Final Submittal
OCONEE JUNE 2004 EXAM
50-26912004-301I
50-27012004-301, &
50-28712004-301
-
JUNE 14 18 & 25,2004
Admin-100 fnl
Page 1 of 7
REGION II
INITIAL LICENSE EXAMINATION
DETERMINE SDM
WITH A DROPPED CONTROL ROD
CANDIDATE
EXAMINER
Admin-100 fnl
Page 2 of 7
REGION II
INITIAL LICENSE EXAWNATION
Task:
DETERMINE SBM WITH A DROPPED CONTROL ROD
Alternate Path:
Facllitv JPM #:
. . . .
KIA Ratindsk
Gsn 2.12 3 3.9/4.0
Task Standard:
PT/l/Ni lOW15, Reactivity Balance Procedure is used to verify > 1% SDM with one inoperable (dropped) CR within
I hour. Determinethat 1% SDM does not exist and boratlon is required within 15 minutes.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator X
--. In-Plant ~ Perform Simulate -
References:
PT/I/Af1103/15, Reactivity Balance Procedure
AP/l/NI 70011 5, Dropped Control Rods
Technical Specifications:
3.1.4, Control Rod Group Alignment Limits
3.2.1, Regulating Rod Position Limits
Validation Time: 10 min. Time Critical: YES
...................................................................................
Candidate: Time Start:
NAME Time Finish:
Performance Ratinq SAT ~ UNSAT - Performance Time
Examiner: - /
NAME SkNATURE DATE
COMMENTS
Admin-100 fnl
Page 3 of 7
SIMULATOR OPERATOR INSTRUCTIONS:
1. Recall Snap 205
2. Import Admin-7 OR Simulator files
Admin-100 fnl
Page 4 of 7
Teo%s/EcluipmentEProcedures Needed:
PT/1/A/1103/8157Reactivity Balance Procedure
OP/0/A/1105/009, Control Rod Drive System
Technical Specifications:
3.4.4,Control Rod Group Alignment Limits
3.2.1,Regulating Rod Position Limits
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
You are the Unit 1 OAYC and Group 6 Rod 3 has dropped into the core. Reactor power is stable
at = 55%. AP/l/a/l700/15, Dropped Control Rods, has been completed up to step 4.5.
INITIATING CUES:
The SWO in the Control Room directs you to continue with AP/l/a/1700/15, Dropped Control
Rods.
TIME CRITICAL
Admin-100 fnl
Page 5 of 7
START TIME:
STEQ: Within one hour verify > 1% SDM with allowance to the inoperable control
rod. Perform PT/l/A/1103/15. Reactivity Balance Procedure.
-SAT
STANDARD: Obtain copy of PT/l/A/1103/15, Reactivity Balance Procedure.
COMMENTS:
-UNSAT
STEP: Determine proper enclosure to use.
STANDARD: Enclosure 13.19, Shutdown Margin at Power, Is chosen.
__ SAT
I COMMENTS:
-UNSAT
Refer to the COLR. Use the "Control Rod Position Setpoints 1 inoperable CRlTICPab STEP
Rod, 4 Pump Flow" curve. Verify SDM is 2 1% AWK by verifying that the
control rod position and power level are within the acceptable region of
the curve. -SAT
STANDARD: SDM is determined to be is s 1% AUK.
__ UNSAT
COMMENTS:
- 4- Appropriate actions are taken per ITS 3.1.4, 3.1.5 and 3.2.1. CRITICAL STEP
STANDARD: Refer to IT§ 3.1.4, 3.1.5 and 3.2.1 and determine that initiation of
boration to restore SDM to within limits is required within 15 minutes. -SAT
C U E !nnfesrPp student that an RQ is commencing boration.
COMMENTS: -UNSAT
END OF TASK
TIME STOP:
Admin-100 fnl
Page 6 of 7
-STEPEs.P.LANATI 0 NS:
STEP # Explanation
3 Step is necessary, the operator must interpret the 4 WCP curve to ensure adequate
SDM.
4 Step is necessary; initiation of boration must QCCW within 15 minutes to restore SDM.
Admin-100 fnl
Page 7 of 7
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
You are the Unit 1 OATC and Group 6 Rod 3 has dropped into the core. Reactor power is stable
at = 55%. AP/t/A/1700/15, Dropped Control Rods, is complete up to step 4.5.
INlTlATlNG CUES:
The SWO in the Control Room directs you to continue with AP/l/PJl700/f5, Dropped Control
Rods.
TIME CRITICAL
Acimin-103 fnl
Page 1 of 10
REGION ll
INITIAL LICENSE EXAMINATION
-
Admin I03
PERFORM MANUAL RCS LEAKAGE CALCULATION
CANDIDATE
EXAMINER
Admin-103 fnl
Page 2 of 10
REGION II
INITIAL LICENSE EXAMINATION
Task:
PERFORM MANUAL RCS LEAKAGE CALCULATION
Alternate Path:
No
Facilitv JPM #:
CRO-43
WA Ratindsl:
Gen 2.1.7 3.714.4
Task Standard:
RCS Leakage is correctly calculated within .Q1 gpm of attached key.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator ~ In-Plant Perform X Simulate -
References:
PT/O/A/060O/OQIA, Loss Of Computer
PT/IiA/600/10. Reactor Coolant Leakage
Examiner: /
NAME SIGNATURE DATE
Admin-I03 fnl
Page 3 of 10
SIMULATOR OPERATOR INSTRUCTIONS:
NONE
Admin-103 fnl
Page4of 10
Poolsl~suipmenffProceduresNeeded:
Enclosure 43.3 of PTIl/N600/10
READ PO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reporis on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
lNlTiAL CONDITIONS:
Unit 1 computer repairs are expected to be extended through turnover for hardware
replacement. The boss of Computer procedure PTl/O/A/0600/001A, boss Of Computer, is in
progress, however an RCS Leakage Calculation has not been performed during this shift.
INITIATING CUES:
The Control ROOM SRO directs you to perform a manual RCS leakage per PT/1/,4/600/10
(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the
final set of leakage data and manually calculate the RCS leakage rate. Enclosure 13.3 of
PT/I/N600/10 (Reactor Coolant Leakage) is complete up to step 2.2.
Admin-103 fnl
Page 5 of 10
START TIME:
Note: Data cues are only applicable if JPM is performed in the control
room. I SAT
Step 2.2
After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, Record final set of data in "Table #I"
-UNSAT
STANDARD: Student enters final set of data into "Table # I " of Enclosure 13.3 (Manual
Leakage Calculation Data Sheet).
CUE: Present student with aifachment of final data readings.
Student locates Prr level gauge on UBI and enters value on data sheet.
CUE: Pzr Level 269.0 inches
Student locates Quench Tank level on AB1 and enters value on data
sheet.
CUE: Quench Tank Level 84.9 inches
Student locates LDST level gauge on UBI and enters value on data
sheet.
CUE: LDST Leveel 73.4 inches
Student locates Tave meter on UB1 and enters value on data sheet.
CUE: Tave Indication 579.0"F
Student locates Power meters on UBI and enters value on data sheet
CUE: Power Range N! indicates 100.1%
Student locates RCS NR Pressure chart on UBI and enters value on
data sheet.
CUE: RCS NR Pressure chart 2450 psig
Student locates Group 7 Control Rod Position on the Computer and
enters value on data sheet.
CUE: Group 7 Control Rod Position is 93.6%
COMMENTS:
Adrnin-103 fnl
Page6 .- 0 f 1 0
Step 2.3
Calculate and record Change values in "Table # I " of Enclosure 13.3
(Manual Leakage Calculation Data Sheet).
-SAT
STANDARD Student performs calculation and records Change values in "Table #?"
Enclosure 13.3 (Manual Leakage Calculation Data Sheet).
-UNSAT
COMMENTS:
Step 2.4
Calculated Corrected PZW Level Change:
-SAT
STANDARD: (- 6.831 inchesl" F x O F) =+ 1.0 inches = 0.3169 inches
UNSAT
COMMENTS:
Step 2.5
Convert Corrected PZR Level Change to gallons:
STANDARD: 0.3269 inches X 14.364 gAlofls/inch = gallons
-UNSAT
COMMENTS:
- 5- Step 2.6
Convert QT Level Change to gallons:
~ SAT
I UNSAT
COMMENTS:
Admin-103 fnl
-. -9 of 10
STEP: Step 4.7
Convert LDST Level Change to gallons:
-SAT
-UNSAT
COMMENTS:
- . ..
- 9- Step 2.8
Calculated Total Volume Change:
-SAT
STANDARD:
4.552 gallons + - q0.482 gallons + I- 9.287 qallons) = - 25.247 gallons -UNSAT
COMMENTS:
STEP: Step 2.9 CRITICAL TAS
Calculate RCS Leakage Rate:
-SAT
STANDARD: - 45.217 gallons '60 -
minutes = 0.254 gpm (k .01 gprn)
COMMENTS:
-UNSAT
~.. . . TASK
END _. _. .. .-
STOP TIME:
Admin-103 fnl
Page 8 of 10
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
8 Necessary data calculation to properly determine manual RCS leakage rate.
Note: If complamenery errors occur while performing calculations is steps 3 - 7 they
will become critical. Credit will not be given for obtaining the correct answer for the
wrong reason.
Admin-I03 fnl
Page 9 of 10
Manuai RCS Leakage Final Data
7 -
Parameter Final
~ Time 0115 I
-~
219.8 inches
Quehch Tank....Level 84.9 inches
Tave Indication __ Ei79.0"F I-
Power ~ a n b eNI __
NR Pr&sure
... . . ... ...
!.. ...
Grouo 7 Control Rod Position
Admin-103 fnl
Page 10 of 10
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 1 computer repairs are expected to be extended through turnover for hardware
replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss Of Computer, is in
progress, however an RCS Leakage Calculation has not been performed during this shift.
INITIATING CUES:
The Control Room SRO directs you to perform a manual RCS leakage per PT/I/A/600/10
(Reactor Coolant Leakage). The initial data given was collected one hour previously. Use the
final set of leakage data and manually calculate the RCS leakage rate. Endosure 13.3 of
PT/il/A/600/10 (Reactor Coolant Leakage) is complete up to step 2.2.
Adrnin-110 fnl
Page 1 of 9
REGION II
INITIAL LICENSE EXAMINATION
Admin-I I O
Determine Minimum Shift Staffing
CANDIDATE
EXAMINER
Admin-I I O fnl
Page 2 of 9
REGION II
INITIAL LICENSE EXAMINATION
Task:
Determine MINIMUM staffing requirements for the shift for NEQ's, RQs and SRQs
Alternate Path:
Facilitv JPM #:
Ad
KIA Ratinals):
Gen214 2.313.4
Task Standard:
SLC 16.13.1-1 (Minimum Station Staffing Requirements) is used to correctly determine MINIMUM staffing
requirements for the shift.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator -in-Plant X Perform ~ Simulate 2
Admin-I 10 fnl
Page 3 of 9
SIMULATOR OPERATOR INSTRUCTIONS:
NONE
Admin-I 10 fnl
Page 4 of 9
Toolsl~uuipmentlProceduresNeeded:
SLC 16.13.1-1
READ TO OPERATOR
DIRECTIONS TO STUDENT:
I will explain the initiab conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Plant conditions are as following:
Unit 1 is in MODE 5 with fuel handling in the SFP in progress
Unit 2 is in MODE 1 at 73% with 2 8 HPlP OOS for the last 85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br />
Unit 3 is in MODE 1 at 700% power
2 on-shift NEO's are qualified as fire brigade leader
1 RP Tech is fire brigade qualified
INITIATING CUE:
What are the MlNlMUM staffing requirements for the shift?
I ...... .
..... .-
Minimum Number
.~.-~.
t
~~~~ ... I . _ '
.
RO ~~~~ ~ I !
-.
NLO .. -.
! .......
.... !
...~ -........
!
Chemistry Technician N/A i
l-r
~
.-... d
I
Admin-I10 fnl
Page 5 of 9
START TIME:
STEP 1: Reference SLC 16.13.1
STANDARD: Reference SLC 16.13.1-1 table SAT
COMMENTS:
__ UNSAT
....
...~ -..-.___
STEP 2: Reference SLC 16.13.1-1 for plant conditions
-SAT
STANDARD: Determine correct table to be used:
Column for 2 units in MODE 1-4 from two control rooms based on: -UNSAT
Unit 1 is in MODE 5 with fuel handling in the SFP in progress
Unit 2 is in MODE Iat 73% with 2 8 HPlP 00s for the last 85
hours
Unit 3 is in MODE 1 at 100% power
COMMENTS:
- 3- Determine correct number from column for 2 units in MODE 1-4 from two
control rooms
STANDARD: 1 QSM. 1 STA. 5 SRO, 5 RO, and 8 NE0 -SAT
COMMENTS:
-UNSAT
=: Determine that available NE0 is fire brigade leader qualified
STANDARD: 2 on-shifi NEO's are qualified as fire brigade leader
1 RP Tech is fire brigade qualified ~ SAT
COMMENTS:
__ UNSAT
Admin-110 fnl
Page 6 of 9
- 5- Adjust total staffing numbers per Step 4
STANDARD: Subtract 1 SRO based on NE0 qualified as fire brigade leader:
-SAT
1 OSM, 1 STA, 4 SRO, 5 RO, and 8 NE0
COMMENTS: UNSAT
Reference TS 3.5.2.B
STANDARD: Determine that TS 3.5.2.B is applicable:
2 8 HPlP 00s for z 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
-SAT
COMMENTS:
I _ UNSAT
- 7- Adjust total staffing numbers per Step 6
STANDARD: Add 1 80 based on TS 3.5.2.8applying
___ SAT
1 OSM, 1 STA. 4 SRO, 6 RO. and 8 NE0
COMMENTS:
-UNSAT
STEP: Adjust total staffing numbers per Step 7
STANDARD: Add 2 NEOs based on TS 3.5.2.8 applying
1 OSM, 1 STA, 4 SRO, 6 RO, and I J NE0
-SAT
COMMENTS: ~ UNSAT
Admin-I 10 fnl
Page 7 of 9
STEP: Determine total staffing requirements CRITICAL STEP
STANDARD: 1 OSM. ISTA, 4 SRO, 6 RO, and 10 NE8
-SAT
Position Minimum Number
_I_ UNSAT
OSM 1
..
II qo
Chemistry Technician I NIA
RP Technician
._
1
.~
COMMENTS:
TIME STOP:
Admin-110 fni
Page 8 of 9
CRlTlCAL STEP EXPLANATIONS:
STEP # Explanation
Determine staffing requirements
Admin-110 fnl
Page 9 of 9
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPQN COMPLETION OF TASK)
INITIAL CONDITIONS:
Plant conditions are as following:
Unit 1 is in MODE 5 with fuel handling in the §FP in progress
Unit 2 is in MODE Iat. 73% with 2 8 HPlP 00s for the last 85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br />
Unit 3 is in MODE Z at 100% power
2 on-shift NEO's are qualified as fire brigade leader
1 RP Tech is fire brigade qualified
INITIATING CUE:
What are the MINIMUM staffing requirements for the shift?
SRO I I
I3
0
t- I
I
.. .
- rlstry
k--Technician
.....
Technician
I NIA
'
I
.
..
, NIA
..
Adrnin-202 fnl
Page 1 of 7
REGION II
INITIAL LICENSE EXAMINATION
PERFORMANCE MEASURE
Ad min-202
Perform surveillance to verify SSF RCMUP Operability
CANDIDATE
EXaMINER
Admin-202 fnl
Page 3 of 7
SIMULATOR OPERATOR INSTRUCTIONS:
NONE
Adrnin-202 fnl
Page 4 of 7
ToolslEquipmenffPrasehiuresNeeded:
a PT/I/N0600/001 (Periodic Instrument Surveillance), Encl. 13.1 (Mode 1 & 2) Page 35 of
36
Q Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve of OQ/O/N1108/001
(Curves And General Information)
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and slate the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CQNDITIONS:
112EOC20 outage in progress
a Unit 2 was shutdown (subcritical) on 3120104 at 0100
- Unit 2 core is defueled
- Spent Fuel Pool Level = +0.1 feet
Spent Fuel Pool Temperature = 91°F
- Current date and time: 3/26/04 at 1100
Q PT/600/001, Enclosure 13.1 in progress
INITIATING CUE§:
The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page
35.
Admin-202 fnl
Page 5 of 7
START TIME:
Determine if 811 fuel in SFP subcritical > maximum days specified on CRITICAL STEP
Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve
__ SAT
STANDARD: Refer to Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature
Curve of OP/l108/001. Determine that Unit 2s fuel has been subcritical
for 6 days and 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />. This is < than the maximum days specified on
Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve. I UNSAT
COMMENTS:
Verify SFP level > specified on appropriate curve of Enclosure Unit 1&2 CRITICAL STEP
Spent Fuel Pool Level Vs Temperature Curve.
_ I _ SAT
STANDARD: Determine that the correct curve is Day > 6 & 5 7.
ent Fuel Pool water temperature is 98°F by looking on SFP
auge on 2AB3 or on the OAC -UNSAT
Pool water level is + 0.10 feet by looking on SFP
Cue: When a SFP temperature indication is located indicate to the candidate that
SFP temperature = 98F
Determine Spent Fuei Pool water level is + 0.10 feet by looking on SFP
Level gauge on 2AB3.
