ML042110135

From kanterella
Jump to navigation Jump to search
Units I & 2, Catawba Nuclear Station Units 1 & 2, Oconee Nuclear Stations Units 1, 2 & 3, Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam
ML042110135
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 07/27/2004
From: Barron H
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-04-001
Download: ML042110135 (30)


Text

? Duke HENRY B BARRON

[UPower.

Group VP, Nuclear Generation and A Duke Energy Company Chief Nuclear Officer Duke Power EC07H / 526 South Church Street Charlotte, NC 28202-1802 July 27, 2004 Mailing Address:

PO Box 1006 EC07H Charlotte, NC 28201-1006 U.S. Nuclear Regulatory Commission 704 382 2200 ATTN: Document Control Desk 704 382 6056 fax 11555 Rockville Pike, hbarron@duke-energy. corn Rockville, Maryland 20852

Subject:

Duke Energy Corporation McGuire Nuclear Station Units I & 2 Docket Nos. 50-369, 370 Catawba Nuclear Station Units I & 2 Docket Nos. 50-413, 414 Oconee Nuclear Stations Units 1, 2 & 3 Docket Nos. 50-269, 270, 287 Response to NRC BULLETIN 2004-01: INSPECTION OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE PIPING CONNECTIONS AT PRESSURIZED-WATER REACTORS Pursuant to 10 CFR 50.54(f), this letter and the associated attached Enclosures provide Duke Energy Corporation's (Duke) response to NRC Bulletin 2004-01 for the McGuire, Catawba and Oconee Nuclear Stations. This bulletin requested plant-specific information as a result of NRC staff concerns related to the inspection of ALLOY 82/182/600 materials used in the fabrication of the pressurizer penetrations and steam space piping connections at PWRs.

Responses are provided for the Bulletin in Attachments 1, 2 and 3 for Catawba, McGuire, and Oconee respectively.

The regulatory commitments made by Duke in response to this bulletin are provided in.

If you have questions or need additional information, please contact Gregory S. Kent at (704) 373-6032.

Very truly yours, Henry B. Barron AAly www. dukepower. corn

U.S. NRC July 27, 2004 Page 2 Henry B. Barron affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.

Group Vice President Nuclear Generation and Chief Nuclear Officer Subscribed and sworn to me: OVAe f

r

~?D gaty uate My Commission Expikott 61?e A Id (fte EN

U.S. NRC July 27, 2004 Page 3 xc:

W.D. Travers U.S. Nuclear Regulatory Commission Regional Administrator Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 J.J. Shea Project Manager NRC Senior Project Manager (MNS)

U.S. Nuclear Regulatory Commission Mail Stop 0-7 D1I Washington, DC 20555-0001 S. E. Peterson NRC Senior Project Manager (CNS)

U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9 Washington, DC 20555-0001 L. N. Olshan NRC Project Manager (ONS)

U.S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 J. B. Brady Senior Resident Inspector (MNS)

E. F. Guthrie Senior Resident Inspector (CNS)

M. C. Shannon Senior Resident Inspector (ONS)

U.S. NRC July 27, 2004 Page 4 bxc:

L. F. Vaughn - PB05E R.L. Gill - ECO50 C. J. Thomas - MG01 RC L.A. Keller - CN01 RC B.G. Davenport - ON03RC G. S. Kent-ECO50 K. L. Crane - MG01 RC K E. Nicholson - CN01 RC J. E. Smith - ON03RC J.M. Shuping - EC07C M.R. Robinson - EC07C C.T. Alley - EC07C W.O. Callaway - CN03SE D.W. Peltola - ON03MC H.V. Dinh - MG05SE J.R. Ferguson - CN03CE Catawba RGC Data File Catawba Master File 801.01 McGuire Master File 801.01 Oconee Master File 801.01 ELL Saluda River Electric Corporation P.O. Box 929 Laurens, SC 29360-0929 NC Municipal Power Agency No. 1 P.O. Box 29513 Raleigh, NC 27626-0513 T. R. Puryear NC Electric Membership Corporation CN03G Piedmont Municipal Power Agency 121 Village Drive Greer, SC 29651 Duke Energy letter dated July 27, 2004 Page 1 of 8 CATAWBA RESPONSE TO BL 2004-01 (1) All subject PWR licensees are requested to provide the following Information within 60 days of the date of this bulletin.

(a) A description of the pressurizer penetrations and steam space piping connections at your plant. At a minimum, this description should Include materials of construction (e.g., stainless steel piping and/or weld metal, Alloy 600 piplnglsleeves, Alloy 82/182 weld metal or buttering, etc.), joint design (e.g., partial penetration welds, full penetration welds, bolted connections, etc.), and, In the case of welded joints, whether or not the weld was stress-relieved prior to being put Into service. Additional Information relevant with respect to determining the susceptibility of your plant's pressurizer penetrations and steam space piping connections to PWSCC should also be Included.

Catawba Nuclear Station has compiled a list and descriptions of pressurizer connections, including those that utilize Alloy 600 wrought or Alloy 82/182 welded materials. The lists for Catawba Units 1 and 2 are provided as Tables 1 and 2 of this response, respectively. The information contained in the tables was compiled from plant and manufacturers' drawings, plant stress reports, and installation weld process control data.

Table 1: Catawba Unit 1 Pressurizer Penetrations and Steam Space Piping Connections

Description 3

The carbon steel nozzles (SA508 Class 2 or 2A) are buttered with Alloy 82 / 182 material and the safe ends, fabricated from SA 182 Gr. F-316L stainless steel, are attached by full penetration Alloy 82 / 182 V-groove welds.

The safe ends attach to the stainless plant piping by stainless steel weld metal.

8 These connections consist of SA213 Gr. TP316 piping Inserted through the vessel wall. Partial penetration with fillet cap welds attach the piping to the inside, built up, stainless steel cladded surface of the pressurizer. The piping Is roll expanded through the vessel. Outside the vessel, SA 182 Gr. F-316 couplings are welded to the stainless steel piping. The couplings then attach to the stainless plant piping. All weld filler material is presumed stainless steel.

I The carbon steel nozzle (SA508 Class 2 or 2A) Is buttered with Alloy 82 / 182 material and the safe end, fabricated from SA 182 Gr. F-316L stainless steel, is attached by a full penetration Alloy 82/ 182 V-groove weld. The safe end attaches to the stainless plant piping by stainless steel weld metal.

Duke Energy letter dated July 27, 2004 Page 2 of 8 Heater Penetrations Ind. heater well tubing, immersion heater end plugs, heater sheath tubing, heater well adaptor 6" Relief Nozzle ind. Pzr nozzle to safe end weld, safe end and safe end to pipe weld 314" Sample Nozzle incl. partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld Manway Diaphragm ind. manway forging, manway studs, nuts, diaphragm plate, seal weld and manway cover 14" Surge Line Nozzle ind. Pzr nozzle to safe end weld, safe end and safe end to pipe weld 78 The heater well tubing (SA 213 TP 316) is roll expanded and welded to the stainless steel cladding on the inner surface of the pressurizer. There are four pressure boundary welds a) end plug (SA479 TP316) to heater sheath tubing (SA 213 TP 316), b) heater well tubing to stainless steel cladded surface of the pressurizer, c) heater well tubing to heater well adaptor (SA 182 GR. F-316) and d) heater well adaptor to heater sheath tubing. All base materials are stainless steel and all welds consist of stainless steel filler material.

I The carbon steel nozzle (SA508 Class 2 or 2A) is buttered with Alloy 82 / 182 material and the safe end, fabricated from SA 182 Gr. F-316L stainless steel, Is attached by a full penetration Alloy 82 /182 V-groove weld. The safe end attaches to the stainless plant piping by stainless steel weld metal.

1 This connection consists of SA213 Gr. TP316 piping Inserted through the vessel wall. A partial penetration with fillet cap weld attaches the piping to the inside, built up, stainless steel cladded surface of the pressurizer. The piping Is roll expanded through the vessel. Outside the vessel, a SA 182 Gr. F-316 coupling is welded to the stainless steel piping.

The coupling then attaches to the stainless plant piping. All weld filler material is presumed stainless steel.

I The manway is a bolted closure consisting of a manway forging (SA508 Class 2 or 2A) welded into the carbon steel Pzr shell, SA193 Gr B7 studs, SA194, Gr 7 nuts, SB-168 diaphragm plate, and a manway cover (SA533 Gr A, Class 1). Alloy 52 / 152 Is used to seal weld the diaphragm to the manway cladding.

