Category:Decommissioning Plan DKTs 30
[Table view] Category:40
MONTHYEARML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 ML21362A4062021-12-17017 December 2021 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Decommissioning Funding Plan Update PLA-7972, Independent Spent Fuel Storage Installation (Isfsi), Decommissioning Funding Plan, Updated2021-12-13013 December 2021 Independent Spent Fuel Storage Installation (Isfsi), Decommissioning Funding Plan, Updated PLA-7923, NRC Decommissioning Funding Status Report2021-03-31031 March 2021 NRC Decommissioning Funding Status Report ML21099A1082021-03-29029 March 2021 NRC Decommissioning Funding Status Report PLA-7778, NRC Decommissioning Funding Status Report2019-04-0101 April 2019 NRC Decommissioning Funding Status Report ML19107A0312019-03-29029 March 2019 NRC Decommissioning Funding Status Report ML18354A7442018-12-17017 December 2018 Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated PLA-7761, Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated (PLA-7761)2018-12-13013 December 2018 Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated (PLA-7761) PLA-7584, NRC Decommissioning Funding Status Report for 12/31/20162017-03-30030 March 2017 NRC Decommissioning Funding Status Report for 12/31/2016 ML17089A6562017-03-30030 March 2017 NRC Decommissioning Fund Status Report ML17102B4162017-03-29029 March 2017 NRC Decommissioning Funding Status Report ML16032A3392016-01-0808 January 2016 ISFSI - Decommissioning Funding Plan, Updated PLA-7424, ISFSI Decommissioning Funding Plan2015-12-16016 December 2015 ISFSI Decommissioning Funding Plan ML15091A3072015-03-25025 March 2015 NRC Decommissioning Funding Status Report PLA-7293, NRC Decommissioning Funding Status Report2015-03-20020 March 2015 NRC Decommissioning Funding Status Report ML13095A0102013-03-28028 March 2013 NRC Decommissioning Funding Status Report PLA-6979, NRC Decommissioning Funding Status Report2013-03-25025 March 2013 NRC Decommissioning Funding Status Report ML13032A0562012-12-17017 December 2012 Amended Susquehanna Steam Electric Station Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation PLA-6951, Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation2012-12-15015 December 2012 Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation ML11109A0462011-04-11011 April 2011 Decommissioning Report of Financial Assurance ML0909206012009-03-26026 March 2009 Susquehanna Steam Electric Station, Decommissioning Report of Financial Assurance, PLA-6491 PLA-6491, Attachment 2 to PLA-6491, Affidavit and Site-Specific Decommissioning Cost Analysis Schedules2009-03-26026 March 2009 Attachment 2 to PLA-6491, Affidavit and Site-Specific Decommissioning Cost Analysis Schedules ML0909104062009-03-25025 March 2009 Decommissioning Report of Financial Assurance PLA-6171, Decommissioning Report of Financial Assurance2007-03-23023 March 2007 Decommissioning Report of Financial Assurance ML0709402772007-03-21021 March 2007 Decommissioning Report of Financial Assurance ML0510301712005-03-31031 March 2005 Decommissioning Report of Financial, Assurance PLA-5774, Decommissioning Survey Report for Ppl'S Former Corporate Dosimety Laboratory Location PLA-57742004-06-29029 June 2004 Decommissioning Survey Report for Ppl'S Former Corporate Dosimety Laboratory Location PLA-5774 ML0309300662003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300352003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300322003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300292003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300212003-03-28028 March 2003 Decommissioning Report of Financial Assurance PLA-5596, Decommissioning Report of Financial Assurance, PLA-55962003-03-21021 March 2003 Decommissioning Report of Financial Assurance, PLA-5596 ML0315305472003-02-28028 February 2003 Decommissioning Plan for the Quehanna, Pennsylvania Site, Pennsylvania Historical & Museum Commission Attachment 2023-03-29
[Table view] Category:50