Cue: When the Unit 1 i% 2 SFP level indication is located indicate to the candidate
that SFP Level = + 0.7 feet.
Determine that SFP level is NOT > than the appropriate curve
COMMENTS:
-
STEP: If limit exceeded, SSF RCMUP is inoperable. CRITICAL STEP
STANDARD: Declare the SSF RCMUQ inoperable. -SAT
COMMENTS:
_ I_ UNSAT
- TOP TIME
Admin-202 fnl
Page 6 of 7
CRITICAL STEP EXPLANATIONS:
STEP tc Explanation
I Must determine that some fuel has been subcritical e than the maximum days
specified on Enclosure Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve
2 Required to determine is SFP level is adequate.
3 SSF RCMUP is declared inoperable.
Adrnin-202 fnl
Page 7 of 7
CANDIDATE CUE SHEET
(TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
e U2EOC20 outage in progress
- Unit 2 was shutdown (subcritical) on 3/20/04 at 0100
Unit 2 core is defueled
e Spent Fuel Pool Level = +0.1 feet
Spent Fuel Pool Temperature = 91°F
Current date and time: 3/26/04 at 1100
PP/600/001, Enclosure 13.1 in progress
INITIATING CUES:
The SRO instructs you to continue with PT/600/001, Enclosure 13.1 starting at the top of page
35.
Admin-300 fnl
Page 1 of 8
REGION ll
INITIAL LICENSE EXAMINATION
Ad mi n-300
Calculate the Maximum Permissible Stay Time
Within Emergency Dose Limits (EDL)
CANDIDATE
EXAMINER
Admin-300 fnl
Page 2 of 8
REGION II
INITIAL LICENSE EXAMINATION
__
Task:
Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits
Alternate Path:
Facilitv JPM #:
KIA Ratinds):
Gen 2.3.4 2.5B.1
Task Standard:
Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (k 5 minutes).
Examiner: I
NAME SIGNATURE DATE
Adrnin-300 fnl
Page 3 of 8
SIMULATOR OPERATOR INSTRUCTIONS:
NONE
Admin-300 fnl
Page 4 of 8
ToolsiEsuiiprnenffProcedur~~ Needed:
None
READ TO OPERATOR
DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be
performed for this JPM, including any required communications. I will provide initiating cues and reports
on other actions when directed by you. Ensure you indicate to me when you understand your assigned
task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
1. Steam Generator Tube Rupture has occurred OR Unit 3
2. Emergency Dose Limits are in effect
3. NEQ Ahas received 2.26 R TEBE this year
4. The following tasks are required to be performed:
...... .
p1 ..... .. , .TASK ...
~. ... .
TIME REQUIRED
. .
... 1.
. ..
O O S...k.. . ..k
... r A
I 1 I Closing 3 ~ - 5 7 3 I 12 min 5.31 Whr I
Open all Unit 3s ADVs 3.65 Whr
Note: Assume no dose received while travelling between tasks.
INITIATING CUE:
Refer to the above information. NEQ A has completed tasks 1 and 2 in the time required. How long does he
have to complete task 3 without exceeding his Emergency Dose Limits?
Admin-300 fnl
Page 5 of 0
START TIME:
Note: Candidate may perform these steps in a different order however the calculated stay time should be
correct.
Note: Candidate should understand the following:
1. EDL is 5 R per event ( L O W or SGTR).
2. Current exposure for the year is not counted toward the Emergency Dose Limit (EDb).
- 1- Determine dose received while performing task 1. CRITICAL STEP
STANDARD: Determine dose received while performing task 1. -SAT
5.31 Whr X 1hr/60 min X 12 min = 1.06 R
UNSAT
COMMENTS:
Determine dose received while performing task 2. CRITICAL STEP
-SAT
STANDARD: Determine dose received while performing task 2.
19.75 Whr X 1hr/60 min X 4 min = 1.32 R
-UNSAT
COMMENTS:
- 3- Determine dose remaining from EDLs. CRITICAL STEP
-SAT
STANDARD: Determine dose remaining from EDLs.
5R - 1..06R - 1.32R = 2.62 R
UNSAT
COMMENTS:
Admin-300 fnl
-. . Page6 o f 8
STEP: Determine time available for the NE0 to complete task 3 without CRITICAL STEP
exceeding EDL.
-SAT
STANDARD: Stay time is calculated to be:
Available Dose = = ,728 hr X = 43.1 min
Dose Rate 3.65 Rlhr 1hr -UNSAT
(i5 minutes)
COMMENTS:
..END OF TASK .,,.. ...~
Admin-300 fnl
Page 7 of 8
CRITICAL STEP. EXPLANATIONS:
STE? # Explanation
4 Required to calculate stay time.
2 Required to calculate stay time.
3 Required to calculate stay time.
4 Required to calculate stay time.
Admin-300 fnl
Page 8 of 8
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
1. Steam Generator Tube Rupture has occurred on Unit 3
2. Emergency Dose Limits are in effect
3. N E 0 "A" has received 2.26 R TEDE this year
4. The following tasks are required to be performed:
...... ~. . ....... ..
r.-
..... # ...I...TASK
~
TIME REQUIRED-. ....
~
D .~ O S E RATE .:
Closing 3C-573 5.31 Rfhr
Open 3FDW-313
..
Note: Assume no dose received while traveling between tasks.
lNlTlATlNG CUE:
Refer to the above information. NE0 "A" has completed tasks 1 and 2 in the time required. How long does he
have to complete task 3 without exceeding his Emergency Dose Limits?
Admin-402 fnl
Page 1 of 14
REGION II
INITIAL LICENSE EXAMINATION
Admin-402
Perform Actions for Medical Emergency
CANDIDATE
EXAMINER
Admin-402 fnl
Page 2 of 14
REGION I1
INITIAL LICENSE EXAMINATION
Task:
Perform Actions for Medical Emergency
Alternate Path:
Facility JPM #
KIA Ratinds):
System: GEN
WA: 2.4.39
Rating:
Task Standard:
Complete RP/lOO01016, Encl. 4.1 (Medical Response) as required
Preferred Evaluatlon Location: Preferred Evaluation Method:
Simulator __ In-Plant Perform -Simulate
References:
RPllOOO/O16, Encl. 4.4 (Medical Response)
Admin-402 fnl
Page 3 of 14
SIMULATOR OPERATOR INSTRUCTIONS:
NONE
Admin-402 fnl
Page 4 of 14
ToolslEuuipmenffP~oceduresNeeded:
RP/1QQQ/OI6,Encl. 4.1 (Medical Emergency Action - Routine Operations)
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
1. You have answered a call on 491 1 (emergency line) repofling a medical emergency.
2. The caller is still on the line.
INITIATING CUES:
The SRQ in the control room instructs you perform the required actions for a medical
emergency.
Admin-402 fnl
Page 5 of 24
START TIME:
STEP: Determine the appropriate procedure to use. CRITICAL STEP
-SAT
STANDARD: RP/OiB/lOQQi016(Medical Response) is referenced and Enclosure 4. I
(Medical Emergency Actions - Routine Operations) is determined to be
the appropriate procedure to use. Enclosure 4.1 is obtained from
notebook located in the front of the control room desk or from the cart in
the TSC. -UNSAT
Cue: When procedure is located give candidate a copy of Enclosure 4. f .
COMMENTS:
Step 1.2 CRITICAL STEP
Complete the following accident information:
Name of person reporting injury
___I
Call back number
Name of person injured
Supervisor of injured person I UNSAT
e Location injury occurred
Brief description of injury
Time
Note: The evaluator will play the role of the person reporting the injury. Answer
questions by referring to the Medical Emergency Phone Call Information Sheet.
STANDARD: The candidate obtains the above information from the evaluator by
asking the appropriate questions and completes step 1.2 correctly.
Note: Refer to the completed procedure as an answer key.
COMMENTS:
Admin-402 fnl
. .. ..~.
~.. .... .
.. Page 6 of 14
STEQ: Step 1.3 CRITICAL STEP
IF There is a Security Event in progress,
THEN Continue with ... -SAT
STANDARD: Determine a Security vent is not in progress and NIA step 1.3.
UNSAT
Cue: lf asked, inform candidate a Security Event is not in progress.
COMMENTS:
-- __ ...~. ___
STEP: Step 1.4.1 CRITICAL STEP
Use Plant Page to request all MERT members to respond to the incident.
-SAT
STANDARD: The phone is used to access the Plant Page and request all MERT
members to respond to the incident.
Cue: inform candidate to simulate onjy. -UNSAIT
COMMENTS:
- 5- Step 1.4.2
Use the radio paging system to request MERT members to respond to
the incident. -SAT
Transmit "Standby for Emergency Message"
o Press the "instant Call" button labeled "MERT"
o Wait for the red "Transmit" light on the radio to turn off ~ UNSAT
Transmit message
STANDARD: The radio paging system is used to request MERT members to respond
to the incident by:
Transmit "Standby for Emergency Message"
Press the "instant Call" button labeled "MERT"
Wait for the red "Transmit" light on the radio to turn off
Transmit message "MERT members respond to a medical
emergency in the Unit 3 clean side of the change room.'r
Note: The red "Transmit" light is normally green and is located next to the "MERT"
button on the radio.
Cue: hnform candidate to simulate only.
COMMENTS:
Admin-402 fnl
Page 7 of 14
Step 1.4.3
Repeat steps 1.4.1 and 1.4.2 __ SAT
STANDARD: The Plant Page and the radio paging system are used a second time to
request MERT members to respond to the incident. -UNSAT
Cue: h f o m candidate to simukaite only.
COMMENTS:
STEP 7: Step 1.4.4
Call Securitv at one of the followina extensions and request they have SAT
security M&T members respondio the emergency
SAS (Secondary Alarm Station) 2205 or 2767
e CAS (Central Alarm Station) 2222 or 2958 -UNSAT
STANDARD: Security is notified at one of the above extensions and are requested to
have security MERT members respond to the emergency.
Cue: Inform candidate to simulate only.
COMMENTS:
Step 1.4.5
IF The incident location is away from the rn ain plant (WOE, Complex,
Keowee Hydro, etc.) and incident occurs during normal working hours,
THEN Notify shuttle Bus... __SAT
STANDARD: Determine that this step does not apply and N/A step 1.4.5
_ I UNSAT
COMMENTS:
Step 1.5
IF A mass casualty event has occurred or is suspected, and a centralized
treatment area is needed. and plant conditions allow,
THEN Make a PA Announcement ... -SAT
STANDARD: Determine that this step does not apply and N/A step 1.5
-UNSAT
COMMENTS:
Admin-402 fnl
Page 8 of 14
STEP IO: Step 1.6 CRITICAL STEP
IF Hospital evacuation is needed as determined by MERT Command or
as indicated by Step 1.6.1,
THEN Arrange transport of patient to the hospital by one of the following _ I SAT
means:
EMS (ambulance)
Dial 9-911 from the Operations Shift Manager's phone or Unit 1
Control Room SROs phone or dial 91 1 from the bell South line - Unit __ UNSAT
1: 2, and 3 Control Rooms. Refer to Step 1.6.2, prior to requesting
EMS.
e Company vehicle (less serious injury)
Personal vehicle (less serious injury)
STANDARD: Ambulance is requested by calling 9-911. Ambulance is requested to
come to Oconee Nuclear Station.
COMMENTS:
I
STEP 11: Step 1.6.1
IF Any of the following illnesses or injuries are reported on the emergency
line (491I)
THEN Immediately request EMS (ambulance) to respond to the site: -SAT
Unconsciousness
-UNSAT
COMMENTS:
STEP 12: step 1.6.2
IF The patient is known or suspected to be radiologically contaminated,
THEN Have the EMS dispatcher inform the EMS personnel to expect a __ SAT
contaminated person.
STANDARD: Determine that this step does not apply and NIA step 1.6.2
UNSAT
Cue: !tasked, inform candidate that the patient is NOT wntaminabed.
COMMENTS:
I
Admin-402 fnl
Page 9 of 24
STEP 13: Step 1.6.3
Notify Security at 2222 that the ambulance is enroute
STANDARD: Security is notified that the ambulance is enroute -SAT
COMMENTS:
-UNSAT
~
STEP 14: Step 1.6.4 CRITICAL STEP
Notify M E N Command that the ambulance is enroute.
STANDARD: MERT Command is notified via radio that the ambulance is enroute. -SAT
Cue: lnforrn candidate to sirnulate only.
COMMENTS: -UNSAT
STEP 15: Step 1.6.5
Nstify World of Energy Duty Person (Ext. 4602 or Pager #777-9414).
STANDARD: World of Energy Duty Person is notified by phone. I SAT
Cue: lnforrn candidate to simulate only.
COMMENTS: _ I_ UNSAT
STEP 16: Step 1.7
Notify the Occupational Health Unit at ONS during normal working hours
(4652).
_ ISAT
STANDARD; Occupational Health Unit at ONS is notified by phone.
Cue: lnforrn candidate to simulate only.
UNSAT
COMMENTS:
STEP 17: Step 1.8
IF Radiological contamination is involved and the person is being sent to
a hospital.
THEN Complete... -SAT
STANDARD: Determine that this step does not apply and N/A step 1.8.
-UNSAT
COMMENTS:
Admin-402 fnl
Page 10 of 14
STEP 18: Step 1.9
Remind MERT Command that a Patient Treatment Form needs to be
completed for all patients and that the completed form is to be sent to the
Medical Unit for inclusion in the patients medical file. -SAT
STANDARD: MERT Command is informed that a Patient Treatment Form needs to be
completed and sent to the Medical Unit.
__ UNSAT
COMMENTS:
STEP 19: Step 1.10
After normal working hours the Operations Shift Manager or designee
shall report the following incidents to ONS Safety 5uty Person who will
determine if additional people need to be notified. -SAT
STANDARD: Determine that this step does not apply and NIA step 1. I O
-UNSAT
COMMENTS:
STEP 20: Step 1.11
Verif), the following notification in the event of a fatality or injuries to 3 or
more people:
__ SAT
STANDARD: Determine that this step does not apply and N/A step I.I1
COMMENTS: -UNSAT
STEP 21: Step 1.12
Notify STA to make appropriate notifications of the transport of an
employee to an off site medical facility.
__ SAT
STANDARD: Notify the STA by phone or in person to make appropriate notifications of
the transport of an employee to an off site medical facility.
__II UNSAT
COMMENTS:
Admin-402 fnl
Page 11 of 14
STEP 22: Step 1.13
IF A death, near death, or major traumatic injury...
STANBARD: Determine step does not apply and NIA Step 1.I3 I SAT
COMMENTS:
-UNSAT
STEP 23: Step 1.14
The Operations Shifl Manager (OSM) or designee shall ensure
notification of next of kin, if applicable.
Fatality - Appropriate Division Manager performs notifications __ SAT
e Injury requiring hospitalization- Employee's Supervisor or Manager
perform notification
STANBARD: Inform the OSM to perform this step as required. __UNSAT
COMMENTS:
STEP 24: Step 2.15
Submit completed Enclosure 4.1, (Medical Emergency Action -Routine
Operations).to the Emergency Planning Section
-SAT
STANDARD: Indicate that form would be submitted to the Emergency Planning
Section.
-UNSAT
COMMENTS:
STOP TIME:
AdMin-402 fnl
Page 12 of 14
Medical Emergency Phone Call Information Sheet
1. Name person calling
John Adams
2. Call back number
2322
3. Name of injured person
David Smith
4. Supervisor of injured person
Allan Jones
5. Location injury occurred
Unit 3 HPI Pump Room
The injured is currently located in the clean side of Unit 3schange room (srd
floor Aux Building).
Injured is NOT contaminated
6. Description of injury
The injured stood up to put on his hard hat and hit his head on a cable tray
resulting in a laceration to tog of head. The wound is continuing to bleed. The
injured is unconscious.
7. Time
Current time
Admin-402 fnl
Page 13 of 14
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
1 Need to select the correct procedure.
2 Need the correct information to ensure proper actions are taken.
3 Need to determine a security event is not in progress so that MERT can be called.
4 Need to activate MERT.
10 Ambulance has to be requested.
14 MERT command should be notified so that the injured can be taken to the pickup
point.
Admin-402 fnl
Page 14 of 14
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
1. You have answered a call on 491 1 (emergency line) reporting a medical emergency.
2. The caller is still on the line.
INITIATING CUES:
The SRO in the control room instructs you perform the required actions for a. medical
emergency.
Admin-403 fnl
Page 1 of 8
REGION II
INITIAL LIC ENSE EXAMINATION
Ad rnin-403
Determine Emergency C lassification and Protective
Action Recommendations
CANDIDATE
EXAMINER
Admin-403 fnl
Page 2 of 8
REGION I1
INITIAL LICENSE EXAMINATION
Task:
Determine Emergency Classification and Protective Action Recommendations
Alternate Path:
FacilitvJPM #:
s
KIA Ratinnk):
Gen 2.4.38 2.2/4.0
Task Standard:
Appropriate classification is determined and associated Protective Action Recommendations are made
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant X Perform -Simulate 2
References:
RP/O/B/1000/01
RP/OlB/l000/02
BASIS Document (Volume A. Section D of the Emergency Plan)
Examiner: I
NAME SIGNATURE DATE
Admin-403 fnl
Page 3 of 8
SIMULATOR OPERATOR INSTRUCTIONS:
NONE
Admin-403 fnl
Page 4 of 8
Tools/Equipment/Procedures Needed:
RPlOlB/lO00101
RPIQIBIZ QOOlO2
BASIS Document (Volume A , Section D of the Emergency Plan)
READ TO OPERATOR
DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. S will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
8800: Civil demonstration occurring at the World of Energy by anti-nuke activists.
