ML042190122

From kanterella
Jump to navigation Jump to search
June 2004 Exam 50-269/2004-301 Final JPMs
ML042190122
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/17/2004
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Bradley Jones
Duke Energy Corp
References
50-269/04-301, 50-270/04-301, 50-287/04-301
Download: ML042190122 (199)


See also: IR 05000269/2004301

Text

Final Submittal

OCONEE JUNE 2004 EXAM

50-26912004-301I

50-27012004-301, &

50-28712004-301

-

JUNE 14 18 & 25,2004

Admin-100 fnl

Page 1 of 7

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

DETERMINE SDM

WITH A DROPPED CONTROL ROD

CANDIDATE

EXAMINER

Admin-100 fnl

Page 2 of 7

REGION II

INITIAL LICENSE EXAWNATION

JOB PERFORMANCE MEASURE

Task:

DETERMINE SBM WITH A DROPPED CONTROL ROD

Alternate Path:

Facllitv JPM #:

. . . .

KIA Ratindsk

Gsn 2.12 3 3.9/4.0

Task Standard:

PT/l/Ni lOW15, Reactivity Balance Procedure is used to verify > 1% SDM with one inoperable (dropped) CR within

I hour. Determinethat 1% SDM does not exist and boratlon is required within 15 minutes.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X

--. In-Plant ~ Perform Simulate -

References:

PT/I/Af1103/15, Reactivity Balance Procedure

AP/l/NI 70011 5, Dropped Control Rods

Technical Specifications:

3.1.4, Control Rod Group Alignment Limits

3.2.1, Regulating Rod Position Limits

Validation Time: 10 min. Time Critical: YES

...................................................................................

Candidate: Time Start:

NAME Time Finish:

Performance Ratinq SAT ~ UNSAT - Performance Time

Examiner: - /

NAME SkNATURE DATE

COMMENTS

Admin-100 fnl

Page 3 of 7

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 205

2. Import Admin-7 OR Simulator files

Admin-100 fnl

Page 4 of 7

Teo%s/EcluipmentEProcedures Needed:

PT/1/A/1103/8157Reactivity Balance Procedure

OP/0/A/1105/009, Control Rod Drive System

Technical Specifications:

3.4.4,Control Rod Group Alignment Limits

3.2.1,Regulating Rod Position Limits

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

You are the Unit 1 OAYC and Group 6 Rod 3 has dropped into the core. Reactor power is stable

at = 55%. AP/l/a/l700/15, Dropped Control Rods, has been completed up to step 4.5.

INITIATING CUES:

The SWO in the Control Room directs you to continue with AP/l/a/1700/15, Dropped Control

Rods.

TIME CRITICAL

Admin-100 fnl

Page 5 of 7

START TIME:

STEQ: Within one hour verify > 1% SDM with allowance to the inoperable control

rod. Perform PT/l/A/1103/15. Reactivity Balance Procedure.

-SAT

STANDARD: Obtain copy of PT/l/A/1103/15, Reactivity Balance Procedure.

COMMENTS:

-UNSAT

STEP: Determine proper enclosure to use.

STANDARD: Enclosure 13.19, Shutdown Margin at Power, Is chosen.

__ SAT

I COMMENTS:

-UNSAT

Refer to the COLR. Use the "Control Rod Position Setpoints 1 inoperable CRlTICPab STEP

Rod, 4 Pump Flow" curve. Verify SDM is 2 1% AWK by verifying that the

control rod position and power level are within the acceptable region of

the curve. -SAT

STANDARD: SDM is determined to be is s 1% AUK.

__ UNSAT

COMMENTS:

4- Appropriate actions are taken per ITS 3.1.4, 3.1.5 and 3.2.1. CRITICAL STEP

STANDARD: Refer to IT§ 3.1.4, 3.1.5 and 3.2.1 and determine that initiation of

boration to restore SDM to within limits is required within 15 minutes. -SAT

C U E !nnfesrPp student that an RQ is commencing boration.

COMMENTS: -UNSAT

END OF TASK

TIME STOP:

Admin-100 fnl

Page 6 of 7

-STEPEs.P.LANATI 0 NS:

STEP # Explanation

3 Step is necessary, the operator must interpret the 4 WCP curve to ensure adequate

SDM.

4 Step is necessary; initiation of boration must QCCW within 15 minutes to restore SDM.

Admin-100 fnl

Page 7 of 7

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

You are the Unit 1 OATC and Group 6 Rod 3 has dropped into the core. Reactor power is stable

at = 55%. AP/t/A/1700/15, Dropped Control Rods, is complete up to step 4.5.

INlTlATlNG CUES:

The SWO in the Control Room directs you to continue with AP/l/PJl700/f5, Dropped Control

Rods.

TIME CRITICAL

Acimin-103 fnl

Page 1 of 10

REGION ll

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

-

Admin I03

PERFORM MANUAL RCS LEAKAGE CALCULATION

CANDIDATE

EXAMINER

Admin-103 fnl

Page 2 of 10

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

PERFORM MANUAL RCS LEAKAGE CALCULATION

Alternate Path:

No

Facilitv JPM #:

CRO-43

WA Ratindsl:

Gen 2.1.7 3.714.4

Task Standard:

RCS Leakage is correctly calculated within .Q1 gpm of attached key.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator ~ In-Plant Perform X Simulate -

References:

PT/O/A/060O/OQIA, Loss Of Computer

PT/IiA/600/10. Reactor Coolant Leakage

Examiner: /

NAME SIGNATURE DATE

Admin-I03 fnl

Page 3 of 10

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Admin-103 fnl

Page4of 10

Poolsl~suipmenffProceduresNeeded:

Enclosure 43.3 of PTIl/N600/10

READ PO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reporis on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

lNlTiAL CONDITIONS:

Unit 1 computer repairs are expected to be extended through turnover for hardware

replacement. The boss of Computer procedure PTl/O/A/0600/001A, boss Of Computer, is in

progress, however an RCS Leakage Calculation has not been performed during this shift.

INITIATING CUES:

The Control ROOM SRO directs you to perform a manual RCS leakage per PT/1/,4/600/10

(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the

final set of leakage data and manually calculate the RCS leakage rate. Enclosure 13.3 of

PT/I/N600/10 (Reactor Coolant Leakage) is complete up to step 2.2.

Admin-103 fnl

Page 5 of 10

START TIME:

Note: Data cues are only applicable if JPM is performed in the control

room. I SAT

Step 2.2

After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, Record final set of data in "Table #I"

-UNSAT

STANDARD: Student enters final set of data into "Table # I " of Enclosure 13.3 (Manual

Leakage Calculation Data Sheet).

CUE: Present student with aifachment of final data readings.

OR

Student locates Prr level gauge on UBI and enters value on data sheet.

CUE: Pzr Level 269.0 inches

Student locates Quench Tank level on AB1 and enters value on data

sheet.

CUE: Quench Tank Level 84.9 inches

Student locates LDST level gauge on UBI and enters value on data

sheet.

CUE: LDST Leveel 73.4 inches

Student locates Tave meter on UB1 and enters value on data sheet.

CUE: Tave Indication 579.0"F

Student locates Power meters on UBI and enters value on data sheet

CUE: Power Range N! indicates 100.1%

Student locates RCS NR Pressure chart on UBI and enters value on

data sheet.

CUE: RCS NR Pressure chart 2450 psig

Student locates Group 7 Control Rod Position on the Computer and

enters value on data sheet.

CUE: Group 7 Control Rod Position is 93.6%

COMMENTS:

Adrnin-103 fnl

Page6 .- 0 f 1 0

Step 2.3

Calculate and record Change values in "Table # I " of Enclosure 13.3

(Manual Leakage Calculation Data Sheet).

-SAT

STANDARD Student performs calculation and records Change values in "Table #?"

Enclosure 13.3 (Manual Leakage Calculation Data Sheet).

-UNSAT

COMMENTS:

Step 2.4

Calculated Corrected PZW Level Change:

-SAT

STANDARD: (- 6.831 inchesl" F x O F) =+ 1.0 inches = 0.3169 inches

UNSAT

COMMENTS:

Step 2.5

Convert Corrected PZR Level Change to gallons:

SAT

STANDARD: 0.3269 inches X 14.364 gAlofls/inch = gallons

-UNSAT

COMMENTS:

5- Step 2.6

Convert QT Level Change to gallons:

~ SAT

I UNSAT

COMMENTS:

Admin-103 fnl

-. -9 of 10

STEP: Step 4.7

Convert LDST Level Change to gallons:

-SAT

-UNSAT

COMMENTS:

- . ..

9- Step 2.8

Calculated Total Volume Change:

-SAT

STANDARD:

4.552 gallons + - q0.482 gallons + I- 9.287 qallons) = - 25.247 gallons -UNSAT

COMMENTS:

STEP: Step 2.9 CRITICAL TAS

Calculate RCS Leakage Rate:

-SAT

STANDARD: - 45.217 gallons '60 -

minutes = 0.254 gpm (k .01 gprn)

COMMENTS:

-UNSAT

~.. . . TASK

END _. _. .. .-

STOP TIME:

Admin-103 fnl

Page 8 of 10

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

8 Necessary data calculation to properly determine manual RCS leakage rate.

Note: If complamenery errors occur while performing calculations is steps 3 - 7 they

will become critical. Credit will not be given for obtaining the correct answer for the

wrong reason.

Admin-I03 fnl

Page 9 of 10

Manuai RCS Leakage Final Data

7 -

Parameter Final

~ Time 0115 I

-~

219.8 inches

Quehch Tank....Level 84.9 inches

Tave Indication __ Ei79.0"F I-

Power ~ a n b eNI __

NR Pr&sure

... . . ... ...

!.. ...

Grouo 7 Control Rod Position

Admin-103 fnl

Page 10 of 10

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 computer repairs are expected to be extended through turnover for hardware

replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss Of Computer, is in

progress, however an RCS Leakage Calculation has not been performed during this shift.

INITIATING CUES:

The Control Room SRO directs you to perform a manual RCS leakage per PT/I/A/600/10

(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the

final set of leakage data and manually calculate the RCS leakage rate. Endosure 13.3 of

PT/il/A/600/10 (Reactor Coolant Leakage) is complete up to step 2.2.

Adrnin-110 fnl

Page 1 of 9

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Admin-I I O

Determine Minimum Shift Staffing

CANDIDATE

EXAMINER

Admin-I I O fnl

Page 2 of 9

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Determine MINIMUM staffing requirements for the shift for NEQ's, RQs and SRQs

Alternate Path:

Facilitv JPM #:

Ad

KIA Ratinals):

Gen214 2.313.4

Task Standard:

SLC 16.13.1-1 (Minimum Station Staffing Requirements) is used to correctly determine MINIMUM staffing

requirements for the shift.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator -in-Plant X Perform ~ Simulate 2

Admin-I 10 fnl

Page 3 of 9

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Admin-I 10 fnl

Page 4 of 9

Toolsl~uuipmentlProceduresNeeded:

SLC 16.13.1-1

READ TO OPERATOR

DIRECTIONS TO STUDENT:

I will explain the initiab conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Plant conditions are as following:

Unit 1 is in MODE 5 with fuel handling in the SFP in progress

Unit 2 is in MODE 1 at 73% with 2 8 HPlP OOS for the last 85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br />

Unit 3 is in MODE 1 at 700% power

2 on-shift NEO's are qualified as fire brigade leader

1 RP Tech is fire brigade qualified

INITIATING CUE:

What are the MlNlMUM staffing requirements for the shift?

I ...... .

..... .-

Minimum Number

.~.-~.

