ML041830169

From kanterella
Jump to navigation Jump to search
Change of PM for South Texas - Effective 6/21/2004 Mr. Jaffe Has Returned Being PM for South Texas
ML041830169
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/30/2004
From: Gramm R
NRC/NRR/DLPM/LPD4
To: Sheppard J
South Texas
Jaffe D, NRR/DLPM, 415-1439
References
Download: ML041830169 (3)


Text

June 30, 2004 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483

SUBJECT:

CHANGE OF NRC PROJECT MANAGER FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2

Dear Mr. Sheppard:

By letter dated March 10, 2004, we informed you that Mr. Michael K. Webb had been temporarily assigned as the Project Manager (PM) for the South Texas Project, Units 1 and 2, until late June 2004 due to the temporary reassignment of Mr. David H. Jaffe. As of June 21, 2004, Mr. Jaffe has returned to his assignment as PM for the South Texas Project, Units 1 and 2, replacing Mr. Webb. Mr. Jaffe may be reached by telephone at (301) 415-1439.

All direct correspondence for Mr. Jaffe should be sent to:

Mr. David H. Jaffe Addressee Only U.S. Nuclear Regulatory Commission Mail Stop O-7D1 Washington, DC 20555 This change was effective June 21, 2004.

Sincerely,

/RA/

Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page

June 30, 2004 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483

SUBJECT:

CHANGE OF NRC PROJECT MANAGER FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2

Dear Mr. Sheppard:

By letter dated March 10, 2004, we informed you that Mr. Michael K. Webb had been temporarily assigned as the Project Manager (PM) for the South Texas Project, Units 1 and 2, until late June 2004 due to the temporary reassignment of Mr. David H. Jaffe. As of June 21, 2004, Mr. Jaffe has returned to his assignment as PM for the South Texas Project, Units 1 and 2, replacing Mr. Webb. Mr. Jaffe may be reached by telephone at (301) 415-1439.

All direct correspondence for Mr. Jaffe should be sent to:

Mr. David H. Jaffe Addressee Only U.S. Nuclear Regulatory Commission Mail Stop O-7D1 Washington, DC 20555 This change was effective June 21, 2004.

Sincerely,

/RA/

Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page Distribution:

PUBLIC RidsAcrsAcnwMailCenter RidsNrrDlpmLpdiv1(RGramm)

PDIV-1 r/f RidsOgcRp RidsNrrDlpmLpdiv (HBerkow) RidsRgn4MailCenter (BJohnson)

RidsNrrPMMWebb RidsNrrOd (JDyer/WBorchardt)

RidsNrrPMDJaffe RidsNrrAdpt (BSheron)

RidsNrrLADBaxley LBerry ACCESSION NO: ML041830169 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME DJaffe DBaxley RGramm DATE 6/30/04 6/30/04 6/30/04 OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041830169.wpd

South Texas Project, Units 1 & 2 cc:

Senior Resident Inspector A. H. Gutterman, Esq.

U.S. Nuclear Regulatory Commission Morgan, Lewis & Bockius P. O. Box 910 1111 Pennsylvania Avenue, NW Bay City, TX 77414 Washington, DC 20004 A. Ramirez/C. M. Canady Mr. T. J. Jordan, Vice President City of Austin Engineering & Technical Services Electric Utility Department STP Nuclear Operating Company 721 Barton Springs Road P. O. Box 289 Austin, TX 78704 Wadsworth, TX 77483 Mr. L. K. Blaylock S. M. Head, Manager, Licensing Mr. W. C. Gunst Nuclear Quality & Licensing Department City Public Service Board STP Nuclear Operating Company P. O. Box 1771 P. O. Box 289, Mail Code: N5014 San Antonio, TX 78296 Wadsworth, TX 77483 Mr. C. A. Johnson/A. C. Bakken Environmental and Natural Resources AEP Texas Central Company Policy Director P. O. Box 289 P. O. Box 12428 Mail Code: N5022 Austin, TX 78711-3189 Wadsworth, TX 77483 Jon C. Wood INPO Matthews & Branscomb Records Center 112 East Pecan, Suite 1100 700 Galleria Parkway San Antonio, TX 78205 Atlanta, GA 30339-3064 Arthur C. Tate, Director Regional Administrator, Region IV Division of Compliance & Inspection U.S. Nuclear Regulatory Commission Bureau of Radiation Control 611 Ryan Plaza Drive, Suite 400 Texas Department of Health Arlington, TX 76011 1100 West 49th Street Austin, TX 78756 D. G. Tees/R. L. Balcom Texas Genco, LP Brian Almon P. O. Box 1700 Public Utility Commission Houston, TX 77251 William B. Travis Building P. O. Box 13326 Judge, Matagorda County 1701 North Congress Avenue Matagorda County Courthouse Austin, TX 78701-3326 1700 Seventh Street Bay City, TX 77414 June 2004

2 cc:

Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109 June 2004