I Per the bulletin instructions, the surge nozzle is not addressed by this bulletin. Therefore, the fabrication details are not included In this bulletin response. This penetration Is Included for completeness of the list.

Table 2: Catawba Unit 2 Pressurizer Penetrations and Steam Space Piping Connections

The carbon steel nozzles (SA508 Class 2 or 2A) are buttered with Alloy 82 / 182 material and the safe ends, fabricated from SA 182 Gr. F-316L stainless steel, are attached by full penetration Alloy 82 / 182 V-groove welds.

The safe ends attach to the stainless plant piping by stainless steel weld metal.

Duke Energy letter dated July 27, 2004 Page 3 of 8 Instrument Nozzles ind. partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld 4" Spray Nozzle Icn. Pzr nozzle to safe end weld, safe end and safe end to pipe weld Heater Penetrations Incl. heater welf tubing, immersion heater end plugs, heater sheath tubing, heater well adaptor 6" Relief Nozzle icn.

Pzr nozzle to safe end weld, safe end and safe end to pipe weld 314" Sample Nozzle Incl. partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld Manway Diaphragm incL. manway forging, manway studs, nuts, diaphragm plate, seal weld and manway cover 8

These connections consist of SA213 Gr. TP316 piping Inserted through the vessel wall. Partial penetration with fillet cap welds attach the piping to the inside, built up, stainless steel cladded surface of the pressurizer. The piping is roll expanded through the vessel. Outside the vessel, SA 182 Gr. F-316 couplings are welded to the stainless steel piping. The couplings then attach to the stainless plant piping. All weld filler material is presumed stainless steel.

I The carbon steel nozzle (SA508 Class 2 or 2A) is buttered with Alloy 82 /182 material and the safe end, fabricated from SA 182 Gr. F-316L stainless steel, Is attached by a full penetration Alloy 82 / 182 V-groove weld. The safe end attaches to the stainless plant piping by stainless steel weld metal.

78 The heater well tubing (SA 213 TP 316) is roll expanded and welded to the stainless steel cladding on the Inner surface of the pressurizer. There are four pressure boundary welds a) end plug (SA479 TP316) to heater sheath tubing (SA 213 TP 316), b) heater well tubing to stainless steel cladded surface of the pressurizer, c) heater well tubing to heater well adaptor (SA 182 GR. F-316) and d) heater well adaptor to heater sheath tubing. All base materials are stainless steel and all welds consist of stainless steel filler material.

I The carbon steel nozzle (SA508 Class 2 or 2A) is buttered with Alloy 82 / 182 material and the safe end, fabricated from SA 182 Gr. F-316L stainless steel, Is attached by a full penetration Alloy 82 / 182 V-groove weld. The safe end attaches to the stainless plant piping by stainless steel weld metal.

I This connection consists of SA213 Gr. TP316 piping inserted through the vessel wall. A partial penetration with fillet cap weld attaches the piping to the inside, built up, stainless steel cladded surface of the pressurizer. The piping is roll expanded through the vessel. Outside the vessel, a SA 182 Gr. F-316 coupling Is welded to the stainless steel piping.

The coupling then attaches to the stainless plant piping. All weld filler material Is presumed stainless steel.

I The manway Is a bolted dosure consisting of a manway forging (SA508 Class 2 or 2A) welded Into the carbon steel Pzr shell, SAI 93 Gr B7 studs, SAI 94, Gr 7 nuts, SB-1 68 diaphragm plate, and a manway cover (SA533 Gr A, Class 1). Alloy 82 /182 Is used to seal weld the diaphragm to the manway cladding.

Duke Energy letter dated July 27, 2004 Page 4 of 8 14" Surge Line Nozzle incl Pzr nozzle to safe end weld, safe end and safe end to pipe weld 1

Per the bulletin Instructions, the surge nozzle is not addressed by this bulletin. Therefore, the fabrication details are not included in this bulletin response. This penetration is included for completeness of the list.

  • Presumptions have been made as to the most probable filler material of small diameter factory welds and as to the likelihood of post weld heat treatment (PWHI) of connections. If a factory weld of a small diameter instrumentation connection or sample tap was made for the purpose of attaching stainless piping to a stainless fitting, the filler metal is presumed to be stainless steel. This condition would be consistent with accepted welding practice. Presumptions were also made about the typical PWHT practice for welded connections to carbon steel. For welded piping connections utilizing a stainless steel safe end without butter, PWHT of the nozzle, weld and safe end is presumed. For welded piping connections consisting of both a butter layer and a subsequent weld attaching the safe end to the carbon steel nozzle, PWHT of only the butter layer and nozzle is presumed. Applying the premise of typical PWHT practices when butter layers are applied, the safe end and weld are not considered post weld heat treated.

Research of manufacturing records is necessary to provide details of PWHT history.

Page 5 of 8 Duke Energy letter dated July 27, 2004 (b) A description of the Inspection program for Alloy 8211821600 pressurizer penetrations and steam space piping connections that has been Implemented at your plant. The description should Include when the Inspections were performed; the areas, penetrations and steam space piping connections Inspected; the extent (percentage) of coverage achieved for each location which was Inspected; the Inspection methods used; tie process used to resolve any Inspection findings; the quality of the documentation of the Inspections (e.g., written report, video record, photographs); and, the basis for concluding that your plant satisfies applicable regulatory requirements related to the Integrity of pressurizer penetrations and steam space piping connections. If leaking pressurizer penetrations or steam space piping connections were found, Indicate what followup NDE was performed to characterize flaws In the leaking penetrations.

Catawba Nuclear Station conducts Inservice Inspections according to Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. The inspections include volumetric and surface examinations that are performed in accordance with Duke Energy Corporation's (Duke's)Section XI program to ensure compliance with applicable codes, standards, and procedures.

In response to industry experience with Alloy 600 degradation, Catawba Nuclear Station has implemented an increasing number of visual inspections of the pressurizer penetrations. These bare metal visual inspections (BMV's) were conducted in addition to the normal ISI required by Section XI of the ASME Code. The BMV's were conducted by a VT-2 qualified Quality Assurance inspector and the results recorded according to the Duke's work control processes. When an unacceptable condition was identified, it was resolved according to the Catawba Nuclear Station corrective action program.

Tables 3 and 4 provide the locations and outages of the inspections that have been completed on Units 1 and 2, respectively. The BMV's listed for Unit 1 were completed at its last RFO. These BMVs were conducted due to an awareness of the relationship between temperature and PWSCC susceptibility which caused Catawba to begin incorporating BMVs of selected pressurizer locations into outage plans. These inspections were completed prior to the publication of industry guidance contained in EPRI MRP 2003-039, issued January 20, 2004, and EPRI MRP 2004-05, issued April 2, 2004. The BMV's for Unit 2 will be conducted per the commitments to 1(c) of this bulletin response during the next RFO scheduled for fall of 2004.

While performing the ISI VT-2 inspection during the Catawba Unit 1 Spring 2002 RFO, boron deposits were discovered on the pressurizer manway flange surface. Engineering evaluation, including penetrant testing revealed cracking attributed to PWSCC in the seating surface of the diaphragm in the vicinity of the seal weld area. Corrective actions, including additional inspections, investigative activities, and plans for replacement of both units' diaphragms with more corrosion resistant material, were administered through Catawba's corrective action program to ensure that all ASME Code and other applicable requirements were satisfied.

Duke Energy letter dated July 27, 2004 Page 6 of 8 Table 3: Inspection History of Alloy 600 Pressurizer Locations for Catawba Unit I Nozzle Description 4" Spray Nozzle 6" Relief Nozzle 6" Safety Nozzle (INC001) 6" Safety Nozzle (1 NC002) 6" Safety Nozzle (1NC003)

Manway Diaphragm Bare Metal Visual Inspection (Note 4)

Fall 2003 (Note 2)

Fall 2003 (Note 1)

Fall 2003 (Note 1)

Fall 2003 (Note 1)

(Note 3)

Surface Inspection (ISO)

Fall 1997 Fall 1997 Spring 2002 Spring 2002 Spring 2002 Not Applicable Volumetric Inspection (ISO)

Fall 1997 Fall 1997 Spring 2002 Spring 2002 Spring 2002 Not Applicable Note 1: The adjacent safe-end to pipe stainless welds were subjected to ASME code surface and volumetric examination during the Fall 2003 refueling outage. Performance of the Code exam would have provided ample opportunity for visualization of evidence of leakage on the adjacent area.