OSM

STA

SRO

t

~~~~ ... I . _ '

.

RO ~~~~ ~ I  !

-.

NLO .. -.

! .......

SPOC ~ NIA  !

....  !

...~ -........

!

Chemistry Technician N/A i

l-r

~

.-... d

I

Admin-I10 fnl

Page 5 of 9

START TIME:

STEP 1: Reference SLC 16.13.1

STANDARD: Reference SLC 16.13.1-1 table SAT

COMMENTS:

__ UNSAT

....

...~ -..-.___

STEP 2: Reference SLC 16.13.1-1 for plant conditions

-SAT

STANDARD: Determine correct table to be used:

Column for 2 units in MODE 1-4 from two control rooms based on: -UNSAT

Unit 1 is in MODE 5 with fuel handling in the SFP in progress

Unit 2 is in MODE Iat 73% with 2 8 HPlP 00s for the last 85

hours

Unit 3 is in MODE 1 at 100% power

COMMENTS:

3- Determine correct number from column for 2 units in MODE 1-4 from two

control rooms

STANDARD: 1 QSM. 1 STA. 5 SRO, 5 RO, and 8 NE0 -SAT

COMMENTS:

-UNSAT

=: Determine that available NE0 is fire brigade leader qualified

STANDARD: 2 on-shifi NEO's are qualified as fire brigade leader

1 RP Tech is fire brigade qualified ~ SAT

COMMENTS:

__ UNSAT

Admin-110 fnl

Page 6 of 9

5- Adjust total staffing numbers per Step 4

STANDARD: Subtract 1 SRO based on NE0 qualified as fire brigade leader:

-SAT

1 OSM, 1 STA, 4 SRO, 5 RO, and 8 NE0

COMMENTS: UNSAT

Reference TS 3.5.2.B

STANDARD: Determine that TS 3.5.2.B is applicable:

2 8 HPlP 00s for z 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

-SAT

COMMENTS:

I _ UNSAT

7- Adjust total staffing numbers per Step 6

STANDARD: Add 1 80 based on TS 3.5.2.8applying

___ SAT

1 OSM, 1 STA. 4 SRO, 6 RO. and 8 NE0

COMMENTS:

-UNSAT

STEP: Adjust total staffing numbers per Step 7

STANDARD: Add 2 NEOs based on TS 3.5.2.8 applying

1 OSM, 1 STA, 4 SRO, 6 RO, and I J NE0

-SAT

COMMENTS: ~ UNSAT

Admin-I 10 fnl

Page 7 of 9

STEP: Determine total staffing requirements CRITICAL STEP

STANDARD: 1 OSM. ISTA, 4 SRO, 6 RO, and 10 NE8

-SAT

Position Minimum Number

_I_ UNSAT

OSM 1

STA

..

SRO

II qo

NLO

SPOC I NIA

Chemistry Technician I NIA

RP Technician

._

1

.~

NIA

COMMENTS:

TIME STOP:

Admin-110 fni

Page 8 of 9

CRlTlCAL STEP EXPLANATIONS:

STEP # Explanation

Determine staffing requirements

Admin-110 fnl

Page 9 of 9

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPQN COMPLETION OF TASK)

INITIAL CONDITIONS:

Plant conditions are as following:

Unit 1 is in MODE 5 with fuel handling in the §FP in progress

Unit 2 is in MODE Iat. 73% with 2 8 HPlP 00s for the last 85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br />

Unit 3 is in MODE Z at 100% power

2 on-shift NEO's are qualified as fire brigade leader

1 RP Tech is fire brigade qualified

INITIATING CUE:

What are the MINIMUM staffing requirements for the shift?

SRO I I

I3

NLO

0

t- I

I

.. .

rlstry

k--Technician

.....

Technician

I NIA

'

I

.

..

, NIA

NIA

..

Adrnin-202 fnl

Page 1 of 7

REGION II

INITIAL LICENSE EXAMINATION

PERFORMANCE MEASURE

Ad min-202

Perform surveillance to verify SSF RCMUP Operability

CANDIDATE

EXaMINER

Admin-202 fnl

Page 3 of 7

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Adrnin-202 fnl

Page 4 of 7

ToolslEquipmenffPrasehiuresNeeded:

a PT/I/N0600/001 (Periodic Instrument Surveillance), Encl. 13.1 (Mode 1 & 2) Page 35 of

36

Q Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve of OQ/O/N1108/001

(Curves And General Information)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and slate the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CQNDITIONS:

112EOC20 outage in progress

a Unit 2 was shutdown (subcritical) on 3120104 at 0100

  • Unit 2 core is defueled
  • Spent Fuel Pool Level = +0.1 feet

Spent Fuel Pool Temperature = 91°F

  • Current date and time: 3/26/04 at 1100

Q PT/600/001, Enclosure 13.1 in progress

INITIATING CUE§:

The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page

35.

Admin-202 fnl

Page 5 of 7

START TIME:

Determine if 811 fuel in SFP subcritical > maximum days specified on CRITICAL STEP

Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve

__ SAT

STANDARD: Refer to Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature

Curve of OP/l108/001. Determine that Unit 2s fuel has been subcritical

for 6 days and 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />. This is < than the maximum days specified on

Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve. I UNSAT

COMMENTS:

Verify SFP level > specified on appropriate curve of Enclosure Unit 1&2 CRITICAL STEP

Spent Fuel Pool Level Vs Temperature Curve.

_ I _ SAT

STANDARD: Determine that the correct curve is Day > 6 & 5 7.

ent Fuel Pool water temperature is 98°F by looking on SFP

auge on 2AB3 or on the OAC -UNSAT

Pool water level is + 0.10 feet by looking on SFP

Cue: When a SFP temperature indication is located indicate to the candidate that

SFP temperature = 98F

Determine Spent Fuei Pool water level is + 0.10 feet by looking on SFP

Level gauge on 2AB3.

Cue: When the Unit 1 i% 2 SFP level indication is located indicate to the candidate

that SFP Level = + 0.7 feet.

Determine that SFP level is NOT > than the appropriate curve

COMMENTS:

-

STEP: If limit exceeded, SSF RCMUP is inoperable. CRITICAL STEP

STANDARD: Declare the SSF RCMUQ inoperable. -SAT

COMMENTS:

_ I_ UNSAT

TOP TIME

Admin-202 fnl

Page 6 of 7

CRITICAL STEP EXPLANATIONS:

STEP tc Explanation

I Must determine that some fuel has been subcritical e than the maximum days

specified on Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve

2 Required to determine is SFP level is adequate.

3 SSF RCMUP is declared inoperable.

Adrnin-202 fnl

Page 7 of 7

CANDIDATE CUE SHEET

(TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

e U2EOC20 outage in progress

  • Unit 2 was shutdown (subcritical) on 3/20/04 at 0100

Unit 2 core is defueled

e Spent Fuel Pool Level = +0.1 feet

Spent Fuel Pool Temperature = 91°F

Current date and time: 3/26/04 at 1100

PP/600/001, Enclosure 13.1 in progress

INITIATING CUES:

The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page

35.

Admin-300 fnl

Page 1 of 8

REGION ll

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Ad mi n-300

Calculate the Maximum Permissible Stay Time

Within Emergency Dose Limits (EDL)

CANDIDATE

EXAMINER

Admin-300 fnl

Page 2 of 8

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

__

Task:

Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits

Alternate Path:

NIA

Facilitv JPM #:

NIA

KIA Ratinds):

Gen 2.3.4 2.5B.1

Task Standard:

Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (k 5 minutes).

Examiner: I

NAME SIGNATURE DATE

Adrnin-300 fnl

Page 3 of 8

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Admin-300 fnl

Page 4 of 8

ToolsiEsuiiprnenffProcedur~~ Needed:

None

READ TO OPERATOR

DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be

performed for this JPM, including any required communications. I will provide initiating cues and reports

on other actions when directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Steam Generator Tube Rupture has occurred OR Unit 3

2. Emergency Dose Limits are in effect

3. NEQ Ahas received 2.26 R TEBE this year

4. The following tasks are required to be performed:

...... .

p1 ..... .. , .TASK ...

~. ... .

TIME REQUIRED

. .

... 1.

. ..

O O S...k.. . ..k

... r A

I 1 I Closing 3 ~ - 5 7 3 I 12 min 5.31 Whr I

Open all Unit 3s ADVs 3.65 Whr

Note: Assume no dose received while travelling between tasks.

INITIATING CUE:

Refer to the above information. NEQ A has completed tasks 1 and 2 in the time required. How long does he

have to complete task 3 without exceeding his Emergency Dose Limits?

Admin-300 fnl

Page 5 of 0

START TIME:

Note: Candidate may perform these steps in a different order however the calculated stay time should be

correct.

Note: Candidate should understand the following:

1. EDL is 5 R per event ( L O W or SGTR).

2. Current exposure for the year is not counted toward the Emergency Dose Limit (EDb).

1- Determine dose received while performing task 1. CRITICAL STEP

STANDARD: Determine dose received while performing task 1. -SAT

5.31 Whr X 1hr/60 min X 12 min = 1.06 R

UNSAT

COMMENTS:

Determine dose received while performing task 2. CRITICAL STEP

-SAT

STANDARD: Determine dose received while performing task 2.

19.75 Whr X 1hr/60 min X 4 min = 1.32 R

-UNSAT

COMMENTS:

3- Determine dose remaining from EDLs. CRITICAL STEP

-SAT

STANDARD: Determine dose remaining from EDLs.

5R - 1..06R - 1.32R = 2.62 R

UNSAT

COMMENTS:

Admin-300 fnl

-. . Page6 o f 8

STEP: Determine time available for the NE0 to complete task 3 without CRITICAL STEP

exceeding EDL.

-SAT

STANDARD: Stay time is calculated to be:

Available Dose = = ,728 hr X = 43.1 min

Dose Rate 3.65 Rlhr 1hr -UNSAT

(i5 minutes)

COMMENTS:

..END OF TASK .,,.. ...~

Admin-300 fnl

Page 7 of 8

CRITICAL STEP. EXPLANATIONS:

STE? # Explanation

4 Required to calculate stay time.

2 Required to calculate stay time.

3 Required to calculate stay time.

4 Required to calculate stay time.

Admin-300 fnl

Page 8 of 8

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

1. Steam Generator Tube Rupture has occurred on Unit 3

2. Emergency Dose Limits are in effect

3. N E 0 "A" has received 2.26 R TEDE this year

4. The following tasks are required to be performed:

...... ~. . ....... ..

r.-

..... # ...I...TASK

~

TIME REQUIRED-. ....

~

D .~ O S E RATE .:

Closing 3C-573 5.31 Rfhr

Open 3FDW-313

..

Note: Assume no dose received while traveling between tasks.

lNlTlATlNG CUE:

Refer to the above information. NE0 "A" has completed tasks 1 and 2 in the time required. How long does he

have to complete task 3 without exceeding his Emergency Dose Limits?

Admin-402 fnl

Page 1 of 14

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Admin-402

Perform Actions for Medical Emergency

CANDIDATE

EXAMINER

Admin-402 fnl

Page 2 of 14

REGION I1

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Perform Actions for Medical Emergency

Alternate Path:

Facility JPM #

KIA Ratinds):

System: GEN

WA: 2.4.39

Rating:

Task Standard:

Complete RP/lOO01016, Encl. 4.1 (Medical Response) as required

Preferred Evaluatlon Location: Preferred Evaluation Method:

Simulator __ In-Plant Perform -Simulate

References:

RPllOOO/O16, Encl. 4.4 (Medical Response)

Admin-402 fnl

Page 3 of 14

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Admin-402 fnl

Page 4 of 14

ToolslEuuipmenffP~oceduresNeeded:

RP/1QQQ/OI6,Encl. 4.1 (Medical Emergency Action - Routine Operations)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. You have answered a call on 491 1 (emergency line) repofling a medical emergency.

2. The caller is still on the line.

INITIATING CUES:

The SRQ in the control room instructs you perform the required actions for a medical

emergency.

Admin-402 fnl

Page 5 of 24

START TIME:

STEP: Determine the appropriate procedure to use. CRITICAL STEP

-SAT

STANDARD: RP/OiB/lOQQi016(Medical Response) is referenced and Enclosure 4. I

(Medical Emergency Actions - Routine Operations) is determined to be

the appropriate procedure to use. Enclosure 4.1 is obtained from

notebook located in the front of the control room desk or from the cart in

the TSC. -UNSAT

Cue: When procedure is located give candidate a copy of Enclosure 4. f .

COMMENTS:

Step 1.2 CRITICAL STEP

Complete the following accident information:

SAT

Name of person reporting injury

___I

Call back number

Name of person injured

Supervisor of injured person I UNSAT

e Location injury occurred

Brief description of injury

Time

Note: The evaluator will play the role of the person reporting the injury. Answer

questions by referring to the Medical Emergency Phone Call Information Sheet.

STANDARD: The candidate obtains the above information from the evaluator by

asking the appropriate questions and completes step 1.2 correctly.

Note: Refer to the completed procedure as an answer key.

COMMENTS:

Admin-402 fnl

. .. ..~.

~.. .... .

.. Page 6 of 14

STEQ: Step 1.3 CRITICAL STEP

IF There is a Security Event in progress,

THEN Continue with ... -SAT

STANDARD: Determine a Security vent is not in progress and NIA step 1.3.

UNSAT

Cue: lf asked, inform candidate a Security Event is not in progress.

COMMENTS:

-- __ ...~. ___

STEP: Step 1.4.1 CRITICAL STEP

Use Plant Page to request all MERT members to respond to the incident.

-SAT

STANDARD: The phone is used to access the Plant Page and request all MERT

members to respond to the incident.

Cue: inform candidate to simulate onjy. -UNSAIT

COMMENTS:

5- Step 1.4.2

Use the radio paging system to request MERT members to respond to

the incident. -SAT

Transmit "Standby for Emergency Message"

o Press the "instant Call" button labeled "MERT"

o Wait for the red "Transmit" light on the radio to turn off ~ UNSAT

Transmit message

STANDARD: The radio paging system is used to request MERT members to respond

to the incident by:

Transmit "Standby for Emergency Message"

Press the "instant Call" button labeled "MERT"

Wait for the red "Transmit" light on the radio to turn off

Transmit message "MERT members respond to a medical

emergency in the Unit 3 clean side of the change room.'r

Note: The red "Transmit" light is normally green and is located next to the "MERT"

button on the radio.

Cue: hnform candidate to simulate only.

COMMENTS:

Admin-402 fnl

Page 7 of 14

Step 1.4.3

Repeat steps 1.4.1 and 1.4.2 __ SAT

STANDARD: The Plant Page and the radio paging system are used a second time to

request MERT members to respond to the incident. -UNSAT

Cue: h f o m candidate to simukaite only.

COMMENTS:

STEP 7: Step 1.4.4

Call Securitv at one of the followina extensions and request they have SAT

security M&T members respondio the emergency

SAS (Secondary Alarm Station) 2205 or 2767

e CAS (Central Alarm Station) 2222 or 2958 -UNSAT

STANDARD: Security is notified at one of the above extensions and are requested to

have security MERT members respond to the emergency.

Cue: Inform candidate to simulate only.

COMMENTS:

Step 1.4.5

IF The incident location is away from the rn ain plant (WOE, Complex,

Keowee Hydro, etc.) and incident occurs during normal working hours,

THEN Notify shuttle Bus... __SAT

STANDARD: Determine that this step does not apply and N/A step 1.4.5

_ I UNSAT

COMMENTS:

Step 1.5

IF A mass casualty event has occurred or is suspected, and a centralized

treatment area is needed. and plant conditions allow,

THEN Make a PA Announcement ... -SAT

STANDARD: Determine that this step does not apply and N/A step 1.5

-UNSAT

COMMENTS:

Admin-402 fnl

Page 8 of 14

STEP IO: Step 1.6 CRITICAL STEP

IF Hospital evacuation is needed as determined by MERT Command or

as indicated by Step 1.6.1,

THEN Arrange transport of patient to the hospital by one of the following _ I SAT

means:

EMS (ambulance)

Dial 9-911 from the Operations Shift Manager's phone or Unit 1

Control Room SROs phone or dial 91 1 from the bell South line - Unit __ UNSAT

1: 2, and 3 Control Rooms. Refer to Step 1.6.2, prior to requesting

EMS.

e Company vehicle (less serious injury)

Personal vehicle (less serious injury)

STANDARD: Ambulance is requested by calling 9-911. Ambulance is requested to

come to Oconee Nuclear Station.

COMMENTS:

I

STEP 11: Step 1.6.1

IF Any of the following illnesses or injuries are reported on the emergency

line (491I)

THEN Immediately request EMS (ambulance) to respond to the site: -SAT

Unconsciousness

-UNSAT

COMMENTS:

STEP 12: step 1.6.2

IF The patient is known or suspected to be radiologically contaminated,

THEN Have the EMS dispatcher inform the EMS personnel to expect a __ SAT

contaminated person.

STANDARD: Determine that this step does not apply and NIA step 1.6.2

UNSAT

Cue: !tasked, inform candidate that the patient is NOT wntaminabed.

COMMENTS:

I

Admin-402 fnl

Page 9 of 24

STEP 13: Step 1.6.3

Notify Security at 2222 that the ambulance is enroute

STANDARD: Security is notified that the ambulance is enroute -SAT

COMMENTS:

-UNSAT

~

STEP 14: Step 1.6.4 CRITICAL STEP

Notify M E N Command that the ambulance is enroute.

STANDARD: MERT Command is notified via radio that the ambulance is enroute. -SAT

Cue: lnforrn candidate to sirnulate only.