MONTHYEARML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 ML21362A4062021-12-17017 December 2021 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Decommissioning Funding Plan Update PLA-7972, Independent Spent Fuel Storage Installation (Isfsi), Decommissioning Funding Plan, Updated2021-12-13013 December 2021 Independent Spent Fuel Storage Installation (Isfsi), Decommissioning Funding Plan, Updated PLA-7923, NRC Decommissioning Funding Status Report2021-03-31031 March 2021 NRC Decommissioning Funding Status Report ML21099A1082021-03-29029 March 2021 NRC Decommissioning Funding Status Report PLA-7778, NRC Decommissioning Funding Status Report2019-04-0101 April 2019 NRC Decommissioning Funding Status Report ML19107A0312019-03-29029 March 2019 NRC Decommissioning Funding Status Report ML18354A7442018-12-17017 December 2018 Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated PLA-7761, Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated (PLA-7761)2018-12-13013 December 2018 Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated (PLA-7761) PLA-7584, NRC Decommissioning Funding Status Report for 12/31/20162017-03-30030 March 2017 NRC Decommissioning Funding Status Report for 12/31/2016 ML17089A6562017-03-30030 March 2017 NRC Decommissioning Fund Status Report ML17102B4162017-03-29029 March 2017 NRC Decommissioning Funding Status Report ML16032A3392016-01-0808 January 2016 ISFSI - Decommissioning Funding Plan, Updated PLA-7424, ISFSI Decommissioning Funding Plan2015-12-16016 December 2015 ISFSI Decommissioning Funding Plan ML15091A3072015-03-25025 March 2015 NRC Decommissioning Funding Status Report PLA-7293, NRC Decommissioning Funding Status Report2015-03-20020 March 2015 NRC Decommissioning Funding Status Report ML13095A0102013-03-28028 March 2013 NRC Decommissioning Funding Status Report PLA-6979, NRC Decommissioning Funding Status Report2013-03-25025 March 2013 NRC Decommissioning Funding Status Report ML13032A0562012-12-17017 December 2012 Amended Susquehanna Steam Electric Station Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation PLA-6951, Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation2012-12-15015 December 2012 Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation ML11109A0462011-04-11011 April 2011 Decommissioning Report of Financial Assurance ML0909206012009-03-26026 March 2009 Susquehanna Steam Electric Station, Decommissioning Report of Financial Assurance, PLA-6491 PLA-6491, Attachment 2 to PLA-6491, Affidavit and Site-Specific Decommissioning Cost Analysis Schedules2009-03-26026 March 2009 Attachment 2 to PLA-6491, Affidavit and Site-Specific Decommissioning Cost Analysis Schedules ML0909104062009-03-25025 March 2009 Decommissioning Report of Financial Assurance PLA-6171, Decommissioning Report of Financial Assurance2007-03-23023 March 2007 Decommissioning Report of Financial Assurance ML0709402772007-03-21021 March 2007 Decommissioning Report of Financial Assurance ML0510301712005-03-31031 March 2005 Decommissioning Report of Financial, Assurance PLA-5774, Decommissioning Survey Report for Ppl'S Former Corporate Dosimety Laboratory Location PLA-57742004-06-29029 June 2004 Decommissioning Survey Report for Ppl'S Former Corporate Dosimety Laboratory Location PLA-5774 ML0309300662003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300352003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300322003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300292003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300212003-03-28028 March 2003 Decommissioning Report of Financial Assurance PLA-5596, Decommissioning Report of Financial Assurance, PLA-55962003-03-21021 March 2003 Decommissioning Report of Financial Assurance, PLA-5596 ML0315305472003-02-28028 February 2003 Decommissioning Plan for the Quehanna, Pennsylvania Site, Pennsylvania Historical & Museum Commission Attachment 2023-03-29
[Table view] Category:70
MONTHYEARML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 ML21362A4062021-12-17017 December 2021 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Decommissioning Funding Plan Update PLA-7972, Independent Spent Fuel Storage Installation (Isfsi), Decommissioning Funding Plan, Updated2021-12-13013 December 2021 Independent Spent Fuel Storage Installation (Isfsi), Decommissioning Funding Plan, Updated PLA-7923, NRC Decommissioning Funding Status Report2021-03-31031 March 2021 NRC Decommissioning Funding Status Report ML21099A1082021-03-29029 March 2021 NRC Decommissioning Funding Status Report PLA-7778, NRC Decommissioning Funding Status Report2019-04-0101 April 2019 NRC Decommissioning Funding Status Report ML19107A0312019-03-29029 March 2019 NRC Decommissioning Funding Status Report ML18354A7442018-12-17017 December 2018 Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated PLA-7761, Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated (PLA-7761)2018-12-13013 December 2018 Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plan, Updated (PLA-7761) PLA-7584, NRC Decommissioning Funding Status Report for 12/31/20162017-03-30030 March 2017 NRC Decommissioning Funding Status Report for 12/31/2016 ML17089A6562017-03-30030 March 2017 NRC Decommissioning Fund Status Report ML17102B4162017-03-29029 