0900: Security reports to the OSM that, one or more persons has been observed cutting their
way through the double security fences. RP/Q/B/1000l007(Security Event) is being
used in conjunction with the Emergency Plan.
0905: intruders have been seen entering the SSF. Security has isolated the area around the
SSF.
0910: Security reports that an explosion has occurred on the Keowee Barn and that water is
beginning to leak through the dam in several places.
0930: Security reports that no additional bombs were found and that no additional intruders
have been located.
NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.
INITIATING CUE:
You are to perform the required actions of the Emergency Coordinator by referring lo
RP/Q/BI1QOO/OI,Emergency Classification and determining the emergency classification and
any Protective Action Recommendations.
Admin-403 fnl
Page 5 of 8
START TIME:
Classify the Event CRITICAL s'
STANDARD: Refer to RP/O/B/lOOO/Ol (Emergency Classification) Enclosure 4.6
(FireslExplosions and Security Actions. __ SAT
Classify the event as a "Site Area Emergency" due to following:
Bomb detonated in Keowee Dam __ UNSAl
COMMENTS:
Determine Protective Action Recommendations
STANDARD: Refer to RP/O/B/1OOO/OO2 (Control Room Emergency Coordinator SAT
Procedure) and GO TO Enclosure 4.2 (Site Emergency)
COMMENTS: -UNSA'
IF It has been determined that an Emergency Action bevel for an
Initiating Conditions has been met,
THEN Declare a Site Area Emergency
Time of Declaration: - -SAT
STANDARD: Determine Initiating Conditions have been met and Declare a Site Area
Emergency due to:
e Bomb detonated in Keowee Dam -UNSA-
Imminent /actual failure of the Keowee Hydro dam
Determine Time of Declaration is pressnt time.
COMMENTS
Admin-403 hi
Page 6 of 8
Appoint a person to maintzin the Emergency Coordinator Log OR
maintain the log yourself.
STANDARD: A person is appointed to maintain the Emergency Coordinator Log or -SAT
indicate that you will maintain the log.
Cue: Masked, indicate someone is maintaining the Emergency Coordinator Log.
__ UNSAT
COMMENTS:
Appoint Control Room Offsite Communicator(s).
STANDARD: A Control Room Offsite Communicator is appointed.
-SAT
Cue: If asked, indicate a Control Room Offsite Communicator has been appointed.
COMMENTS:
UNSAT
STEP: Provide the Protective Action Recommendations from Enclosure 4.7. CRITICAL STEP
(Condition A I Condition B Response Action). Step 1.O,for use by the
Offsite Communicator if a Condition A, Imminent or Actual Dam Failure,
exists. -SAT
STANDARD: Enclosure 4.7, (Condition A I Condition B Response Action) is used to
determine that the following protective action recommendations are given
to Oconee and Pickens County: -UNSAT
1, Provide the following recommendationfor Emergency Notification
Form Section 15 (B)Evacuate:
Move residents living downstream of the Keowee Hydro
Project dams to higher ground.
2. Provide the following recornmendation for Emergency Notification
Form Section 15 (El) Other:
Prohibit traffic flow across bridges identified on your
inundation maps until the danger has passed.
Cue: If asked, inform the candidate that Keowee Dam failure is imminent
COMMENTS:
END OF TASK
'IME STOP:
Admin-403 fnl
Page 7 of a
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
I The candidate needs to be able to utilize the procedure and determine that a Site
Area Emergency needs to be declared.
6 The candidate must be abk?to make recommendations to the local agencies as to
what actions are necessary to protect the health and safety of the public.
Admin-403 fnl
Page 8 of 8
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
I INITIAL CONDITIONS:
0800: Civil demonstration occurring at the World of Energy by anti-nuke activists.
0900: Security reports to the QSM that, one or more persons has been observed cutting their
way through the double security fences. RP/O/B/1000/087 (Security Event) is being
used in conjunction with the Emergency Plan.
0905: Intruders have been seen entering the SSF. Security has isolated the area around the
SSF.
0910: Security reports that an explosion has occurred on the K ~ O W WDam and that water is
beginning to leak through the dam in several places.
0930: Security reports that no additional bombs were found and that no additional intruders
have been located.
NOTE: All three Oconee Units remain in MODE 1 at 100% power during this event.
INITIATING CUE:
YOU are to perform the required actions of the Emergency Coordinator by referring to
RP/O/B/'l OOOlOI , Emergency Classification and detWmiRing the emergency classification and
any Protective Action Recommendations.
CRO-12A fnl
Page 1 of 11
REGION II
INITIAL LICENSE EXAMINATION
CRO-Ol2A
RECOVER A DROPPED CONTROL ROD
CANDIDATE
EXAMINER
CRO-12A fnl
Page2of11
REGION II
INITIAL LICENSE EXAMINATION
Task:
RECOVER A DROPPED CONTROL ROD
Alternate Path:
Facilitv JPM #
WA Ratinats):
System: APE 005
KIA: AA2.03
Rating: 3.5/4.4
Task Standard:
Unit is tripped manually upon receipt of second dropped rod
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator InPlant __ Perform X Simulate -
References:
APIIIAII 700/15 (10110102)
OQIQINI105/09 (1 1/21/02)
T.S. 3.1 4
OMP 1-18
Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT- UNSAT - Performance Time _I_
CRO-12A fnl
Page 3 of 1I
SIMULATOR OPERATOR INSTRUCTIONS:
I.Recall Snap 206
2. Import files for CRQ-128
3. GotoRUN
CRO-12A fnl
Page 4 of 11
Too~s/~quipmentl8rocedures Needed:
Enclosure 5.3 of APlOlI (Recovery From Loss of Power)
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shali be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit #I dropped a control rod in Group 6 approximately one hour ago and the unit is stable at
55%.
The Subsequent Actions of AP/15, DROPPED CONTROL RODS, have been completed
through step 4.9.
Shutdown Margin calculation has been run to verify that an adequate SBM exists.
Systems Duty Engineer has been notified and no special maneuvering instructions are
required,
Enclosure 4.10 of OP/O/A/I 105/09 has been completed up tu step 2.0.
INITIATING CUE::
The Control Room SRO informs you that the problem has been corrected and that recovery of
the dropped rod can now begin.
CR0-12A fnl
Page 5 of 11
START TIME:
CRITICAL !
Step 2.1
Take manual control of rods at the Diamond Control Station:
Ensure the SG Master in HAND _ ISAT
Ensure the Diamond Station in MANUAL
-UNSI
STANDARD: The manual pushbutton for the SG Master handlauto station is
depressed. The White Hand light comes ON and the Red Auto light -Jes
OFF.
The AUTOlMANUAL pushbutton on the Diamond Control Panel is
depressed; the MANUAL half of the Push Button is back lighted.
Location 1UB1
COMMENTS:
STEP: Step 2.2 CRITICAL I
Ensure group with drcppedlrnisaligned rod selected on the Group Select
Switch. -SAT
STANDARD: GKOUP SELECT SWITCH on 1UB1 is located by the student and __ UNSP
rotated to Group 6.
COMMENTS:
m: Step 2.3 CRITICAL E
Ensure in SEQ OVERRIDE.
__I SAT
STANDARD: The SEQlSEQ OR pushbutton is located on the Diamond Control panel
on 1UB1 and depressed. "SEB 08"is backlighted. __ UNSP
COMMENTS:
CRO-12
Page 6 (
Step 2.4 CRlTlCAb STI
Ensure JOG selected on Speed Selector.
STANDARD: The SPEED Selector is located by the student on the Diamond Control
panel on 1UBI and rotated to the JOG position. ~ UNSAT
COMMENTS:
Step 2.5 CRITICAL STI
If Group is at the OUT LIMIT:
Depress and hold LATCH switch. -SAT
Insert group for approximately 15 seconds or until the group OUT
LIMIT lamp on the Diamond Panel goes off.
Release LATCH switch. -UNSAT
The IN LIMIT (LATCH) BYPASS pushbutton is located by the student and
depressed and held while the INSERT/WITHDRAW joystick is used to
insert Group 6 until the Group 6 But limit lamp, located on the Diamond
Control Panel on 1UBI, extinguishes.
The LATCH pushbutton is then released and the INSERTMITHDRAW
joystick returned to neutral.
COMMENTS:
CRQ-12A fnl
Page 7 of 11
CRITICAL STEP
- 6- Step 2.6
TRANSFER the droppedlmisaligned rod to the Auxiliary Power Supply:
Ensure desired group selected on Group Select Switch. I SAT
Ensure droppedimisaligned rod selected on Single Select Switch
UNSAT
Ensure in SEQ OVERRIDE.
Ensure in AUXILIARY.
Verify Manual Transfer Sync light is lit before pressing clamp.
Depress CLAMP.
Depress selector for MANUAL TRANSFER switch until TRANSFER
CONFIRM lamp and the CONTROL ON lamp on the PI panel light.
Depress CLAMP RELEASE
STANDARD: On the CRD Panel on 1UB1:
Verify Group Select Switch positioned to Group 6.
SELECT droppedlmisaligned rod on the SINGLE SELECT SWITCH.
VERIFY SEQ OR is backlit (Not Critical).
Depresses GRQUWAUXIL pushbutton to make transfer to AUXIL.
Verifies SYNC is backlit on MAN TRANSISYITU CF pushbutton (Not
Critical)
Depresses CLAMPCLAMP REL pushbutton to make transfer to CLAMP.
CLAMP will be backlit.
Depresses MAN TRANSISYITR CF pushbutton. TR CF will become
backlit. White CONTROL ON lights will illuminate for the Dropped Rod
on the Position Indication panel.
Depresses CLAMPCLAMP REL pushbutton and verifies CLAMP REL is
backlit.
COMMENTS:
CRO-12A fnl
Page8of11
Step 2.7
Perform PI alignment on the droppedlmisaligned rod as follows: -SAT
Depress and hold LATCH switch.
Insert rod for 15 seconds. -UNSAT
Release LATCH switch
STANDARD: Depress and hold LATCH switch and use the INSEWTFAITHDRAW
joystick to insert rod for 15 seconds. Release the LATCH switch.
COMMENTS:
Step 2.8
Perform PI alignment on droppedhnisaligned rod as follows:
__ SAT
Compare absolute and relative readings on the PI panel
Use PI reset raisellower switch to match absolute and relative
-UNSAT
readings.
STANDARD: Absolute and relative indications on the PI panel, on 1UBI, are compared
using toggle switch to make comparison.
RPI is selected with the select toggle switch. The POSITION RESET
WISEILOWER toggle switch is then placed in the lower position and RPI
indication is matched to API position.
When matched the aAlSElLOWER toggle is released to neutral.
The select toggle switch is returned to the API position.
COMMENTS
CRO-12A fnl
Page 9 of 11
STEQ: Step 2.9
Ensure RUN selected on Speed Selector _ I SAT
STANDARD: SPEED SELECTOR is located by the student on 1UB1 and rotated to the -UNSAT
run position.
NOTE: Instructor in Booth: at this time fire timer to drop second control rod.
COMMENTS:
Manually trip the reactor CRlTlCAL STEP
STEQ I O :
-SAT
STANDARB: The student recognizes the second control rod inserting and manually
trips the reactor by depressing the Reactor Trip pushbutton and verifies
that the reactor is shutdovdn.
__ UNS T
COMMENTS:
END TASK
STOP TIME:
CRQ-12A fnl
Page 10of 11
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
1 Step is necessary for the operator to select the single rod and not move the plant
around due to power excursions.
2 Step is necessary to instruct the rod logic as to which group the rod is in that the
operator wants to recover.
3 Step is necessary to allow the operator to withdraw the dropped rod.
4 Jog is necessary because the roods will not latch with the selector switch in RUN
5 The latching of the group to clear the out limit is necessary so that the individual rod
can be withdrawn.
6 Necessary to place the dropped rod on the auxiliary power supply for withdrawal while
leaving the group on the group power supply.
10 Necessary because the second dropped FOCI places the unit in an unanalyzed
condition and this is a direction, which is given by OMP 1-58.
CRO-12A fnl
Page 11 of 11
CANDIDATE CUE SHET
(TO BE RETURNED TO EXAMINER UPON CQMPLETIOM OF TASK)
INITIAL CONDITIONS:
Unit #I dropped a control rod in Group 6 approximately one hour ago and the unit is stable at
55%.
The Subsequent Actions of AP/I/A/I 700115, DROPPED CONTROL RODS, have been
completed through step 4.9.
Shutdown Margin calculation has been run to verify that an adequate SDM exists.
Systems Duty Engineer has been notified and no special maneuvering instructions are
required.
Enclosure 4.10 of OP/O/A/1105/09 has been completed up to step 2.0.
INITIATING CUE:
The Control Room SRO informs you that the problem has been corrected and that rec~vsryof
the dropped rod can now begin.
CRO-015 fnl
Page 1 of 16
REGION II
INlTlAL LICENSE EXAMINATION
CRO-015
ESTABLISH EFDW FLOW THROUGH STARTUP
VALVES
CANDIDATE
EXAMINER
CRO-015 fni
Page 2 of 16
REGION II
INITIAL LICENSE EXAMINATION
Task:
ESTABLISH EFDW FLOW THROUGH STARTUP VALVES.
Alternate Path:
N
Facilitv JPM #:
KIA Ratinds):
System: APE-054
KIA: AA204
Rating: 4.2/4.3
Task Standard:
EFDW flow IS established to the affected header through the startup valve
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator in-Piant - Perform X Simulate -
References:
EOP Rule 3,(boss of Main or Emergency FDW)
EOP Rule 7 , (SG Feed Control)
EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)
Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT -UNSAT - Performance Time -
Examiner: I
NAME SIGNATURE DATE
CRO-015 fnl
Page 3 of 16
SIMULATOR OPERATOR INSTRUCTIONS:
1. Recall Snap 209
2. Import files for CRO-015
3. GotoRUN
CRO-015 fnl
Page 4 of 16
TooIslEquipmenff Procedures Needed:
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when YOU understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
The reactor has tripped
Main feedwater is lost
NQ increase in Reactor Building pressure is occurring and all KCPs are running
Subsequent Actions are complete
Kule 3 is complete up to Step 29.
1FDW-32 5 is determined to be failed closed.
INITIATING CUES:
The SRO directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow
and establish 200 gpm EFBW flow to the 1A SG.
CRO-015 fnl
Page 5 of 16
START TIME:
Step 1
Verify EFDW is being supplied by an alternate unit. -SAT
RNO
GO TO Step 7
STANDARD: Determine EFDW is not being supplied from another unit. _ I UNSAT
Perform RMO step and GO TO Step 7
CUE: EFDWis NOT being supplied by an alternate unit
COMMENTS:
Step 7 CRITICAL STEP
Stop MD EFWP in a headers with malfunctioning EFDW control valve. _ I SAT
STANDARD: Observes 1A steam generator level decreasing below setpoint on the SG
EXTENDED SU RANGE LEVEL meters (1UB1) or OAC screens.
andlor
-UNSAT
Observes zero flow indicated to the 1A steam generator on the TOTAL
EFDW FLOW meters: on 1UBI.
Based on these indications. candidate determines that 18 steam
generator EFDW header is the affected header.
Control switch for the l A MD EFWP is rotated to the OFF position.
Continue to Step 8
COMMENTS:
Step 8 CRITICAL STEP
Place TD EFDWP in PULL TO LOCK.
__ SAP
STANBARB: The TI3 EFDWP switch is placed in the LOCKOUT position.
Continue to Step 9
-UNSAT
COMMENTS:
CRO-015 fnl
Page 6 of 16
Step 9 CRlTlCAL STEP
Place controllers for the following in HAND and set demand to 0% in
affected headers: -SAT
IFDW-35 ( I A STARTUP FDW Control)
STANDARD: Candidate locates 1FDW-35 on 1UBI and the Bailey control station is
piaced in Hand by depressing the white HAND pushbutton, and observing -UNSAT
the white HAND light ON. Valve position demand is reduced to 0 using
the toggle switch to close the valve.
Continue to Step 10
NOTE: Candidate should perform all actions for 1A header because it is the header
with the failed valve.
COMMENTS:
Step 10 CRITICAL STEP
Place control switch for the following in CLOSE in all affected headers:
IFDW-33 ( I A S U FDW Block) _ II SAT
IFDW-372 (la MDEFWP DISCH BLOCK)
STANDARD: Candidate Locates IFDW-33 control switch on 1UB1 and rotates to the -UNSAT
CLOSE position, observing the green CLOSE light ON and red OPEN
light OFF. (NOT CRITICAL IF IFDW-35 IS CLOSED)
Locates IFDW-372 Control Switch on 1UB1 and rotates to the CLOSE
position, observing the green CLOSE light ON and the red OPEN light
OFF.
Continue to Step 11
COMMENTS:
CRO-015 fnl
Page 7 of 16
Step 11 CRITICAL STEP
Place control switch for the following in OPEN in all affected headers:
STANDARD: Candidate locates IFDW-374 on l U B l and the red OPEN pushbutton is
depressed, the red OPEN indication is observed to be ON. -UNSAT
Continue to Step 12
COMMENTS:
Step 12
Place control switch for the following in CLOSE in all affected headers:
m IFDW-36 ( I A S G NORM SU FDW HDR) -SAT
STANDARD: Candidate locates 1FDW-36 on 1VB3 places control switch in the
CLOSE position and the green CLOSE indication is observed to be I UNSAT
illuminated; and the red OPEN indication is observed to be extinguished.