COMMENTS: -UNSAT

STEP 15: Step 1.6.5

Nstify World of Energy Duty Person (Ext. 4602 or Pager #777-9414).

STANDARD: World of Energy Duty Person is notified by phone. I SAT

Cue: lnforrn candidate to simulate only.

COMMENTS: _ I_ UNSAT

STEP 16: Step 1.7

Notify the Occupational Health Unit at ONS during normal working hours

(4652).

_ ISAT

STANDARD; Occupational Health Unit at ONS is notified by phone.

Cue: lnforrn candidate to simulate only.

UNSAT

COMMENTS:

STEP 17: Step 1.8

IF Radiological contamination is involved and the person is being sent to

a hospital.

THEN Complete... -SAT

STANDARD: Determine that this step does not apply and N/A step 1.8.

-UNSAT

COMMENTS:

Admin-402 fnl

Page 10 of 14

STEP 18: Step 1.9

Remind MERT Command that a Patient Treatment Form needs to be

completed for all patients and that the completed form is to be sent to the

Medical Unit for inclusion in the patients medical file. -SAT

STANDARD: MERT Command is informed that a Patient Treatment Form needs to be

completed and sent to the Medical Unit.

__ UNSAT

COMMENTS:

STEP 19: Step 1.10

After normal working hours the Operations Shift Manager or designee

shall report the following incidents to ONS Safety 5uty Person who will

determine if additional people need to be notified. -SAT

STANDARD: Determine that this step does not apply and NIA step 1. I O

-UNSAT

COMMENTS:

STEP 20: Step 1.11

Verif), the following notification in the event of a fatality or injuries to 3 or

more people:

__ SAT

STANDARD: Determine that this step does not apply and N/A step I.I1

COMMENTS: -UNSAT

STEP 21: Step 1.12

Notify STA to make appropriate notifications of the transport of an

employee to an off site medical facility.

__ SAT

STANDARD: Notify the STA by phone or in person to make appropriate notifications of

the transport of an employee to an off site medical facility.

__II UNSAT

COMMENTS:

Admin-402 fnl

Page 11 of 14

STEP 22: Step 1.13

IF A death, near death, or major traumatic injury...

STANBARD: Determine step does not apply and NIA Step 1.I3 I SAT

COMMENTS:

-UNSAT

STEP 23: Step 1.14

The Operations Shifl Manager (OSM) or designee shall ensure

notification of next of kin, if applicable.

Fatality - Appropriate Division Manager performs notifications __ SAT

e Injury requiring hospitalization- Employee's Supervisor or Manager

perform notification

STANBARD: Inform the OSM to perform this step as required. __UNSAT

COMMENTS:

STEP 24: Step 2.15

Submit completed Enclosure 4.1, (Medical Emergency Action -Routine

Operations).to the Emergency Planning Section

-SAT

STANDARD: Indicate that form would be submitted to the Emergency Planning

Section.

-UNSAT

COMMENTS:

STOP TIME:

AdMin-402 fnl

Page 12 of 14

Medical Emergency Phone Call Information Sheet

1. Name person calling

John Adams

2. Call back number

2322

3. Name of injured person

David Smith

4. Supervisor of injured person

Allan Jones

5. Location injury occurred

Unit 3 HPI Pump Room

The injured is currently located in the clean side of Unit 3schange room (srd

floor Aux Building).

Injured is NOT contaminated

6. Description of injury

The injured stood up to put on his hard hat and hit his head on a cable tray

resulting in a laceration to tog of head. The wound is continuing to bleed. The

injured is unconscious.

7. Time

Current time

Admin-402 fnl

Page 13 of 14

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

1 Need to select the correct procedure.

2 Need the correct information to ensure proper actions are taken.

3 Need to determine a security event is not in progress so that MERT can be called.

4 Need to activate MERT.

10 Ambulance has to be requested.

14 MERT command should be notified so that the injured can be taken to the pickup

point.

Admin-402 fnl

Page 14 of 14

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

1. You have answered a call on 491 1 (emergency line) reporting a medical emergency.

2. The caller is still on the line.

INITIATING CUES:

The SRO in the control room instructs you perform the required actions for a. medical

emergency.

Admin-403 fnl

Page 1 of 8

REGION II

INITIAL LIC ENSE EXAMINATION

JOB PERFORMANCE MEASURE

Ad rnin-403

Determine Emergency C lassification and Protective

Action Recommendations

CANDIDATE

EXAMINER

Admin-403 fnl

Page 2 of 8

REGION I1

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Determine Emergency Classification and Protective Action Recommendations

Alternate Path:

FacilitvJPM #:

s

KIA Ratinnk):

Gen 2.4.38 2.2/4.0

Task Standard:

Appropriate classification is determined and associated Protective Action Recommendations are made

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform -Simulate 2

References:

RP/O/B/1000/01

RP/OlB/l000/02

BASIS Document (Volume A. Section D of the Emergency Plan)

Examiner: I

NAME SIGNATURE DATE

Admin-403 fnl

Page 3 of 8

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

Admin-403 fnl

Page 4 of 8

Tools/Equipment/Procedures Needed:

RPlOlB/lO00101

RPIQIBIZ QOOlO2

BASIS Document (Volume A , Section D of the Emergency Plan)

READ TO OPERATOR

DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. S will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

8800: Civil demonstration occurring at the World of Energy by anti-nuke activists.

0900: Security reports to the OSM that, one or more persons has been observed cutting their

way through the double security fences. RP/Q/B/1000l007(Security Event) is being

used in conjunction with the Emergency Plan.

0905: intruders have been seen entering the SSF. Security has isolated the area around the

SSF.

0910: Security reports that an explosion has occurred on the Keowee Barn and that water is

beginning to leak through the dam in several places.

0930: Security reports that no additional bombs were found and that no additional intruders

have been located.

NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.

INITIATING CUE:

You are to perform the required actions of the Emergency Coordinator by referring lo

RP/Q/BI1QOO/OI,Emergency Classification and determining the emergency classification and

any Protective Action Recommendations.

Admin-403 fnl

Page 5 of 8

START TIME:

Classify the Event CRITICAL s'

STANDARD: Refer to RP/O/B/lOOO/Ol (Emergency Classification) Enclosure 4.6

(FireslExplosions and Security Actions. __ SAT

Classify the event as a "Site Area Emergency" due to following:

Bomb detonated in Keowee Dam __ UNSAl

COMMENTS:

Determine Protective Action Recommendations

STANDARD: Refer to RP/O/B/1OOO/OO2 (Control Room Emergency Coordinator SAT

Procedure) and GO TO Enclosure 4.2 (Site Emergency)

COMMENTS: -UNSA'

IF It has been determined that an Emergency Action bevel for an

Initiating Conditions has been met,

THEN Declare a Site Area Emergency

Time of Declaration: - -SAT

STANDARD: Determine Initiating Conditions have been met and Declare a Site Area

Emergency due to:

e Bomb detonated in Keowee Dam -UNSA-

OR

Imminent /actual failure of the Keowee Hydro dam

Determine Time of Declaration is pressnt time.

COMMENTS

Admin-403 hi

Page 6 of 8

Appoint a person to maintzin the Emergency Coordinator Log OR

maintain the log yourself.

STANDARD: A person is appointed to maintain the Emergency Coordinator Log or -SAT

indicate that you will maintain the log.

Cue: Masked, indicate someone is maintaining the Emergency Coordinator Log.

__ UNSAT

COMMENTS:

Appoint Control Room Offsite Communicator(s).

STANDARD: A Control Room Offsite Communicator is appointed.

-SAT

Cue: If asked, indicate a Control Room Offsite Communicator has been appointed.

COMMENTS:

UNSAT

STEP: Provide the Protective Action Recommendations from Enclosure 4.7. CRITICAL STEP

(Condition A I Condition B Response Action). Step 1.O,for use by the

Offsite Communicator if a Condition A, Imminent or Actual Dam Failure,

exists. -SAT

STANDARD: Enclosure 4.7, (Condition A I Condition B Response Action) is used to

determine that the following protective action recommendations are given

to Oconee and Pickens County: -UNSAT

1, Provide the following recommendationfor Emergency Notification

Form Section 15 (B)Evacuate:

Move residents living downstream of the Keowee Hydro

Project dams to higher ground.

2. Provide the following recornmendation for Emergency Notification

Form Section 15 (El) Other:

Prohibit traffic flow across bridges identified on your

inundation maps until the danger has passed.

Cue: If asked, inform the candidate that Keowee Dam failure is imminent

COMMENTS:

END OF TASK

'IME STOP:

Admin-403 fnl

Page 7 of a

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

I The candidate needs to be able to utilize the procedure and determine that a Site

Area Emergency needs to be declared.

6 The candidate must be abk?to make recommendations to the local agencies as to

what actions are necessary to protect the health and safety of the public.

Admin-403 fnl

Page 8 of 8

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

I INITIAL CONDITIONS:

0800: Civil demonstration occurring at the World of Energy by anti-nuke activists.

0900: Security reports to the QSM that, one or more persons has been observed cutting their

way through the double security fences. RP/O/B/1000/087 (Security Event) is being

used in conjunction with the Emergency Plan.

0905: Intruders have been seen entering the SSF. Security has isolated the area around the

SSF.

0910: Security reports that an explosion has occurred on the K ~ O W WDam and that water is

beginning to leak through the dam in several places.

0930: Security reports that no additional bombs were found and that no additional intruders

have been located.

NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.

INITIATING CUE:

YOU are to perform the required actions of the Emergency Coordinator by referring to

RP/O/B/'l OOOlOI , Emergency Classification and detWmiRing the emergency classification and

any Protective Action Recommendations.

CRO-12A fnl

Page 1 of 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-Ol2A

RECOVER A DROPPED CONTROL ROD

CANDIDATE

EXAMINER

CRO-12A fnl

Page2of11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

RECOVER A DROPPED CONTROL ROD

Alternate Path:

Facilitv JPM #

WA Ratinats):

System: APE 005

KIA: AA2.03

Rating: 3.5/4.4

Task Standard:

Unit is tripped manually upon receipt of second dropped rod

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator InPlant __ Perform X Simulate -

References:

APIIIAII 700/15 (10110102)

OQIQINI105/09 (1 1/21/02)

T.S. 3.1 4

OMP 1-18

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT- UNSAT - Performance Time _I_

CRO-12A fnl

Page 3 of 1I

SIMULATOR OPERATOR INSTRUCTIONS:

I.Recall Snap 206

2. Import files for CRQ-128

3. GotoRUN

CRO-12A fnl

Page 4 of 11

Too~s/~quipmentl8rocedures Needed:

Enclosure 5.3 of APlOlI (Recovery From Loss of Power)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shali be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit #I dropped a control rod in Group 6 approximately one hour ago and the unit is stable at

55%.

The Subsequent Actions of AP/15, DROPPED CONTROL RODS, have been completed

through step 4.9.

Shutdown Margin calculation has been run to verify that an adequate SBM exists.

Systems Duty Engineer has been notified and no special maneuvering instructions are

required,

Enclosure 4.10 of OP/O/A/I 105/09 has been completed up tu step 2.0.

INITIATING CUE::

The Control Room SRO informs you that the problem has been corrected and that recovery of

the dropped rod can now begin.

CR0-12A fnl

Page 5 of 11

START TIME:

CRITICAL !

Step 2.1

Take manual control of rods at the Diamond Control Station:

Ensure the SG Master in HAND _ ISAT

Ensure the Diamond Station in MANUAL

-UNSI

STANDARD: The manual pushbutton for the SG Master handlauto station is

depressed. The White Hand light comes ON and the Red Auto light -Jes

OFF.

The AUTOlMANUAL pushbutton on the Diamond Control Panel is

depressed; the MANUAL half of the Push Button is back lighted.

Location 1UB1

COMMENTS:

STEP: Step 2.2 CRITICAL I

Ensure group with drcppedlrnisaligned rod selected on the Group Select

Switch. -SAT

STANDARD: GKOUP SELECT SWITCH on 1UB1 is located by the student and __ UNSP

rotated to Group 6.

COMMENTS:

m: Step 2.3 CRITICAL E

Ensure in SEQ OVERRIDE.

__I SAT

STANDARD: The SEQlSEQ OR pushbutton is located on the Diamond Control panel

on 1UB1 and depressed. "SEB 08"is backlighted. __ UNSP

COMMENTS:

CRO-12

Page 6 (

Step 2.4 CRlTlCAb STI

Ensure JOG selected on Speed Selector.

STANDARD: The SPEED Selector is located by the student on the Diamond Control

panel on 1UBI and rotated to the JOG position. ~ UNSAT

COMMENTS:

Step 2.5 CRITICAL STI

If Group is at the OUT LIMIT:

Depress and hold LATCH switch. -SAT

Insert group for approximately 15 seconds or until the group OUT

LIMIT lamp on the Diamond Panel goes off.

Release LATCH switch. -UNSAT

The IN LIMIT (LATCH) BYPASS pushbutton is located by the student and

depressed and held while the INSERT/WITHDRAW joystick is used to

insert Group 6 until the Group 6 But limit lamp, located on the Diamond

Control Panel on 1UBI, extinguishes.

The LATCH pushbutton is then released and the INSERTMITHDRAW

joystick returned to neutral.

COMMENTS:

CRQ-12A fnl

Page 7 of 11

CRITICAL STEP

6- Step 2.6

TRANSFER the droppedlmisaligned rod to the Auxiliary Power Supply:

Ensure desired group selected on Group Select Switch. I SAT

Ensure droppedimisaligned rod selected on Single Select Switch

UNSAT

Ensure in SEQ OVERRIDE.

Ensure in AUXILIARY.

Verify Manual Transfer Sync light is lit before pressing clamp.

Depress CLAMP.

Depress selector for MANUAL TRANSFER switch until TRANSFER

CONFIRM lamp and the CONTROL ON lamp on the PI panel light.

Depress CLAMP RELEASE

STANDARD: On the CRD Panel on 1UB1:

Verify Group Select Switch positioned to Group 6.

SELECT droppedlmisaligned rod on the SINGLE SELECT SWITCH.

VERIFY SEQ OR is backlit (Not Critical).

Depresses GRQUWAUXIL pushbutton to make transfer to AUXIL.

Verifies SYNC is backlit on MAN TRANSISYITU CF pushbutton (Not

Critical)

Depresses CLAMPCLAMP REL pushbutton to make transfer to CLAMP.

CLAMP will be backlit.

Depresses MAN TRANSISYITR CF pushbutton. TR CF will become

backlit. White CONTROL ON lights will illuminate for the Dropped Rod

on the Position Indication panel.

Depresses CLAMPCLAMP REL pushbutton and verifies CLAMP REL is

backlit.

COMMENTS:

CRO-12A fnl

Page8of11

Step 2.7

Perform PI alignment on the droppedlmisaligned rod as follows: -SAT

Depress and hold LATCH switch.

Insert rod for 15 seconds. -UNSAT

Release LATCH switch

STANDARD: Depress and hold LATCH switch and use the INSEWTFAITHDRAW

joystick to insert rod for 15 seconds. Release the LATCH switch.

COMMENTS:

Step 2.8

Perform PI alignment on droppedhnisaligned rod as follows:

__ SAT

Compare absolute and relative readings on the PI panel

Use PI reset raisellower switch to match absolute and relative

-UNSAT

readings.

STANDARD: Absolute and relative indications on the PI panel, on 1UBI, are compared

using toggle switch to make comparison.

RPI is selected with the select toggle switch. The POSITION RESET

WISEILOWER toggle switch is then placed in the lower position and RPI

indication is matched to API position.

When matched the aAlSElLOWER toggle is released to neutral.

The select toggle switch is returned to the API position.

COMMENTS

CRO-12A fnl

Page 9 of 11

STEQ: Step 2.9

Ensure RUN selected on Speed Selector _ I SAT

STANDARD: SPEED SELECTOR is located by the student on 1UB1 and rotated to the -UNSAT

run position.

NOTE: Instructor in Booth: at this time fire timer to drop second control rod.

COMMENTS:

Manually trip the reactor CRlTlCAL STEP

STEQ I O :

-SAT

STANDARB: The student recognizes the second control rod inserting and manually

trips the reactor by depressing the Reactor Trip pushbutton and verifies

that the reactor is shutdovdn.

__ UNS T

COMMENTS:

END TASK

STOP TIME:

CRQ-12A fnl

Page 10of 11

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

1 Step is necessary for the operator to select the single rod and not move the plant