March 2017 NRC Decommissioning Funding Status Report ML16032A3392016-01-0808 January 2016 ISFSI - Decommissioning Funding Plan, Updated PLA-7424, ISFSI Decommissioning Funding Plan2015-12-16016 December 2015 ISFSI Decommissioning Funding Plan ML15091A3072015-03-25025 March 2015 NRC Decommissioning Funding Status Report PLA-7293, NRC Decommissioning Funding Status Report2015-03-20020 March 2015 NRC Decommissioning Funding Status Report ML13095A0102013-03-28028 March 2013 NRC Decommissioning Funding Status Report PLA-6979, NRC Decommissioning Funding Status Report2013-03-25025 March 2013 NRC Decommissioning Funding Status Report ML13032A0562012-12-17017 December 2012 Amended Susquehanna Steam Electric Station Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation PLA-6951, Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation2012-12-15015 December 2012 Decommissioning Funding Plan for the Independent Spent Fuel Storage Installation ML11109A0462011-04-11011 April 2011 Decommissioning Report of Financial Assurance ML0909206012009-03-26026 March 2009 Susquehanna Steam Electric Station, Decommissioning Report of Financial Assurance, PLA-6491 PLA-6491, Attachment 2 to PLA-6491, Affidavit and Site-Specific Decommissioning Cost Analysis Schedules2009-03-26026 March 2009 Attachment 2 to PLA-6491, Affidavit and Site-Specific Decommissioning Cost Analysis Schedules ML0909104062009-03-25025 March 2009 Decommissioning Report of Financial Assurance PLA-6171, Decommissioning Report of Financial Assurance2007-03-23023 March 2007 Decommissioning Report of Financial Assurance ML0709402772007-03-21021 March 2007 Decommissioning Report of Financial Assurance ML0510301712005-03-31031 March 2005 Decommissioning Report of Financial, Assurance PLA-5774, Decommissioning Survey Report for Ppl'S Former Corporate Dosimety Laboratory Location PLA-57742004-06-29029 June 2004 Decommissioning Survey Report for Ppl'S Former Corporate Dosimety Laboratory Location PLA-5774 ML0309300662003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300352003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300322003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300292003-03-28028 March 2003 Decommissioning Report of Financial Assurance ML0309300212003-03-28028 March 2003 Decommissioning Report of Financial Assurance PLA-5596, Decommissioning Report of Financial Assurance, PLA-55962003-03-21021 March 2003 Decommissioning Report of Financial Assurance, PLA-5596 ML0315305472003-02-28028 February 2003 Decommissioning Plan for the Quehanna, Pennsylvania Site, Pennsylvania Historical & Museum Commission Attachment 2023-03-29
[Table view] Category:Letter type:PLA
MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] |
Text
Bryce L. Shriver PPL Susquehanna, LLC Senior Vice President and 769 Salem Boulevard . II ;
Chief Nuclear Officer Berwick, PA 18603 %
- 31 Tel. 570.542.3120 Fax 570.542.1504 *t blshriver@pplweb.com JUN 2 9 2004 v T.
Division of Fuel Cycle Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555 DECOMMISSIONING SURVEY REPORT FOR PPL'S FORMER CORPORATE DOSIMETY LABORATORY LOCATION PLA-5774 The purpose of this letter is to transmit for NRC review and concurrence the Decommissioning Survey Report for the former PPL Corporate Dosimetry Laboratory at 13-21 North Tenth Street, Allentown, Pennsylvania so that this facility can be released for unrestricted use. This report was developed to comply with guidelines in the document titled, "Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for Byproduct, Source, or Special Nuclear Material," dated April 1993. The former Corporate Dosimetry Laboratory will be released for unrestricted use on August 1, 2004.
If you any questions, please contact Mr. Stephen Ingram at (570) 542-3245.
Sincerely, QA-h ,k B. L. Shriver
Enclosure:
Decommissioning Survey for CERML and Associated Facilities Attachment I to
Enclosure:
CERML Radioactive Materials List to
Enclosure:
Contamination Survey Levels cc: NRC Region I Mr. A. J. Blamey, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OPI-17 ilkD4 H Washington, DC 20555
Enclosure to PLA-5774 Page I of 5 DECOMMISSIONING SURVEY FOR CERML AND ASSOCIATED FACILITIES Purpose To demonstrate compliance with NRC, Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for Byproduct. Source or Special Nuclear Material, April 1993.
Scope This survey includes the CERML Lab (CL), adjacent storage room (CSR), waste storage closet (CWC) and TLD irradiator room (ISR). The survey included alpha, beta and gamma surveys for removable and fixed contamination and general area beta and gamma dose rate surveys.