Continue to Step 13
COMMENTS:
m: Step 13
Place control switch for the following in OPEN in all affected headers:
STANDARD: Candidate locates IFDW-38 on IVB3 places control switch in the OPEN
position and the red OPEN indication is observed to be illuminated and -UNSAT
the green CLOSE indication is observed to be extinguished.
Continue to Step 14
COMMENTS:
CRO-015 fnl
Page 8 of 16
Step 14
Verify 1FBW-315 failed
-SAT
STANDARD: h4anual Loader Knob is turned counter-clockwise to OPEN valve, on
1UB1.
Candidate recognizes that 1FDW-315 is NOT responding to manual
-UNSAT
control.
Continue to Step 15
COMMENTS:
STEP I O : Step 15
Verify I the following:
e 1FDW-38 open -SAT
1FDW-36 closed
IFDW-35 closed
IFDW-33 closed
-UNSAT
STANDARD: Candidate locates 1FDW-38 on 1V53 and the red OPEN indication is
observed to be illuminated and the green CLOSE indication is observed
to be extinguished.
Candidate locates IFDW-36 on 1VB3 and the green CLOSE indication is
observed to be illuminated; and the red OPEN indication is observed to
be extinguished.
Candidate locates 1FDW-35 on 1UBI and observes the Bailey control
station position demand is zero.
Candidate locates 1FDW-33 control switch on 1UBI and observes the
green CLOSE light ON and red OPEN light OFF.
Continue to Step 16
COMMENTS:
CRO-015 fnl
Page 9 of 16
STEP 11: Step 16
Verify 1FDW-372 closed
-SAT
STANDARD: Candidate locates IFDW-372 Control Switch on l U B i and observes the
green CLOSE light ON arid the red OPEN light OFF.
I UNSAT
Continue to Step 17
COMMENTS:
STEP 12: Step 17
Verify both of the following:
Verify 1FDW-374 is open.
0 Verify 1A MDEFDWP available. __ SAT
STANDARD: Candidate locates IFDW-374 on 1UB1 and the red OPEN indication is
-UNSAT
observed to be ON.
1A MD EFDWP control switch green OFF light is verified illuminated.
This pump was secured by the candidate in a previous step.
Continue to Step 18
CQMMENTS:
STEP 13: Step 18
GO TO Step 22
-SAT
STANDARD: Candidate goes to Step 22.
COMMENTS:
UNSAP
CRO-015 fnl
Page 10 of 16
STEP 14: Step 22 CRITICAL STEP
Verify IFDW-316 failed
RNO
GO TO Step 30. -SAT
STANDARD: Candidate verifies IFDW-316 is controlling SG level @ --j 30%.
-UNSAT
or
Manual Loader Knob is turned counter-clockwise to OPEN valve, on
1UB1. Recognizes that IFBW-316 & responding to manual control.
Perform RNO and GO TO Step 30.
COMMENTS:
STEP 15: Step 30
Verify AFlS actuation has occurred (either Statalarm on):
AFlS HEADER A INITIATED (1SA-2/C-8)
AFIS HEADER E3 INITIATED (ISA-2/B-8) -SAT
RNO
GO TO Step 34.
UNSAT
STANDARD: Candidate observes indicated Statalarms and verifies that they are NOT
i__
illuminated. Perform RNO and GO TO Step 34.
COMMENTS:
CRO-015 fnl
Page 11 of 16
STEP 16: Step 34
Verify an operator has been sent to locally position any FDW valvi
IFDW-94
IFDW-315 _ I SAT
RNO
GO TO Step 36.
-UNSAT
STANDARD: Determine that an operator has NOT been sent to locally position
FDW valve.
Perform RNO and GO TO Step 36.
CUE: No operators have been dispatched to locally operate any valves.
COMMENTS:
STEP 17: Step 36
Verify 1FDW-315 failed open.
RNO
If lineup to feed through 1A SIU Control Valve was successful. -SAT
THEN GO TO Step 37.
STANDARD: Candidate should determine that the Manual Loader on 1UBI indi
0% and 1FDW-315 has failed dosed. I_ UNSAT
Of
Green CLOSED light is ON.
Perform RNO step 2., 1A SIU control valve linsup has been SUCCE
THEN GO TO Step 37
CQMMENTS:
STEP 18: Step 37
Verifv an operator has been sent to locally open IFDW-94.
-SAT
STANDARD: Determine an operator has NOT been sent to locally open 1FDW.
Perform RNO and GO TO Step 40
__ UNSAT
CUE: No operators have been dispatched to locally operate any valves.
COMMENTS:
CRO-015 fnl
Page 12 of 16
STEP 39: Step 40
Start 1A MB EFDWP.
-SAT
STANDARD: The 1A MD EFDWP control switch is rotated clockwise to the RUN
position and the red RUN light is verified ON.
Contjnue to Step 41 -UNSAT
COMMENTS:
STEP 20: Step 41
Verify IFDW-316 failed open
-SAT
STANDARD: Verifies IFDW-316 is controlling SG level @ r% 30%.
Manual Loader Knob is turned counter-clockwise to OPEN valve, on UNSAT
1 UBI.
Student recognizes that 1FDW-316 &responding to manual control.
Perform RNO and GO TO Step 46.
COMMENTS:
STEP 21: Step 46
Verify HPI forced cooling is in progress.
-SAT
STANDARD: Determine that HPI Forced Cooling is NOT in progress
Perform RNO and GO TO Step 48.
-UNSAT
CUE: HPI forced cooling is NOT in progress.
COMMENTS:
CRO-015 fnl
Page 13 of 16
STEP 22: Step 48
Verify LOHT tab is NOT in progress
STANDARD: Determine LQHT is NOT in progress.
Perform RMO and GO TO Step 51.
CUE: LOHT tab is NOT in progress. -UNSAT
COMMENTS:
Verify 1FDW-315 failed.
I SAT
STANDARD: Manual Loader on 1UBI indicates 0% 1FDW-315 has failed closed.
or
Green CLOSED light is ON. -UNSAT
Continue to Step 52
COMMENTS:
Verify one of the following:
Lineup to feed through l A SIU Control Valve was successful
Operator sent to locally throttle 1FDW-315 -SAT
STANDARD: Determine that Lineup to feed through 1A SIU Control Valve was
successful. __ UNSAT
Continue to Step 53
CUE: 1A s/u control valve lineup has been successfurrl.
COMMENTS:
CRO-015 fnl
Page 14of 16
STEP 25: Step 53
Verify an operator has been sent to locally control 1FBW-315.
STANDARD: Determine that an operator has NOT been sent to locally control IFDW-
315.
Perform RNO and GO TO Step 56 I UNSAT
CUE: NO operators have been dispatched to localjy operate any valves.
COMMENTS:
.. .-- .
NOTE CRITICAL STEP
FIQWfrom the TDEFDWP through a SIU control valve should be reads on the FDW
SU FLOW gauge.
I
Flow from the MDEFDWP through a SIU control valve should be read on the
MDEFDWP DlSCH FLOW gauge..... ... .. .._..
STEP 26: Step 56 ~ UNSAT
Throttle 1FDW-35 S/U to obtain desired flow rate and/or SG level per
Rule 7 (SG Feed Control).
STANDARD: Manually throttle 4 FBW-35 on 1UBI. The raise/lower toggle switch is
pushed up to increase the valve position demand signal to throttle open
the valve. Flow is maintained within allowable limits. If flow exceeds
pump runout limits, action must be taken to reduce flow to within limits
prior to completing the task.
When feeding through the S/U Control Valves with the MDEFW Pumps,
the MBEFOWP RISCH FLOW gauge should be used to verify flow within
limits.
NOTE: When flow has been established and level is increasing in the ? ASG, the
JPM is complete.
CQMMENTS:
STOP TIME:
CRO-015 fnl
Page 15 of 16
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
2&3 Necessary because the MD EFWP in the affected header needs to be sewred so
that the header can be isolated and valves repositioned. Step is necessary because
the TD EFWP needs to be secured so that the header can be isolated and valves
repositioned.
4& 5 Necessary to prevent the EFDW flow, which is meant for 1A SG from getting to other
portions of the system.
6 Aligns the emergency feed water to the 1A SG through the startup valves.
19 Restarts the MD EFDWP, which was stopped to reduce the DIP for the closure of
valves to isolate the affected header.
26 Actually establishes flow to the 1A SG to establish required S6 levels.
CRO-015 fnl
Page 16 of 16
CANDIDATE CUE SHEET
(TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
The reactor has tripped
Main feedwater is lost
No increase in Reactor Building pressure is occurring and all RCPs are running
Subsequent Actions are complete
Rule 3 is complete up to Step 29.
IFDW-325 is determined to be failed closed.
INITIATING CUES:
The SR6 directs you to initiate Enclosure 5.27, Alternate Methods for Controlling EFDW Flow
and establish 200 gpm EFDW flow to the 1A SG.
CRO-053 fnl
Page 1 of 8
REGION II
INITlAL LICENSE EXAMINAT ION
CRO-053
BYPASS COOLANT PUMP STARTING INTERLOCKS
CANDIDATE
EXAMINER
CRO-053 fnl
Page 2 of 8
REGION II
lNlTlAL LICENSE EXAMINATION
Tirsk:
BYPASS COOLANT BUMP STARTING INTERLOCKS
Alternate Path:
Facilitv JPM #:
KIA Ratinds):
System: EPE-074
WA: A3.04
Rating:
Task Standard:
Reactor Coolant Pump starting interlocks are correctly bypassed
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator _s In-Plant X Perform -Simulate _X___
References:
Examiner: I
NAME SIGNATURE DATE
CRO-053 fnl
Page 3 of 8
SIMULATOR OPEFUTBR INSTRUCTIONS:
NONE
CRO-853 fnl
Page 4 of 8
TooIslE~uipmen~Procedures Needed:
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
An accident has occurred on Unit 3 in which the EQP is being used.
All RCPs are off and full HPI has been initiated.
Inadequate core cooling exists with Core Exit Thermocouples > 780°F but 1200°F and not
decreasing.
INITIATING CUE:
The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per
Enclosure 5.14, "Jumpe~Contacts for RCP Starting interlocks" of the EO$.
CRO-053 fnl
Page 5 of 8
START TIME:
Obtain Reactor Coolant Pump Motor starting interlock jumper cables for CRITICAL STEP
affected unit(§), per Endosure 5.14 of EP/1,2,or 3/A11800/01 Emergency
Operating Procedure. SAT
~
I _
'
~
STANDARD: Jumper cables are obtained from the key locker located in the Work
Control Center.
-UNSAT
NOTE: Jumper cables for unit #1 unit #2 RCPs are located in the same key
locker. Ensure correct set of jumper cables are identified and obtained.
CUE: After correct jumpers have been located, inform student that he may leave
jumpers in the key locker.
COMMENTS:
STEP: LOCATE Termin81 Cabinet MTC3 for the affected unit(s) CRITICAL STEP
STANDARD: Terminal Cabinet MTC3 is correctly located:
3MTC3 is located in Unit #3 Cable Room near south Cable Room door.
-UNSAT
COMMENTS:
CRO-053 fnl
Page 6 of 8
a:BYPASS the Reactor Coolant Pump Motor starting interlocks on the CRITICAL STEP
affected unit(s), as listed on Enclosure 5.14 of EW 4/Nl800/01,
Emergency Operating Procedure. SAT
Bcp Contacts
UNSAT
AI A3PA to A305
82 B8PBto8805
BI A4PA to A405
E2 BSPB to B905
STANDARD: MTC3 cabinet door is opened and the following steps are performed for
EACH Reactor Coolant Pump Motor:
The first contact is located and identified on the terminal board
One end of the jumper cable is simulated to be clipped to this contact.
The second specified contact is located and identified on the terminal
board.
The other end of the jumper cable is simulated to be clipped to the
second contact.
NOTE: End task when you have determined that student is proficient at identifying
RCB jumper contacts.
COMMENTS:
CRQ-053 fnl
Page 7 of 8
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
1 Necessary because the cables must be obtained to jumper the interlocks.
2 Necessary because the operator must locate the correct cabinet for the correct unit
3 Necessary because the operator must be able to identify the correct contacts for each
WCP or the interlocks will not be bypassed as required.
CRO-053 fnl
Page 8 of 8
CANDIDATE CUE SHEEP
(TO BE RETURNED TO EXMIINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
An accident has occurred on Unit 3 in which the EQP is being used.
All WCPs are off and full HPI has been initiated.
Inadequate core cooling exists with Core Exit Thermocouples 700°F but c 1200°F and not
decreasing.
INITIATING CUE:
The Procedure Director directs you to bypass Reactor Coolant Pump starting interlocks per
Enclosure 5.14?"Jumper Contacts for WCP Starting interlocks" of the EOQ.
CRO-060 fnl
Page Iof 11
REGION II
INITIAL LICENSE EXAMINATION
CRO-060
PERFORM REQUIRED ACTIONS FOR A TURBINE
BUILDING FLOOD
CANDIDATE
EXAMINER
CRO-060 fnl
Page 2 of 11
REGION II
INITIAL LICENSE EXAMINATION
Task:
PERFORM REQUIRED ACTIONS FOR A TURBINE BUILDING FLOOD
Alternate Path:
Facilitv JPM #:
KIA Ratinds):
System: APE BW/A07
K/A: AA1.3
Rating:
Task Standard:
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant __ Perform Simulate -
References:
APllO, Uncontrollable Flooding of Turbine Building
Candidate: Time Start:
NAME Time Finish:
PerformanCeg SAT-UNSAT - Performance Time -
CRO-060 fnl
Page 3 of 11
SIMULATOR OPERATOR INSTRUCTIONS:
1. Recall Snap 212
2. Import files for CRO-060
3. GotoWUN
CRO-060 fnl
Page 4 of 11
TQosslEquipmentlPrQcedures Needed:
READ TO OPERATOR
DIRECTION TO TRAINEE:
I wiil explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 was operating at 108% power with no known problems.
Unit 2 is in cold shutdown.
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water
level is rising.
Unit 1 has been tripped and the EOP is being completed by other team members.
INITIATING CUES:
The Control Room §a0 directs you to refer to APIIO, Uncontrollable Flooding of Turbine
Building, and peldorm required actions.
CRO-060 fnl
Page 5 of 11
START TIME:
STEP: Step 4
Ensure Rx is tripped
-SAT
STANDAKD: Determine RX has tripped by observing all control rods inserted and
power is < 1%.
-UNSAT
Continue to Step 2.
COMMENTS:
.. .......
NOTE CRITICAL STEP
Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs
of the MFDWPs.
-.. ...... -. _.__
STEP: Step 2
Ensure all CCW pumps are shutdown ___ UNSAT
STANDARD: The I A , 1B. and I C CCW pump switches are rotated to the TRIP
position. (located on 1AB3)
Continue to Step 3.
COMMENTS:
STEP: Step 3 CRITICAL STEP
Press both of the following on the TURB BLDG FLOOD MER CLOSING
ALL CCWP DISCH VALVES control switch: __ SAT
CLOSE1
CLOSE2
-UNSAT
STANDARD: "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD MER
CLOSING ALL CCWP BlSCH VALVES control switch are both
depressed. (located on IAB3)
Continue to Step 4
COMMENTS:
L....... ..... ......
CRO-060 fnl
Page 6 of 11
STEP: Step 4
Verify all CCW pump discharge valves are closed
-SAT
STANDARD: The green CLOSED lights for ICCW-IO, 11, 12 & 23 are verified
illuminated and the red OPEN lights for the same valves are verified
extinguished. (located on 1AE3) -UNSP
Continue to Step 5.
COMMENTS:
I NOTE
Field tasks.that may affect multiple units should be coordinated
. with Unit 2 and Unit 3.
CRITICAL S
___ SAT
STEP: Step 5
Dispatch operators to ensure all three flood doors are closed and in the
SECURED position from the AB side (A-I, at Unit 1, 2, and 3 stairwell UNSP
entrances to TB): (2)
Unit 1 Flood Door
Unit 2 Flood Door
Unit 3 Flood Door
STANDARD: Candidate should dispatch and NE0 to ensure all three flood doors are
closed and in the SECURED position from the AB side.
Continue to Step 6
Cue: An operator has been dispatched.
COMMENTS:
- 6- Step 6
Verify LPI decay heat removal is NOT in progress
-SAT
STANDARD: Determine LPI pumps are not operating by observing pumps switch
indicaticns on 1UB2.
UNSP
Continue to Step 7.
COMMENTS:
CRO-OB0 fnl
Page 7 of I 1
Step 7
Dispatch an operator to place the following waterbox discharge valve
switches to HAND and CLOSE (T-3, East of condenser catwalk): -SAT
1CCW-20 ( I A I )
ICCW-21 (1A2)
0 ICCW-22 ( I B I )
__ UNSAT
. 1CCW-23 (182)
16CW-24(1C1)
ICCW-25 (IC2)
Nc -
RD: Candidate should disp an opei tor to plac tt 3b valves to
HAND and CLOSE.
Continue to Step 8
Cue: QperatQr has been dispatched.