Note 2: These locations were inspected visually by VT-2 qualified personnel as part of the Alloy 600 program.

Note 3: The pressurizer manway receives a VT-2 Inspection every RFO using ASME Code case N-533 (Reactor Coolant system is unpressurized and at ambient temperature.)

Note 4: This nozzle was omitted from the previous BMV inspections due to is estimated operating temperature being less that 590 F and the previous susceptibility criteria suggesting a reduced probability of PWSCC.

Table 4: Inspection History of Alloy 600 Pressurizer Locations for Catawba Unit 2 Nozzle Description 4" Spray Nozzle 6" Relief Nozzle 6" Safety Nozzle (2NCO01) 6" Safety Nozzle (2NC002) 6" Safety Nozzle (2NC003)

Manway Diaphragm Bare Metal Visual Inspection (Note 2)

(Note 2)

(Note 2)

(Note 2)

(Note 2)

(Note 1)

Surface Inspection Volumetric (ISI)

Inspection (ISI)

Fall 1998 Fall 1998 Fall 1998 Fall 1998 Spring 1994 Spring 1994 Spring 1994 Spring 1994 Spring 1994 Spring 1994 Not Applicable Not Applicable Note 1: The pressurizer manway receives a VT-2 inspection every RFO using ASME Code case N-533 (Reactor Coolant system is unpressurized and at ambient temperature.)

Note 2: The BMV's will be conducted during the next RFO In the fall of 2004.

Page 7 of 8 Duke Energy letter dated July 27, 2004 (c) A description of the Alloy 8211821600 pressurizer penetration and steam space piping connection Inspection program that will be Implemented at your plant during the next and subsequent refueling outages. The description should Include the areas, penetrations and steam space piping connections to be Inspected; the extent (percentage) of coverage to be achieved for each location; Inspection methods to be used; qualification standards for the Inspection methods and personnel; the process used to resolve any Inspection Indications; the Inspection documentation to be generated; and the basis for concluding that your plant will satisfy applicable regulatory requirements related to the structural and leakage Integrity of pressurizer penetrations and steam space piping connections. If leaking pressurizer penetrations or steam space piping connections are found, Indicate what followup NDE will be performed to characterize flaws In the leaking penetrations. Provide your plans for expansion of the scope of NDE to be performed If circumferential flaws are found In any portion of the leaking pressurizer penetrations or steam space piping connections.

Duke will implement the following inspection program for the Catawba Alloy 82/182/600 pressurizer penetrations and steam space piping connections addressed in NRC Bulletin 2004-01 at the next and each subsequent refueling outage.

  • Bare metal visual inspection around 100% of each Alloy 600 penetration and each Alloy 82/182 weld, except those penetrations subject to volumetric or surface ISI during that RFO;
  • Bare metal visual inspection of the gap between the manway cover and pressurizer manway for evidence of manway diaphragm plate seal weld leakage;
  • Inservice Inspections in accordance with Section XI of the applicable ASME Code.

This program will remain in effect until revised by Duke as a result of fiurther guidance provided by the industry or the component is modified to mitigate PWSCC susceptibility or replaced.

The bare metal visual inspections will be conducted by personnel qualified to perform VT-2 inspections according to ASME code. Inspection results will be documented according to applicable procedures. Evidence of leakage will be addressed in accordance with the Boric Acid Corrosion program, including evaluation by engineering to determine extent of condition, applicability to other locations, and establishing the basis for concluding that the plant satisfies applicable regulatory requirements.

The Inservice Inspections (ISI) will be performed in accordance with Section XI of the applicable ASME Code, and will be performed using qualified personnel and procedures.

Any indications found during ISI will be addressed in accordance with Code requirements and the ISI program.

Engineering will evaluate evidence of leakage to determine cause and extent of condition.

Catawba's corrective action program will be utilized to evaluate the need for additional Page 8 of 8 Duke Energy letter dated July 27, 2004 NDE methods and increased inspection scopes, including like locations and other Duke units. These actions will ensure detection of unsafe conditions and the appropriate response to the discovery of circumferential cracking.

(d) In light of the Information discussed In this bulletin and your understanding of the relevance of recent Industry operating experience to your facility, explain why the Inspection program Identified In your response to Item (1)(c) above Is adequate for the purpose of maintaining the Integrity of your facility's RCPB and for meeting all applicable regulatory requirements which pertain to your facility.

Duke performs Inservice Inspection, including system leakage testing, of its nuclear power plants in accordance with Section XI of the applicable ASME Code. Duke'sSection XI program utilizes qualified personnel and procedures, and includes activities to identify evidence of through wall leakage and initiate corrective action for unacceptable conditions, which may include supplemental examination, analytical evaluation, repair, and replacement.

As a result of industry experience with the degradation of Alloy 600 and welding Alloys 82 / 182, and the associated occurrences of degradation of the reactor coolant boundaries due to borated water leakage, Duke has created an Alloy 600 program and Boric Acid Corrosion program. These programs, in association with Catawba's corrective action program, prescribe activities for the detection, investigation, and mitigation of reactor coolant pressure boundary leakage due to PWSCC of Alloy 600.

Industry experience indicates that leakage attributed to degradation of Alloy 600 due to PWSCC has been detected prior to the occurrence of gross leakage from the reactor coolant pressure boundary. Implementation of the rigorous visual inspection program described in Duke's response to lc, including continued ISI required by ASME Section XI should be adequate to detect leakage through the reactor coolant pressure boundary prior to the occurrence of extensive degradation. Aggressive investigative and evaluation practices as dictated by the previously mentioned programs should ensure appropriate response to the discovery of circumferential cracking, including expansion of NDE scope to include "like locations," and should provide adequate protection against the occurrence of rupture of and/or gross reactor coolant pressure boundary leakage, thus satisfying applicable regulatory requirements.

Duke Energy letter dated July 27, 2004 Page 1 of 8 MCGUIRE RESPONSE TO BL 2004-01 (1) All subject PWR licensees are requested to provide the following Information within 60 days of the date of this bulletin.

(a) A description of the pressurizer penetrations and steam space piping connections at your plant. At a minimum, this description should Include materials of construction (e.g., stainless steel piping andfor weld metal, Alloy 600 piping/sleeves, Alloy 821182 weld metal or buttering, etc.), joint design (e.g., partial penetration welds, full penetration welds, bolted connections, etc.), and, In the case of welded Joints, whether or not the weld was stress-relieved prior to being put Into service. Additional Information relevant with respect to determining the susceptibility of your plant's pressurizer penetrations and steam space piping connections to PWSCC should also be Included.

McGuire Nuclear Station has compiled a list and descriptions of pressurizer connections, including those that utilize Alloy 600 wrought or Alloy 82/182 welded materials. The lists for McGuire Units 1 and 2 are provided as Tables 1 and 2 of this response, respectively. The information contained in the tables was compiled from plant and manufacturers' drawings, plant stress reports, and installation weld process control data.

Table 1: McGuire Unit 1 Pressurizer Penetrations and Steam Space Piping Connections*

Location / Item 6" Safety Nozzles incl, Pzr nozzle to safe end weld, safe end and safe end to pipe weld Instrument Nozzles ind.

partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld 314" Code Safety Drain incl. partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld Qty Description 3

The carbon steel nozzles (SA508 Class 2 or 2A) are buttered with Alloy 82 /182 material and the safe ends, fabricated from SA 182 Gr. F-316L stainless steel, are attached by full penetration Alloy 82 / 182 V-groove welds. The safe ends attach to the stainless plant piping by stainless steel weld metal.

7 These connections consist of SA213 Gr. TP316 piping Inserted through the vessel wall. Partial penetration with fillet cap welds attach the piping to the inside, built up, stainless steel cladded surface of the pressurizer. The piping is roll expanded through the vessel. Outside the vessel, SA 182 Gr. F-316 couplings are welded to the stainless steel piping. The couplings then attach to the stainless plant piping. All weld filler material Is presumed stainless steel.

I This connection consists of SA213 Gr. TP316 piping inserted through the vessel wall. A partial penetration with fillet cap weld attaches the piping to the Inside, built up, stainless steel cladded surface of the pressurizer. The piping is roll expanded through the vessel. Outside the vessel, a SA 182 Gr. F-316 coupling is welded to the stainless steel piping.