Background
The CERML Lab (Corporate Environmental Radiation Monitoring Lab) and the PPL Dosimetry Lab were located on the third floor of PPL's corporate Annex 9 (address:
13 - 21 North Tenth Street, Allentown, PA). This facility was used for approximately 10 years.
The CERML Lab was used to perform measurements of environmental samples including samples spiked with radioisotopes. These measurements included gamma spectroscopy, liquid scintillation counting and gas flow proportional counting. The spiked samples, typically in pico-Curie/l quantities, were handled minimally. Many of the samples came in stabilized media and were analyzed in the sample containers in which they were received (e.g., marinelli beakers, plated on planchettes). Some of the liquid samples were decanted into other containers for analysis. All handling and analysis was performed in the CERML Lab. Three other rooms were used only for storage of samples. After completion of analysis the spiked samples and any non-spiked environmental samples with levels of radioactive material detectable above normal environmental levels were also stored for later disposal.
The CERML Lab ceased operation in the fall of 2002. The remaining byproduct material was packaged for shipping in April and shipped in May 2004.
Enclosure to PLA-5774 Page 2 of 5 The Dosimetry Lab was used for TLD processing and had one Cs-137 - 2 Ci sealed source in a TLD irradiator.: The irradiator was relocated ii March 2004 to a new facility.
During relocation the source was temporarily removed from its shield. The inside of the shield was leak tested before relocation and was found to have < 0.005 uCi of residual contamination.
Remaining PPL personnel and equipment are scheduled to be removed from the building by the end of June 2004 with turn over of the building to the owner in the summer of 2004. (All remaining personnel are non-nuclear and no work with radioactive materials has been conducted since the Dosimetry Lab and CERML labs were relocated
[March 2004] and/or decommissioned [May 2004]).
Radioactive Source Material A listing of the radioactive material present at the time the CERML Lab ceased operation has been included as Attachment 1. The spiked samples were acquired from 2000 to 2002. The sources, primarily calibration and check sources, had been acquired over the life of the facility. Only two alpha emitters were present with a total activity of less than 1 uci.
Equipment/Supplies Alpha Contamination Survey Meter:
Fixed, ASP-1 with AC3 alpha probe (Inst. # HP-387A Cal. Due Date 8/10/2004)
Removable, Alpha counting of smears Beta / Gamma Contamination Survey Meter:
Fixed, Ludlum-3 with frisker probe (Inst. # HP-2677 Cal. Due Date 1/13/2005)
Removable, beta / gamma counting of smears Beta Gamma Dose Rate Survey Meter:
Ludlum-3 with frisker probe (Inst. # HP-2677 Cal. Due Date 1/13/2005)
Fixed, dose rate survey Will assume detectable activity is all from gamma -3600 cpm/mrad/hr (Note: This is a conservative assumption since the beta efficiency for the detector is significantly higher than the gamma efficiency). If any activity above background is detected additional surveys will be conducted with a uR meter.
Smears Container for smears (small zip bags)
Masslin
Enclosure to PLA-5774 Page 3 of 5 Area Preparation
- 1. Mark out all surfaces to be surveyed in grids of not more than Im2.
- 2. Assign grid numbers.
- 3. Masslin all areas to remove any loose contamination.
- 4. Shutdown and de-energize CERML HVAC.
Survey
- 1. Smear survey each grid section, identifying each smear with a corresponding grid #.
Include a background survey for reference.
- 2. Count smears with frisker probe for beta and gamma contamination and record in corresponding section of survey data sheet. (Note: Retain smears for later alpha evaluation).
- 3. Alpha contamination survey each grid section entering the average and maximum readings on the survey data sheet.
- 4. Beta and gamma contamination survey each grid section entering the average and maximum readings on the survey data sheet.
- 5. Beta and gamma dose rate survey each grid section using frisker.
- 6. Divide frisker cpm by 3600 cpm/mrad/hr to get dose rate and record as maximum and average on survey data form.
Post Survey Evaluation
- 1. Alpha count smears for Am-24 1 to determine DPM quantities and record on survey data form.
- 2. Evaluate all survey results against NRC standard, document and submit results to NRC for approval to decommission facility.
Results A summary of survey results have been included as Attachment 2 Analysis Alpha One transuranic (Am-241) was included in the source inventory
Enclosure to PLA-5774 Page 4 of 5 Fixed Contamination Level:
Instrument AC3 Probe area = 70 cm 2 Detector efficiency = 15%
Background = 5 cpm Activity assuming background equals activity = 48 dpm/I 00 cm 2 If we conservatively assume background is detectable activity 48 dpm/100 cm2 is less than half of the acceptable surface contamination level for alpha.