COMMENTS:
Step 8
Make a PA announcement of the event including restrictions on entry into
TB basement due to electrical hazard. -SAT
STANDARD: FA announcement is made using the Control Room phone
-UNSAT
Continue tu Step 9.
COMMENTS:
Step 9
Attempt to locate and isolate the suurce of the flooding
-SAT
STANDARD: Dispatch operators to locate and isolate the source of the flooding
Continue to Step I O . -UNSAT
Cue: Operators have been dispatched.
COMMENTS:
CRO-060 fnl
Page 8 of 11
STEP IO: Step 10
Ensure all Unit 1 ESV pumps are shutdown:
e IAESVPump __ SAT
1CESVPump
1BESVPump
-UNSAT
STANDARD: Stop ALL Unit 1 ESV pumps by rotating their pumps switches to OFF.
(located on 1AB3)
Continue to Step 11
COMMENTS:
STEP 11: Step 11
Verify all CCW pump discharge valves were suecessfully closed in earlier
steps. -SAT
STANDARD:
Continue to SteD 12 -UNSAT
COMMENTS:
STEP 12: Step 12
Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW
Pumps).
-SAT
STANDARD: Candidate should dispatch an operator to perform Encl 5.1 (Isolation of
-UNSAT
Continue to Step 13
Cue: Operator is dispatched.
COMMENTS:
CRO-060 fnl
Page 9 of Z 1
STEP 53: Step 13
IAAT HPSW is NOT available,
THEN ensure End 5.31 (Temporarily Charging the HPSW System) of
EP/l has been initiated. -SAT
STANDARD: Determine that HPSW is available by observing the HPSW Jockey pump
operating and level in the EWST. (located on 1AB3) UNSAT
Continue to Steo <4
COMMENTS:
STEP 14: Step 14
Notify a SRO to evaluate de-energizing electrical components in the
flooded areas.
-SAT
- - Candidate should inform a SRO to evaluate de-energizing electrical
components in the flooded areas.
__ UNSAT
Cue: SRO will evaluate which electrical equipment to de-energize.
COMMENTS:
-- END TASK
STOP TIME:
CWQ-060 fnl
Page 10 of 11
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
2 Necessary to attempt to terminate the flooding and not contribute to the water level in
the TB basement.
3 Necessary to attempt to terminate the flooding and not contribute to the water level in
the TB basement.
5 Necessary to prevent the waters from the flooding from entering the Aux. Bldg.,
causing more problems and the spread of contamination,
CRO-060 fnl
Page 12 of 11
CANDIDATE CUE SHEET
(TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 1 was operating at 100% power with no known problems.
Unit 2 is in cold shutdown.
The 2/41 condenser inlet expansion joint has ruptured and Turbine Building Basement water
level is rising.
Unit 1 has been tripped and the EOP is being completed by other team members.
INITIATING CUES:
The Control Room SRO directs you to refer to AW10, Uncontrollable Flooding of Turbine
Building, and perform required actions.
CRO-067 fnl
Page Iof 13
REGION II
INITIAL LICENSE EXAMINATION
CRO-067
Perform Required Actions far ES Actuation (> 3psig)
CANDIDATE
EXAMINER
CRO-067 fnl
Page 2 of 23
REGION II
INITIAL LICENSE EXAMINATION
Task:
Perform Required Actions for ES Actuation (> 3psig)
Alternate Path:
Facilitv JPM #:
c
KIA Ratin&):
System: EPE-009
UfA: E.41.13
Rating.
Task Standard:
Proper E$ conditions are verified using the appropriate procedures and re-start the 1A and 1B LPI pump
when required.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator 2In-Piant __ Perform X Simulate _.
References:
EOP Enclosure 5.1, E§ ACTUATION
Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT -UNSAT ~ Performance Time _ I_
CRQ-067 fnl
Page 3 of I 3
SIMULATOR OPERATOR INSTRUCTIONS:
1. Recall Snap 207
2. Import files for CRQ-(367
3. GotoRUN
CRO-069 fnl
Page 4 of 43
ToolslEquipment/Praceduses Needed:
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Small Break LOCA is in progress.
Rule 2 in progress
RCS is saturated and KCPs are off.
ES Channels I 6 have actuated.
~
INITIATING CUES:
The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.
CRO-067 fnl
Page 5 of 13
START TIME:
Step 1
Determine all ES channels that should have actuated based on
pressure and RB Dressure: -SAT
Actuation
-UNSAT
10 ...
STANDARD: Candidate should monitor the existing RCS Pressure, using valid
pressure indication, ICCM Train A or B, OAC,RCS Pressure (NR), RCS
Pressure (WR) on 1UB1 and 1UB2 to verify RB pressure is > 3 psig.
Determines that ES Channels 1-6 should be actuated
Continue to Step 2
COMMENTS:
- 2- Step 2
Verify ES channels associated with actuation setpoint have actuated: -§AT
STANDARD: Ensure ES digital channels 1-6 are actuated by observing "Tripped" lights
on 1UB1.
Continue to Step 3 -UNSAT
COMMENTS:
CRO-067 fni
Page 6 of 13
Step 3
IAAT additional ES actuation setpoints are exceeded.
THEN perform Steps 1 - 2.
_ I
Continue to Step 4
UNSAT
STANDARD:
_I_
IAAT additional ES actuation setpoints are exceeded candidate perform
Steps 1 - 2.
Note: During the performance of thi5 JPM ES Channels 7 and 8 will actuate.
COMMENTS:
Step 4
Place HPI in manual control
_ ISAT
STANDARD: Go to RZ modules on 1VB2 and select manual for the #PI components.
Continue to Step 5
-UNSAT
COMMENTS:
Step 5
Verify Rule 2 in progress or complete.
~ SAT
STANDARD: Determine Rule 2 in progress by referring to the Initial Conditions.
Continue to Step 6
-UNSAT
COMMENTS:
CRO-067 fnl
Page 7 of 13
m: Step 6
Open the following:
0 IBS-4 __ SAT
IBS-2
STANDARD: At the ES RZ modules an 1AB2, OPEN 1BS-1 and 1BS-2 by depressing -UNSAT
the open pushbutton.
Continue to Step 7
COMMENTS:
Verify any RCP operating
-SAT
STANDARD: Determine NO RCP is operating.
Perform RNO step and GO TO Step 9.
-UNSAT
COMMENTS:
STEP: Step 9
IAAT any RCP is operating
AND ES Channels 5 and 6 actuate -SAT
THEN perform Steps 40 and 11
I UNSAT
STANDARD: Determine NO RCP is operating.
Perform RNO step and GO TO Step 12.
COMMENTS:
CRO-067 fnl
Page 8 of 13
Step 12
I M T ES Channels 3 & 4 are actuated,
-§AT
THEN GO TO Step 13
STANDARD: Determine E§ Channels 3 & 4 are actuated by one of the following: -UNSAT
Statalarms: ISA-IC-10 (ES Channel 3 Trip) and 1SA-IID-IO (ES
Channel 4 Trip)
E§ Channel 3 and Channel 4 Tripped lights lit on 1UBI.
GO TO step 13
COMMENTS:
STEP 10: Step 13
Place the following in manual control:
IAbPIPump ISAT
1B LPI Pump
.
- ILP-17
IbP-18 -UNSAT
STANDARD: Go to the ES RZ modules on 1VB2 and place the above components in
manual by depressing each components manual pushbutton.
Continue to Step 14
COMMENTS:
CRO-069 fnl
Page 9 of 13
.~.~.- ......
. -. .
CAUTION
LPI pump damage
......may occur if operated in excess of 30 minutes
... against
~ .. a shutoff head.
-SAT
Step 14
IAAT any LPI pump is operating against a shutoff head,
THEN at the CR SROs discretion stop affected LPI pumps. __ UNSAT
STANDARD: Determine RCS pressure is above LPI pump discharge head and then
ask for SRO direction. When directed by the SRO secure both the A
and WLPI pump.
Continue to Step 15
Cue: When asked inform candidate that the SRO desires to stop BOTH LPI pumps.
COMMENTS:
Step 15
IAAT RCS pressure is .z LPI pump shutoff head.
THEN perform Steps 46 - 17. -SAT
STANDARD: Determine RCS pressure is NOT .z LPI pump shutoff head (=ZOO psig)
Perform RNO step and GO TO Step 18. __ UNSAT
COMMENTS:
CRO-067 fnl
Page l o o f 13
STEP I O : Step 18
IAAT 1A and 1B LPI pumps are off I tripped,
AND ail the following conditions exist: -§AT
RCS pressure z LPI pump shutoff head
ILP-19 closed
1LP-20 closed -UNSAT
IBS-1 open OR throttled open
IBS-2 open OR throttled open
THEN perform Steps 19 - 21
STANDARD: Determine conditions of step NOT met because RCS pressure is not
< LPI pump shutoff head ( ~ 2 0 0psig).
Perform RNO Step and GO TO Step 22
COMMENTS:
Note: After Step 18 is completed RCS pressure will decrease to LPI pump SkLItQff
head. The candidate should datermime that IAAT step 15 is mat and transfer to step
15. -SAT
STEP 11: Step I 5
IAAT RCS pressure is < LPI pump shutoff head,
THEN perform Steps 16 - 17. -UNSAT
STANDARD: psig)
Determine that RCS pressure is z LPI pump shutoff head ( ~ 2 0 0
Continue to Step 16
COMMENTS:
STEP 12: Step 16 CRITICAL STEP
Perform the following:
Open ILP-17 (already open)
Start I A LPI pump -SAT
STANDARD: Verify 1LP-17 is open by observing the open light on the ES RZ module.
Start the 1A LPI pump by using the pump switch on 1UB2.
Continue to Step 17 -UNSAT
COMMENTS:
CRQ-069 fnl
Page 11 of 13
STEP 13: Step 17 CRITICAL STEP
Perform the following:
- Open 1LP-18 (already open)
Start 18 LPI pump -SAT
STANDARD: Verify 1 LP-18 is open by observing the open light on the ES E module.
Start the 1B LPI pump by using !he pump switch on 1UB4.
-UNSAT
COMMENTS:
END TASK
STOP TIME:
CRO-067 fnl
Page 12 of 13
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
12 The " A bPl pump must be started when RCS pressure is less than LPI pump head to
ensure LPI flow into the core.
13 The " B LPI pump must be started when RC§ pressure is less than LPI pump head to ensure
LPI flew into the core.
CRO-067 fnl
Page 13 of 13
CANDIDATE CUE SHEET
(TO B RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Small Break LBCA is in progress.
Rule 2 in progress
RCS is saturated and RCPs are off.
E§ Channels 1 - 6 have actuated.
INITIATING CUES:
The Control Room SRO instructs you to perform EOP Enclosure 5.1, ES Actuation.
CR6-097 fnl
Page IOf 13
REGION II
INITIAL LICENSE EXAMINATION
CRQ-097
Transfer ECCS Suction to the Emergency Sump
(1LP-15 Failed Closed)
CANDIDATE
EXAMINER
CRO-097 fnl
Page 2 of 13
REGION II
INITIAL LICENSE EXAMINATION
Transfer ECCS Suction to the Emergency Sump (1LP-I 5 Failed Closed)
Alternate Path:
Facilitv JPM #:
KIA Ratinds):
System: BWIEOB
WA: EA1.1
Rating. 4013.7
Task Standard:
Steps of EOP are properly completed by the student to align HPllbPl piggyback mode
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator 2In-Plant - Perform X Simulate __
References:
EOP Enclosure 5.12, (ECCS Suction Swap to R E S )
Candidate: Time Start:
NAME Time Finish:
Performance Rating: SAT- wsa-r - Performance Time -
Examiner: I
NAME SIGNATURE DATE
CRO-097 fnl
Page 3 of 13
SIMULATOR OPERATOR INSTRUCTIONS:
1. Recall Snap 208
2. Import files for CRO-097
3. GotoRUN
CRO-097 fnl
Page 4 of 13
ToolslEquipmenffProcedures Needed:
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
A small break LOCA has occurred which is depleting the 5WST.
Core SCM = 0°F.
The BWST level is 19 feet and RB level is increasing.
LOCA CD tab has been completed up to step 7.
" 1 A LPI header indicates no flow
"15" LPI header indicates no flow
INITIATING CUES:
The Procedure Director directs you to perform IAAT Step I;Initiate Enclosure 5.12, (ECCS
Suction Swap to RBES).
CRO-097 fnl
Page 5 of 13
START TIME:
STEP: Step I CRITICAL STEP
Start both of the following: -SAT
IALPIPump
1B LPI Pump
-UNSAT
STANDARD: The candidate rotates the control switches on 1UB2 for "1A"and "IB LPI
Pumps clockwise to the CLOSE position and verifies that the Red TRIP
COIL lights illuminate and the White CLOSE COIL light is OFF and the
ammeter responds.
Continue to Step 2
COMMENTS:
- 2- Step 2
Verify either of the foliowing exist:
LPI FLOW TRAIN A plus LPI FLOW TRAIN B 2 3300 gpm
-SAT
Only one LPI header is operating AND flow in that header is 2 2850
gpm
-UNSAT
STANDARD: The candidate locates the flow instrumentation (on IUB1) for the LPI
headers and determines that no flow is indicated in either header.
Perform RNO Step and GO PO Step 4
COMMENTS:
CRO-097 fnl
Page 6 of 13
Step 4
Verify 6 three HPI pumps operating
-SAT
RNO
STOP 1 B HPI pump
STANDARD: Candidate observes the indications for the HPI Pump controls on ?UBI -UNSAT
and determines that all 3 #PI Pumps are operating.
The candidate locates the control switch for the 1B HPI Pump and rotates
it to OFF position and verifies that the white OFF light comes on and the
red RUN lights go off.
Continue to Step 5
COMMENTS:
Step 5
Dispatch an operator to perform Enel. 5.37 (Isolation of HPI Pump
Reeirc) without dressing out. (PSI -SAT
STANDARD: Candidate should dispatch NEO(s) to perform End. 5.37.
Continue to Step 6 -UNSAT
CUE: inform candidate operatcir(s) dispatched as requested.
COMMENTS:
Step 6
Notify Control Room personnel that the 170 gpfnlpump minimum HPI
flow requirement is in effect. -SAT
STANDARD: Candidate informs control room personnel of HPI minimum flow
requirements for HPI. -VNSAT
Continue to Step 7
CUE: lnform student the control mom has been notified.
COMMENTS:
CRO-097 fnl
Page 7 of 13
..... ~ ... ..... .-
CAUTION
ECCS pump damage may occur if LPI pumps are operated below the following minimum
flows:
-SAT
Any LPI pump operated at e 100 gprn for > 30 minutes
Two LPI pumps operating in piggyback with NO LPI flow and total HPI flow e 500
-UNSAT
...... -......._- ....... ...
- 6- Step 7
Verify two LPI pumps operating.
STANDARD: The candidate locates the controls for "1K and "1 B" LPI pumps on 1UB2
and determines that both LPI pumps are running.
Continue to Step 8
COMMENTS:
STEP: Step 8
Verify total HPI flow including seal injection is > 500 gpm.
ISAT
STANDARD: Observe HPI headers flows on 1UBI and determine total #PI flow
including seal injection is > 500 gpm.
Continue to Step 9 -UNSAT
COMMENTS:
..... ........
CRO-097 fnl
Page 8 of 13
- 8- Step 9 CRITICAL STEP
Simultaneously open the following:
.
_I_
RNO
-UNSAT
Limit total HPI flow to < 750 gpm including seal injection
STANBARD: Candidate locates the control switches and light indication for ILP-15 and
ILP-16 on 1UB2 and determines that the valves are closed.
1LP-15 and 1LP-16 switches are rotated to the OPEN direction and the
student verifies that the green CLOSED light goes out and the red OPEN
light comes on.
The candidate identifies that 1LP-15 did not open when its control switch
was placed in the OPEN position and performs RNO.
Throttle 1HP-26 and 1HP-27 to limit total HPI flow to 750 gpm including
seal injection.
Continue to Step 10
NOPE: aLP-15 ( ' I A LPI TO HPI AND RBS) will NOT respond, and will not be
COMMENTS:
Step 10
GO TO Step 14
-SAT
STANDARD: Candidate goes to step 14
COMMENTS: __ UNSAT
CRO-097 fnl
Page 9 of 13
STEP I O : Step 14
Place the "LDST LEVEL INTERLOCK switch in the "DISABLE" position. SAT
STANDARD: The candidate locates the "LDST LEVEL INTERLOCK" switch and places
it in the "DISABLE" position. -UNSAl
Continue to Step 15
COMMENTS:
STEP 11: Step 15
Position the following valves switches to close until valve travel is
initiated: SAT
e 1HP-23
IHP-24
~ UNSA-
IHP-25
STANDARD: The controls for 1HP-23, 24 and 25 are located by the candidate on
IUBI. The switches are rotated to the CLOSE position and the grec
CLOSED lights are observed to come on and the red OPEN lights are
observed to go off.
Continue to Step 16
COMMENTS:
STEP 12: Step 16
Verify any of the following are open:
-SAT
0 ILPSW-4
ILPSW-5
Continue to Step 17 __I UNSA'
STANDARD: Verify any of the above valves are open by observing their open
indications on 1VB2.
COMMENTS:
CRB-097 fnl
Page 10 of 13
STEP 13: Step 17
GO TO Step 22
-SAT
STANDARD: Candidate goes to Step 22.