Duke Energy letter dated July 27, 2004 Page 2 of 8 The coupling then attaches to the stainless plant piping. Ail weld filler material Is presumed stainless steel.

4" Spray Nozzle inci. Pzr nozzle to safe end weld, safe end and safe end to pipe weld Heater Penetrations Inci. heater well tubing, immersion heater end plugs, heater sheath tubing, heater well adaptor 6" Relief Nozzle Ind. Pzr nozzle to safe end weld, safe end and safe end to pipe weld 314" Sample Nozzle incl. partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld Manway Diaphragm incl. manway forging, manway studs, nuts, diaphragm plate, seal weld and manway cover 14" Surge Line Nozzle ncl. Pzr nozzle to safe end weld, safe end and safe end to pipe weld 1

The carbon steel nozzle (SA508 Class 2 or 2A) is buttered with Alloy 82/ 182 material and the safe end, fabricated from SA 182 Gr. F-316L stainless steel, Is attached by a full penetration Alloy 82/ 182 V-groove weld. The safe end attaches to the stainless plant piping by stainless steel weld metal.

78 The heater well tubing (SA 213 TP 316) is roll expanded and welded to the stainless steel cladding on the Inner surface of the pressurizer. There are four pressure boundary welds a) end plug (SA479 TP316) to heater sheath tubing (SA 213 TP 316), b) heater well tubing to stainless steel cladded surface of the pressurizer, c) heater well tubing to heater well adaptor (SA 182 GR. F-316) and d) heater well adaptor to heater sheath tubing. All base materials are stainless steel and all welds consist of stainless steel filler material.

I The carbon steel nozzle (SA508 Class 2 or 2A) Is buttered with Alloy 82 / 182 material and the safe end, fabricated from SA 182 Gr. F-316L stainless steel, is attached by a full penetration Alloy 82 /182 V-groove weld. The safe end attaches to the stainless plant piping by stainless steel weld metal.

I This connection consists of SA213 Gr. TP316 piping inserted through the vessel wall. A partial penetration with fillet cap weld attaches the piping to the Inside, built up, stainless steel cladded surface of the pressurizer. The piping is roll expanded through the vessel. Outside the vessel, a SA 182 Gr. F-316 coupling Is welded to the stainless steel piping.

The coupling then attaches to the stainless plant piping. All weld filler material is presumed stainless steel.

1 The manway is a bolted closure consisting of a manway forging (SA508 Class 2 or 2A) welded into the carbon steel Pzr shell, SA193 Gr B7 studs, SA194, Gr 7 nuts, SB-168 diaphragm plate, and a manway cover (SA533 Gr A, Class 1). Alloy 82 / 182 is used to seal weld the diaphragm to the manway cladding.

I Per the bulletin Instructions, the surge nozzle Is not addressed by this bulletin. Therefore, the fabrication details are not Included in this bulletin response. This penetration is included for completeness of the list.

Duke Energy letter dated July 27, 2004 Page 3 of 8 Table 2: McGuire Unit 2 Pressurizer Penetrations and Steam Space Piping Connections*

Location I Item 6" Safety Nozzles incL Pzr nozzle to safe end weld, safe end and safe end to pipe weld Instrument Nozzles Ind. partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld 314" Code Safety Drain incl partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld 4" Spray Nozzle incl Pzr nozzle to safe end weld, safe end and safe end to pipe weld Heater Penetrations Incl. heater well tubing, Immersion heater end plugs, heater sheath tubing, heater well adaptor 6" Relief Nozzle inc. Pzr nozzle to safe end weld, safe end and safe end to pipe weld Qty-Description 3

The carbon steel nozzles (SA508 Class 2 or 2A) are buttered with Ahloy 82/ 182 material and the safe ends, fabricated from SA 182 Gr. F-316L stainless steel, are attached by full penetration Alloy 82 1 182 V-groove welds. The safe ends attach to the stainless plant piping by stainless steel weld metal.

7 These connections consist of SA213 Gr. TP316 piping inserted through the vessel wall. Partial penetration with fillet cap welds attach the piping to the Inside, built up, stainless steel cladded surface of the pressurizer. The piping is roll expanded through the vessel. Outside the vessel, SA 182 Gr. F-316 couplings are welded to the stainless steel piping. The couplings then attach to the stainless plant piping. All weld filler material Is presumed stainless steel.

1 This connection consists of SA213 Gr. TP316 piping Inserted through the vessel wall. A partial penetration with fillet cap weld attaches the piping to the Inside, built up, stainless steel cladded surface of the pressurizer. The piping Is roll expanded through the vessel. Outside the vessel, a SA 182 Gr. F-316 coupling Is welded to the stainless steel piping.

The coupling then attaches to the stainless plant piping. All weld filler material is presumed stainless steel.

I The carbon steel nozzle (SA508 Class 2 or 2A) is buttered with Alloy 82 / 182 material and the safe end, fabricated from SA 182 Gr. F-316L stainless steel, Is attached by a full penetration Alloy 82 / 182 V-groove weld. The safe end attaches to the stainless plant piping by stainless steel weld metal.

78 The heater well tubing (SA 213 TP 316) is roll expanded and welded to the stainless steel cladding on the Inner surface of the pressurizer. There are four pressure boundary welds a) end plug (SA479 TP316) to heater sheath tubing (SA 213 TP 316), b) heater well tubing to stainless steel cladded surface of the pressurizer, c) heater well tubing to heater well adaptor (SA 182 GR. F-316) and d) heater well adaptor to heater sheath tubing. All base materials are stainless steel and all welds consist of stainless steel filler material.

I The carbon steel nozzle (SA508 Class 2 or 2A) Is buttered with Alloy 82 / 182 material and the safe end, fabricated from SA 182 Gr. F-316L stainless steel, Is attached by a full penetration Alloy 82 / 182 V-groove weld. The safe end attaches to the stainless plant piping by stainless steel weld metal.

Duke Energy letter dated July 27, 2004 Page 4 of 8 314" Sample Nozzle incl. partial penetration plus fillet weld, piping. piping to coupling weld, coupling, coupling to plant piping weld Manway Diaphragm icn.

manway forging, manway studs, nuts, diaphragm plate, seat weld and manway cover 14" Surge Line Nozzle incl Pzr nozzle to safe end weld, safe end and safe end to pipe weld This connection consists of SA213 Gr. TP316 piping inserted through the vessel wall. A partial penetration with fillet cap weld attaches the piping to the inside, built up, stainless steel cladded surface of the pressurizer. The piping Is roll expanded through the vessel. Outside the vessel, a SA 182 Gr. F-316 coupling is welded to the stainless steel piping.

The coupling then attaches to the stainless plant piping. Ail weld filler material is presumed stainless steel.

The manway Is a bolted closure consisting of a manway forging (SA508 Class 2 or 2A) welded Into the carbon steel Pzr shell, SA193 Gr B7 studs, SA194, Gr 7 nuts, SB-168 diaphragm plate, and a manway cover (SA533 Gr A, Class 1). Alloy 82/ 182 is used to seal weld the diaphragm to the manway cladding.

Per the bulletin Instructions, the surge nozzle is not addressed by this bulletin. Therefore, the fabrication details are not included in this bulletin response. This penetration Is included for completeness of the list.

  • Presumptions have been made as to the most probable filler material of small diameter factory welds and as to the likelihood of post weld heat treatment (PWHT) of connections. If a factory weld of a small diameter instrumentation connection or sample tap was made for the purpose of attaching stainless piping to a stainless fitting, the filler metal is presumed to be stainless steel. This condition would be consistent with accepted welding practice. Presumptions were also made about the typical PWHT practice for welded connections to carbon steel. For welded piping connections utilizing a stainless steel safe end without butter, PWHT of the nozzle, weld and safe end is presumed. For welded piping connections consisting of both a butter layer and a subsequent weld attaching the safe end to the carbon steel nozzle, PWHT of only the butter layer and nozzle is presumed. Applying the premise of typical PWHT practices when butter layers are applied, the safe end and weld are not considered post weld heat treated.

Research of manufacturing records is necessary to provide details of PWHT history.