Removable Contamination Level:
Alpha counting instrument performance check:
Date: 5/6/2004 Instrument Type: Ludlum - L2000 Number: HP-L200-002 LLD = 6 dpm (additional supporting data available on request)
Detectable activity levels (LLD) are well below those required to demonstrate compliance with NRC limits.
Beta/Gamma Fixed Contamination Level:
Instrument Ludlum 3 with frisker probe Probe area = 20 cm 2 Detector efficiency = 10%
Background = 30 cpm Activity assuming background equals activity= 1500 dpmll00 cm 2 Removable Contamination Level:
Beta counting instrument performance check:
Date: 5/6/04 Instrument Type: BC4 Number: BC4/0005 LLD = 43 dpm (additional supporting data available on request)
Detectable activity levels (LLD) are well below those required to demonstrate compliance with NRC limits.
Enclosure to PLA-5774 Page 5 of 5 Evaluation and Recommendations All measurements demonstrated compliance with limits in Guidelines for Decontamination of Facilities and Equipment Prior to release for Unrestricted Use or Termination of Licenses for Byproduct. Source or Special Nuclear Material, April 1993 Table 1. With the concurrence of the NRC it is recommended that this facility be released for unrestricted use.
Report Prepared By:
Stephen Ingram Radiation Safety Officer
)
Attachment 1 to Enclosure to PLA-5774 Page I of I CERML Radioactive Materials (Accumulated Since 2000)
Packaged for Disposal April 2004 SPIKED SAMPLES SOLIDS Activity (uCi) LIQUIDS Activity (uCi) Combined activity (uCi)
Ce-141 1.36E-04 Ce-141 2.03E-07 1.36E-04 Co-58 1.18E-01 Co-58 7.07E-05 1.1 8E-0 1 Co-60 1.04E+03 Co-60 5.41E-02 1.04E+03 Cr-51 4.75E-05 Cr-51 1.77E-07 4.76E-05 Cs-134 5.12E+01 Cs-134 1.9 1E-02 5.12E+01 Cs-137 4.95E+02 Cs-137 6.40E-02 4.951E+02 Fe-59 4.5 1E-03 Fe-59 5.74E-06 4.52E-03 Mn-54 2.2 1E+01 Mn-54 8.92E-03 2.21E+01 Zn-65 2.21E+01 Zn-65 7.67E-03 2.2 1E+01 Eu-152 1.09E+02 1.09E+02 Am-241 5.68E-03 5.68E-03 Pb-210 1.05E-01 1.05E-01 Cd-109 1.87E+00 1.87E+00 Co-57 5.14E-04 5.14E-04 Ce-139 1.87E-08 1.87E-08 Hg-203 2.43E-27 2.43E-27 Sn-113 3.04E- 10 3.04E- 10 Y-88 9.45E-1 I 9.45E-I 1 Ba-133 2.60E-01 2.60E-0 1 Total Activity 1.74E+03 SOURCES FORM Nuclide Activitv (uCi)
Button Source Eu-152 0.93 Button Source Eu-152 0.93 Button Source Co-60 0.13 Button Source Ba-133 0.18 Button Source Eu-152 0.91 Pipe Source Eu-152 4.03 Plated Source Cs-137 0.02 Total Activity 7.13
Attachment 2 to Enclosure to PLA-5774 Page 1 of 1 CONTAMINATION SURVEY LEVELS RADIATION FIXED CONTAMINATION' REMOVABLE CONTAMINATION 2 OSURVEAY Transurnaics (alpha) Actual < 48 dpm/100 cm2 < 6 dpm/100 cm2 n/a Limit 100 dpm/100 cm2 20 dpm/100 cm2 n/a BETA / GAMMA Actual < 1500 dpm/100 cm2 < 43 dpm/100 cm2 <0.01 mrad/hr Limit 5000 dpm/100 cm 2 1000 dpm/100 cm2 0.20 mrad/hr NOTES:
- 1. Fixed contamination - No grid was found to have maximum levels of fixed contamination above background.
Alpha background = 48 dpm/100cm 2 Beta / Gamma background = 1500 dpm/1 00 cm2
- 2. Removable contamination - No grid was found to have removable contamination detectable above LLD.
Alpha LLD = 6 dpm/100 cm2 Beta / Gamma LLD = 43 dpm/100 cm2
- 3. Dose rate survey - No grid was found to have a dose rate above 0.01 mrad/hr.
A total of 101 grids were surveyed in 4 rooms. In addition to floor areas the survey included counter tops, shelves and the Lab HVAC system.