around due to power excursions.

2 Step is necessary to instruct the rod logic as to which group the rod is in that the

operator wants to recover.

3 Step is necessary to allow the operator to withdraw the dropped rod.

4 Jog is necessary because the roods will not latch with the selector switch in RUN

5 The latching of the group to clear the out limit is necessary so that the individual rod

can be withdrawn.

6 Necessary to place the dropped rod on the auxiliary power supply for withdrawal while

leaving the group on the group power supply.

10 Necessary because the second dropped FOCI places the unit in an unanalyzed

condition and this is a direction, which is given by OMP 1-58.

CRO-12A fnl

Page 11 of 11

CANDIDATE CUE SHET

(TO BE RETURNED TO EXAMINER UPON CQMPLETIOM OF TASK)

INITIAL CONDITIONS:

Unit #I dropped a control rod in Group 6 approximately one hour ago and the unit is stable at

55%.

The Subsequent Actions of AP/I/A/I 700115, DROPPED CONTROL RODS, have been

completed through step 4.9.

Shutdown Margin calculation has been run to verify that an adequate SDM exists.

Systems Duty Engineer has been notified and no special maneuvering instructions are

required.

Enclosure 4.10 of OP/O/A/1105/09 has been completed up to step 2.0.

INITIATING CUE:

The Control Room SRO informs you that the problem has been corrected and that rec~vsryof

the dropped rod can now begin.

CRO-015 fnl

Page 1 of 16

REGION II

INlTlAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-015

ESTABLISH EFDW FLOW THROUGH STARTUP

VALVES

CANDIDATE

EXAMINER

CRO-015 fni

Page 2 of 16

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

ESTABLISH EFDW FLOW THROUGH STARTUP VALVES.

Alternate Path:

N

Facilitv JPM #:

KIA Ratinds):

System: APE-054

KIA: AA204

Rating: 4.2/4.3

Task Standard:

EFDW flow IS established to the affected header through the startup valve

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator in-Piant - Perform X Simulate -

References:

EOP Rule 3,(boss of Main or Emergency FDW)

EOP Rule 7 , (SG Feed Control)

EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT -UNSAT - Performance Time -

Examiner: I

NAME SIGNATURE DATE

CRO-015 fnl

Page 3 of 16

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 209

2. Import files for CRO-015

3. GotoRUN

CRO-015 fnl

Page 4 of 16

TooIslEquipmenff Procedures Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when YOU understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The reactor has tripped

Main feedwater is lost

NQ increase in Reactor Building pressure is occurring and all KCPs are running

Subsequent Actions are complete

Kule 3 is complete up to Step 29.

1FDW-32 5 is determined to be failed closed.

INITIATING CUES:

The SRO directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow

and establish 200 gpm EFBW flow to the 1A SG.

CRO-015 fnl

Page 5 of 16

START TIME:

Step 1

Verify EFDW is being supplied by an alternate unit. -SAT

RNO

GO TO Step 7

STANDARD: Determine EFDW is not being supplied from another unit. _ I UNSAT

Perform RMO step and GO TO Step 7

CUE: EFDWis NOT being supplied by an alternate unit

COMMENTS:

Step 7 CRITICAL STEP

Stop MD EFWP in a headers with malfunctioning EFDW control valve. _ I SAT

STANDARD: Observes 1A steam generator level decreasing below setpoint on the SG

EXTENDED SU RANGE LEVEL meters (1UB1) or OAC screens.

andlor

-UNSAT

Observes zero flow indicated to the 1A steam generator on the TOTAL

EFDW FLOW meters: on 1UBI.

Based on these indications. candidate determines that 18 steam

generator EFDW header is the affected header.

Control switch for the l A MD EFWP is rotated to the OFF position.

Continue to Step 8

COMMENTS:

Step 8 CRITICAL STEP

Place TD EFDWP in PULL TO LOCK.

__ SAP

STANBARB: The TI3 EFDWP switch is placed in the LOCKOUT position.

Continue to Step 9

-UNSAT

COMMENTS:

CRO-015 fnl

Page 6 of 16

Step 9 CRlTlCAL STEP

Place controllers for the following in HAND and set demand to 0% in

affected headers: -SAT

IFDW-35 ( I A STARTUP FDW Control)

STANDARD: Candidate locates 1FDW-35 on 1UBI and the Bailey control station is

piaced in Hand by depressing the white HAND pushbutton, and observing -UNSAT

the white HAND light ON. Valve position demand is reduced to 0 using

the toggle switch to close the valve.

Continue to Step 10

NOTE: Candidate should perform all actions for 1A header because it is the header

with the failed valve.

COMMENTS:

Step 10 CRITICAL STEP

Place control switch for the following in CLOSE in all affected headers:

IFDW-33 ( I A S U FDW Block) _ II SAT

IFDW-372 (la MDEFWP DISCH BLOCK)

STANDARD: Candidate Locates IFDW-33 control switch on 1UB1 and rotates to the -UNSAT

CLOSE position, observing the green CLOSE light ON and red OPEN

light OFF. (NOT CRITICAL IF IFDW-35 IS CLOSED)

Locates IFDW-372 Control Switch on 1UB1 and rotates to the CLOSE

position, observing the green CLOSE light ON and the red OPEN light

OFF.

Continue to Step 11

COMMENTS:

CRO-015 fnl

Page 7 of 16

Step 11 CRITICAL STEP

Place control switch for the following in OPEN in all affected headers:

  • IFDW-374 (MD EFDWP I A DISCH TO SG A) -SAT

STANDARD: Candidate locates IFDW-374 on l U B l and the red OPEN pushbutton is

depressed, the red OPEN indication is observed to be ON. -UNSAT

Continue to Step 12

COMMENTS:

Step 12

Place control switch for the following in CLOSE in all affected headers:

m IFDW-36 ( I A S G NORM SU FDW HDR) -SAT

STANDARD: Candidate locates 1FDW-36 on 1VB3 places control switch in the

CLOSE position and the green CLOSE indication is observed to be I UNSAT

illuminated; and the red OPEN indication is observed to be extinguished.

Continue to Step 13

COMMENTS:

m: Step 13

Place control switch for the following in OPEN in all affected headers:

STANDARD: Candidate locates IFDW-38 on IVB3 places control switch in the OPEN

position and the red OPEN indication is observed to be illuminated and -UNSAT

the green CLOSE indication is observed to be extinguished.

Continue to Step 14

COMMENTS:

CRO-015 fnl

Page 8 of 16

Step 14

Verify 1FBW-315 failed

-SAT

STANDARD: h4anual Loader Knob is turned counter-clockwise to OPEN valve, on

1UB1.

Candidate recognizes that 1FDW-315 is NOT responding to manual

-UNSAT

control.

Continue to Step 15

COMMENTS:

STEP I O : Step 15

Verify I the following:

e 1FDW-38 open -SAT

1FDW-36 closed

IFDW-35 closed

IFDW-33 closed

-UNSAT

STANDARD: Candidate locates 1FDW-38 on 1V53 and the red OPEN indication is

observed to be illuminated and the green CLOSE indication is observed

to be extinguished.

Candidate locates IFDW-36 on 1VB3 and the green CLOSE indication is

observed to be illuminated; and the red OPEN indication is observed to

be extinguished.

Candidate locates 1FDW-35 on 1UBI and observes the Bailey control

station position demand is zero.

Candidate locates 1FDW-33 control switch on 1UBI and observes the

green CLOSE light ON and red OPEN light OFF.

Continue to Step 16

COMMENTS:

CRO-015 fnl

Page 9 of 16

STEP 11: Step 16

Verify 1FDW-372 closed

-SAT

STANDARD: Candidate locates IFDW-372 Control Switch on l U B i and observes the

green CLOSE light ON arid the red OPEN light OFF.

I UNSAT

Continue to Step 17

COMMENTS:

STEP 12: Step 17

Verify both of the following:

Verify 1FDW-374 is open.

0 Verify 1A MDEFDWP available. __ SAT

STANDARD: Candidate locates IFDW-374 on 1UB1 and the red OPEN indication is

-UNSAT

observed to be ON.

1A MD EFDWP control switch green OFF light is verified illuminated.

This pump was secured by the candidate in a previous step.

Continue to Step 18

CQMMENTS:

STEP 13: Step 18

GO TO Step 22

-SAT

STANDARD: Candidate goes to Step 22.

COMMENTS:

UNSAP

CRO-015 fnl

Page 10 of 16

STEP 14: Step 22 CRITICAL STEP

Verify IFDW-316 failed

RNO

GO TO Step 30. -SAT

STANDARD: Candidate verifies IFDW-316 is controlling SG level @ --j 30%.

-UNSAT

or

Manual Loader Knob is turned counter-clockwise to OPEN valve, on

1UB1. Recognizes that IFBW-316 & responding to manual control.

Perform RNO and GO TO Step 30.

COMMENTS:

STEP 15: Step 30

Verify AFlS actuation has occurred (either Statalarm on):

AFlS HEADER A INITIATED (1SA-2/C-8)

AFIS HEADER E3 INITIATED (ISA-2/B-8) -SAT

RNO

GO TO Step 34.

UNSAT

STANDARD: Candidate observes indicated Statalarms and verifies that they are NOT

i__

illuminated. Perform RNO and GO TO Step 34.

COMMENTS:

CRO-015 fnl

Page 11 of 16

STEP 16: Step 34

Verify an operator has been sent to locally position any FDW valvi

IFDW-94

IFDW-315 _ I SAT

RNO

GO TO Step 36.

-UNSAT

STANDARD: Determine that an operator has NOT been sent to locally position

FDW valve.

Perform RNO and GO TO Step 36.

CUE: No operators have been dispatched to locally operate any valves.

COMMENTS:

STEP 17: Step 36

Verify 1FDW-315 failed open.

RNO

If lineup to feed through 1A SIU Control Valve was successful. -SAT

THEN GO TO Step 37.

STANDARD: Candidate should determine that the Manual Loader on 1UBI indi

0% and 1FDW-315 has failed dosed. I_ UNSAT

Of

Green CLOSED light is ON.

Perform RNO step 2., 1A SIU control valve linsup has been SUCCE

THEN GO TO Step 37

CQMMENTS:

STEP 18: Step 37

Verifv an operator has been sent to locally open IFDW-94.

-SAT

STANDARD: Determine an operator has NOT been sent to locally open 1FDW.

Perform RNO and GO TO Step 40

__ UNSAT

CUE: No operators have been dispatched to locally operate any valves.

COMMENTS:

CRO-015 fnl

Page 12 of 16

STEP 39: Step 40

Start 1A MB EFDWP.

-SAT

STANDARD: The 1A MD EFDWP control switch is rotated clockwise to the RUN

position and the red RUN light is verified ON.

Contjnue to Step 41 -UNSAT

COMMENTS:

STEP 20: Step 41

Verify IFDW-316 failed open

-SAT

STANDARD: Verifies IFDW-316 is controlling SG level @ r% 30%.

OI

Manual Loader Knob is turned counter-clockwise to OPEN valve, on UNSAT

1 UBI.

Student recognizes that 1FDW-316 &responding to manual control.

Perform RNO and GO TO Step 46.

COMMENTS:

STEP 21: Step 46

Verify HPI forced cooling is in progress.

-SAT

STANDARD: Determine that HPI Forced Cooling is NOT in progress

Perform RNO and GO TO Step 48.

-UNSAT

CUE: HPI forced cooling is NOT in progress.

COMMENTS:

CRO-015 fnl

Page 13 of 16

STEP 22: Step 48

Verify LOHT tab is NOT in progress

SAT

STANDARD: Determine LQHT is NOT in progress.

Perform RMO and GO TO Step 51.

CUE: LOHT tab is NOT in progress. -UNSAT

COMMENTS:

Verify 1FDW-315 failed.

I SAT

STANDARD: Manual Loader on 1UBI indicates 0% 1FDW-315 has failed closed.

or

Green CLOSED light is ON. -UNSAT

Continue to Step 52

COMMENTS:

Verify one of the following:

Lineup to feed through l A SIU Control Valve was successful

Operator sent to locally throttle 1FDW-315 -SAT

STANDARD: Determine that Lineup to feed through 1A SIU Control Valve was

successful. __ UNSAT

Continue to Step 53

CUE: 1A s/u control valve lineup has been successfurrl.

COMMENTS:

CRO-015 fnl

Page 14of 16

STEP 25: Step 53

Verify an operator has been sent to locally control 1FBW-315.

STANDARD: Determine that an operator has NOT been sent to locally control IFDW-

315.

Perform RNO and GO TO Step 56 I UNSAT

CUE: NO operators have been dispatched to localjy operate any valves.

COMMENTS:

.. .-- .

NOTE CRITICAL STEP

FIQWfrom the TDEFDWP through a SIU control valve should be reads on the FDW

SU FLOW gauge.

SAT

I

Flow from the MDEFDWP through a SIU control valve should be read on the

MDEFDWP DlSCH FLOW gauge..... ... .. .._..

STEP 26: Step 56 ~ UNSAT

Throttle 1FDW-35 S/U to obtain desired flow rate and/or SG level per

Rule 7 (SG Feed Control).

STANDARD: Manually throttle 4 FBW-35 on 1UBI. The raise/lower toggle switch is

pushed up to increase the valve position demand signal to throttle open

the valve. Flow is maintained within allowable limits. If flow exceeds

pump runout limits, action must be taken to reduce flow to within limits

prior to completing the task.

When feeding through the S/U Control Valves with the MDEFW Pumps,

the MBEFOWP RISCH FLOW gauge should be used to verify flow within

limits.

NOTE: When flow has been established and level is increasing in the ? ASG, the

JPM is complete.

CQMMENTS:

STOP TIME:

CRO-015 fnl

Page 15 of 16

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

2&3 Necessary because the MD EFWP in the affected header needs to be sewred so

that the header can be isolated and valves repositioned. Step is necessary because

the TD EFWP needs to be secured so that the header can be isolated and valves

repositioned.

4& 5 Necessary to prevent the EFDW flow, which is meant for 1A SG from getting to other

portions of the system.

6 Aligns the emergency feed water to the 1A SG through the startup valves.

19 Restarts the MD EFDWP, which was stopped to reduce the DIP for the closure of

valves to isolate the affected header.

26 Actually establishes flow to the 1A SG to establish required S6 levels.

CRO-015 fnl

Page 16 of 16

CANDIDATE CUE SHEET

(TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The reactor has tripped

Main feedwater is lost

No increase in Reactor Building pressure is occurring and all RCPs are running

Subsequent Actions are complete

Rule 3 is complete up to Step 29.

IFDW-325 is determined to be failed closed.

INITIATING CUES:

The SR6 directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow

and establish 200 gpm EFDW flow to the 1A SG.

CRO-053 fnl

Page 1 of 8

REGION II

INITlAL LICENSE EXAMINAT ION

JOB PERFORMANCE MEASURE

CRO-053

BYPASS COOLANT PUMP STARTING INTERLOCKS

CANDIDATE

EXAMINER

CRO-053 fnl

Page 2 of 8

REGION II

lNlTlAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Tirsk:

BYPASS COOLANT BUMP STARTING INTERLOCKS

Alternate Path:

Facilitv JPM #:

KIA Ratinds):

System: EPE-074

WA: A3.04

Rating:

Task Standard:

Reactor Coolant Pump starting interlocks are correctly bypassed

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _s In-Plant X Perform -Simulate _X___

References:

Examiner: I

NAME SIGNATURE DATE

CRO-053 fnl

Page 3 of 8

SIMULATOR OPEFUTBR INSTRUCTIONS:

NONE

CRO-853 fnl

Page 4 of 8

TooIslE~uipmen~Procedures Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

An accident has occurred on Unit 3 in which the EQP is being used.

All RCPs are off and full HPI has been initiated.

Inadequate core cooling exists with Core Exit Thermocouples > 780°F but 1200°F and not

decreasing.

INITIATING CUE:

The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per

Enclosure 5.14, "Jumpe~Contacts for RCP Starting interlocks" of the EO$.

CRO-053 fnl

Page 5 of 8

START TIME:

Obtain Reactor Coolant Pump Motor starting interlock jumper cables for CRITICAL STEP

affected unit(§), per Endosure 5.14 of EP/1,2,or 3/A11800/01 Emergency

Operating Procedure. SAT

~

I _

'

~

STANDARD: Jumper cables are obtained from the key locker located in the Work

Control Center.

-UNSAT

NOTE: Jumper cables for unit #1 unit #2 RCPs are located in the same key

locker. Ensure correct set of jumper cables are identified and obtained.

CUE: After correct jumpers have been located, inform student that he may leave

jumpers in the key locker.

COMMENTS:

STEP: LOCATE Termin81 Cabinet MTC3 for the affected unit(s) CRITICAL STEP

SAT

STANDARD: Terminal Cabinet MTC3 is correctly located:

3MTC3 is located in Unit #3 Cable Room near south Cable Room door.

-UNSAT

COMMENTS:

CRO-053 fnl

Page 6 of 8

a:BYPASS the Reactor Coolant Pump Motor starting interlocks on the CRITICAL STEP

affected unit(s), as listed on Enclosure 5.14 of EW 4/Nl800/01,

Emergency Operating Procedure. SAT

Bcp Contacts

UNSAT

AI A3PA to A305

82 B8PBto8805

BI A4PA to A405

E2 BSPB to B905

STANDARD: MTC3 cabinet door is opened and the following steps are performed for

EACH Reactor Coolant Pump Motor:

The first contact is located and identified on the terminal board

One end of the jumper cable is simulated to be clipped to this contact.

The second specified contact is located and identified on the terminal

board.

The other end of the jumper cable is simulated to be clipped to the

second contact.

NOTE: End task when you have determined that student is proficient at identifying

RCB jumper contacts.