Page 5 of 8 Duke Energy letter dated July 27, 2004 (b) A description of the Inspection program for Alloy 8211821600 pressurizer penetrations and steam space piping connections that has been Implemented at your plant. The description should Include when the Inspections were performed; the areas, penetrations and steam space piping connections Inspected; the extent (percentage) of coverage achieved for each location which was Inspected; the Inspection methods used; the process used to resolve any Inspection findings; the quality of the documentation of the Inspections (e.g., written report, video record, photographs); and, the basis for concluding that your plant satisfies applicable regulatory requirements related to the Integrity of pressurizer penetrations and steam space piping connections. If leaking pressurizer penetrations or steam space piping connections were found, Indicate what followup NDE was performed to characterize flaws In the leaking penetrations.

McGuire Nuclear Station conducts Inservice Inspections according to Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Code case N-577 addressing Risk Informed Inspection for Piping Inservice Inspection, and the associated Westinghouse Owners' Group topical report on risk informed inspection. The inspections include volumetric, surface, and visual examinations that are performed in accordance with Duke Energy Corporation's (Duke's)Section XI program and associated procedures to ensure compliance with applicable codes and standards.

In response to the industry experience with Alloy 600 degradation, McGuire Nuclear Station has conducted bare metal visual inspections of some pressurizer penetrations.

These bare metal visual inspections (BMV's) were conducted in addition to the normal ISI required by Section XI of the ASME Code. The BMV's were conducted by a VT-2 qualified Quality Assurance inspector and the results recorded according to Duke's work control processes. No leaking penetrations or other unacceptable conditions were detected. If unacceptable conditions had been detected, they would have been resolved according to procedural guidance and the McGuire corrective action program.

Tables 3 and 4 provide the locations and outages of the inspections that have been completed on Units 1 and 2, respectively. The BMV's listed were completed during the last RFO for each unit. These BMVs were conducted due to an awareness of the relationship between temperature and PWSCC susceptibility which caused McGuire to begin incorporating BMVs of selected pressurizer locations into outage plans. These inspections were completed prior to or shortly after the publication of industry guidance contained in EPRI MRP 2003-039, issued January 20, 2004, and EPRI MRP 2004-05, issued April 2, 2004.

Duke Energy letter dated July27, 2004 Page 6 of 8 Table 3: Inspection History of Alloy 600 Pressurizer Locations for McGuire Unit I Nozzle Description 4" Spray Nozzle 6" Relief Nozzle 6" Safety Nozzle 6" Safety Nozzle 6" Safety Nozzle Manway Diaphragm Bare Metal Visual InspectIon (Note 3)

Spring 2004 (Note 1)

Spring 2004 (Note 1)

Spring 2004 (Note 1)

Spring 2004 (Note 1)

(Note 2)

Surface Inspection (ISO)

Fall 1995 Fall 1995 Fall 1995 Fall 1999 Fall 1999 Not Applicable Volumetric Inspection (ISO)

Fall 1995 Fall 1995 Fall 1995 Fall 1999 Fall 1999 Not Applicable Note 1: These locations were Inspected visually by VT-2 qualified personnel as part of the Alloy 600 program.

Note 2: The pressurizer manway receives a VT-2 Inspection every RFO using ASME Code case N-533 (Reactor Coolant system is unpressurized and at ambient temperature.)

Note 3: This location will receive a BMV inspection during the next scheduled RFO.

Table 4: Inspection History of Alloy 600 Pressurizer Locations for McGuire Unit 2 Nozzle Description 4" Spray Nozzle 6" Relief Nozzle 6" Safety Nozzle 6" Safety Nozzle 6" Safety Nozzle Manway Diaphragm Bare Metal Visual Inspection (Note 3)

Fall 2003 (Note 1)

Fall 2003 (Note 1)

(Note 3)

(Note 3)

(Note 2)

Surface Inspection (ISO Spring 1996 Spring 1999 Spring 1999 Fall 2003 Fall 2003 Not Applicable Volumetric Inspection (ISI)

Spring 1996 Spring 1999 Spring 1999 Fall 2003 Fall 2003 Not Applicable Note 1: These locations were inspected visually by VT-2 qualified personnel as part of the Alloy 600 program.

Note 2: The pressurizer manway receives a VT-2 inspection every RFO using ASME Code case N-533 (Reactor Coolant system Is unpressurized and at ambient temperature.)

Note 3: These locations will receive a BMV Inspection during the next scheduled RFO.

Page 7 of 8 Duke Energy letter dated July 27, 2004 (c) A description of the Alloy 82/182/600 pressurizer penetration and steam space piping connection Inspection program that will be Implemented at your plant during the next and subsequent refueling outages. The description should Include the areas, penetrations and steam space piping connections to be Inspected; the extent (percentage) of coverage to be achieved for each location; Inspection methods to be used; qualification standards for the Inspection methods and personnel; the process used to resolve any Inspection Indications; the Inspection documentation to be generated; and the basis for concluding that your plant will satisfy applicable regulatory requirements related to the structural and leakage Integrity of pressurizer penetrations and steam space piping connections. If leaking pressurizer penetrations or steam space piping connections are found, Indicate what followup NDE will be performed to characterize flaws In the leaking penetrations. Provide your plans for expansion of the scope of NDE to be performed If circumferential flaws are found In any portion of the leaking pressurizer penetrations or steam space piping connections.

Duke will implement the following inspection program for the McGuire Alloy 82/182/600 pressurizer penetrations and steam space piping connections addressed in NRC Bulletin 2004-01 at the next and each subsequent refueling outage.

  • Bare metal visual inspection around 100% of each Alloy 600 penetration and each Alloy 82/182 weld, except those penetrations subject to volumetric or surface ISI during that RFO;
  • Bare metal visual inspection of the gap between the manway cover and pressurizer manway for evidence of manway diaphragm plate seal weld leakage;
  • Inservice Inspections in accordance with Section XI of the applicable ASME Code.

This program will remain in effect until revised by Duke as a result of further guidance provided by the industry or the component is modified to mitigate PWSCC susceptibility or replaced.

The bare metal visual inspections will be conducted by personnel qualified to perform VT-2 inspections according to ASME code. Inspection results will be documented according to applicable procedures. Evidence of leakage will be addressed in accordance with the Boric Acid Corrosion program, including evaluation by engineering to determine extent of condition, applicability to other locations, and establishing the basis for concluding that the plant satisfies applicable regulatory requirements.

The Inservice Inspections (ISI) will be performed in accordance with Section XI of the applicable ASME Code, and will be performed using qualified personnel and procedures.

Any indications found during ISI will be addressed in accordance with Code requirements and the ISI program.

Page 8 of 8 Duke Energy letter dated July 27, 2004 Engineering will evaluate evidence of leakage to determine cause and extent of condition.

McGuire's corrective action program will be utilized to evaluate the need for additional NDE methods and increased inspection scopes, including like locations and other Duke units. These actions will ensure detection of unsafe conditions and the appropriate response to the discovery of circumferential cracking.

(d) In light of the Information discussed In this bulletin and your understanding of the relevance of recent Industry operating experience to your facility, explain why the Inspection program Identified In your response to Item (1)(c) above Is adequate for the purpose of maintaining the Integrity of your facility's RCPB and for meeting all applicable regulatory requirements which pertain to your facility.

Duke performs Inservice Inspection, including system leakage testing, of its nuclear power plants in accordance with Section XI of the applicable ASME Code. Duke'sSection XI program utilizes qualified personnel and procedures, and includes activities to identify evidence of through wall leakage and initiate corrective action for unacceptable conditions, which may include supplemental examination, analytical evaluation, repair, and replacement.

As a result of industry experience with the degradation of Alloy 600 and welding Alloys 82 / 182, and the associated occurrences of degradation of the reactor coolant boundaries due to borated water leakage, Duke has created an Alloy 600 program and Boric Acid Corrosion program. These programs, in association with McGuire's corrective action program, prescribe activities for the detection, investigation, and mitigation of reactor coolant pressure boundary leakage due to PWSCC of Alloy 600.

Industry experience indicates that leakage attributed to degradation of Alloy 600 due to PWSCC has been detected prior to the occurrence of gross leakage from the reactor coolant pressure boundary. Implementation of the rigorous visual inspection program described in Duke's response to lc, including continued ISI required by ASME Section XI should be adequate to detect leakage through the reactor coolant pressure boundary prior to the occurrence of extensive degradation. Aggressive investigative and evaluation practices as dictated by the previously mentioned programs should ensure appropriate response to the discovery of circumferential cracking, including expansion of NDE scope to include "like locations," and should provide adequate protection against the occurrence of rupture of and/or gross reactor coolant pressure boundary leakage, thus satisfying applicable regulatory requirements.