COMMENTS: ___UNSAT
STEP 14: Step 22
Verify both LPI coolers available for LPI and LPSW.
__ SAT
STANDARD: Determine both LPI coolers available for LPI and LPSW
Continue to Step 23
-UNSAT
COMMENTS:
STEP 15: Step 23
Verify any LPI pump has been secured in this enclosure due to low flow
conditions. -SAT
STANDARD: Determine BOTH LPI pumps are operating and perform RNO and GO
TO Step 25. _ I UNSAT
Continue to Step 25
COMMENTS:
CRO-897 fnl
Page 11 of 13
~. . .. ..~.. ~ . ~.~
.. ..-
NOTE'-
. level
~ ~ is~expected
of 2~2' ~.... . when BWST level reaches 9'.
-SAT
STEP 16: Step 25
WHEN BWST level is 2 9'.
AND RB level is rising,
-UNSAT
THEN continue in this enclosure.
STANDARD: Monitor EWST level and RB level and determine that this step is sat
and continue to Step 26.
Cue: If required, inform cand!dafe time compression will be used and the BWS
level will be lowered.
COMMENTS:
STEP 17: Step 26 CRlPlCAL STEP
Simultaneously open the following:
ILP-19 -SAT
ILP-20
-UNSAT
STANDARD: The candidate locates the controls for 1LP-19 ( I A RX BLBG SUCTll
AN5 ILP-20 (1E RX BLDG SUCTION) on UB2.
The switches are placed in the OPEN position and the valves are ve
to open.
COMMENTS:
__._ ...~.. ... END TASK
I ...
- TOP TIME
CRO-097 fnl
Page 12 of 13
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
.l Required to provide HPI pump suction
8 Necessary to allow the flow from the LPI headers to the HPI pump suctions.
Candidate must determine that ILP-15 did not open and then throttle HPI flow to
protect the HPI pumps.
16 Necessary to allow the suction source for the LPI system to be the WBES and not the
BWSP, which is almost depleted.
CRQ-097 fnl
Page 13 of 13
CANDIDATE CUE SHEET
(TO B RETURNED TO EXAMINER UPON COMPLTIQN OF TASK)
INITIAL CONDITIONS:
A small break LOCA has occurred which is depleting the BWST
Core SCM = 0°F
The BWST level is 19 feet and RB level is increasing.
LOCA CD tab has been completed up to step 7.
INLPI header indicates no flow
IB LPI header indicates no flow
INITIATING CUES:
The Procedure Director directs you to perform lAaT Step 1; Initiate Enclosure 5.12, (ECCS
Suction Swap to R E S ) .
CRO-600 fnl
Page 1 of 12
REGION It
INITIAL LICENSE EXAMINATION
CRO-600
RECOVER FROM SWITCHYARD ISOLATION
CANDIDATE
EXAMINER
CRO-GOO fnl
Page 2 of 12
REGION II
INITIAL LICENSE EXANllNATlON
Task:
Recover from Switchyard Isolation
Alternate Path:
Facility JPM #:
IVA Ratinq(s):
System: BW/AQS
WA: AA1.l
Rating: 4.3/4.2
Task Standard:
Recovery from Switchyard Isolation is performed correctly including manually synchronizing the overhead Keowee
Unit onto the 230 KV Red Bus.
Preferred Evaluation Leeation: Preferred Evaluation Method:
Simulator In-Plant - Perform X Simulate _ .
References:
Enclosure 5.3 of APlOl Z (Recovery From Loss of Power)
Validation Time: 15 minutes Time Critical: NO
......................................................................................
Candidate: Time Start:
NAME Time Finish:
Performance Ratinq: SAT -UNSAT - Performance Time I _
Examiner: I
NAME SIGNATURE BATE
CRO-600 fnl
Page 3 of 12
SIMULATOR OPERATOR INSTRUCTIONS:
1. Recall Snap 210
2. Import files for CRO-600
3. GotoRUN
4. Use the Speed Change Motor on Keowee Unit 1 to ensure the unit is out of sync.
5. Timer 2 will reset the SWYD Isolation
6. Timer 3 will give remote control of Keowee
CRO-600 fnl
Page 4 of 12
ToolslEquipmenffP~oceduresNeeded:
Enclosure 5.3 of AW01-i (Recovery From Loss of Power)
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be petformed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
1. A switchyard Isolation has occurred
2. Unit 1 and Unit 2 reactors have tripped
3. Unit 3 remains online at 100% power
4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via
the overhead power path
5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency
has returned to normal and recovery from switchyard isolation may be initiated.
INITIATING CUES:
1. The SRO in the control room instructs you utilize Enclosure 5.3 of APlOl1 (Recovery From
Loss of Power) to recover from the Switchyard Isolation.
2. Procedure steps 1 and 2 have been completed. Begin on step 3.
CRO-600 fnl
Page 5 of 12
START TIME:
- 1- Step 3
Verify NO ES 1 or 2 actuation on Oconee unit:
Unit 1
-SAT
Unit 2
Unit 3
-UNSAT
STANDARD: Verify ES 1 or 2 has NOT actuated on Unit 1 by observing the RZ
modules and/or statalarrns. Contact Unit 2 and 3 to determine if ES 1 or
2 has actuated.
Continue to Step 4.
Cue: Unit 2 and 3 have not had an ES actuation.
COMMENTS:
STEQ: Step 4
Ensure of the following AUTOlMAN transfer switches in MAN:
-SAT
-UNSAT
STANDARD: Place the Unit ITA and TB AUTOIMAN transfer switches in MAN
Contact Unit 2 and 3 by phone and have them ensure TA and TB
AUTOlMAN transfer switches in MAN.
Continue to Step 5.
Cue: Unit 2 and 3 TA and TB AUTO/MAN transfer switches are in MANUAL.
COMMENTS:
CRO-600 fni
Page 6 of 12
_.
STEP 3: Step 5
Depress all of !he following RESET pushbuttons: CRITICAL STEP
GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL I RESET
GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET -SAT
'GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET
- GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET
UNSAT
STANDARD: The following RESET pushbuttons are depressed:
GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 1 RESET
GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET
GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET
GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET
Continue to Step 6.
Note: Buttons are located electrical mimic board.
- Not critical
COMMENTS:
- 4- Step 6
Verify the following statalarms are off:
SA-15/A-2 (CHANNEL #I UNBERFREBUENCY)
SA-138-4 (CHANNEL #2 UNDERFREQUENCY) il_ SAT
- SA-15/C-1 (CHANNEL #I UNDERVOLTAGE)
SA-15/C-3 (CHANNEL #2 UNDERVOLTAGE)
-UNSAT
STANDARD: The above Statalarms are verified to be off. Statalarms are loci in
SA-I 5.
Continue to Step 7
COMMENTS:
STEP: Step 7 CRITICAL STEP
Notify Keowee Qperator to transfer control of & t
JKeowee units to
Oconee. -SAT
STANDARD: Contact Keowee Operator, by phone, to transfer control of Keowee
units to Oconee. -UNSAT
Continue to Step 8.
NOTE: Simulator instructor will transfer control of @ Keowee
J units to Oconee.
t
COMMENTS:
CRO-600 fnl
Page 7 of 12
STEP 6: Step 8
Verify both channels of all Oconee units Main Feeder Bus Monitor Relay
Panels reset as indicated by the following statalarms off:
-. ..... -SAT
S'H~I'CHNL A L ~ G I C UNSAT
INITIATE)
4 (2)(3)SA74/Q-4 (LOAD
SHED CHNL B LOGIC
~b'S6 CHNL A LOGIC I
INITIATE
1(2)(3w-I4/D-6
% ,\ ,
TO SB CHNL B LQGlC
INITIATE) ... -
STANDARD: Both channels of Oconee unit 1 Main Feeder Bus Monitor Relay Panel is
verified reset as indicated by observing the above statalarms off. Contact
Unit 2 and 3 and have them verify their Main Feeder Buses are reset.
Continue to Step 9.
Cue: Unit 2 and 3 Main Feeder Bus Monitor Panels are reset as indicated by the
above alarms ar@off.
Note: Unit 1's Main Feeder Bus Monitor Panel has not actuated.
COMMENTS:
STEP 7: Step 9 CRITICAL STEP
Verify overhead Keovfee unit energizing a Oconee unit MFB
-SAT
STANDARD: Determine that Kecwee Unit 1 is energizing Oconee Unit 1 MFBs via the
overhead path, by observing Keowee Unit 1 has emergency started and
ACB-1 is closed energizing unit 1's MFBs.
Continue to Step 10.
-UNSAT
COMMENTS:
CRQ-600 fnl
Page 8 of 12
STEP: Step 10
GO TO Step 23
STANDARD: Candidate goes to Step 23 -SAT
COMMENTS:
-UNSAT
STEP: Step 23
Verify Keowee overhead unit is energizing a Oconee unit MFB.
-SAT
STANBARD: Determine that Keovvee Unit 1 is energizing Oconee Unit 1 MFBs via the
overhead path, by observing Keowee Unit 1 has emergency started and
ACB-1 is closed energizing Unit ts MFBs.
-UNSAT
Continue to Step 24.
COMMENTS:
STEP IO: Step 24
Notify Emergency Coordinator to determine which of the following is
desired:
Manually synchronize overhead Keowee unit onto the 230 KV Red -SAT
Bus
Disconnect overhead Keowee unit from the 230 KV Yellow Bus and
reconnect (dead bus transfer) 230 KV Yellow Bus to the System Grid
-UNSAT
STANDARD: Call Emergency Coordinator and ask which of the above methods is
desired.
Continue to Step 25
Cue: The Emergency Coordinator determines that manually synchronizing the
overhead Keowee unit onto the 230 KV Red Bus is desired.
COMMENTS:
CRO-GOO fnl
Page 9 of 12
STEP ? I: Step 25
Verify manual Synchronization of the overhead Keowee Unit onto the
System Grid via the 230 KV Red Bus is desired.
__ SAT
STANDARD: Determine from previous discussion with the Emergency Coordinator that
manual synchronization of the overhead Keowee Unit onto the System
Grid via the 230 KV Red Bus is desired.
UNSAT
Continue to Step 26.
COMMENTS:
STEP 12: Step 26
Obtain permission from TCC to connect overhead Keowee unit (230 KV
Yellow Bus Supply) to the System Grid. -SAT
Cue: The TCC gives permission to connect overhead Keowee unit (230 KV Yeellow
Bus Supply) io ihe System Grid.
__ UNSAT
STANDARD: Call the permission from TCC to connect overhead Keowee unit (230 KV
Yellow Bus Supply) to the System Grid.
Continue to Step 27.
COMMENTS:
CRO-600 fnl
Page 10 of 12
STEP 13: Step 27 CRITICAL STEP
Perform the followina to svnc and tie overhead Keowee unit (Yellow Bus
Supply) to 230 KV RLd Bds:
-SAT
Establish communications with Keowee Operations
Depress and hold PCB-8 SYNC push button
Adjust overhead Keowee unit SPEED CHANGER MOTOR to -UNSAT
Synchronize overhead Keowee unit to 230 KV Red Bus.
e WHEN synchronization is achieved,
THEN perform the following:
2. Close PCB-8.
2. Release PCB-8 SYNC push button
STANDARD: The overhead Keowee unit (Yellow Bus Supply) is synced and tied to the
230 KV Red Bus by:
e Establishing communications with Keowee Operations.
Depressing and holding the PCB-8 SYNC push button.
Cue: The simulator operator will act as a second operator and operate the PCB-8
SYNC butfon. After synchronization is achieved (slow in the fast direction), inform
the candidate to close the PCB.
e Adjusting the overhead Keowee unit SPEED CHANGER MOTOR to
synchronize overhead Keowee unit to 230 KV Red Bus.
WHEN synchronization is achieved,
THEN perform the following:
> Close PCH-8 (Red closed light illuminated)
2 Release PCB-8 SYNC push button.
Note: The SYNC CHECK provides only indication, NOT protection against out of
phase closure.
Cue: lnform candidate that this task is complete.
COMMENTS:
END TASK
- TOP TIME:
CRB-SOOfnl
Page 11 of 12
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
3 Reset buttons must be pushed to reset the Switchyard Isolation circuit to allow PCBs
to be repositioned.
5 Oconee must have Keowee control to operate any Keowee Unit.
7 Must recognize power is coming from a Keowee Unit via the overhead path in order
to transfer power back to the switchyard.
I3 Manually syncing of the Keowee Unit is required to put the Oconee axillaries on the
CRO-GOB fnl
Page 12 of 12
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION QF TASK)
INITIAL CONDITIONS:
1. A switchyard isofation has occurred
2. Unit 1 and Unit 2 reactors have tripped
3. Unit 3 remains online at 100% power
4. Power has been restored to Unit 1 and Unit 2's Main Feeder Buses from Keowee Unit 1 via
the overhead power path
5. The TCC has notified Oconee that the 230 KV transmission system voltage and frequency
has returned to normal and recovery from switchyard isolation may be initiated.
INITIATING CUES:
1. The SRO in the control room instructs you utilize Enclosure 5.3 of AP/511 (Recovery From
boss of Power) to recover from the Switchyard Isolation.
2. Procedure steps Z and 2 have been completed. Begin on step 3.
CRO-700 fnl
Page Z of 18
REGION II
INITIAL LICENSE EXAMINATION
CRO-700
Place IC§ In Auto following Loss Of Auto Power
CANDIDATE
EXAMINER
CRO-700 fnl
Page 2 of 18
REGION II
INITIAL LICENSE EXAMINATION
Task:
Place ICS In Auto following Loss Of Auto Power
Alternate Path:
Facility JPM #:
KIA Ratinqfs):
System' BWIA02
WA. MI.1
Rating: 4.013.8
Task Standard:
Use AP/23 (boss Of ICs Power) Enclosure 5 5 (Placing ICs In Auto) to place the 16s in AUTO following a
Loss Of Auto Power.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant __ Perform 2Simulate __
References:
CRO-700 fnl
Page 3 of 18
SIMULATOR OPERATOR INSTRUCTIONS:
I.Recall Snap 22 1
2. Import files for CRO-708
3. GotoRUN
CRO-700 fnl
Page 4 of 18
TooIslEquipmenffProcedures Needed:
AW23 (boss Of ICs Power) Enclosure 5.5 (Placing ICs In Auto)
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate l o me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
1. ICs AUTO power lost
2. AP/23 (Loss of ICs Power) in progress
3. 16s AUTO power has been restored
INITEATING CUES:
The SRO directs you to perform Enclosure 5.5 (Placing 16s in AUTO) to place ALL ICs H/A
stations in AUTO.
CRO-700 fnl
Page 5 of 18
START TIME:
Note: All operations will be performed on the ICs stations located on I U B I .
Step I
Perform a pre-job briefing for AP/l/Ai1700/023 from the pra-job briefing
database. _I_ SAT
STANDARD: State that 8 pre-job briefing should be performed.
UNSAT
Continue to Step 2.
I _
Cue: Inform candidate that the pre-job briefing has been performed.
Note: Candidate will obtain setpoint information from the OAC during this JPM.
COMMENTS:
Step 2
Ensure RATE SET to 0.0
-SAT
STANDARD: Ensure RATE SET thumbwheel located is set to 0.0
Continue to SteD 3. __ UNSAT
COMMENTS:
CRO-700 fnl
Page 6 of 18
STEQ: Step 3 CRITICAL STEP
Verify TflP setpoint at THP by comparing the following,
0 1 E2089 (TURB HBR PRESS SETPOINT)
0 1 E2088 (IC5 SELECTED TURB HDR PRESS) -SAT
RNQ
Ensure the following in HAND:
TURBINE MASTER
- 1A TURBINE BYPASS VALVES -UNSAT
e 1B TURBINE BYPASS VALVES
Adjust THP setpoint to = THP at the TURBINE MASTER.
STANDARD Call up the appropriate OAC display (enter GB AP28) anti determine
THP setpoint NOT at THP and perform RNO.
J
Verify the above stations are in HAND.
Use the Setpoint knob on the TURBINE MASTER to match THP setpoint
to i- THP while monitoring on the OAC.
Continue to Step 4.
COMMENTS:
=: Step 4 CRITICAL STEP
Place TURBINE MASTER in AUTO
STANDARD: TURBINE MASTER is placed in AUTO by depressing the Auto -SAT
pushbutton on the TURBINE MASTER Bailey station.
Continue to Step 5
UNSAT
COMMENTS:
STEP: Step 5
Verify Main Turbine controlling THP.
-SAT
STANDARD: Verify Main Turbine controlling THP by observing THP being maintained
at setpoint.
Continue to Step 6 I _ UNSAT
COMMENTS:
CRO-700 fnl
Page 7 of 18
Step 6
Verify all TBVs are closed.
-SAT
STANDARD: Verify all TBVs closed by observing the Green closed indication
Continue to Step 7.
-UNSAT
COMMENTS:
Step 7 CRITICAL STEP
Ensure all TBVs in AUTO:
1B TURBINE BYPASS VALVES I _ SAT
STANDARD: Place TBVs in AUTO by depressing the red AUTO pushbutton and verify
the red AUTO light illuminates and the white HAND light extinguishes. __ UNSAT
Continue to Step 8 .