COMMENTS:

CRQ-053 fnl

Page 7 of 8

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

1 Necessary because the cables must be obtained to jumper the interlocks.

2 Necessary because the operator must locate the correct cabinet for the correct unit

3 Necessary because the operator must be able to identify the correct contacts for each

WCP or the interlocks will not be bypassed as required.

CRO-053 fnl

Page 8 of 8

CANDIDATE CUE SHEEP

(TO BE RETURNED TO EXMIINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

An accident has occurred on Unit 3 in which the EQP is being used.

All WCPs are off and full HPI has been initiated.

Inadequate core cooling exists with Core Exit Thermocouples 700°F but c 1200°F and not

decreasing.

INITIATING CUE:

The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per

Enclosure 5.14?"Jumper Contacts for WCP Starting interlocks" of the EOQ.

CRO-060 fnl

Page Iof 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-060

PERFORM REQUIRED ACTIONS FOR A TURBINE

BUILDING FLOOD

CANDIDATE

EXAMINER

CRO-060 fnl

Page 2 of 11

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

PERFORM REQUIRED ACTIONS FOR A TURBINE BUILDING FLOOD

Alternate Path:

Facilitv JPM #:

KIA Ratinds):

System: APE BW/A07

K/A: AA1.3

Rating:

Task Standard:

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant __ Perform Simulate -

References:

APllO, Uncontrollable Flooding of Turbine Building

Candidate: Time Start:

NAME Time Finish:

PerformanCeg SAT-UNSAT - Performance Time -

CRO-060 fnl

Page 3 of 11

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 212

2. Import files for CRO-060

3. GotoWUN

CRO-060 fnl

Page 4 of 11

TQosslEquipmentlPrQcedures Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I wiil explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 was operating at 108% power with no known problems.

Unit 2 is in cold shutdown.

The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water

level is rising.

Unit 1 has been tripped and the EOP is being completed by other team members.

INITIATING CUES:

The Control Room §a0 directs you to refer to APIIO, Uncontrollable Flooding of Turbine

Building, and peldorm required actions.

CRO-060 fnl

Page 5 of 11

START TIME:

STEP: Step 4

Ensure Rx is tripped

-SAT

STANDAKD: Determine RX has tripped by observing all control rods inserted and

power is < 1%.

-UNSAT

Continue to Step 2.

COMMENTS:

.. .......

NOTE CRITICAL STEP

Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs

of the MFDWPs.

-.. ...... -. _.__

SAT

STEP: Step 2

Ensure all CCW pumps are shutdown ___ UNSAT

STANDARD: The I A , 1B. and I C CCW pump switches are rotated to the TRIP

position. (located on 1AB3)

Continue to Step 3.

COMMENTS:

STEP: Step 3 CRITICAL STEP

Press both of the following on the TURB BLDG FLOOD MER CLOSING

ALL CCWP DISCH VALVES control switch: __ SAT

CLOSE1

CLOSE2

-UNSAT

STANDARD: "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD MER

CLOSING ALL CCWP BlSCH VALVES control switch are both

depressed. (located on IAB3)

Continue to Step 4

COMMENTS:

L....... ..... ......

CRO-060 fnl

Page 6 of 11

STEP: Step 4

Verify all CCW pump discharge valves are closed

-SAT

STANDARD: The green CLOSED lights for ICCW-IO, 11, 12 & 23 are verified

illuminated and the red OPEN lights for the same valves are verified

extinguished. (located on 1AE3) -UNSP

Continue to Step 5.

COMMENTS:

I NOTE

Field tasks.that may affect multiple units should be coordinated

. with Unit 2 and Unit 3.

CRITICAL S

___ SAT

STEP: Step 5

Dispatch operators to ensure all three flood doors are closed and in the

SECURED position from the AB side (A-I, at Unit 1, 2, and 3 stairwell UNSP

entrances to TB): (2)

Unit 1 Flood Door

Unit 2 Flood Door

Unit 3 Flood Door

STANDARD: Candidate should dispatch and NE0 to ensure all three flood doors are

closed and in the SECURED position from the AB side.

Continue to Step 6

Cue: An operator has been dispatched.

COMMENTS:

6- Step 6

Verify LPI decay heat removal is NOT in progress

-SAT

STANDARD: Determine LPI pumps are not operating by observing pumps switch

indicaticns on 1UB2.

UNSP

Continue to Step 7.

COMMENTS:

CRO-OB0 fnl

Page 7 of I 1

Step 7

Dispatch an operator to place the following waterbox discharge valve

switches to HAND and CLOSE (T-3, East of condenser catwalk): -SAT

1CCW-20 ( I A I )

ICCW-21 (1A2)

0 ICCW-22 ( I B I )

__ UNSAT

. 1CCW-23 (182)

16CW-24(1C1)

ICCW-25 (IC2)

Nc -

RD: Candidate should disp an opei tor to plac tt 3b valves to

HAND and CLOSE.

Continue to Step 8

Cue: QperatQr has been dispatched.

COMMENTS:

Step 8

Make a PA announcement of the event including restrictions on entry into

TB basement due to electrical hazard. -SAT

STANDARD: FA announcement is made using the Control Room phone

-UNSAT

Continue tu Step 9.

COMMENTS:

Step 9

Attempt to locate and isolate the suurce of the flooding

-SAT

STANDARD: Dispatch operators to locate and isolate the source of the flooding

Continue to Step I O . -UNSAT

Cue: Operators have been dispatched.

COMMENTS:

CRO-060 fnl

Page 8 of 11

STEP IO: Step 10

Ensure all Unit 1 ESV pumps are shutdown:

e IAESVPump __ SAT

1CESVPump

1BESVPump

-UNSAT

STANDARD: Stop ALL Unit 1 ESV pumps by rotating their pumps switches to OFF.

(located on 1AB3)

Continue to Step 11

COMMENTS:

STEP 11: Step 11

Verify all CCW pump discharge valves were suecessfully closed in earlier

steps. -SAT

STANDARD:

Continue to SteD 12 -UNSAT

COMMENTS:

STEP 12: Step 12

Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW

Pumps).

-SAT

STANDARD: Candidate should dispatch an operator to perform Encl 5.1 (Isolation of

SSW to CCW Pumps).

-UNSAT

Continue to Step 13

Cue: Operator is dispatched.

COMMENTS:

CRO-060 fnl

Page 9 of Z 1

STEP 53: Step 13

IAAT HPSW is NOT available,

THEN ensure End 5.31 (Temporarily Charging the HPSW System) of

EP/l has been initiated. -SAT

STANDARD: Determine that HPSW is available by observing the HPSW Jockey pump

operating and level in the EWST. (located on 1AB3) UNSAT

Continue to Steo <4

COMMENTS:

STEP 14: Step 14

Notify a SRO to evaluate de-energizing electrical components in the

flooded areas.

-SAT

- Candidate should inform a SRO to evaluate de-energizing electrical

components in the flooded areas.

__ UNSAT

Cue: SRO will evaluate which electrical equipment to de-energize.

COMMENTS:

-- END TASK

STOP TIME:

CWQ-060 fnl

Page 10 of 11

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

2 Necessary to attempt to terminate the flooding and not contribute to the water level in

the TB basement.

3 Necessary to attempt to terminate the flooding and not contribute to the water level in

the TB basement.

5 Necessary to prevent the waters from the flooding from entering the Aux. Bldg.,

causing more problems and the spread of contamination,

CRO-060 fnl

Page 12 of 11

CANDIDATE CUE SHEET

(TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 was operating at 100% power with no known problems.

Unit 2 is in cold shutdown.

The 2/41 condenser inlet expansion joint has ruptured and Turbine Building Basement water

level is rising.

Unit 1 has been tripped and the EOP is being completed by other team members.

INITIATING CUES:

The Control Room SRO directs you to refer to AW10, Uncontrollable Flooding of Turbine

Building, and perform required actions.

CRO-067 fnl

Page Iof 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-067

Perform Required Actions far ES Actuation (> 3psig)

CANDIDATE

EXAMINER

CRO-067 fnl

Page 2 of 23

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Perform Required Actions for ES Actuation (> 3psig)

Alternate Path:

Facilitv JPM #:

c

KIA Ratin&):

System: EPE-009

UfA: E.41.13

Rating.

Task Standard:

Proper E$ conditions are verified using the appropriate procedures and re-start the 1A and 1B LPI pump

when required.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator 2In-Piant __ Perform X Simulate _.

References:

EOP Enclosure 5.1, E§ ACTUATION

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT -UNSAT ~ Performance Time _ I_

CRQ-067 fnl

Page 3 of I 3

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 207

2. Import files for CRQ-(367

3. GotoRUN

CRO-069 fnl

Page 4 of 43

ToolslEquipment/Praceduses Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Small Break LOCA is in progress.

Rule 2 in progress

RCS is saturated and KCPs are off.

ES Channels I 6 have actuated.

~

INITIATING CUES:

The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.

CRO-067 fnl

Page 5 of 13

START TIME:

Step 1

Determine all ES channels that should have actuated based on

pressure and RB Dressure: -SAT

Actuation

-UNSAT

10 ...

STANDARD: Candidate should monitor the existing RCS Pressure, using valid

pressure indication, ICCM Train A or B, OAC,RCS Pressure (NR), RCS

Pressure (WR) on 1UB1 and 1UB2 to verify RB pressure is > 3 psig.

Determines that ES Channels 1-6 should be actuated

Continue to Step 2

COMMENTS:

2- Step 2

Verify ES channels associated with actuation setpoint have actuated: -§AT

STANDARD: Ensure ES digital channels 1-6 are actuated by observing "Tripped" lights

on 1UB1.

Continue to Step 3 -UNSAT

COMMENTS:

CRO-067 fni

Page 6 of 13

Step 3

IAAT additional ES actuation setpoints are exceeded.

SAT

THEN perform Steps 1 - 2.

_ I

Continue to Step 4

UNSAT

STANDARD:

_I_

IAAT additional ES actuation setpoints are exceeded candidate perform

Steps 1 - 2.

Note: During the performance of thi5 JPM ES Channels 7 and 8 will actuate.

COMMENTS:

Step 4

Place HPI in manual control

_ ISAT

STANDARD: Go to RZ modules on 1VB2 and select manual for the #PI components.

Continue to Step 5

-UNSAT

COMMENTS:

Step 5

Verify Rule 2 in progress or complete.

~ SAT

STANDARD: Determine Rule 2 in progress by referring to the Initial Conditions.

Continue to Step 6

-UNSAT

COMMENTS:

CRO-067 fnl

Page 7 of 13

m: Step 6

Open the following:

0 IBS-4 __ SAT

IBS-2

STANDARD: At the ES RZ modules an 1AB2, OPEN 1BS-1 and 1BS-2 by depressing -UNSAT

the open pushbutton.

Continue to Step 7

COMMENTS:

Verify any RCP operating

-SAT

STANDARD: Determine NO RCP is operating.

Perform RNO step and GO TO Step 9.

-UNSAT

COMMENTS:

STEP: Step 9

IAAT any RCP is operating

AND ES Channels 5 and 6 actuate -SAT

THEN perform Steps 40 and 11

I UNSAT

STANDARD: Determine NO RCP is operating.

Perform RNO step and GO TO Step 12.

COMMENTS:

CRO-067 fnl

Page 8 of 13

Step 12

I M T ES Channels 3 & 4 are actuated,

-§AT

THEN GO TO Step 13

STANDARD: Determine E§ Channels 3 & 4 are actuated by one of the following: -UNSAT

Statalarms: ISA-IC-10 (ES Channel 3 Trip) and 1SA-IID-IO (ES

Channel 4 Trip)

E§ Channel 3 and Channel 4 Tripped lights lit on 1UBI.

GO TO step 13

COMMENTS:

STEP 10: Step 13

Place the following in manual control:

IAbPIPump ISAT

1B LPI Pump

.

  • ILP-17

IbP-18 -UNSAT

STANDARD: Go to the ES RZ modules on 1VB2 and place the above components in

manual by depressing each components manual pushbutton.

Continue to Step 14

COMMENTS:

CRO-069 fnl

Page 9 of 13

.~.~.- ......

. -. .

CAUTION

LPI pump damage

......may occur if operated in excess of 30 minutes

... against

~ .. a shutoff head.

-SAT

Step 14

IAAT any LPI pump is operating against a shutoff head,

THEN at the CR SROs discretion stop affected LPI pumps. __ UNSAT

STANDARD: Determine RCS pressure is above LPI pump discharge head and then

ask for SRO direction. When directed by the SRO secure both the A

and WLPI pump.

Continue to Step 15

Cue: When asked inform candidate that the SRO desires to stop BOTH LPI pumps.

COMMENTS:

Step 15

IAAT RCS pressure is .z LPI pump shutoff head.

THEN perform Steps 46 - 17. -SAT

STANDARD: Determine RCS pressure is NOT .z LPI pump shutoff head (=ZOO psig)

Perform RNO step and GO TO Step 18. __ UNSAT

COMMENTS:

CRO-067 fnl

Page l o o f 13

STEP I O : Step 18

IAAT 1A and 1B LPI pumps are off I tripped,

AND ail the following conditions exist: -§AT

RCS pressure z LPI pump shutoff head

ILP-19 closed

1LP-20 closed -UNSAT

IBS-1 open OR throttled open

IBS-2 open OR throttled open

THEN perform Steps 19 - 21

STANDARD: Determine conditions of step NOT met because RCS pressure is not

< LPI pump shutoff head ( ~ 2 0 0psig).

Perform RNO Step and GO TO Step 22

COMMENTS:

Note: After Step 18 is completed RCS pressure will decrease to LPI pump SkLItQff

head. The candidate should datermime that IAAT step 15 is mat and transfer to step

15. -SAT

STEP 11: Step I 5

IAAT RCS pressure is < LPI pump shutoff head,

THEN perform Steps 16 - 17. -UNSAT

STANDARD: psig)

Determine that RCS pressure is z LPI pump shutoff head ( ~ 2 0 0

Continue to Step 16

COMMENTS:

STEP 12: Step 16 CRITICAL STEP

Perform the following:

Open ILP-17 (already open)

Start I A LPI pump -SAT

STANDARD: Verify 1LP-17 is open by observing the open light on the ES RZ module.

Start the 1A LPI pump by using the pump switch on 1UB2.

Continue to Step 17 -UNSAT

COMMENTS:

CRQ-069 fnl

Page 11 of 13

STEP 13: Step 17 CRITICAL STEP

Perform the following:

Start 18 LPI pump -SAT

STANDARD: Verify 1 LP-18 is open by observing the open light on the ES E module.

Start the 1B LPI pump by using !he pump switch on 1UB4.

-UNSAT

COMMENTS:

END TASK

STOP TIME:

CRO-067 fnl

Page 12 of 13

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

12 The " A bPl pump must be started when RCS pressure is less than LPI pump head to

ensure LPI flow into the core.

13 The " B LPI pump must be started when RC§ pressure is less than LPI pump head to ensure

LPI flew into the core.

CRO-067 fnl

Page 13 of 13

CANDIDATE CUE SHEET

(TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Small Break LBCA is in progress.

Rule 2 in progress

RCS is saturated and RCPs are off.

E§ Channels 1 - 6 have actuated.

INITIATING CUES:

The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.

CR6-097 fnl

Page IOf 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRQ-097

Transfer ECCS Suction to the Emergency Sump

(1LP-15 Failed Closed)

CANDIDATE

EXAMINER

CRO-097 fnl

Page 2 of 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Transfer ECCS Suction to the Emergency Sump (1LP-I 5 Failed Closed)

Alternate Path:

Facilitv JPM #:

KIA Ratinds):

System: BWIEOB

WA: EA1.1

Rating. 4013.7

Task Standard:

Steps of EOP are properly completed by the student to align HPllbPl piggyback mode

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator 2In-Plant - Perform X Simulate __

References:

EOP Enclosure 5.12, (ECCS Suction Swap to R E S )

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT- wsa-r - Performance Time -

Examiner: I

NAME SIGNATURE DATE

CRO-097 fnl

Page 3 of 13

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 208

2. Import files for CRO-097

3. GotoRUN

CRO-097 fnl

Page 4 of 13

ToolslEquipmenffProcedures Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A small break LOCA has occurred which is depleting the 5WST.

Core SCM = 0°F.

The BWST level is 19 feet and RB level is increasing.

LOCA CD tab has been completed up to step 7.

" 1 A LPI header indicates no flow

"15" LPI header indicates no flow

INITIATING CUES:

The Procedure Director directs you to perform IAAT Step I;Initiate Enclosure 5.12, (ECCS

Suction Swap to RBES).

CRO-097 fnl

Page 5 of 13

START TIME:

STEP: Step I CRITICAL STEP

Start both of the following: -SAT

IALPIPump

1B LPI Pump

-UNSAT

STANDARD: The candidate rotates the control switches on 1UB2 for "1A"and "IB LPI

Pumps clockwise to the CLOSE position and verifies that the Red TRIP

COIL lights illuminate and the White CLOSE COIL light is OFF and the

ammeter responds.

Continue to Step 2

COMMENTS:

2- Step 2

Verify either of the foliowing exist:

LPI FLOW TRAIN A plus LPI FLOW TRAIN B 2 3300 gpm

-SAT

Only one LPI header is operating AND flow in that header is 2 2850

gpm

-UNSAT

STANDARD: The candidate locates the flow instrumentation (on IUB1) for the LPI

headers and determines that no flow is indicated in either header.

Perform RNO Step and GO PO Step 4

COMMENTS:

CRO-097 fnl

Page 6 of 13

Step 4

Verify 6 three HPI pumps operating

-SAT

RNO

STOP 1 B HPI pump