Duke Energy letter dated July 27, 2004 Page 1 of 9 OCONEE RESPONSE TO BL 2004-01 (1) All subject PWR licensees are requested to provide the following Information within 60 days of the date of this bulletin.

(a) A description of the pressurizer penetrations and steam space piping connections at your plant. At a minimum, this description should Include materials of construction (e.g., stainless steel piping and/or weld metal, Alloy 600 piping/sleeves, Alloy 821182 weld metal or buttering, etc.), joint design (e.g., partial penetration welds, full penetration welds, bolted connections, etc.), and, In the case of welded joints, whether or not the weld was stress-relieved prior to being put Into service. Additional Information relevant with respect to determining the susceptibility of your plant's pressurizer penetrations and steam space piping connections to PWSCC should also be Included.

Oconee Nuclear Station has compiled a list and descriptions of pressurizer connections, including those that utilize Alloy 600 wrought or welded materials. The lists for Oconee Units 1, 2, and 3 are provided as Tables 1, 2, and 3 of this response, respectively. The information contained in the tables was compiled from plant and manufacturers' drawings, vendor supplied information, plant stress reports, and installation weld process control data.

Table 1: Oconee Unit 1 Pressurizer Penetrations and Steam Space Piping Connections*

Location / Item 1.5" Thermowell incl. J-groove weld 1" Level Taps incL. safe end, safe end to pzr nozzle weld and safe end to pipe weld 1" Sample Tap incL safe end, safe end to PZR nozzle weld, and safe end to pipe weld.

0ty.

Description 1

The 1.5" Thermowell Is fabricated from SB-1 66 bar stock.

The thermowell extends through the carbon steel pressurizer wall and is welded to the inner surface of the vessel wall by an Alloy 182 J-groove weld and butter. Butter is most probably post weld heat treated.

6 The 1" Level Tap safe ends are fabricated from SB-66 bar stock. The safe ends attach to the carbon steel PZR nozzles by Alloy 82 full penetration V-groove welds that are most probably post weld heat treated. The safe ends attach to stainless steel piping by Alloy 182 or 82 full penetration V-groove welds that were not post weld heat treated.

I The I" Sample Tap safe end Is fabricated from SB-166 bar stock. The safe end attaches to the carbon steel PZR nozzle by an Alloy 82 full penetration Vgroove weld that is most probably post weld heat treated. The safe end attaches to stainless steel piping by an Alloy 182 or 82 full penetration V-groove weld that was not post weld heat treated.

Duke Energy letter dated July 27, 2004 Page 2 of 9 1" Vent incl. vent nozzle, vent nozzle safe end, J-groove weld, vent nozzle to safe end weld, and safe end to pipe weld 4" Spray Nozzle lncl. safe end, safe end to PZR nozzle weld, safe end to pipe weld, internal safe end weld buttons, 4" Spray Nozzle Extension Pin incl. extension pin to cladding weld, extension pin to pipe weld, and internal weld buttons 2.5" Relief Nozzles ncd. stainless steel fiange Heater Diaphragm Plates incl. diaphragm plate to PZR cladding welds.

Heater Sleeves inc. heater sleeve to diaphragm weld and heater sleeve to sheath weld.

10" Surge Nozzle I

The 1" Vent Nozzle and Vent Nozzle safe end are fabricated from SB-66 bar stock. The vent nozzle penetrates the carbon steel PZR shell and Is attached to the inner surface of the shell and cladding with a partial penetration Alloy 182 J-groove weld using Alloy 182 butter. The butter and J-groove weld are most probably post weld heat treated. The vent nozzle attaches to the safe end with a full penetration Alloy 82 weld. The J-groove and full penetration welds are most probably post weld heat treated. The safe end is welded to the stainless piping using Alloy 82 or 182 and not post weld heat treated.

I The 4" PZR Spray nozzle safe end is fabricated from SB-166 bar stock. The Spray nozzle safe end attaches to the carbon steel spray nozzle by an Alloy 82 full penetration V-groove weld with Alloy 82 butter. The butter and J-groove weld are most probably post weld heat treated. The safe end attaches to the stainless steel pipe by a full penetration Alloy 182 or 82 V-groove weld that was not post weld heat treated.

Four weld buttons on the inner surface of the safe end are fabricated from Alloy 182 or 82 weld metal.

1 The 4" PZR Spray nozzle extension pin Is a pipe fabricated from SB-1 66 bar stock. The extension pin attaches to the stainless steel weld build-up on the inside of the carbon steel shell and the stainless steel pipe inside the PZR by Alloy 82 full penetration V-groove welds. The weld attaching the pin to the carbon steel shell is most probably post weld heat treated. Four weld buttons on the Inside surface of the extension pin are fabricated from Alloy 182 or 82 weld metal.

3 The 2.5" carbon steel relief nozzles are welded to the stainless steel flanges with a full penetration Alloy 821182 V-groove weld using Alloy 182 buttering. The buttering is most probably post weld heat treated.

3 The heater diaphragm plates are fabricated from SB-1 68 Alloy 600 plate. An Alloy 82 or 182 partial penetration seal weld Is between the diaphragm plate and the PZR cladding.

This non-structural seal weld was not post weld heat treated.

117 The heater sleeves are fabricated from SB-1 66 Alloy 600 bar. Alloy 82 partial penetration J-groove welds attach the ndividual heater sleeves to the diaphragm plate. An Alloy 82 fillet weld attaches the Type 316L stainless steel heater sheath to each heater sleeve. None of the welds are considered to be post weld heat treated.

1 Per the bulletin Instructions, the surge nozzle Is not addressed by this bulletin. Therefore, the fabrication details are not included in this bulletin response. This penetration is Included for completeness of the list.

Duke Energy letter dated July 27, 2004 Page 3 of 9 Manway Incl. boss, cladding, diaphragm plate, and cover 1

The Manway boss is fabricated from the weld build-up of carbon steel, clad with stainless steel. The diaphragm plate is stainless steel, and the manway cover is carbon steel.

Table 2: Oconee Unit 2 Pressurizer Penetrations and Steam Space Piping Connections*

Location / Item 1.5" Thermowell ncl. J-groove weld 11 Level Taps Ind. safe end, safe end to pzr nozzle weld and safe end to pipe weld 1' Sample Tap Icl. safe end, safe end to PZR nozzle weld, and safe end to pipe weld.

1" Vent cIn. vent nozzle, J-groove weld, vent nozzle to pipe weld 4" Spray Nozzle inc, safe end, safe end to PZR nozzle weld, safe end to pipe weld, Internal safe end weld buttons, QIYn DescriDtion The 1.5" Thermowell Is fabricated from SB-66 bar stock.

The thermowell extends through the carbon steel pressurizer wall and is welded to the inner surface of the vessel wall by an Alloy 182 J-groove weld. The J-groove weld is most probably post weld heat treated.

6 The 1" Level Tap safe ends are fabricated from SB-66 bar stock. The safe ends attach to the carbon steel PZR nozzles by Ailoy 82 full penetration V-groove welds that are most probably post weld heat treated. The safe ends attach to stainless steel piping by Alloy 182 or 82 full penetration V-groove welds that were not post weld heat treated.

I The 1" Sample Tap safe end Is fabricated from SB-166 bar stock. The safe end attaches to the carbon steel PZR nozzle by an Alloy 82 full penetration V-groove weld that is most probably post weld heat treated. The safe end attaches to stainless steel piping by an Alloy 182 or 82 full penetration V-groove weld that was not post weld heat treated.

I The I f Vent nozzle is fabricated from SB-66 bar stock. The vent nozzle penetrates the carbon steel PZR shell and Is attached to the Inner surface of the shell and cladding with a partial penetration Alloy 182 J-groove weld. The J-groove weld Is most probably post weld heat treated. The vent nozzle attaches to the stainless piping using Alloy 82 or 182 that was not post weld heat treated.

I The 4" PZR Spray nozzle safe end Is fabricated from SB-166 bar stock. The Spray nozzle safe end attaches to the carbon steel spray nozzle by an Alloy 82 full penetration V-groove weld with no buttering. The V-groove weld is most probably post weld heat treated. The safe end attaches to the stainless steel pipe by a full penetration Alloy 182 or 82 V-groove weld that was not post weld heat treated. Four weld buttons on the Inner surface of the safe end are fabricated from Alloy 182 or 82 weld metal.

