ML041410089
| ML041410089 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon (DPR-080, DPR-082) |
| Issue date: | 05/13/2004 |
| From: | Holland D NRC/NRR/DLPM/LPD4 |
| To: | Rueger G Pacific Gas & Electric Co |
| Holland D, NRR/DLPM, 415-1436 | |
| Shared Package | |
| ML041410297 | List: |
| References | |
| TAC MB5796, TAC MB5797 | |
| Download: ML041410089 (2) | |
Text
Definitions 1.1 1.1 Definitions (continued)
PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)
QUADRANT POWER TILT RATIO (QPTR)
RATED THERMAL POWER (RTP)
REACTOR TRIP SYSTEM (RTS) RESPONSE TIME SHUTDOWN MARGIN (SDM)
The PTLR is the unit specific document that provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates, and the power operated relief valve (PORV) lift settings and arming temperature associated with the Low Temperature Overpressurization Protection (LTOP) System, for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 5.6.6.
QPTR shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater.
RTP shall be a total reactor core heat transfer rate to the reactor coolant of 3411 MWt for each unit.
The RTS RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its RTS trip setpoint at the channel sensor until loss of stationary gripper coil voltage. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC.
SDM shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:
- a.
All rod cluster control assemblies (RCCAs) are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn. With any RCCA not capable of being fully inserted, the reactivity worth of the RCCA must be accounted for in the determination of SDM; and
- b.
In MODES 1 and 2, the fuel and moderator temperatures are changed to the hot zero power temperatures.
I (continued)
Diablo Canyon - Units 1 & 2 1.1-5 Unit 1 - Amendment No. 35, 443j 170 Unit 2 - Amendment No. 4-35,171
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.6 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) (continued)
- b.
The analytical methods used to determine the RCS pressure and temperature and LTOP limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1.
WCAP 14040-NP-A, "Methodology Used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves."
- 2.
Chapter 6.0 of WCAP-1 5958, "Analysis of Capsule V from Pacific Gas and Electric Company Diablo Canyon Unit 1 Reactor Vessel Radiation Surveillance Program."
- c.
The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for any revision or supplement thereto.
5.6.7 Not Used 5.6.8 PAM Report When a report is required by Condition B or F of LCO 3.3.3, "Post Accident Monitoring (PAM) Instrumentation,' a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
5.6.9 Not Used I
(continued)
Diablo Canyon - Units 1 & 2 5.0-28 Unit 1 - Amendment No. 445, 468,170 Unit 2 - Amendment No. 1-35, 4-6,171