STANDARD: Candidate observes the indications for the HPI Pump controls on ?UBI -UNSAT

and determines that all 3 #PI Pumps are operating.

The candidate locates the control switch for the 1B HPI Pump and rotates

it to OFF position and verifies that the white OFF light comes on and the

red RUN lights go off.

Continue to Step 5

COMMENTS:

Step 5

Dispatch an operator to perform Enel. 5.37 (Isolation of HPI Pump

Reeirc) without dressing out. (PSI -SAT

STANDARD: Candidate should dispatch NEO(s) to perform End. 5.37.

Continue to Step 6 -UNSAT

CUE: inform candidate operatcir(s) dispatched as requested.

COMMENTS:

Step 6

Notify Control Room personnel that the 170 gpfnlpump minimum HPI

flow requirement is in effect. -SAT

STANDARD: Candidate informs control room personnel of HPI minimum flow

requirements for HPI. -VNSAT

Continue to Step 7

CUE: lnform student the control mom has been notified.

COMMENTS:

CRO-097 fnl

Page 7 of 13

..... ~ ... ..... .-

CAUTION

ECCS pump damage may occur if LPI pumps are operated below the following minimum

flows:

-SAT

Any LPI pump operated at e 100 gprn for > 30 minutes

Two LPI pumps operating in piggyback with NO LPI flow and total HPI flow e 500

-UNSAT

...... -......._- ....... ...

6- Step 7

Verify two LPI pumps operating.

STANDARD: The candidate locates the controls for "1K and "1 B" LPI pumps on 1UB2

and determines that both LPI pumps are running.

Continue to Step 8

COMMENTS:

STEP: Step 8

Verify total HPI flow including seal injection is > 500 gpm.

ISAT

STANDARD: Observe HPI headers flows on 1UBI and determine total #PI flow

including seal injection is > 500 gpm.

Continue to Step 9 -UNSAT

COMMENTS:

..... ........

CRO-097 fnl

Page 8 of 13

8- Step 9 CRITICAL STEP

Simultaneously open the following:

SAT

.

_I_

1bP-15

1bP-16

RNO

-UNSAT

Limit total HPI flow to < 750 gpm including seal injection

STANBARD: Candidate locates the control switches and light indication for ILP-15 and

ILP-16 on 1UB2 and determines that the valves are closed.

1LP-15 and 1LP-16 switches are rotated to the OPEN direction and the

student verifies that the green CLOSED light goes out and the red OPEN

light comes on.

The candidate identifies that 1LP-15 did not open when its control switch

was placed in the OPEN position and performs RNO.

Throttle 1HP-26 and 1HP-27 to limit total HPI flow to 750 gpm including

seal injection.

Continue to Step 10

NOPE: aLP-15 ( ' I A LPI TO HPI AND RBS) will NOT respond, and will not be

operable during this JPM.

COMMENTS:

Step 10

GO TO Step 14

-SAT

STANDARD: Candidate goes to step 14

COMMENTS: __ UNSAT

CRO-097 fnl

Page 9 of 13

STEP I O : Step 14

Place the "LDST LEVEL INTERLOCK switch in the "DISABLE" position. SAT

STANDARD: The candidate locates the "LDST LEVEL INTERLOCK" switch and places

it in the "DISABLE" position. -UNSAl

Continue to Step 15

COMMENTS:

STEP 11: Step 15

Position the following valves switches to close until valve travel is

initiated: SAT

e 1HP-23

IHP-24

~ UNSA-

IHP-25

STANDARD: The controls for 1HP-23, 24 and 25 are located by the candidate on

IUBI. The switches are rotated to the CLOSE position and the grec

CLOSED lights are observed to come on and the red OPEN lights are

observed to go off.

Continue to Step 16

COMMENTS:

STEP 12: Step 16

Verify any of the following are open:

-SAT

0 ILPSW-4

ILPSW-5

Continue to Step 17 __I UNSA'

STANDARD: Verify any of the above valves are open by observing their open

indications on 1VB2.

COMMENTS:

CRB-097 fnl

Page 10 of 13

STEP 13: Step 17

GO TO Step 22

-SAT

STANDARD: Candidate goes to Step 22.

COMMENTS: ___UNSAT

STEP 14: Step 22

Verify both LPI coolers available for LPI and LPSW.

__ SAT

STANDARD: Determine both LPI coolers available for LPI and LPSW

Continue to Step 23

-UNSAT

COMMENTS:

STEP 15: Step 23

Verify any LPI pump has been secured in this enclosure due to low flow

conditions. -SAT

STANDARD: Determine BOTH LPI pumps are operating and perform RNO and GO

TO Step 25. _ I UNSAT

Continue to Step 25

COMMENTS:

CRO-897 fnl

Page 11 of 13

~. . .. ..~.. ~ . ~.~

.. ..-

NOTE'-

RB

. level

~ ~ is~expected

of 2~2' ~.... . when BWST level reaches 9'.

-SAT

STEP 16: Step 25

WHEN BWST level is 2 9'.

AND RB level is rising,

-UNSAT

THEN continue in this enclosure.

STANDARD: Monitor EWST level and RB level and determine that this step is sat

and continue to Step 26.

Cue: If required, inform cand!dafe time compression will be used and the BWS

level will be lowered.

COMMENTS:

STEP 17: Step 26 CRlPlCAL STEP

Simultaneously open the following:

ILP-19 -SAT

ILP-20

-UNSAT

STANDARD: The candidate locates the controls for 1LP-19 ( I A RX BLBG SUCTll

AN5 ILP-20 (1E RX BLDG SUCTION) on UB2.

The switches are placed in the OPEN position and the valves are ve

to open.

COMMENTS:

__._ ...~.. ... END TASK

I ...

TOP TIME

CRO-097 fnl

Page 12 of 13

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

.l Required to provide HPI pump suction

8 Necessary to allow the flow from the LPI headers to the HPI pump suctions.

Candidate must determine that ILP-15 did not open and then throttle HPI flow to

protect the HPI pumps.

16 Necessary to allow the suction source for the LPI system to be the WBES and not the

BWSP, which is almost depleted.

CRQ-097 fnl

Page 13 of 13

CANDIDATE CUE SHEET

(TO B RETURNED TO EXAMINER UPON COMPLTIQN OF TASK)

INITIAL CONDITIONS:

A small break LOCA has occurred which is depleting the BWST

Core SCM = 0°F

The BWST level is 19 feet and RB level is increasing.

LOCA CD tab has been completed up to step 7.

INLPI header indicates no flow

IB LPI header indicates no flow

INITIATING CUES:

The Procedure Director directs you to perform lAaT Step 1; Initiate Enclosure 5.12, (ECCS

Suction Swap to R E S ) .

CRO-600 fnl

Page 1 of 12

REGION It

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-600

RECOVER FROM SWITCHYARD ISOLATION

CANDIDATE

EXAMINER

CRO-GOO fnl

Page 2 of 12

REGION II

INITIAL LICENSE EXANllNATlON

JOB PERFORMANCE MEASURE

Task:

Recover from Switchyard Isolation

Alternate Path:

Facility JPM #:

IVA Ratinq(s):

System: BW/AQS

WA: AA1.l

Rating: 4.3/4.2

Task Standard:

Recovery from Switchyard Isolation is performed correctly including manually synchronizing the overhead Keowee

Unit onto the 230 KV Red Bus.

Preferred Evaluation Leeation: Preferred Evaluation Method:

Simulator In-Plant - Perform X Simulate _ .

References:

Enclosure 5.3 of APlOl Z (Recovery From Loss of Power)

Validation Time: 15 minutes Time Critical: NO

......................................................................................

Candidate: Time Start:

NAME Time Finish:

Performance Ratinq: SAT -UNSAT - Performance Time I _

Examiner: I

NAME SIGNATURE BATE

CRO-600 fnl

Page 3 of 12

SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 210

2. Import files for CRO-600

3. GotoRUN

4. Use the Speed Change Motor on Keowee Unit 1 to ensure the unit is out of sync.

5. Timer 2 will reset the SWYD Isolation

6. Timer 3 will give remote control of Keowee

CRO-600 fnl

Page 4 of 12

ToolslEquipmenffP~oceduresNeeded:

Enclosure 5.3 of AW01-i (Recovery From Loss of Power)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be petformed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. A switchyard Isolation has occurred

2. Unit 1 and Unit 2 reactors have tripped

3. Unit 3 remains online at 100% power

4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via

the overhead power path

5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency

has returned to normal and recovery from switchyard isolation may be initiated.

INITIATING CUES:

1. The SRO in the control room instructs you utilize Enclosure 5.3 of APlOl1 (Recovery From

Loss of Power) to recover from the Switchyard Isolation.

2. Procedure steps 1 and 2 have been completed. Begin on step 3.

CRO-600 fnl

Page 5 of 12

START TIME:

1- Step 3

Verify NO ES 1 or 2 actuation on Oconee unit:

Unit 1

-SAT

Unit 2

Unit 3

-UNSAT

STANDARD: Verify ES 1 or 2 has NOT actuated on Unit 1 by observing the RZ

modules and/or statalarrns. Contact Unit 2 and 3 to determine if ES 1 or

2 has actuated.

Continue to Step 4.

Cue: Unit 2 and 3 have not had an ES actuation.

COMMENTS:

STEQ: Step 4

Ensure of the following AUTOlMAN transfer switches in MAN:

-SAT

-UNSAT

STANDARD: Place the Unit ITA and TB AUTOIMAN transfer switches in MAN

Contact Unit 2 and 3 by phone and have them ensure TA and TB

AUTOlMAN transfer switches in MAN.

Continue to Step 5.

Cue: Unit 2 and 3 TA and TB AUTO/MAN transfer switches are in MANUAL.

COMMENTS:

CRO-600 fni

Page 6 of 12

_.

STEP 3: Step 5

Depress all of !he following RESET pushbuttons: CRITICAL STEP

GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL I RESET

GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET -SAT

'GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET

  • GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET

UNSAT

STANDARD: The following RESET pushbuttons are depressed:

GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 1 RESET

GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET

GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET

GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET

Continue to Step 6.

Note: Buttons are located electrical mimic board.

  • Not critical

COMMENTS:

4- Step 6

Verify the following statalarms are off:

SA-15/A-2 (CHANNEL #I UNBERFREBUENCY)

SA-138-4 (CHANNEL #2 UNDERFREQUENCY) il_ SAT

  • SA-15/C-1 (CHANNEL #I UNDERVOLTAGE)

SA-15/C-3 (CHANNEL #2 UNDERVOLTAGE)

-UNSAT

STANDARD: The above Statalarms are verified to be off. Statalarms are loci in

SA-I 5.

Continue to Step 7

COMMENTS:

STEP: Step 7 CRITICAL STEP

Notify Keowee Qperator to transfer control of & t

JKeowee units to

Oconee. -SAT

STANDARD: Contact Keowee Operator, by phone, to transfer control of Keowee

units to Oconee. -UNSAT

Continue to Step 8.

NOTE: Simulator instructor will transfer control of @ Keowee

J units to Oconee.

t

COMMENTS:

CRO-600 fnl

Page 7 of 12

STEP 6: Step 8

Verify both channels of all Oconee units Main Feeder Bus Monitor Relay

Panels reset as indicated by the following statalarms off:

-. ..... -SAT

S'H~I'CHNL A L ~ G I C UNSAT

INITIATE)

4 (2)(3)SA74/Q-4 (LOAD

SHED CHNL B LOGIC

~b'S6 CHNL A LOGIC I

INITIATE

1(2)(3w-I4/D-6

% ,\ ,

TO SB CHNL B LQGlC

INITIATE) ... -

STANDARD: Both channels of Oconee unit 1 Main Feeder Bus Monitor Relay Panel is

verified reset as indicated by observing the above statalarms off. Contact

Unit 2 and 3 and have them verify their Main Feeder Buses are reset.

Continue to Step 9.

Cue: Unit 2 and 3 Main Feeder Bus Monitor Panels are reset as indicated by the

above alarms ar@off.

Note: Unit 1's Main Feeder Bus Monitor Panel has not actuated.

COMMENTS:

STEP 7: Step 9 CRITICAL STEP

Verify overhead Keovfee unit energizing a Oconee unit MFB

-SAT

STANDARD: Determine that Kecwee Unit 1 is energizing Oconee Unit 1 MFBs via the

overhead path, by observing Keowee Unit 1 has emergency started and

ACB-1 is closed energizing unit 1's MFBs.

Continue to Step 10.

-UNSAT

COMMENTS:

CRQ-600 fnl

Page 8 of 12

STEP: Step 10

GO TO Step 23

STANDARD: Candidate goes to Step 23 -SAT

COMMENTS:

-UNSAT

STEP: Step 23

Verify Keowee overhead unit is energizing a Oconee unit MFB.

-SAT

STANBARD: Determine that Keovvee Unit 1 is energizing Oconee Unit 1 MFBs via the

overhead path, by observing Keowee Unit 1 has emergency started and

ACB-1 is closed energizing Unit ts MFBs.

-UNSAT

Continue to Step 24.

COMMENTS:

STEP IO: Step 24

Notify Emergency Coordinator to determine which of the following is

desired:

Manually synchronize overhead Keowee unit onto the 230 KV Red -SAT

Bus

Disconnect overhead Keowee unit from the 230 KV Yellow Bus and

reconnect (dead bus transfer) 230 KV Yellow Bus to the System Grid

-UNSAT

STANDARD: Call Emergency Coordinator and ask which of the above methods is

desired.

Continue to Step 25

Cue: The Emergency Coordinator determines that manually synchronizing the

overhead Keowee unit onto the 230 KV Red Bus is desired.

COMMENTS:

CRO-GOO fnl

Page 9 of 12

STEP ? I: Step 25

Verify manual Synchronization of the overhead Keowee Unit onto the

System Grid via the 230 KV Red Bus is desired.

__ SAT

STANDARD: Determine from previous discussion with the Emergency Coordinator that

manual synchronization of the overhead Keowee Unit onto the System

Grid via the 230 KV Red Bus is desired.

UNSAT

Continue to Step 26.

COMMENTS:

STEP 12: Step 26

Obtain permission from TCC to connect overhead Keowee unit (230 KV

Yellow Bus Supply) to the System Grid. -SAT

Cue: The TCC gives permission to connect overhead Keowee unit (230 KV Yeellow

Bus Supply) io ihe System Grid.

__ UNSAT

STANDARD: Call the permission from TCC to connect overhead Keowee unit (230 KV

Yellow Bus Supply) to the System Grid.

Continue to Step 27.

COMMENTS:

CRO-600 fnl

Page 10 of 12

STEP 13: Step 27 CRITICAL STEP

Perform the followina to svnc and tie overhead Keowee unit (Yellow Bus

Supply) to 230 KV RLd Bds:

-SAT

Establish communications with Keowee Operations

Depress and hold PCB-8 SYNC push button

Adjust overhead Keowee unit SPEED CHANGER MOTOR to -UNSAT

Synchronize overhead Keowee unit to 230 KV Red Bus.

e WHEN synchronization is achieved,

THEN perform the following:

2. Close PCB-8.

2. Release PCB-8 SYNC push button

STANDARD: The overhead Keowee unit (Yellow Bus Supply) is synced and tied to the

230 KV Red Bus by:

e Establishing communications with Keowee Operations.

Depressing and holding the PCB-8 SYNC push button.

Cue: The simulator operator will act as a second operator and operate the PCB-8

SYNC butfon. After synchronization is achieved (slow in the fast direction), inform

the candidate to close the PCB.

e Adjusting the overhead Keowee unit SPEED CHANGER MOTOR to

synchronize overhead Keowee unit to 230 KV Red Bus.

WHEN synchronization is achieved,

THEN perform the following:

> Close PCH-8 (Red closed light illuminated)

2 Release PCB-8 SYNC push button.

Note: The SYNC CHECK provides only indication, NOT protection against out of

phase closure.

Cue: lnform candidate that this task is complete.

COMMENTS:

END TASK

TOP TIME:

CRB-SOOfnl

Page 11 of 12

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

3 Reset buttons must be pushed to reset the Switchyard Isolation circuit to allow PCBs

to be repositioned.

5 Oconee must have Keowee control to operate any Keowee Unit.

7 Must recognize power is coming from a Keowee Unit via the overhead path in order

to transfer power back to the switchyard.

I3 Manually syncing of the Keowee Unit is required to put the Oconee axillaries on the

switchyard.

CRO-GOB fnl

Page 12 of 12

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION QF TASK)

INITIAL CONDITIONS:

1. A switchyard isofation has occurred

2. Unit 1 and Unit 2 reactors have tripped

3. Unit 3 remains online at 100% power

4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via

the overhead power path

5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency

has returned to normal and recovery from switchyard isolation may be initiated.

INITIATING CUES:

1. The SRO in the control room instructs you utilize Enclosure 5.3 of AP/511 (Recovery From

boss of Power) to recover from the Switchyard Isolation.

2. Procedure steps Z and 2 have been completed. Begin on step 3.

CRO-700 fnl

Page Z of 18

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-700

Place IC§ In Auto following Loss Of Auto Power

CANDIDATE

EXAMINER

CRO-700 fnl

Page 2 of 18

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

Place ICS In Auto following Loss Of Auto Power

Alternate Path:

Facility JPM #:

KIA Ratinqfs):

System' BWIA02

WA. MI.1

Rating: 4.013.8

Task Standard:

Use AP/23 (boss Of ICs Power) Enclosure 5 5 (Placing ICs In Auto) to place the 16s in AUTO following a

Loss Of Auto Power.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant __ Perform 2Simulate __

References:

CRO-700 fnl

Page 3 of 18

SIMULATOR OPERATOR INSTRUCTIONS:

I.Recall Snap 22 1

2. Import files for CRO-708

3. GotoRUN

CRO-700 fnl

Page 4 of 18