Duke Energy letter dated July 27, 2004 Page 4 of 9 4" Spray Nozzle Extension Pin Inc. extension pin to cladding weld, extension pin to pipe weld, and internal weld buttons 2.5" Relief Nozzles incl. stainless steel flange Heater Diaphragm Plates Incl. diaphragm plate to Pzr clad weld 10" Surge Nozzle Manway Incl. boss, cladding, diaphragm plate, and cover 1

The 4" PZR Spray nozzle extension pin Is a pipe fabricated from SB-166 bar stock. The extension pin attaches to the stainless steel weld build-up on the Inside of the carbon steel shell and the stainless steel pipe Inside the PZR by Alloy 82 full penetration V-groove welds. The weld attaching the pin to the carbon steel shell Is most probably post weld heat treated. Four weld buttons on the Inside surface of the extension pin are fabricated from Alloy 182 or 82 weld metal.

3 The 2.5" carbon steel relief nozzles are welded to the stainless steel flanges with a full penetration Alloy 82/182 V-groove weld using Alloy 182 buttering. The butter Is most probably post weld heat treated.

3 The Heater diaphragm plates are fabricated from Type 304 stainless steel plate. A stainless steel partial penetration seal weld Is between the diaphragm plate and the Pzr cladding. This non-structural weld is not considered to be post weld heat treated.

I Per the bulletin Instructions, the surge nozzle Is not addressed by this bulletin. Therefore, the fabrication details are not included In this bulletin response. This penetration Is included for completeness of the list.

1 The Manway boss Is fabricated from the weld build-up of carbon steel, clad with stainless steel. The diaphragm plate is stainless steel, and the manway cover Is carbon steel.

Table 3: Oconee Unit 3 Pressurizer Penetrations and Steam Space Piping Connections*

Location / Item 1.5" Thermowell incl. J-groove weld 1" Level Taps nt. safe end, safe end to pzr nozzle weld and safe end to pipe weld Qtv.

Description I

The 1.5" Thermowell is fabricated from SB-66 bar stock.

The thermowell extends through the carbon steel pressurizer wall and Is welded to the Inner surface of the vessel wall by an Alloy 182 J-groove weld. The J-groove weld Is most probably post weld heat treated.

6 The 1" Level Tap safe ends are fabricated from SB-166 bar stock. The safe ends attach to the carbon steel PZR nozzles by Alloy 82 full penetration V-groove welds that are most probably post weld heat treated. The safe ends attach to stainless steel piping by Alloy 182 or 82 full penetration V-groove welds that were not post weld heat treated.

Duke Energy letter dated July 27, 2004 Page 5 of 9 1" Sample Tap incl. safe end, safe end to PZR nozzle weld, and safe end to pipe weld.

1" Vent Ancl. vent nozzle, J-groove weld, vent nozzle to pipe weld 4" Spray Nozzle ind. safe end, safe end to PZR nozzle weld, safe end to pipe weld, internal safe end weld buttons, 4" Spray Nozzle Extension Pin incl. extension pin to cladding weld, extension pin to pipe weld, and Internal weld buttons 2.5" Relief Nozzles Ancl. stainless steel flange Heater Diaphragm Plates Ind. diaphragm plate to Pzr clad weld 10" Surge Nozzle Manway Incd. boss, cladding, diaphragm The I" Sample Tap safe end Is fabricated from SB-1 66 bar stock. The safe end attaches to the carbon steel PZR nozzle by an Alloy 82 full penetration V-groove weld that is most probably post weld heat treated. The safe end attaches to stainless steel piping by an Alloy 182 or 82 full penetration V-groove weld that was not post weld heat treated.

The 1" Vent nozzle is fabricated from SB-1 66 bar stock. The vent nozzle penetrates the carbon steel PZR shell and Is attached to the Inner surface of the shell and cladding with a partial penetration Alloy 182 J-groove weld. The J-groove weld is most probably post weld heat treated. The vent nozzle attaches to the stainless piping using Alloy 82 or 182.

that was not post weld heat treated.

The 4w PZR Spray nozzle safe end Is fabricated from SB-1 66 bar stock. The Spray nozzle safe end attaches to the carbon steel spray nozzle by an Alloy 82 full penetration V-groove weld with no buttering. The V-groove weld Is most probably post weld heat treated. The safe end attaches to the stainless steel pipe by a full penetration Alloy 182 or 82 V-groove weld that was not post weld heat treated. Four weld buttons on the inner surface of the safe end are fabricated from Alloy 182 or 82 weld metal.

1 The 4" PZR Spray nozzle extension pin is a pipe fabricated from SB-66 bar stock. The extension pin attaches to the stainless steel weld build-up on the inside of the carbon steel shell and the stainless steel pipe Inside the PZR by Alloy 82 full penetration V-groove welds. The weld attaching the pin to the carbon steel shell Is most probably post weld heat treated. Four weld buttons on the inside surface of the extension pin are fabricated from Alloy 182 or 82 weld metal.

3 The 2.5" carbon steel relief nozzles are welded to the stainless steel flanges with a full penetration Alloy 82/182 V-groove weld using Alloy 182 buttering. The butter Is most probably post weld heat treated.

3 The Heater diaphragm plates are fabricated from Type 304 stainless steel plate. A stainless steel partial penetration seal weld is between the diaphragm plate and the Pzr cladding. This non-structural weld Is not considered to be post weld heat treated.

1 Per the bulletin instructions, the surge nozzle Is not addressed by this bulletin. Therefore, the fabrication details are not Included In this bulletin response. This penetration Is included for completeness of the list.

I The Manway boss is forged from carbon steel, welded to the vessel with carbon steel, and clad with stainless steel. The Page 6 of 9 Duke Energy letter dated July 27, 2004 plate, and cover diaphragm plate is stainless steel, and the manway cover is carbon steel.

  • Information on post weld heat treatment was assimilated from an owner's group document providing the design and configuration information of the Alloy 600/82/182 in the pressurizers. Some presumptions were required. Where vendor information indicated that a weld was "most probably" post weld heat treated, that information is included. These presumptions are based on the premise of accepted manufacturing techniques and vendor information provided by the Babcock and Wilcox Owner's Group project document.

Research of manufacturing records is necessary to provide detailed PWHT histories.

(b) A description of the Inspection program for Alloy 821182/600 pressurizer penetrations and steam space piping connections that has been Implemented at your plant. The description should Include when the Inspections were performed; the areas, penetrations and steam space piping connections Inspected; the extent (percentage) of coverage achieved for each location which was Inspected; the Inspection methods used; the process used to resolve any Inspection findings; the quality of the documentation of the Inspections (e.g., written report, video record, photographs); and, the basis for concluding that your plant satisfies applicable regulatory requirements related to the Integrity of pressurizer penetrations and steam space piping connections. If leaking pressurizer penetrations or steam space piping connections were found, Indicate what followup NDE was performed to characterize flaws In the leaking penetrations.

Oconee Nuclear Station conducts Inservice Inspections according to Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. The inspections include volumetric and surface examinations that are performed in accordance with Duke Energy Corporation's (Duke's)Section XI program to ensure compliance with applicable codes, standards, and procedures.

In response to industry experience with Alloy 600 degradation, Oconee Nuclear Station has implemented an increasing number of visual inspections of the pressurizer penetrations. These bare metal visual inspections (BMV's) were conducted in addition to the normal ISI required by Section XI of the ASME Code. The BMV's were conducted by a VT-2 qualified Quality Assurance inspector, a VT-1 qualified Quality Assurance inspector or an experienced boric acid corrosion evaluation engineer and the results recorded according to Duke's work control processes. When a unacceptable condition was identified, it was resolved according to the Oconee Nuclear Station corrective action program.

Tables 4, 5, and 6 provide the locations and outages of the inspections that have been completed on Units 1, 2, and 3, respectively. The BMV's listed for Units 1, 2, and 3 were completed at the last RFO of each unit. These BMVs were conducted due to an awareness of the relationship between temperature and PWSCC susceptibility which caused Oconee to begin incorporating BMVs of selected pressurizer locations into outage plans. These inspections were completed prior to the publication of industry guidance Page 7 of 9 Duke Energy letter dated July 27, 2004 contained in EPRI MRP 2003-039, issued January 20, 2004, and EPRI MRP 2004-05, issued April 2, 2004.

