|
---|
Category:- No Document Type Applies
MONTHYEARML22041B1072022-02-10010 February 2022 LTR-22-0033-1 Oedo Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML20177A4932020-06-25025 June 2020 Enclosure a - Redacted Owners, Officers, Directors, and Executive Personnel Forms for Energy Harbor Corp., Energy Harbor Nuclear Corp., and Energy Harbor Nuclear Generation LLC ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 62016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 ML16132A3962016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 5 of 6 ML16132A3942016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 3 of 6 ML16132A3932016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 2 of 6 ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML12167A0622012-07-16016 July 2012 Enclosure - Davis-Besse 17RFO SG Tube Inspection Tables ML12170B1042012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #4 Scenario ML12170B1052012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #5 Scenario ML12200A1832012-06-12012 June 2012 Unit Licensing Basis Seismic Ground Motion Concern ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11348A0432011-12-12012 December 2011 Email -- Davis-Besse SB Crack Rc Investigation RFI ML12213A3532011-11-15015 November 2011 Shield Building Laminar Cracking ML12213A3512011-11-10010 November 2011 Containment Shield Building Issue ML12200A1952011-11-0707 November 2011 Shield Building Issue NRC Technical Reviewer Focus Questions ML11301A2392011-10-31031 October 2011 Reference: Wind Resource Estimates Developed by Aws Truepower LLC for Windnavigator ML11301A2352011-10-31031 October 2011 References: Concentrating Solar Resources of the United States ML1126601882011-09-23023 September 2011 NRC 2011 Davis-Besse L-11-165, Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30)2011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30) ML11193A1332011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 1 Through Tab H 16) ML11193A1042011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 17 to Tab C 2) ML11227A1962011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab Am 1 Through a 7) ML11109A0842011-04-15015 April 2011 Attachments B-D, to L-11-107, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML1016006942010-06-10010 June 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse - T. Gurdziel Questions ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0906500232009-03-0606 March 2009 Safety Culture Policy Statement (Safety & Security) Comments ML0904800182009-02-17017 February 2009 Public Comments Regarding the Safety Culture Policy Statement ML0906404392009-01-28028 January 2009 Enclosure 5: Case Study 1: Structure of TS for Ultrasonic Flow Meters - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0829101252008-11-20020 November 2008 ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues ML0829007802008-11-20020 November 2008 ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues ML0829006832008-11-20020 November 2008 Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues ML0829101122008-11-20020 November 2008 ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues ML0824902712008-10-0202 October 2008 List of Acronyms to Davis Besse Draft Amend. ITS Conversion L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs2008-08-26026 August 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs ML0803600792008-02-0101 February 2008 Attachment 1- DBNPS Steam Generator Inspections Data ML0802800442008-01-25025 January 2008 Special Inspection Evaluation, Basis for Investigatory Response Decision for a Significant Operational Power Reactor Event ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0733801902007-06-27027 June 2007 Meeting Attendees, 6/27/07, Meeting with Firstenergy Nuclear Operating Company Regarding May 14, 2007, Demand for Information ML0634705992006-12-14014 December 2006 Plant Service List ML0535402852005-12-16016 December 2005 Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment 7 to Indemnity Agreement B-79 ML0530704422005-11-0808 November 2005 Proposal to Clean Incore Tunnel and Below Vessel - a Locked High Radiation Area ML0531302012005-04-21021 April 2005 Timeline for Enforcement Actions ML0423002112004-08-0505 August 2004 Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 2 2022-02-10
[Table view] |
Text
NEW FOR PANEL 02119104 RAM Item No. - -37 Closed:
Descriotion of Issue - Are there any outstanding NRC staff questions concerning the Davis-Besse steam generator tube inspection completed March 9, 2002, specifically with regard to the Information provided by the licensee dated November 3, 2003.
Description of Resolution - In accordance with Technical Specification (TS) 4.4.5.5.a, the licensee submitted the 2002 steam generator tube inspection results concerning the number of tubes plugged and repaired by letter dated March 22, 2002. Additionally, in accordance with TSs 4.4.5.5.b and 6.9.1.5.b, the licensee submitted more detailed inspection results by letter dated March 31, 2003. The NRC. staff reviewed the Inspection results and requested additional Information from the licensee. The staff questions were placed on the docket by letter dated September 23, 2003, and the licensee responded to the questions by letter dated November 3, 2003.
Based on Its review of the Information provided on November 3, 2003, the staff developed additional questions which were provided to the licensee and placed on the docket by letter dated December 11, 2003. The licensee responded to those questions by letters dated December 17, 2003, and January 7, 2004. The NRC staff has reviewed the submittals and determined that the licensee has adequately responded to the staff's questions. This item is closed.
Reference Material - March 22, 2002 letter (ADAMS ML020850568), March 31, 2003 letter (ADAMS ML030930374), September 23, 2003 letter (ADAMS ML032550146),
November 3, 2003 letter (ADAMS ML033100370), December 11, 2003 letter (ADAMS ML033421010), December 17, 2003 letter (ADAMS ML033560258), and January 7, 2004 letter (ADAMS ML040090189).
RAM Item No. - C-38 Closed:
Description of Issue - Requests for Issues: Resolve TIA on Fire Protection Issues Description of Resolution -
By memorandum dated December 15, 2003, the Panel requested technical assistance from the Office of Nuclear Reactor Regulation (NRR) regarding procedural allowance permitting reactor coolant level to go to the top of active fuel under certain post-fire safe shutdown scenarios at the Davis-Besse Nuclear Power Station, Unit 1.
The NRR staff has concluded that Davis-Besse Abnormal Procedure DB-OP-02519, Serious Control Room Fire,* continues to provide reasonable assurance that, for anticipated fires in the control room or cable spreading room, the reactor can be safely shut down.
The detailed NRR staff determination Is provided In a February 6, 2004, memorandum from E.
Leeds to J. Grobe transmitting the response to TIA 2003-006.
Based on the above, the concern regarding procedural allowance permitting reactor coolant level to go to the top of active fuel under certain post-fire safe shutdown scenarios at the Davis-Besse is resolved.
Reference Material - February 6, 2004, memorandum from E. Leeds to J. Grobe transmitting the response to TIA 2003-006.
RAM Item No. - C-42 Closed:
Descrlotion of Issue - Commenter at Restart Meeting on 2/12/04 Asked What Had Happened to Thermo-lag Orders of May and June 1998 for Davis-Besse. Were the Actions Completed?
Description of Resolution -
Jon Hopkins researched this Issue and-found that there was one Confirmatory Order issued to Davis-Besse on Thermo-Lag dated June 22, 1998.
On May 4, 1998, NRR sent the draft Confirmatory Order to the licensee asking them to sign for consent to the Order. Following some negotiation of the Order language, consent was signed on June 11,1998 and Order was issued June 22,1998. In summary, the Order said complete Thermo-Lag corrective actions by December 31, 1998.
By letter dated January 25, 1999, the licensee provided written confirmation of a telephone call to the NRC on December 23, 1998, that modifications for Thermo-Lag were completed on December 22, 1998.
Reference Material - February 18, 2004, email from J. Hopkins to Grobe, John; Lipa, Christine; Mendiola, Anthony; Ruland, William and cc to Baker, Randal; Lyon, Carl; Passehl, Dave; Phillips, Monte; Rutkowski, John; Salter-Williams, Monica; Shea, James; Stang, John; Thomas, Christopher.