COMMENTS:
Step 8 CRITICAL STEP
Verify Tave setpoint at = Tave by comparing the following:
OlE2087 (ICs TAVE SETPOINT)
e OlE2086 (ICs SELECTED TAVE) -SAT
RNO
Ensure the following:
DIAMOND in HAND -UNSAT
I A FDW MASTER in HAND
e 1B FBW MASTER in HAND
STANDA. Call up the appropriate OAC display (enter G- AP28) and determine
Tave setpoint NOT at = Tave and perform RNO.
Verify the above stations are in HAND.
Adjust Tave setpoint to = Tave at the REACTOR MASTER while
mcnitoring on the OAC.
Continue to Step 9
COMMENTS:
CRO-900 fnl
Page 8 of 18
Step 9
Ensure DIAMOND in MANUAL.
-SAT
STANDARD: Verify DIAMOND in MANUAL by observing MANUAL light illuminated on
DIAMOND panel.
-UNSAT
Continue to Step I O .
COMMENTS:
STEP I O : Step 10 CRITICAL STEP
Place REACTOR MASTER in AUTO.
STANDARD: REACTOR MASTER is placed in AUTO by depressing the Auto __ SAT
pushbutton on the REACTOR MASTER Bailey station and verify the red
AUTO light illuminates and the white HAND light extinguishes.
Continue to Step 11 _ I UNSAT
COMMENTS:
STEP 11: Step 11
Verify Neutron Error is 0 f I0h.
-SAT
STANDARD: Verify Neutron Error is 0 f 1% by observing Neutron Error meter on
IUBI.
Continue to Step 52 -UNSAT
COMMENTS:
.. . ... ... ..
CRO-700 fnl
Page 9 of 18
STEP 12: Step 12 CRITICAL STEP
Place DIAMOND in AUTO
-SAT
STANDARD: Place DIAMOND in AUTO by depressing the AUTO pushbutton on the
DIAMOND panel pushbutton and verify the AUTO light illuminates and
the HAND light extinguishes. Verify plant parameters do not change.
Continue to Step 13 -UNSAT
COMMENTS:
STEP 13: Step 13
Verify STM GENERATOR MASTER Measured Variable is on the caret.
I__ SAT
STANDARD; Place selector switch to Measured Variable and verify the pointer on the
STM GENERATOR MASTER is on the caret.
Continue to Step 14. -UNSAT
COMMENTS:
STEP 14: Step 14 CRITICAL STEP
Place STM GENERATOR MASTER in AUTO.
STANDARD: STM GENERATOR MASTER is placed in AUTO by depressing the Auto I SAT
pushbutton on the STM GENERATOR MASTER Bailey station and verify
the red AUTO light illuminates and the white HAND light extinguishes.
-UNSAT
Continue to Step 15
COMMENTS:
CRO-700 fnl
Page 10 of 18
Verify Delta Tc setpoint at = Delta Tc by comparing the following:
0 O1E2091 (ICs DELTA TC SETPOINT) I _ SAT
0 OlP1608 (RCS NARROW WNGE BELTATC)
STANDARD: Verify Delta Tc setpoint at = Delta Tc by comparing the above points on UNSAT
the OAC.
I _
Continue to Step 16
COMMENTS:
-
STEP 16: Step 16 CRITICAL STEP
Place DELTA Tc station in AUTO.
STANDARD: -SAT
The DELTA Tc station is placed in AUTO by depressing the Auto
pushbutton on the DELTA Tc Bailey station and verifying the red AUTO
light illuminates and the white HAND light extinguishes.
Continue to Step 17. -UNSAT
COMMENTS:
STEP 17: Step 17
Verify 1A FDW MASTER Measured Variable is on the caret.
I SAT
STANDARD: Place selector switch to Measured Variable and verify the pointer on the
1A FCIW MASTER is on the caret.
Continue to Step 18. -UNSAT
COMMENTS:
CRO-780 fnl
Page 11 of 18
STEP 18: Step 18
Verify 1B FBW MASTER Measured Variable is on the caret.
-SAT
STANBARD: Place selector switch to Measured Variable and verify the pointer on the
1B FDW MASTER is on the caret.
Continue to Step 19. -UNSAT
COMMENTS:
NOTE CRITICAL STEP
1A FDW MASTER and 18 FDW MASTER should both be placed in AUTO
- .~... simultaneously. .... ...
__ SAT
STEP 19: Step 19
Place the following in AUTO:
I A FDW MASTER -UNSAT
- I B FDW MASTER
STANDARD: The 1A FBW MASTER and 1B FBW MASTER is placed in AUTO
simultaneously by depressing the Auto pushbuttons on both the 1A FDW
MASTER and IB FDW MASTER Bailey stations and verifying the red
AUTO lights illuminate and the white HAND lights extinguish.
Continue to Step 20.
Note: Simultaneous operation is not critical.
COMMENTS:
'
STEP 20:
STANDARD:
Step 20
CAUTION
Changing Total FDW flow will result in Rx power change. Total FDW flow should be
maintained as near constant as possible by adjusting FDW pump speed and FDW control
valve positions. ._.. .......
Verify lowest FDW VALVE AP = 35 psid
.. .~
Verify lowest FDW VALVE AP = 35 psid by observing the FBW VALVE
-SAT
CRO-700 fnl
Page 12 of 18
___ UNSAT
Continue to Step 21
COMMENTS:
STEP 21 : Step 21
Verify 18 MAIN FDW PUMP Measured Variable is on the caret.
__ SAT
STANDARD: Place selector switch to Measured Variable and verify the pointer on the
I A MAIN FDW PUMP is on the caret.
Continue to Step 22.
-UNSAT
COMMENTS:
STEP 22: Step 22 CRITICAL STEP
IAAT 1A MAIN FDW PUMP Measured Variable is on the caret,
AND desired in AUTO,
THEN place 1A MAIN FDW PUMP in AUTO. ___ SAT
STANDARD: Place I A MAIN FDW PUMP in AUTO by depressing the AUTO
pushbutton and verify the red AUTO light illuminates and the white HAND -UNSA?
light extinguishes.
Continue to Step 23.
COMMENTS:
CRO-700 fnl
Page 13of 18
STEP 23: Step 23
Verify 18 MAIN FDW PUMP Measured Variable is on the caret.
-SAT
STANDARD: Place selector switch to Measured Variable and verify the pointer on the
I B MAIN FDW PUMP is on the caret.
-UNSAT
Continue to Step 24.
COMMENTS:
STEP 24: Step 24 CRITICAL STEP
IAAT 16 MAIN FDW PUMP Measured Variable is on the caret,
AND desired in AUTO.
THEN perform the following: -SAT
0 Adjust I B MAIN FDW 6UMP bias as required using 0 1 E2092 (FWT
. 1B BIAS).
Place r E MAIN FDW PUMP in AUTO.
__ UNSAT
STANDARD: Place 1B MAIN FDW PUMP in AUTO by depressing the AUTO
pushbutton and verify the red AUTO light illuminates and the white HAND
light extinguishes.
Continue toStep 25
COMMENTS:
STEP 25: Step 25
Verify 1FDW-32 Measured Variable is on the caret
-SAT
STANDARD: Place selector switch to Measured Variable and verify the pointer on the
1FDW-32 controller is on the caret.
-UNSAT
Continue to Step 26
COMMENTS:
.. ... .. -. .......
CRO-700 fnl
Page 14of 18
STEP 26: Step 26
Verify ?FDW-35 Mmsured Variable is on the caret.
-SAT
STANDARD: Place selector switch to Measured Variable and verify the pointer on the
1FBW-35 controller is on the caret.
UNSAT
Continue to Step 27.
COMMENTS:
.~~.. _. .. .
NOTE" CRlTlCAL STEP
...._. should.
. both
.-. be placed in......
AUTO simultaneously.
~ ~ ~
STEP 27: Step 27
-SAT
Place the following in AUTO:
IFDW-32
IFDW-35 __ UNSAT
STANDARD: The IFDW-32 and IFDW-35 is placed in AUTO simultaneously by
depressing the Auto pushbuttons on both the IFDW-32 and 1FDW-35
Bailey stations and verifying the red AUTO lights illuminate and the M i t e
HAND lights extinguish.
Continue to Step 28
COMMENTS:
STEP 28: Step 28
Verify IFDW-41 Measured Variable is on the caret
~ SAT
STANDARD: Place selector switch to Measured Variable and verify the pointer on the
1FDW-41 controller is on the caret.
-UNSAT
Continue to Step 29.
COMMENTS:
CRO-900 fnl
Page 15of 18
STEP 29: Step 29
Verify 1FDW-44 Measured Variable is on the caret.
I SAT
STANDARD: Place selector switch to Measured Variable and verify the pointer Qnthe
1FDW-44 controller is on the caret.
UNSAT
Continue to Step 30.
_ I
COMMENTS:
NOTE CRITICAL STEP
~ -. 1..
FDW-41
.. ,. and 1FDW-44 should both be placed
~ .... .
in AUTO simultaneously.
-SAT
STEP 30: Step 30
Place the following in AUTO:
IFDW-41
IFDW-44 -UNSAT
STANDARD: The 1FDW-41 and 1FDW-44 is placed in AUTO simultaneously by
depressing the Auto pushbuttons on both the 1FDW-41 and 1FDW.
Bailey stations and verifying the red AUTO lights illuminate and the white
HAND lights extinguish.
Continue to Step 31.
COMMENTS:
STEP 31: Step 31
Slowly adjust the following as required by unit operation:
Tave I SAT_ .
THP
Delta Tc
UNSAT
STANDARD: Adjust the above on 1UBI as required by unit operation.
Continue to Step 32.
COMMENTS:
CRO-700 fill
Page 16 of 18
STEP 32: Step 32
Ensure CTPD SET at desired value
I_ SAT
STANDARD Ensure CTPD SET at desired value on 1UBI.
___ UNSAT
COMMENTS:
... ...~.. END.. TASK ... .
STOP TIME:
CRO-700 fRl
Page 17 of 18
CRITICAL STEP EXPLANATIONS:
STEP tC Explanation
3 The setpoint and the parameter have to be matched to prevent a plant transient as
the ICs is place in AUTO.
4 Required to place the ICs in AUTO.
7 Required to place the 16s in AUTO.
8 The setpoint and the parameter have to be matched to prevent a plant transient as the ICs is
place in AUTO.
I0 Required to place the ICs in AUTO.
12 Required to place the ICs in AUTO.
14 Required to place the ICs in AUTO.
16 Required to place the ICs in AUTO.
19 Required to place the ICs in AUTO.
22 Required to place the ICs in AUTO.
24 Required to place the IC§ in AUTO.
27 Required to place the IC§ in AUTO.
30 Required to place the ICs in AUTO.
CRO-700 ftll
Page 18 of 18
CANDIDATE CUE SHEET
(TOBE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
I ICs AUTO power lost
~
2. AP/23 (Loss of ICs Power) in progress
3. ICS AUTO power has been restored
INITIATING CUES:
The SRO directs you to perform Enclosure 5.5 (Placing ICs in AUTO) to place ALL ICs H/A
stations in AUTO.
CRO-900 fnl
Page 1 of 13
REGION II
INITIAL LICENSE EXAMINATION
CRO-900
Release GWD Tank
CANDIDATE
EXAMINER
CRO-900 fnl
Page 2 of 13
REGION II
INITIAL LICENSE WAMINATION
Task:
Release GWD Tank
Alternate Path:
N
FacilitvJPM #:
WA Rating(&
System: 071
WA: A426
Rating: 3.1/3.9
Task Standard:
Release a GWD tank correctly using OP1I&2iAl104~018
End 4 9 (GWDTankRelease)
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator 2In-Piant __ Perform Simulate -
CRO-900 fnl
Page 3 of 13
SIMULATOR OPERATOR INSTRUCTIONS:
Z . Recall IC-30
2. GotoRUN
CRO-900 ffll
Page 4 of 13
TooIslEauipment/Procedu~esNeeded:
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be periormed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet i provided you.
INITIAL CONDITIONS:
Release of "B"GWB tank is desired
QP/1&2/N1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to
step 2.3.
INITIATING CUES:
SRO directs you to complete the release of the "B"G W D tank at step 2.3 of Enclosure 4.9.
CRO-900 fnl
Page 5 of 13
START TIME:
Step 2.3
Determine any other GWR(s) are in progress at station.
-SAT
STANDARD: Determine that no other GWR(s) are in progress at ONS
Continue to Step 2.4
-UNSAT
Cue: No other GWRs are in progress.
COMMENTS:
Step 2.4 CRITICAL STE
EF release will be made at 1/3 station release limit, verify IRIA-45 High
and Alert Alarm setpoints set per PT/0/A/0230/001 (Radiation MonitQr _ I SAT
Check).
STANDARD: Refer to PT/OIA/0230/001 (Radiation Monitor Check) and verify 1RIA-45 -UNSAT
High and Aiert Alarm setpoints using the RIA View Node.
Continue to Step 2.5
Note: The setpoints will not be correct and will require the candidate to reset them
per PT~02301001.
COMMENTS:
m: Step 2.5
IF release will be made at 2/3 station release limit:
STANDARD Determine that this release will be made a 1/3 station limit
N/A steps 2.5.1 - 2.5.5. -UNSAT
Continue to Step 3.1
Cue: If asked inform the candidate as the SRO that this release will be at 5/3 station
limit
COMMENTS:
CRO-900 fnl
Page 6 of 13
STEP: Step 3.1
Record background readings for 1RIA-37 & 1RIA-38 on Enclosure 4.10
GWD Tank Sample Request. __ SAT
STANDARD: Determine background readings for 1RIA-37 & 1RIA-38 by observing the
RIA readings on the RIA View Node and record on Enclosure 4.10. -UNSAT
Note: The background readings should be as follows:
ZRIA-37 Background reading is: 45 cps
IRIA-38 Background reading is: 6.6 cps
Continue to Step 3.2
COMMENTS:
....
[%OTE: The RIArequired to terminate release (ILIA within range) must be
1 operable or .....
two independent samples must be taken ._.. (SLG 16.1 1.3).
...... I SAT
m: Step 3.2
Recommended 1RIA-37 and 38 High and Alert setpcints:
e 1RIA-37 cpm above background
-UNSAT
1RIA-38 cpm above background
STANDARD: Obtain this information from the sample request and record on form.
Continue to Step 3.3
COMMENTS:
CRO-900 fnl
Page 7 of 13
Step 3.3 CRITICAL STE
Adjust 1RIA-37 setpoints for release per on6 of the foliowing:
3.3.1 IF above instrument range over-ride 1RIA-37 setpoints: __ SAT
o Set 1RIA-37 alert setpoint at zero
Set 1RIA-37 High setpoint at zero
Or
__ UNSAT
3.3.2 IF required to set alarms:
a Set 1RIA-37 Alert setpoint at 4795 cpm
Set 1RIA-37 High setpoint at 4795 cpm
STANDARD: Determine setpoints for release are NOT above instrument range and
NIA step 3.3.1.
Determine required setpoints by adding background to data from the
sample request and enter it on this form.
Continue to Step 3.4
COMMENTS:
Step 3.4 CRITICAL STE
Adjust 1RIA-38 setpoints for release per one of the following:
3.4.1 IF above instrument range over-ride 1RIA-38 setpoints: __ SAT
Set 1RIA-38 Alert setpoint at zero
e Set 1RIA-38 High setpoint at zero
Or
3.4.2 IF required to set alarms:
-UNSAT
Set 1RIA-38 Alert setpoint at 31E).6 cpm
Set 1RIA-38 High setpoint at 319.6 cpm
STANDARD: Determine setpoints for release are NOT above instrument range and
NIA step 3.3.1.
Determine required setpoints by adding background to data from the
sample request and enter it on this form.
Continue to Step 3.5
COMMENTS
CRO-900 fnl
Page 8 of 13
Step 3.5
Reset WASTE GASTANK DISCH integrator to zero.
I SAT
STANDARD: Reset WASTE GASTANK DISC# integrator located on 1AB3 to zero by
deprsssing the reset button.
__ UNSAT
Continue to Step 3.6
COMMENTS:
Step 3.6
Ensure GWW DISCHARGE FLOW CONTROL in '"HAND".
Verify GWR DISCHARGE FLOW CONTROL "CLOSED" -SAT
STANDARD: Ensure GWR DISCHARGE FLOW CONTROL in "HAND" and CLOSED
located on 1AB3.
UNSAT
Continue to Step 3.7
COMMENTS:
STEP 10: Step 3.7 CRITICAL STEl
Open GWD-100 (Decay Tanks Bischarge Header Block). (A-2-2091E 13'
N of Door) -SAT
STANDARD: Dispatch N E 0 to Open GWD-100 (Decay Tanks Discharge Header
Block). -UNSAT
Continue to Step 3.8
Cue: inform candidate that GWD-IO0 is open.
COMMENTS:
CRO-900 fnl
Page 9 of 13
STEP 11: Step 3.8 CRITICAL STEP
IF releasing GWD Tank B perform the following:
Open GWD-99 (Decay Tank 1B Discharge Block) -SAT
e Place GWD-5 (5 GWB TANK DISCHARGE) switch to "AUTO
STANDARD: Dispatch N E 0 to open GWD-99 (Decsy Tank 15 Discharge Block). -UNSAT
Cue: Inform candidate that GWB-99 is open.
Located GWD-5 (B GWD TANK DISCHARGE) on 1863 and place
switch to "AUTO"
Continue to Step 3.9
COMMENTS:
STEP 12: Steps 3.9 - 3.1 1
IF releasing GWD Tank B perform the following...
