Units 1 and 2 - Supplemental Response to the Design Basis Threat Order Physical Security Plans - NRC Order EA-03-086 (TAC Nos. MC2972 and MC2973)
ML042590061
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/10/2004
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
EA-03-086, TAC MC2972, TAC MC2973
Download: ML042590061 (2)


Text

SAFEGUARDS INFORMATION Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 September 10, 2004 EA-03-086 U.S. Nuclear Regulatory Commission 10 CFR 2.202 ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT - UNITS 1 AND 2 - SUPPLEMENTAL RESPONSE TO THE DESIGN BASIS THREAT ORDER PHYSICAL SECURITY PLANS - NRC ORDER EA-03-086 (TAC NOS. MC2972 AND MC2973)

The purpose of this letter is to provide the Physical Security Plan including the Training and Qualification Plan and the Safeguards Contingency Plan. This plan included in the enclosure supercedes TVA's proposed Physical Security Plan dated April 29, 2004, pursuant to the subject Order and includes proposed changes in response to NRC's requests for additional information.

In TVA's letter to NRC dated September 1, 2004, TVA stated that the force-on-force exercises shall follow the guidance of NEI 03-09 (Revision 1), January 2004. As stated in the supplemental Physical Security Plan TVA will follow the guidance of NEI 03-09 (Revision 2), April 2004. This response contains Safeguards Information as defined in 10 CFR 73.21.

TVA therefore, requests that the enclosure be withheld from public disclosure.

There are no regulatory commitments identified in this submittal. If you have any questions about these responses, please contact me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Safeguards Information Classification Does Not Apply To This Page When Separated From The Attachment.

SAFEGUARDS INFORMATION PFnled paep on ncyded

-. SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 2 September 10, 2004 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 10th day of September 2004.

Sincerelyr P..Pace Manager, Licensing and Industry Affairs Enclosure cc (Enclosure):

Dr. William D. Travers Regional Administrator, Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30323-8931 Safeguards Information Classification Does Not Apply To This Page When Separated From The Attachment.