In the fall of 1989, a leaking seal weld was discovered between the heater bundle diaphragm plate and the heater bundle access port cladding on Oconee Unit 1. The flaw location was identified by the leakage. Liquid penetrant (PT) NDE was used, but did not identify the flaw location. The portion of the seal weld containing the leak was replaced.

No leakage has occurred at this location since this repair.

Table 4: Inspection History of Alloy 600 Pressurizer Locations for Oconee Unit I Nozzle Description 1.5" Thermowell 1" Level (qty 6) 1 Sample I"'Vent 4" Spray (Noz to SE) 4" Spray ( SE to pipe) 2.5" Relief (qty 3)

Heater Bundle Diaphragm (qty 3)

Bare Metal Visual Inspection Fall 2003 Fall 2003 (qty 6)

Fall 2003 Fall 2003 Fall 2003 Fall 2003 Fall 2003 (qty 3)

Surface Inspection (ISI)

Not Applicable Fall 2003 (qty 6)

Fall 2003 Not Applicable Fall 1997 Spring 2002 Fall 2000 (qty 1)

Fall 1995 (qty 2)

Not Applicable Fall 2003 (qty 3)

Volumetric Inspection (ISI)

Not Applicable Not Applicable Not Applicable Not Applicable Fall 1997 Spring 2002 Not Applicable Not Applicable Unit 2 Volumetric Inspection (ISQ)

Not Applicable Not Applicable Not Applicable Not Applicable Fall 2002 Fall 2002 Not Applicable Table 5: Inspection History of Alloy 600 Pressurizer Locations for Oconee Bare Metal Surface Nozzle Description Visual Inspection Inspection (ISI) 1.5" Thermowell Spring 2004 Not Applicable 1" Level (qty 6)

Spring 2004 (qty 6)

Fall 2002 (qty 6) 1" Sample Spring 2004 Fall 2002 1" Vent Spring 2004 Not Applicable 4" Spray (Noz to SE)

Spring 2004 Fall 2002 4" Spray ( SE to pipe)

Fall 2002 Fall 2002 2.5" Relief (qty 3)

Spring 2004 (qty 3)

Spring 2001 (qty 3)

Table 6: Inspection History of Alloy 600 Pressurizer Locations for Oconee Unit 3.

Bare Metal Surface Volumetric Nozzle Description Visual Inspection Inspection (ISQ)

Inspection (ISI) 1.5" Thermowell Spring 2003 Not Applicable Not Applicable 1 Level (qty 6)

Spring 2003 (qty 6)

Spring 2003 (qty 6)

Not Applicable 1" Sample Spring 2003 Spring 2003 Not Applicable 1" Vent Spring 2003 Not Applicable Not Applicable 4" Spray (Noz to SE)

Spring 2003 Fall 1996 Fall 1996 4" Spray ( SE to pipe)

Spring 2003 Fall 1992 Fall 1992 2.5" Relief (qty 3)

Spring 2003 (qty 3)

Fall 1998 (qty 3)

Not Applicable Page 8 of 9 Duke Energy letter dated July 27, 2004 (c) A description of the Alloy 82/1821600 pressurizer penetration and steam space piping connection Inspection program that will be Implemented at your plant during the next and subsequent refueling outages. The description should Include the areas, penetrations and steam space piping connections to be Inspected; the extent (percentage) of coverage to be achieved for each location; Inspection methods to be used; qualification standards for the Inspection methods and personnel; the process used to resolve any Inspection Indications; the Inspection documentation to be generated; and the basis for concluding that your plant will satisfy applicable regulatory requirements related to the structural and leakage Integrity of pressurizer penetrations and steam space piping connections. If leaking pressurizer penetrations or steam space piping connections are found, Indicate what followup NDE will be performed to characterize flaws In the leaking penetrations. Provide your plans for expansion of the scope of NDE to be performed If circumferential flaws are found In any portion of the leaking pressurizer penetrations or steam space piping connections.

Duke will implement the following inspection program for the Oconee Alloy 82/182/600 pressurizer penetrations and steam space piping connections addressed in NRC Bulletin 2004-01 at the next and each subsequent refueling outage.

  • Bare metal visual inspection around 100% of each Alloy 600 penetration and each Alloy 82/182 weld, except those penetrations subject to volumetric or surface ISI during that RFO;
  • Inservice Inspections in accordance with Section XI of the applicable ASME Code.

This program will remnain in effect until revised by Duke as a result of further guidance provided by the industry or the component is modified to mitigate PWSCC susceptibility or replaced.

The bare metal visual inspections will be conducted by personnel qualified to perform VT-2 inspections according to ASME code. Inspection results will be documented according to applicable procedures. Evidence of leakage will be addressed in accordance with the Boric Acid Corrosion program, including evaluation by engineering to determine extent of condition, applicability to other locations, and establishing the basis for concluding that the plant satisfies applicable regulatory requirements.

The Inservice Inspections (ISI) will be performed in accordance with Section XI of the applicable ASME Code, and will be performed using qualified personnel and procedures.

Any indications found during ISI will be addressed in accordance with Code requirements and the ISI program.

Engineering will evaluate evidence of leakage to determine cause and extent of condition.

Oconee's corrective action program will be utilized to evaluate the need for additional NDE methods and increased inspection scopes, including like locations and other Duke Page 9 of 9 Duke Energy letter dated July 27, 2004 units. These actions will ensure detection of unsafe conditions and the appropriate response to the discovery of circumferential cracking.

(d) In light of the Information discussed In this bulletin and your understanding of the relevance of recent Industry operating experience to your facility, explain why the Inspection program Identified In your response to Item (1)(c) above Is adequate for the purpose of maintaining the Integrity of your facility's RCPB and for meeting all applicable regulatory requirements which pertain to your facility.

Duke performs Inservice Inspection, including system leakage testing, of its nuclear power plants in accordance with Section XI of the applicable ASME Code. Duke'sSection XI program utilizes qualified personnel and procedures, and includes activities to identify evidence of through wall leakage and initiate corrective action for unacceptable conditions, which may include supplemental examination, analytical evaluation, repair, and replacement.

As a result of industry experience with the degradation of Alloy 600 and welding Alloys 82 / 182, and the associated occurrences of degradation of the reactor coolant boundaries due to borated water leakage, Duke has created an Alloy 600 program and Boric Acid Corrosion program. These programs, in association with Oconee's corrective action program, prescribe activities for the detection, investigation, and mitigation of reactor coolant pressure boundary leakage due to PWSCC of Alloy 600.

Industry experience indicates that leakage attributed to degradation of Alloy 600 due to PWSCC has been detected prior to the occurrence of gross leakage from the reactor coolant pressure boundary. Implementation of the rigorous visual inspection program described in Duke's response to lc, including continued ISI required by ASME Section XI should be adequate to detect leakage through the reactor coolant pressure boundary prior to the occurrence of extensive degradation. Aggressive investigative and evaluation practices as dictated by the previously mentioned programs should ensure appropriate response to the discovery of circumferential cracking, including expansion of NDE scope to include "like locations," and should provide adequate protection against the occurrence of rupture of and/or gross reactor coolant pressure boundary leakage, thus satisfying applicable regulatory requirements.

Page 1 of 1 Duke Energy letter dated July 27, 2004 Duke Energy's Regulatory Commitments Made in Response to NRC BL 2004-01 Duke Energy will implement the following inspection program for the Catawba, McGuire, and Oconee Alloy 82/182/600 pressurizer penetrations and steam space piping connections addressed by NRC Bulletin 2004-01 at the next and each subsequent refueling outage.

  • Bare metal visual inspection around 100% of each Alloy 600 penetration and each Alloy 82/182 weld, except those penetrations subject to volumetric or surface ISI during that RFO;
  • Bare metal visual inspection of the gap between the manway cover and pressurizer manway for evidence of manway diaphragm plate seal weld leakage (for Catawba and McGuire only); and The bare metal visual inspections will be conducted by personnel qualified to perform VT-2 inspections according to ASME code
  • Inspection results will be documented according to applicable procedures;
  • Evidence of leakage will be addressed in accordance with the Boric Acid Corrosion program, including evaluation by engineering to determine extent of condition, applicability to other locations.

Engineering will evaluate evidence of leakage to determine cause and extent of condition.

The station corrective action program will be utilized to evaluate the need for additional NDE methods and increased inspection scopes, including like locations and other Duke units.