TooIslEquipmenffProcedures Needed:

AW23 (boss Of ICs Power) Enclosure 5.5 (Placing ICs In Auto)

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate l o me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. ICs AUTO power lost

2. AP/23 (Loss of ICs Power) in progress

3. 16s AUTO power has been restored

INITEATING CUES:

The SRO directs you to perform Enclosure 5.5 (Placing 16s in AUTO) to place ALL ICs H/A

stations in AUTO.

CRO-700 fnl

Page 5 of 18

START TIME:

Note: All operations will be performed on the ICs stations located on I U B I .

Step I

Perform a pre-job briefing for AP/l/Ai1700/023 from the pra-job briefing

database. _I_ SAT

STANDARD: State that 8 pre-job briefing should be performed.

UNSAT

Continue to Step 2.

I _

Cue: Inform candidate that the pre-job briefing has been performed.

Note: Candidate will obtain setpoint information from the OAC during this JPM.

COMMENTS:

Step 2

Ensure RATE SET to 0.0

-SAT

STANDARD: Ensure RATE SET thumbwheel located is set to 0.0

Continue to SteD 3. __ UNSAT

COMMENTS:

CRO-700 fnl

Page 6 of 18

STEQ: Step 3 CRITICAL STEP

Verify TflP setpoint at THP by comparing the following,

0 1 E2089 (TURB HBR PRESS SETPOINT)

0 1 E2088 (IC5 SELECTED TURB HDR PRESS) -SAT

RNQ

Ensure the following in HAND:

TURBINE MASTER

e 1B TURBINE BYPASS VALVES

Adjust THP setpoint to = THP at the TURBINE MASTER.

STANDARD Call up the appropriate OAC display (enter GB AP28) anti determine

THP setpoint NOT at THP and perform RNO.

J

Verify the above stations are in HAND.

Use the Setpoint knob on the TURBINE MASTER to match THP setpoint

to i- THP while monitoring on the OAC.

Continue to Step 4.

COMMENTS:

=: Step 4 CRITICAL STEP

Place TURBINE MASTER in AUTO

STANDARD: TURBINE MASTER is placed in AUTO by depressing the Auto -SAT

pushbutton on the TURBINE MASTER Bailey station.

Continue to Step 5

UNSAT

COMMENTS:

STEP: Step 5

Verify Main Turbine controlling THP.

-SAT

STANDARD: Verify Main Turbine controlling THP by observing THP being maintained

at setpoint.

Continue to Step 6 I _ UNSAT

COMMENTS:

CRO-700 fnl

Page 7 of 18

Step 6

Verify all TBVs are closed.

-SAT

STANDARD: Verify all TBVs closed by observing the Green closed indication

Continue to Step 7.

-UNSAT

COMMENTS:

Step 7 CRITICAL STEP

Ensure all TBVs in AUTO:

1A TURBINE BYPASS VALVES

1B TURBINE BYPASS VALVES I _ SAT

STANDARD: Place TBVs in AUTO by depressing the red AUTO pushbutton and verify

the red AUTO light illuminates and the white HAND light extinguishes. __ UNSAT

Continue to Step 8 .

COMMENTS:

Step 8 CRITICAL STEP

Verify Tave setpoint at = Tave by comparing the following:

OlE2087 (ICs TAVE SETPOINT)

e OlE2086 (ICs SELECTED TAVE) -SAT

RNO

Ensure the following:

DIAMOND in HAND -UNSAT

I A FDW MASTER in HAND

e 1B FBW MASTER in HAND

STANDA. Call up the appropriate OAC display (enter G- AP28) and determine

Tave setpoint NOT at = Tave and perform RNO.

Verify the above stations are in HAND.

Adjust Tave setpoint to = Tave at the REACTOR MASTER while

mcnitoring on the OAC.

Continue to Step 9

COMMENTS:

CRO-900 fnl

Page 8 of 18

Step 9

Ensure DIAMOND in MANUAL.

-SAT

STANDARD: Verify DIAMOND in MANUAL by observing MANUAL light illuminated on

DIAMOND panel.

-UNSAT

Continue to Step I O .

COMMENTS:

STEP I O : Step 10 CRITICAL STEP

Place REACTOR MASTER in AUTO.

STANDARD: REACTOR MASTER is placed in AUTO by depressing the Auto __ SAT

pushbutton on the REACTOR MASTER Bailey station and verify the red

AUTO light illuminates and the white HAND light extinguishes.

Continue to Step 11 _ I UNSAT

COMMENTS:

STEP 11: Step 11

Verify Neutron Error is 0 f I0h.

-SAT

STANDARD: Verify Neutron Error is 0 f 1% by observing Neutron Error meter on

IUBI.

Continue to Step 52 -UNSAT

COMMENTS:

.. . ... ... ..

CRO-700 fnl

Page 9 of 18

STEP 12: Step 12 CRITICAL STEP

Place DIAMOND in AUTO

-SAT

STANDARD: Place DIAMOND in AUTO by depressing the AUTO pushbutton on the

DIAMOND panel pushbutton and verify the AUTO light illuminates and

the HAND light extinguishes. Verify plant parameters do not change.

Continue to Step 13 -UNSAT

COMMENTS:

STEP 13: Step 13

Verify STM GENERATOR MASTER Measured Variable is on the caret.

I__ SAT

STANDARD; Place selector switch to Measured Variable and verify the pointer on the

STM GENERATOR MASTER is on the caret.

Continue to Step 14. -UNSAT

COMMENTS:

STEP 14: Step 14 CRITICAL STEP

Place STM GENERATOR MASTER in AUTO.

STANDARD: STM GENERATOR MASTER is placed in AUTO by depressing the Auto I SAT

pushbutton on the STM GENERATOR MASTER Bailey station and verify

the red AUTO light illuminates and the white HAND light extinguishes.

-UNSAT

Continue to Step 15

COMMENTS:

CRO-700 fnl

Page 10 of 18

Verify Delta Tc setpoint at = Delta Tc by comparing the following:

0 O1E2091 (ICs DELTA TC SETPOINT) I _ SAT

0 OlP1608 (RCS NARROW WNGE BELTATC)

STANDARD: Verify Delta Tc setpoint at = Delta Tc by comparing the above points on UNSAT

the OAC.

I _

Continue to Step 16

COMMENTS:

-

STEP 16: Step 16 CRITICAL STEP

Place DELTA Tc station in AUTO.

STANDARD: -SAT

The DELTA Tc station is placed in AUTO by depressing the Auto

pushbutton on the DELTA Tc Bailey station and verifying the red AUTO

light illuminates and the white HAND light extinguishes.

Continue to Step 17. -UNSAT

COMMENTS:

STEP 17: Step 17

Verify 1A FDW MASTER Measured Variable is on the caret.

I SAT

STANDARD: Place selector switch to Measured Variable and verify the pointer on the

1A FCIW MASTER is on the caret.

Continue to Step 18. -UNSAT

COMMENTS:

CRO-780 fnl

Page 11 of 18

STEP 18: Step 18

Verify 1B FBW MASTER Measured Variable is on the caret.

-SAT

STANBARD: Place selector switch to Measured Variable and verify the pointer on the

1B FDW MASTER is on the caret.

Continue to Step 19. -UNSAT

COMMENTS:

NOTE CRITICAL STEP

1A FDW MASTER and 18 FDW MASTER should both be placed in AUTO

- .~... simultaneously. .... ...

__ SAT

STEP 19: Step 19

Place the following in AUTO:

I A FDW MASTER -UNSAT

  • I B FDW MASTER

STANDARD: The 1A FBW MASTER and 1B FBW MASTER is placed in AUTO

simultaneously by depressing the Auto pushbuttons on both the 1A FDW

MASTER and IB FDW MASTER Bailey stations and verifying the red

AUTO lights illuminate and the white HAND lights extinguish.

Continue to Step 20.

Note: Simultaneous operation is not critical.

COMMENTS:

'

STEP 20:

STANDARD:

Step 20

CAUTION

Changing Total FDW flow will result in Rx power change. Total FDW flow should be

maintained as near constant as possible by adjusting FDW pump speed and FDW control

valve positions. ._.. .......

Verify lowest FDW VALVE AP = 35 psid

.. .~

Verify lowest FDW VALVE AP = 35 psid by observing the FBW VALVE

AP gauge.

-SAT

CRO-700 fnl

Page 12 of 18

___ UNSAT

Continue to Step 21

COMMENTS:

STEP 21 : Step 21

Verify 18 MAIN FDW PUMP Measured Variable is on the caret.

__ SAT

STANDARD: Place selector switch to Measured Variable and verify the pointer on the

I A MAIN FDW PUMP is on the caret.

Continue to Step 22.

-UNSAT

COMMENTS:

STEP 22: Step 22 CRITICAL STEP

IAAT 1A MAIN FDW PUMP Measured Variable is on the caret,

AND desired in AUTO,

THEN place 1A MAIN FDW PUMP in AUTO. ___ SAT

STANDARD: Place I A MAIN FDW PUMP in AUTO by depressing the AUTO

pushbutton and verify the red AUTO light illuminates and the white HAND -UNSA?

light extinguishes.

Continue to Step 23.

COMMENTS:

CRO-700 fnl

Page 13of 18

STEP 23: Step 23

Verify 18 MAIN FDW PUMP Measured Variable is on the caret.

-SAT

STANDARD: Place selector switch to Measured Variable and verify the pointer on the

I B MAIN FDW PUMP is on the caret.

-UNSAT

Continue to Step 24.

COMMENTS:

STEP 24: Step 24 CRITICAL STEP

IAAT 16 MAIN FDW PUMP Measured Variable is on the caret,

AND desired in AUTO.

THEN perform the following: -SAT

0 Adjust I B MAIN FDW 6UMP bias as required using 0 1 E2092 (FWT

. 1B BIAS).

Place r E MAIN FDW PUMP in AUTO.

__ UNSAT

STANDARD: Place 1B MAIN FDW PUMP in AUTO by depressing the AUTO

pushbutton and verify the red AUTO light illuminates and the white HAND

light extinguishes.

Continue toStep 25

COMMENTS:

STEP 25: Step 25

Verify 1FDW-32 Measured Variable is on the caret

-SAT

STANDARD: Place selector switch to Measured Variable and verify the pointer on the

1FDW-32 controller is on the caret.

-UNSAT

Continue to Step 26

COMMENTS:

.. ... .. -. .......

CRO-700 fnl

Page 14of 18

STEP 26: Step 26

Verify ?FDW-35 Mmsured Variable is on the caret.

-SAT

STANDARD: Place selector switch to Measured Variable and verify the pointer on the

1FBW-35 controller is on the caret.

UNSAT

Continue to Step 27.

COMMENTS:

.~~.. _. .. .

NOTE" CRlTlCAL STEP

~ .. 1FDW-32 and 1FDW-35

...._. should.

. both

.-. be placed in......

AUTO simultaneously.

~ ~ ~

STEP 27: Step 27

-SAT

Place the following in AUTO:

IFDW-32

IFDW-35 __ UNSAT

STANDARD: The IFDW-32 and IFDW-35 is placed in AUTO simultaneously by

depressing the Auto pushbuttons on both the IFDW-32 and 1FDW-35

Bailey stations and verifying the red AUTO lights illuminate and the M i t e

HAND lights extinguish.

Continue to Step 28

COMMENTS:

STEP 28: Step 28

Verify IFDW-41 Measured Variable is on the caret

~ SAT

STANDARD: Place selector switch to Measured Variable and verify the pointer on the

1FDW-41 controller is on the caret.

-UNSAT

Continue to Step 29.

COMMENTS:

CRO-900 fnl

Page 15of 18

STEP 29: Step 29

Verify 1FDW-44 Measured Variable is on the caret.

I SAT

STANDARD: Place selector switch to Measured Variable and verify the pointer Qnthe

1FDW-44 controller is on the caret.

UNSAT

Continue to Step 30.

_ I

COMMENTS:

NOTE CRITICAL STEP

~ -. 1..

FDW-41

.. ,. and 1FDW-44 should both be placed

~ .... .

in AUTO simultaneously.

-SAT

STEP 30: Step 30

Place the following in AUTO:

IFDW-41

IFDW-44 -UNSAT

STANDARD: The 1FDW-41 and 1FDW-44 is placed in AUTO simultaneously by

depressing the Auto pushbuttons on both the 1FDW-41 and 1FDW.

Bailey stations and verifying the red AUTO lights illuminate and the white

HAND lights extinguish.

Continue to Step 31.

COMMENTS:

STEP 31: Step 31

Slowly adjust the following as required by unit operation:

Tave I SAT_ .

THP

Delta Tc

UNSAT

STANDARD: Adjust the above on 1UBI as required by unit operation.

Continue to Step 32.

COMMENTS:

CRO-700 fill

Page 16 of 18

STEP 32: Step 32

Ensure CTPD SET at desired value

I_ SAT

STANDARD Ensure CTPD SET at desired value on 1UBI.

___ UNSAT

COMMENTS:

... ...~.. END.. TASK ... .

STOP TIME:

CRO-700 fRl

Page 17 of 18

CRITICAL STEP EXPLANATIONS:

STEP tC Explanation

3 The setpoint and the parameter have to be matched to prevent a plant transient as

the ICs is place in AUTO.

4 Required to place the ICs in AUTO.

7 Required to place the 16s in AUTO.

8 The setpoint and the parameter have to be matched to prevent a plant transient as the ICs is

place in AUTO.

I0 Required to place the ICs in AUTO.

12 Required to place the ICs in AUTO.

14 Required to place the ICs in AUTO.

16 Required to place the ICs in AUTO.

19 Required to place the ICs in AUTO.

22 Required to place the ICs in AUTO.

24 Required to place the IC§ in AUTO.

27 Required to place the IC§ in AUTO.

30 Required to place the ICs in AUTO.

CRO-700 ftll

Page 18 of 18

CANDIDATE CUE SHEET

(TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

I ICs AUTO power lost

~

2. AP/23 (Loss of ICs Power) in progress

3. ICS AUTO power has been restored

INITIATING CUES:

The SRO directs you to perform Enclosure 5.5 (Placing ICs in AUTO) to place ALL ICs H/A

stations in AUTO.

CRO-900 fnl

Page 1 of 13

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

CRO-900

Release GWD Tank

CANDIDATE

EXAMINER

CRO-900 fnl

Page 2 of 13

REGION II

INITIAL LICENSE WAMINATION

JOB PERFORMANCE MEASURE

Task:

Release GWD Tank

Alternate Path:

N

FacilitvJPM #:

WA Rating(&

System: 071

WA: A426

Rating: 3.1/3.9

Task Standard:

Release a GWD tank correctly using OP1I&2iAl104~018

End 4 9 (GWDTankRelease)

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator 2In-Piant __ Perform Simulate -

CRO-900 fnl

Page 3 of 13

SIMULATOR OPERATOR INSTRUCTIONS:

Z . Recall IC-30

2. GotoRUN

CRO-900 ffll

Page 4 of 13

TooIslEauipment/Procedu~esNeeded:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be periormed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet i provided you.

INITIAL CONDITIONS:

Release of "B"GWB tank is desired

QP/1&2/N1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to

step 2.3.

INITIATING CUES:

SRO directs you to complete the release of the "B"G W D tank at step 2.3 of Enclosure 4.9.

CRO-900 fnl

Page 5 of 13

START TIME:

Step 2.3

Determine any other GWR(s) are in progress at station.

-SAT

STANDARD: Determine that no other GWR(s) are in progress at ONS

Continue to Step 2.4

-UNSAT

Cue: No other GWRs are in progress.

COMMENTS:

Step 2.4 CRITICAL STE

EF release will be made at 1/3 station release limit, verify IRIA-45 High

and Alert Alarm setpoints set per PT/0/A/0230/001 (Radiation MonitQr _ I SAT

Check).

STANDARD: Refer to PT/OIA/0230/001 (Radiation Monitor Check) and verify 1RIA-45 -UNSAT

High and Aiert Alarm setpoints using the RIA View Node.

Continue to Step 2.5

Note: The setpoints will not be correct and will require the candidate to reset them

per PT~02301001.

COMMENTS:

m: Step 2.5

IF release will be made at 2/3 station release limit:

SAT

STANDARD Determine that this release will be made a 1/3 station limit

N/A steps 2.5.1 - 2.5.5. -UNSAT

Continue to Step 3.1

Cue: If asked inform the candidate as the SRO that this release will be at 5/3 station

limit

COMMENTS:

CRO-900 fnl

Page 6 of 13

STEP: Step 3.1

Record background readings for 1RIA-37 & 1RIA-38 on Enclosure 4.10

GWD Tank Sample Request. __ SAT

STANDARD: Determine background readings for 1RIA-37 & 1RIA-38 by observing the

RIA readings on the RIA View Node and record on Enclosure 4.10. -UNSAT

Note: The background readings should be as follows:

ZRIA-37 Background reading is: 45 cps

IRIA-38 Background reading is: 6.6 cps

Continue to Step 3.2

COMMENTS:

....

[%OTE: The RIArequired to terminate release (ILIA within range) must be

1 operable or .....

two independent samples must be taken ._.. (SLG 16.1 1.3).

...... I SAT

m: Step 3.2

Recommended 1RIA-37 and 38 High and Alert setpcints:

e 1RIA-37 cpm above background

-UNSAT

1RIA-38 cpm above background

STANDARD: Obtain this information from the sample request and record on form.

Continue to Step 3.3

COMMENTS:

CRO-900 fnl

Page 7 of 13

Step 3.3 CRITICAL STE

Adjust 1RIA-37 setpoints for release per on6 of the foliowing:

3.3.1 IF above instrument range over-ride 1RIA-37 setpoints: __ SAT

o Set 1RIA-37 alert setpoint at zero

Set 1RIA-37 High setpoint at zero

Or

__ UNSAT

3.3.2 IF required to set alarms:

a Set 1RIA-37 Alert setpoint at 4795 cpm

Set 1RIA-37 High setpoint at 4795 cpm

STANDARD: Determine setpoints for release are NOT above instrument range and

NIA step 3.3.1.

Determine required setpoints by adding background to data from the

sample request and enter it on this form.

Continue to Step 3.4

COMMENTS:

Step 3.4 CRITICAL STE

Adjust 1RIA-38 setpoints for release per one of the following:

3.4.1 IF above instrument range over-ride 1RIA-38 setpoints: __ SAT

Set 1RIA-38 Alert setpoint at zero

e Set 1RIA-38 High setpoint at zero

Or

3.4.2 IF required to set alarms:

-UNSAT

Set 1RIA-38 Alert setpoint at 31E).6 cpm

Set 1RIA-38 High setpoint at 319.6 cpm

STANDARD: Determine setpoints for release are NOT above instrument range and

NIA step 3.3.1.

Determine required setpoints by adding background to data from the

sample request and enter it on this form.

Continue to Step 3.5

COMMENTS

CRO-900 fnl

Page 8 of 13

Step 3.5

Reset WASTE GASTANK DISCH integrator to zero.

I SAT

STANDARD: Reset WASTE GASTANK DISC# integrator located on 1AB3 to zero by

deprsssing the reset button.

__ UNSAT

Continue to Step 3.6

COMMENTS:

Step 3.6

Ensure GWW DISCHARGE FLOW CONTROL in '"HAND".

Verify GWR DISCHARGE FLOW CONTROL "CLOSED" -SAT

STANDARD: Ensure GWR DISCHARGE FLOW CONTROL in "HAND" and CLOSED

located on 1AB3.

UNSAT

Continue to Step 3.7

COMMENTS:

STEP 10: Step 3.7 CRITICAL STEl

Open GWD-100 (Decay Tanks Bischarge Header Block). (A-2-2091E 13'

N of Door) -SAT

STANDARD: Dispatch N E 0 to Open GWD-100 (Decay Tanks Discharge Header

Block). -UNSAT

Continue to Step 3.8

Cue: inform candidate that GWD-IO0 is open.

COMMENTS:

CRO-900 fnl

Page 9 of 13

STEP 11: Step 3.8 CRITICAL STEP

IF releasing GWD Tank B perform the following:

Open GWD-99 (Decay Tank 1B Discharge Block) -SAT

e Place GWD-5 (5 GWB TANK DISCHARGE) switch to "AUTO

STANDARD: Dispatch N E 0 to open GWD-99 (Decsy Tank 15 Discharge Block). -UNSAT

Cue: Inform candidate that GWB-99 is open.

Located GWD-5 (B GWD TANK DISCHARGE) on 1863 and place

switch to "AUTO"

Continue to Step 3.9

COMMENTS:

STEP 12: Steps 3.9 - 3.1 1

IF releasing GWD Tank B perform the following...

SAT

STANDARD: Determine NOT releasing GWD Tank A, C, D and NIA steps 3.8. 3.10,

and 3.1 1.

Continue to Step 3.12

__ UNSAT

COMMENTS:

- ~

NOTE: Station Limit release rates, per SLC 16.11, will NOT be exceeded if

....

recommended release rates per Enclosure 4.10 "GWD Tank Sample Request"

are followed.

  • Limit and Precautions have~required

. . ~ approval levels for release. -SAT

STEP 13: Step 3.12

Approval granted for release.

-UNSAT

STANDARD: Obtain approval for release.

Continue to Step 3.13

Cue: Approval is granted for release by Trac: Lemons at current Daterrime.

COMMENTS:

CRO-900 fnl

Page 10 of 13

STEP 14: Step 3.43

IF releasing at 2/3 Station Limit:

-SAT

STANDARD: Determine NOT releasing at 2/3 Station Limit by previous cue.

Continue to Step 3.14

II_ UNSAT

COMMENTS:

STEP 15: Step 3.14

Recommended Release Rate from Enclosure 4.10 "GWD Tank Sample

Request": cfm. I SAT

STANDARD: Record Recommended Release Rate from Enclosure 4.10 "GWD Tank

Sample Request". -UNSAT

Continue to Step 3.15

CQMMENPS:

NOTE:

If U1 Penetration Room Ventilation (PRV) system is shutdown, RIA-32 U1 Penetration

Room sample point does NOT sample general area air properly.

SAT

With U1 PRV system shutdown. RIA-32 sample point for U1 Penetration Room is

_ I

e

sampling air in piping between U1 Unit Vent and PRV discharge.

e RIA-32 counts may increase when selected to U1 Penetration Room while making a

GWD Release. -UNSAT

STEP 16: Step 3.15

Place a note on Turnover sheet that RIA-32 Penetration Room sample

point may alarm when selected to U'i Penetration Room during GWD

release.

STANDARD: Candidate should indicate a note should be placed on the Turnover sheet

indicating that RIA-32 Penetration Room sample point may alarm when

selected to U1 Penetration Room during GWD release.

Continue to Step 3.16

COMMENTS:

I

CRO-900 fnl

Page I 1 of 13

STEP 17: Step3.16 CRITICAL STEP

Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release

rate.

-SAT

STANDARD: Slowly adjust the manual loading knob to obtain the desired release rate.

Continue to Step 3.17

-UNSAT

Note: Although the maximum rate is high the actual release rate will be low.

COMMENTS:

STEP 18: Step 3.17

Record "Begin GWR # " in Unit Log

I SAT

STANDARD: Candidate should indicate a Unit log entry would be made.

-UNSAT

COMMENTS:

END

.~ TASK

- .. .....

STOP TIME:

CRO-900 fnl

Page 1 2 0 f 13

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

2 Required to set RIA to prevent station release above limits.

6 Required to set RIA to prevent station release above limits.

7 Required to set RIA to prevent station release above limits.

10 Required to align release flow path.

21 Required to align release flow path.

17 Required to align release flow path.

CRO-900 fnl

Page 13 of 13

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Release of "5" GWD tank is desired

OQ/l&2/A/1104/818, Endosure 4.9 (GWD Tank Release) is in progress and completed up to

step 2.3.

INITIATING CUES:

SRQ directs you to complete the release of the "B" GWD tank at step 2.3 of Enclosure 4.9.

NLO-036 fnl

Page 1 of 10

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

NLO-036

STARTUP A VITAL BUS INVERTER

CANDIDATE

EXAMINER

NLO-036 fnl

Page 2 of 10

REGION II

INlTiAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

STARTUP A VITAL BUS INVERTER

Alternate Path:

N

Facilitv JPM #

N

WA Ratinds):

System: 062

WA: A3.04

Rating: 2.9/2.9

Task Standard:

Vital Bus Inverter placed in service correctly

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator -In-Plant X Perform -Simulate

References:

OP/l,2,3/A/t 107/04. Enclosure 4 2 (Startup Of The Vital Bus Inverters)

Validation Time: 3 minutes Time Critical: NO


____-_____________---ssssss_______ss------------------------------------------

_ ~ ~ ~ ~ _ _ _ _ _ ~ _ _ ~ ~ ~ ~ ~ _ _ ~ - - - s s s s s s _ _ _ _ _ _ _ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ - - - - - ~

Candidate: Time Start,

NAME Time Finish.

Performance R a t i n s SAT ~ UNSAT - Performance Time -

Examiner: -I

NAME SIGNATURE DATE

NLO-036 fnl

Page 3 of 10

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

NLO-036 fnl

Page4of10

ToolslEquipmentIProcedures Needed:

READ TO OPERATOR

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I will

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Earkies today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel

have just notified the Control Room SRO that they have completed their work on the inverter.

The affected I2OVAC Vital Instrumentation Power Panelboard is being supplied by Regulated

AC Panelboard KRA.

INITIATING C U E

The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OPlllNZ 107/04

(Enctosure 4.2). DC Power to the inverter has been isolated.

Begin at Step 2.1.

NbQ-036 fnl

Page 5 of 10

START TIME:

Step 2.1

IF DC power to the inverter has been isolated, close breaker #33 on the

associated DC paneiboard. -SAT

STANDARD: Determine that DC power to the inverter has not been isolated by

referring to the initial conditions. -UNSAT

Continue to Step 2.2.

CUE: Indicate to candidate that breaker #33 is closed.

COMMENTS:

Step 2.2 CRITICAL TASK

Press the PRECHARGE SWITCH pushbutton until the PRECHARGE

light comes on. -SAT

STANDARD: The candidate depresses the PRECHARGE SWITCH pushbutton untii

the PRECHARGE light comes on. -UNSAT

CUE: Indicate to the student that the PRECHARGE light is ON.

Continue to Step 2.3.

COMMENTS:

NLO-036 fnl

Page 6 of 10

Step 2.3 CRITICAL TASK

CLOSE the DC INPUT circuit breaker and verify Vital Bus INVERTER I SAT

OUTPUT voltage increases to approximately 120 volts AC.

STANDARD: The DC INPUT circuit breaker is CLOSED

-UNSAT

Cue: indicate to the student that the DC INPUT breaker is ifl the ON position.

INVERTER OUTPUT voltmeter, AC volts, is observed and verified to

indicate approximately 120 volts AC.

Cue: indicate to student that inverter voltage iNCREASES from 0 to 120 volts AC,

as indicated on the INVRTER OUTPUT voltmeter.

Continue to Step 2.4.

COMMENTS:

Step 2.4 CRITICAL TASK

CLOSE the INVERTER OUTPUT circuit breaker.

-SAT

STANDARD: The INVERTER OUTPUT circuit breaker is CLOSED

CUE: indicate to the student that the INVERTER OUTPUT breaker is in the ON UNSAT

position.

Continue to Step 2.5.

COMMENTS:

NLO-036 fnl

Page 7 of 10

Step 2.5

VERIFY the IN SYNC light is on.

-SAT

STANDARD: Green IN SYNC light is verified ON.

CUE: indicate to student that IN SYNC light is ON. I UNSAT

Continue to Step 2.6.

COMMENTS:

Step 2.6 CRITICAL TASK

POSITION the MANUAL BYPASS SWITCH to the NORMAL SOURCE

position. _I_ SAT

STANDARD: Student rotates the Manual Bypass Switch from the ALTERNATE

SOURCE position to the NORMAL SOURCE position.

-UNSAT

Cue: lndicate to the sfudenf that the Maflual Bypass Switch is in the NORMAL

SOURCE position.

Continue to Step 2.7.

COMMENTS:

NLO-036 fnl

Page 8 of 10

Step 2.7

VERIFY the following indications: -SAT

INVERTER OUTPUT volt meter = 120 volts

e Inverter Output frequency meters 60 Hz

INVERTER OUTPUT amp meter increases and stabilizes to match -UNSAT

SYSTEM OUTPUT amp meter.

-

STANDARD: The following indications are verified:

INVERTER OUTPUT volts 120

INVERTER OUTPUT frequency = 60 tiz.

INVERTER OUTPUT amp meter increases and stabilizes to match

SYSTEM OUTPUT amp meter.

Cue: Provide the following indications to the student:

INV. OUTPUT volts f20.

INV. OUTPUT freq. 60.

INV. OUTPUT amps 20 40. -

SYS. OUTPUT amps 20 40. -

COMMENTS:

..... END TASK ...... ...

STOP TIME:

NLO-036 fnl

Page 9 of 10

CRITICAL STEP EX-PLANATIONS:

STEP # Explanation

2 Recharge input filter capacitor prevents a large increase in current when the inverter

is placed on line.

3 Closing the DC input breaker supplies DC input to the inverter.

4 Closing this breaker connects the inverter output to the input of the autotransformer.

6 Selecting NORMAL Source with the Manual Bypass Switch causes a make before

break transfer to the inverter output placing the inverter in service.

NLO-036 fnl

Page 10 of 10

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Earlier today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel

have just notified the Control Room SRO that they have completed their work on the inverter.

The affected I20VAC Vital Instrumentation Power Panelboard is being supplied by Regulated

AC Panelboard KKA.

lNlTIATlNG CUE:

The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OP/l/Ail107/04

(Enclosure 4.2). DC Power to the inverter has ROf been isolated.

Begin at Step 2.1

NLO-039 fnl

Page 1 of 10

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

NLO-039

PRIME THE SPENT FUEL POOL FILL LINE

CANDIDATE

EXAMBUER

NbO-039 fnl

Pags 2 of 10

REGION II

INITIAL LICENSE EXAMINATION

JOB PERFORMANCE MEASURE

Task:

PRIME THE SPENT FUEL POOL FILL LINE

Alternate Path:

Facilihr JPM #:

KIA Ratinnb):

System: APE022

KIA: AK3.02

Rating. 3.5/3.8

Task Standard:

SFP Priming Pump is aligned and started

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator -In-Plant X Perform -Simulate X

References:

EOP Enclosure "HPI Pump Operations from ASW Pump Switchgear"

Candidate: I- Time Start:

NAME Time Finish:

Performance RatinR: SAT-UNSAT - Performance Time ~

Examiner: I

NAME SIGNATURE DATE

Nb0-039 fnl

Page 3 of 10

SIMULATOR OPERATOR INSTRUCTIONS:

NONE

NLO-039 fnl

Pageeof 10

Tools/auipmenffProcedu~~s Needed:

READ TO OPERATOR

DlRECTlON TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM, including any required communications. I wil[

provide initiating cues and reports on other actions when directed by you. Ensure you

indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TD,

and TE.

it also struck the Unit 2 BWST, rupturing and draining it.

The SSF Reactor Coolant Makeup Pump failed to start.

2A HPIP has been powered from the ASW switchgear.

The Spent Fuel Pool level is currently +I .Q feet.

INITIATING CUES:

The EOP directs the operator to perform "HPI Pump Operation From ASW Pump Switchgear"

Enclosure to align HPlPs to the SFP.

Another operator is aligning the HPI Suction from the SFP.

The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this

Enclosure, beginning at Step 20.

NLO-039 fnl

Page 5 of 10

START TIME:

Step 20

Obtain bucket and rope from EOP equipment locker U2AB5. (A-5.U2

elevator lobby) -SAT

STANDARD: Locate EOQ equipment locker U2AB5 located at A-5, U2 elevator lobby

and idcaite that you would obtain a bucket and rope from the locker.

_ I UNSAT

Continue to Step 21.

Cue: Inform candidate that opening the docker is not rqUiFed.

COMMENTS:

2- Step 21A

Connect SF priming pump suction hose to quick disconnect fitting at SF-

86 (SF PRIMING PUMP SEAL WATEK INLET) -SAT

STANDARD: Candidate connects suction hose to quick disconnect fitting at SF-86, 01

verifies it is connected I_ UNSAT

Continue to Step 21B.

COMMENTS:

STEP: Step 21B

Connect ths Spent Fuel Priming Pump suction hose to the Spent Fuel

Pool Fill line connection tap on SF-85 (SF PRIMING PUMP I SAT

UNDERWATER SUPPLY BLOCK).

STANDARD: Verify the Spent Fuel Priming Pump suction hose to the Spent Fuel Pool

Fill line connection tap on SF-85 (SFPRIMING PUMP UNDERWATER

-UNSAT

SUPPLY BLOCK) is connected.

Continue to Step 21C

COMMENTS:

NLO-039 fnl

Page 6 of 10

4- Step 21C CRITICAL

Open SF-85 (SF PRIMING PUMP UNDRWATER SUPPLY BLOCK)

STANDARD: The student locates and opens SF-85 (Pool Underwater Supply Block to __ SAT

Priming Pump) by rotating valve operator until handle is parallel with pipe.

Continue to Step 210.

-UNSI

Note: There is a special tool for operating SF-85 and SF-84 hanging at the South

end of the Spent Fuel Pool.

COMMENTS:

5- Step 21D

Place the flex hose on the discharge of the SF Priming Pump into the

SFP. ~ SAT

STANDARD: The student (simulates) placing the free end of discharge hose into the

Spent Fuel Peel. -UNSC

Continue to Step 21E.

COMMENTS:

a:Step 21E

CLOSE SF-84 (SF POOL UNDERWATER SUPPLY VENT)

-SAT

STANDARD: SF-84 (SF Pool Underwater Supply Vent) is CLOSED by rotating valve

operator until handle is perpendicular to pipe.

UNSF

Continue to Step 21F.

_ I

Note: There is a special tool for operating SF-85 and SF-84 hanging at the South

end of the Spent Fuel Pool.

COMMENTS:

Nb0-039 fnl

Page 7 of 10

STEQ: Step 21F CRITICAL TASK

Fill the SF Priming Pump Seal Tank to at least half-full with DW or water

-SAT

from SFP using bucket.

STANDARD: The candidate fills the SF Priming Pump Seal Tank at least half-full using

DW from the North-West end of the SFP or by using the rope and bucket

to dip out of the SFP. -UNSAT

Note: It will take several buckets of water to fill the SF Priming Pump Seal Tank

half-full.

Continue to Step 22

CUE: Communications have been established with operators at the ASWPump

Room and East Penetration Room.

COMMENTS:

Step 22 CRITICAL TASK

WHEN communication is established with operators in the following

locations:

-SAT

ASW Pump Room

East Pen Room

THEN open SF-86 (SF PRIMING PUMP SEAL WATER INLET)

-UNSAT

STANDARD: Determine communications have been established with the above

locations and then open SF-86 (SF PRIMING PUMP SEAL WATER

INLET).

Continue to Step 23.

Cue: Communications have been established.

COMMENTS:

NbO-039 fnl

Page 8 of I O

9- Step 23 CRITICAL TASK

Notify operator in ASW pump Rm to start U1/2 SF PRIMING PUMP

(remote starter on S wall)

-SAT

STANDAKD: Notify operator in ASW pump Rm to start U112 SF PRIMING PUMP

Continue to Step 24.

__ UNSAT

Cue: The UV2 SF P R M N G PUMP is operafing.

COMMENTS:

STEP IO: Step 24

IAAT seal tank level begins to rise,

SAT

THEN close SF-86 (SF PRIMING PUMP SEAL WATER INLET)

_ I

STANDARD: Monitor seal tank level and determine it is NOT rising

Continue to Step 25.

-UNSAT

Cue: Seal tank level is NOT rising.

COMMENTS:

STEP 11: Step 25

WHEN SFP fill line is primed (as indicated by a steady discharge stream -SAT

from the SF priming pump),

THEN notify Control Room of the following:

HPI suction aligned to SFP fill line __ UNSAT

HPI pump cooling water status

An operator is available in the E Pen Rm to throttle 1HP-26

STANDARD: Monitor the hose attached to the SF priming pump discharge and

determine the SFP line is primed.

THEN

Notify the Control Room the HPI suction is aligned to SFP fill line.

Cue: The SFpriming pump has steady discharge stream.

Cue: Notifying the Control of the last two bulieted items is not required for this

JPM.

COMMENTS:

L... ..~END

~ . TASK .-. __.__

STOP TIME:

NLO-039 fnl

Page 9 of 10

CRITICAL STEP EXPLANATIONS:

STEP # Explanation

4 Necessary to provide suction to the priming pump.

7 Tank must be %full to provide adequate water for priming

8 Required to provide flow path.

9 Priming pump must operate to fill the line.

NLO-039 fnl

Page 20 of 10

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TB,

and TE.

it also struck the Unit 2 BWST, rupturing and draining it.

The SSF Reactor Coolant Makeup Pump failed to start.

2A HPlP has been powered from the ASW switchgear.

The Spent Fuel Po01 level is currently +I .Qfeet.

INITIATING CUES:

The EOP directs the operator to petform HPI Pump Operation From ASW Pump Switchgear

Enclosure to align HPlPs to the SFP.

Another operator js aiigning the HPI Suction from the SFP.

The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this

Enclosure, beginning at Step 20.