August 2, 2004 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Bo Pham, Project Manager, Section 2
/RA/
Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF MEETING HELD ON JULY 27, 2004, WITH THE BOILING WATER REACTORS OWNERS GROUP (BWROG) TO DISCUSS PILOT APPLICATIONS FOR OPTION 3 (TAC NO. MC3042)
On July 27, 2004, the BWROG met with the NRC staff to discuss future potential application of Option 3, as outlined in Licensing Topical Report (LTR) NEDO-33148, "Separation of Loss of Offsite Power [LOOP] from Large Break [LB] LOCA," dated April 27, 2004. During the acceptance review of LTR NEDO-33148, the NRC staff noted that a pilot plant-specific application would provide pertinent analysis and data that could assist in the review of the subject LTR.
During the meeting, the BWROG indicated interest from three licensees that may potentially participate in the pilot application. Representatives from the licensees were present at the meeting. The goal of this meeting was to determine the scope of a plant-specific review, and establish a feasible timeframe for submittals. The NRC staff asked the BWROG to describe its general approach to the application, while providing feedback of the staffs expectations. Key issues discussed during the meeting were:
The number of pilot applications submitted for review within the timeframe.
The general bounding approach proposed by the BWROG, as described in the LTR, and the staffs continuing concern that the bounding approach does not provide for adequate plant-specific analyses.
The possibility of piloting Regulatory Guide 1.200, "Determining the Adequacy of PRA Results for Risk-informed Activities," in licensees pilot submittals.
The staffs requirements for computer code review in applications.
S. Dembek The BWROG also agreed that NRC staff questions regarding material referenced in the LTR (e.g., Electric Power Research Institutes work on double sequencing and NRCs Office of Regulatory Researchs work on LBLOCA/LOOP frequencies) will be directed to the BWROG.
By the meeting's conclusion, the BWROG had expressed that it gained a better understanding of the NRC staff's concern and the preliminary scope of the pilot application reviews. The NRC staff also better understood the BWROG's proposed general approach to plant-specific applications in reference to LTR NEDO-33148.
An attendance list is provided in the attachment.
Project No. 691
Attachment:
Meeting Attendees cc w/att: See next page
ML042160264 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME BPham:mp EPeyton SDembek DATE 8/2/04 7/30/04 8/2/04 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042160264.wpd
BWR Owners Group Project No. 691 cc:
Mr. Joseph E. Conen Vice Chairman, BWR Owners Group DTE Energy - Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 Mr. J. A. Gray, Jr.
Regulatory Response Group Chairman BWR Owners Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 Mr. H. Lewis Sumner Southern Nuclear Company 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35242 Mr. Carl D. Terry Vice President, Nuclear Engineering Nine Mile Point - Station OPS Building/2nd Floor P.O. Box 63 Lycoming, NY 13093 Mr. Thomas G. Hurst GE Nuclear Energy M/C 782 175 Curtner Avenue San Jose, CA 95125 Mr. Thomas A. Green GE Nuclear Energy M/C 782 175 Curtner Avenue San Jose, CA 95125 Mr. James Meister Exelon Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 Mr. William A. Eaton ENTERGY Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 Mr. Mark Reddeman Vice President Engineering Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 Mr. Richard Libra DTE Energy Fermi 2 M/C 280 OBA 6400 North Dixie Highway Newport, MI 48166 Mr. James F. Klapproth GE Nuclear Energy M/C 706 175 Curtner Avenue San Jose, CA 95125 Mr. Kenneth Putnam, Chairman BWR Owners Group Nuclear Management Company Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324
MEETING ATTENDEES MEETING WITH BOILING WATER REACTORS OWNERS GROUP (BWROG)