STANDARD: Determine NOT releasing GWD Tank A, C, D and NIA steps 3.8. 3.10,
and 3.1 1.
Continue to Step 3.12
__ UNSAT
COMMENTS:
- ~
NOTE: Station Limit release rates, per SLC 16.11, will NOT be exceeded if
....
recommended release rates per Enclosure 4.10 "GWD Tank Sample Request"
are followed.
- Limit and Precautions have~required
. . ~ approval levels for release. -SAT
STEP 13: Step 3.12
Approval granted for release.
-UNSAT
STANDARD: Obtain approval for release.
Continue to Step 3.13
Cue: Approval is granted for release by Trac: Lemons at current Daterrime.
COMMENTS:
CRO-900 fnl
Page 10 of 13
STEP 14: Step 3.43
IF releasing at 2/3 Station Limit:
-SAT
STANDARD: Determine NOT releasing at 2/3 Station Limit by previous cue.
Continue to Step 3.14
II_ UNSAT
COMMENTS:
STEP 15: Step 3.14
Recommended Release Rate from Enclosure 4.10 "GWD Tank Sample
Request": cfm. I SAT
STANDARD: Record Recommended Release Rate from Enclosure 4.10 "GWD Tank
Sample Request". -UNSAT
Continue to Step 3.15
CQMMENPS:
NOTE:
If U1 Penetration Room Ventilation (PRV) system is shutdown, RIA-32 U1 Penetration
Room sample point does NOT sample general area air properly.
With U1 PRV system shutdown. RIA-32 sample point for U1 Penetration Room is
_ I
e
sampling air in piping between U1 Unit Vent and PRV discharge.
e RIA-32 counts may increase when selected to U1 Penetration Room while making a
GWD Release. -UNSAT
STEP 16: Step 3.15
Place a note on Turnover sheet that RIA-32 Penetration Room sample
point may alarm when selected to U'i Penetration Room during GWD
release.
STANDARD: Candidate should indicate a note should be placed on the Turnover sheet
indicating that RIA-32 Penetration Room sample point may alarm when
selected to U1 Penetration Room during GWD release.
Continue to Step 3.16
COMMENTS:
I
CRO-900 fnl
Page I 1 of 13
STEP 17: Step3.16 CRITICAL STEP
Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release
rate.
-SAT
STANDARD: Slowly adjust the manual loading knob to obtain the desired release rate.
Continue to Step 3.17
-UNSAT
Note: Although the maximum rate is high the actual release rate will be low.
COMMENTS:
STEP 18: Step 3.17
Record "Begin GWR # " in Unit Log
I SAT
STANDARD: Candidate should indicate a Unit log entry would be made.
-UNSAT
COMMENTS:
END
.~ TASK
- .. .....
STOP TIME:
CRO-900 fnl
Page 1 2 0 f 13
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
2 Required to set RIA to prevent station release above limits.
6 Required to set RIA to prevent station release above limits.
7 Required to set RIA to prevent station release above limits.
10 Required to align release flow path.
21 Required to align release flow path.
17 Required to align release flow path.
CRO-900 fnl
Page 13 of 13
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Release of "5" GWD tank is desired
OQ/l&2/A/1104/818, Endosure 4.9 (GWD Tank Release) is in progress and completed up to
step 2.3.
INITIATING CUES:
SRQ directs you to complete the release of the "B" GWD tank at step 2.3 of Enclosure 4.9.
NLO-036 fnl
Page 1 of 10
REGION II
INITIAL LICENSE EXAMINATION
NLO-036
STARTUP A VITAL BUS INVERTER
CANDIDATE
EXAMINER
NLO-036 fnl
Page 2 of 10
REGION II
INlTiAL LICENSE EXAMINATION
Task:
STARTUP A VITAL BUS INVERTER
Alternate Path:
N
Facilitv JPM #
N
WA Ratinds):
System: 062
WA: A3.04
Rating: 2.9/2.9
Task Standard:
Vital Bus Inverter placed in service correctly
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator -In-Plant X Perform -Simulate
References:
OP/l,2,3/A/t 107/04. Enclosure 4 2 (Startup Of The Vital Bus Inverters)
Validation Time: 3 minutes Time Critical: NO
____-_____________---ssssss_______ss------------------------------------------
_ ~ ~ ~ ~ _ _ _ _ _ ~ _ _ ~ ~ ~ ~ ~ _ _ ~ - - - s s s s s s _ _ _ _ _ _ _ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ - - - - - ~
Candidate: Time Start,
NAME Time Finish.
Performance R a t i n s SAT ~ UNSAT - Performance Time -
Examiner: -I
NAME SIGNATURE DATE
NLO-036 fnl
Page 3 of 10
SIMULATOR OPERATOR INSTRUCTIONS:
NONE
NLO-036 fnl
Page4of10
ToolslEquipmentIProcedures Needed:
READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I will
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Earkies today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel
have just notified the Control Room SRO that they have completed their work on the inverter.
The affected I2OVAC Vital Instrumentation Power Panelboard is being supplied by Regulated
AC Panelboard KRA.
INITIATING C U E
The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OPlllNZ 107/04
(Enctosure 4.2). DC Power to the inverter has been isolated.
Begin at Step 2.1.
NbQ-036 fnl
Page 5 of 10
START TIME:
Step 2.1
IF DC power to the inverter has been isolated, close breaker #33 on the
associated DC paneiboard. -SAT
STANDARD: Determine that DC power to the inverter has not been isolated by
referring to the initial conditions. -UNSAT
Continue to Step 2.2.
CUE: Indicate to candidate that breaker #33 is closed.
COMMENTS:
Step 2.2 CRITICAL TASK
Press the PRECHARGE SWITCH pushbutton until the PRECHARGE
light comes on. -SAT
STANDARD: The candidate depresses the PRECHARGE SWITCH pushbutton untii
the PRECHARGE light comes on. -UNSAT
CUE: Indicate to the student that the PRECHARGE light is ON.
Continue to Step 2.3.
COMMENTS:
NLO-036 fnl
Page 6 of 10
Step 2.3 CRITICAL TASK
CLOSE the DC INPUT circuit breaker and verify Vital Bus INVERTER I SAT
OUTPUT voltage increases to approximately 120 volts AC.
STANDARD: The DC INPUT circuit breaker is CLOSED
-UNSAT
Cue: indicate to the student that the DC INPUT breaker is ifl the ON position.
INVERTER OUTPUT voltmeter, AC volts, is observed and verified to
indicate approximately 120 volts AC.
Cue: indicate to student that inverter voltage iNCREASES from 0 to 120 volts AC,
as indicated on the INVRTER OUTPUT voltmeter.
Continue to Step 2.4.
COMMENTS:
Step 2.4 CRITICAL TASK
CLOSE the INVERTER OUTPUT circuit breaker.
-SAT
STANDARD: The INVERTER OUTPUT circuit breaker is CLOSED
CUE: indicate to the student that the INVERTER OUTPUT breaker is in the ON UNSAT
position.
Continue to Step 2.5.
COMMENTS:
NLO-036 fnl
Page 7 of 10
Step 2.5
VERIFY the IN SYNC light is on.
-SAT
STANDARD: Green IN SYNC light is verified ON.
CUE: indicate to student that IN SYNC light is ON. I UNSAT
Continue to Step 2.6.
COMMENTS:
Step 2.6 CRITICAL TASK
POSITION the MANUAL BYPASS SWITCH to the NORMAL SOURCE
position. _I_ SAT
STANDARD: Student rotates the Manual Bypass Switch from the ALTERNATE
SOURCE position to the NORMAL SOURCE position.
-UNSAT
Cue: lndicate to the sfudenf that the Maflual Bypass Switch is in the NORMAL
SOURCE position.
Continue to Step 2.7.
COMMENTS:
NLO-036 fnl
Page 8 of 10
Step 2.7
VERIFY the following indications: -SAT
INVERTER OUTPUT volt meter = 120 volts
e Inverter Output frequency meters 60 Hz
INVERTER OUTPUT amp meter increases and stabilizes to match -UNSAT
SYSTEM OUTPUT amp meter.
-
STANDARD: The following indications are verified:
INVERTER OUTPUT volts 120
INVERTER OUTPUT frequency = 60 tiz.
INVERTER OUTPUT amp meter increases and stabilizes to match
SYSTEM OUTPUT amp meter.
Cue: Provide the following indications to the student:
INV. OUTPUT volts f20.
INV. OUTPUT freq. 60.
INV. OUTPUT amps 20 40. -
SYS. OUTPUT amps 20 40. -
COMMENTS:
..... END TASK ...... ...
STOP TIME:
NLO-036 fnl
Page 9 of 10
CRITICAL STEP EX-PLANATIONS:
STEP # Explanation
2 Recharge input filter capacitor prevents a large increase in current when the inverter
is placed on line.
3 Closing the DC input breaker supplies DC input to the inverter.
4 Closing this breaker connects the inverter output to the input of the autotransformer.
6 Selecting NORMAL Source with the Manual Bypass Switch causes a make before
break transfer to the inverter output placing the inverter in service.
NLO-036 fnl
Page 10 of 10
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Earlier today the 1DIB Vital Bus Inverter was shutdown for maintenance. I & E personnel
have just notified the Control Room SRO that they have completed their work on the inverter.
The affected I20VAC Vital Instrumentation Power Panelboard is being supplied by Regulated
AC Panelboard KKA.
lNlTIATlNG CUE:
The Control Room SRQ directs you to startup IDIB Vital Bus Inverter per OP/l/Ail107/04
(Enclosure 4.2). DC Power to the inverter has ROf been isolated.
Begin at Step 2.1
NLO-039 fnl
Page 1 of 10
REGION II
INITIAL LICENSE EXAMINATION
NLO-039
PRIME THE SPENT FUEL POOL FILL LINE
CANDIDATE
EXAMBUER
NbO-039 fnl
Pags 2 of 10
REGION II
INITIAL LICENSE EXAMINATION
Task:
PRIME THE SPENT FUEL POOL FILL LINE
Alternate Path:
Facilihr JPM #:
KIA Ratinnb):
System: APE022
KIA: AK3.02
Rating. 3.5/3.8
Task Standard:
SFP Priming Pump is aligned and started
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator -In-Plant X Perform -Simulate X
References:
EOP Enclosure "HPI Pump Operations from ASW Pump Switchgear"
Candidate: I- Time Start:
NAME Time Finish:
Performance RatinR: SAT-UNSAT - Performance Time ~
Examiner: I
NAME SIGNATURE DATE
Nb0-039 fnl
Page 3 of 10
SIMULATOR OPERATOR INSTRUCTIONS:
NONE
NLO-039 fnl
Pageeof 10
Tools/auipmenffProcedu~~s Needed:
READ TO OPERATOR
DlRECTlON TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room
steps shall be performed for this JPM, including any required communications. I wil[
provide initiating cues and reports on other actions when directed by you. Ensure you
indicate to me when you understand your assigned task. To indicate that you have
completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TD,
and TE.
it also struck the Unit 2 BWST, rupturing and draining it.
The SSF Reactor Coolant Makeup Pump failed to start.
2A HPIP has been powered from the ASW switchgear.
The Spent Fuel Pool level is currently +I .Q feet.
INITIATING CUES:
The EOP directs the operator to perform "HPI Pump Operation From ASW Pump Switchgear"
Enclosure to align HPlPs to the SFP.
Another operator is aligning the HPI Suction from the SFP.
The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this
Enclosure, beginning at Step 20.
NLO-039 fnl
Page 5 of 10
START TIME:
Step 20
Obtain bucket and rope from EOP equipment locker U2AB5. (A-5.U2
elevator lobby) -SAT
STANDARD: Locate EOQ equipment locker U2AB5 located at A-5, U2 elevator lobby
and idcaite that you would obtain a bucket and rope from the locker.
_ I UNSAT
Continue to Step 21.
Cue: Inform candidate that opening the docker is not rqUiFed.
COMMENTS:
- 2- Step 21A
Connect SF priming pump suction hose to quick disconnect fitting at SF-
86 (SF PRIMING PUMP SEAL WATEK INLET) -SAT
STANDARD: Candidate connects suction hose to quick disconnect fitting at SF-86, 01
verifies it is connected I_ UNSAT
Continue to Step 21B.
COMMENTS:
STEP: Step 21B
Connect ths Spent Fuel Priming Pump suction hose to the Spent Fuel
Pool Fill line connection tap on SF-85 (SF PRIMING PUMP I SAT
UNDERWATER SUPPLY BLOCK).
STANDARD: Verify the Spent Fuel Priming Pump suction hose to the Spent Fuel Pool
Fill line connection tap on SF-85 (SFPRIMING PUMP UNDERWATER
-UNSAT
SUPPLY BLOCK) is connected.
Continue to Step 21C
COMMENTS:
NLO-039 fnl
Page 6 of 10
- 4- Step 21C CRITICAL
Open SF-85 (SF PRIMING PUMP UNDRWATER SUPPLY BLOCK)
STANDARD: The student locates and opens SF-85 (Pool Underwater Supply Block to __ SAT
Priming Pump) by rotating valve operator until handle is parallel with pipe.
Continue to Step 210.
-UNSI
Note: There is a special tool for operating SF-85 and SF-84 hanging at the South
end of the Spent Fuel Pool.
COMMENTS:
- 5- Step 21D
Place the flex hose on the discharge of the SF Priming Pump into the
STANDARD: The student (simulates) placing the free end of discharge hose into the
Spent Fuel Peel. -UNSC
Continue to Step 21E.
COMMENTS:
a:Step 21E
CLOSE SF-84 (SF POOL UNDERWATER SUPPLY VENT)
-SAT
STANDARD: SF-84 (SF Pool Underwater Supply Vent) is CLOSED by rotating valve
operator until handle is perpendicular to pipe.
UNSF
Continue to Step 21F.
_ I
Note: There is a special tool for operating SF-85 and SF-84 hanging at the South
end of the Spent Fuel Pool.
COMMENTS:
Nb0-039 fnl
Page 7 of 10
STEQ: Step 21F CRITICAL TASK
Fill the SF Priming Pump Seal Tank to at least half-full with DW or water
-SAT
from SFP using bucket.
STANDARD: The candidate fills the SF Priming Pump Seal Tank at least half-full using
DW from the North-West end of the SFP or by using the rope and bucket
to dip out of the SFP. -UNSAT
Note: It will take several buckets of water to fill the SF Priming Pump Seal Tank
half-full.
Continue to Step 22
CUE: Communications have been established with operators at the ASWPump
Room and East Penetration Room.
COMMENTS:
Step 22 CRITICAL TASK
WHEN communication is established with operators in the following
locations:
-SAT
ASW Pump Room
East Pen Room
THEN open SF-86 (SF PRIMING PUMP SEAL WATER INLET)
-UNSAT
STANDARD: Determine communications have been established with the above
locations and then open SF-86 (SF PRIMING PUMP SEAL WATER
INLET).
Continue to Step 23.
Cue: Communications have been established.
COMMENTS:
NbO-039 fnl
Page 8 of I O
- 9- Step 23 CRITICAL TASK
Notify operator in ASW pump Rm to start U1/2 SF PRIMING PUMP
(remote starter on S wall)
-SAT
STANDAKD: Notify operator in ASW pump Rm to start U112 SF PRIMING PUMP
Continue to Step 24.
__ UNSAT
Cue: The UV2 SF P R M N G PUMP is operafing.
COMMENTS:
STEP IO: Step 24
IAAT seal tank level begins to rise,
THEN close SF-86 (SF PRIMING PUMP SEAL WATER INLET)
_ I
STANDARD: Monitor seal tank level and determine it is NOT rising
Continue to Step 25.
-UNSAT
Cue: Seal tank level is NOT rising.
COMMENTS:
STEP 11: Step 25
WHEN SFP fill line is primed (as indicated by a steady discharge stream -SAT
from the SF priming pump),
THEN notify Control Room of the following:
HPI suction aligned to SFP fill line __ UNSAT
HPI pump cooling water status
An operator is available in the E Pen Rm to throttle 1HP-26
STANDARD: Monitor the hose attached to the SF priming pump discharge and
determine the SFP line is primed.
THEN
Notify the Control Room the HPI suction is aligned to SFP fill line.
Cue: The SFpriming pump has steady discharge stream.
Cue: Notifying the Control of the last two bulieted items is not required for this
JPM.
COMMENTS:
L... ..~END
~ . TASK .-. __.__
STOP TIME:
NLO-039 fnl
Page 9 of 10
CRITICAL STEP EXPLANATIONS:
STEP # Explanation
4 Necessary to provide suction to the priming pump.
7 Tank must be %full to provide adequate water for priming
8 Required to provide flow path.
9 Priming pump must operate to fill the line.
NLO-039 fnl
Page 20 of 10
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
A tornado has struck Unit 2 Turbine Building and destroyed the 4160 volt switchgear TC, TB,
and TE.
it also struck the Unit 2 BWST, rupturing and draining it.
The SSF Reactor Coolant Makeup Pump failed to start.
2A HPlP has been powered from the ASW switchgear.
The Spent Fuel Po01 level is currently +I .Qfeet.
INITIATING CUES:
The EOP directs the operator to petform HPI Pump Operation From ASW Pump Switchgear
Enclosure to align HPlPs to the SFP.
Another operator js aiigning the HPI Suction from the SFP.
The Control Room SRO directs you to prime the Spent Fuel Pool fill line on Unit 2 per this
Enclosure, beginning at Step 20.