Wholesale Waterford, CT 06385 Electric Company P.O. Box 426 Charles Brinkman, Director Ludlow, MA 01056 Washington Operations Nuclear Services Westinghouse Electric Company Mr. David A. Christian 12300 Twinbrook Pkwy, Suite 330 Sr. Vice President & Chief Nuclear Officer Rockville, MD 20852 Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center Senior Resident Inspector 5000 Dominion Boulevard Millstone Power Station Glen Allen, VA 23060-6711 c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz
Dominion Company North Anna Power Station, Units 1 and 2 Surry Power Station, Units 1 and 2 cc:
Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.
Roper Ferry Road Waterford, CT 06385 Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.
Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711