IR 05000346/2003020

From kanterella
Jump to navigation Jump to search
IR 05000346-03-020 (Drs); 09/08/03 - 10/01/03; Davis-Besse Nuclear Power Station; Ti 2515/148, Verification of Compliance with Interim Compensatory Measures Order, Revision 2; Baseline Procedures 71130.02, 71130.03 and 71151
ML033630738
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/11/2003
From: Grobe J
NRC/RGN-III
To: Myers L
FirstEnergy Nuclear Operating Co
References
IR-03-020
Download: ML033630738 (4)


Text

ber 11, 2003

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION NRC SAFEGUARDS INSPECTION OF COMPLIANCE WITH ORDER AND BASELINE INSPECTION INSPECTION REPORT 05000346/2003020(DRS)

Dear Mr. Myers:

On October 1, 2003, the NRC completed an inspection at your Davis-Besse Nuclear Power Station. The enclosed report documents the inspection findings which were discussed on September 12, 2003, and October 1, 2003, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to compliance with the Commissions regulations, orders, and the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, without enclosure, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Enclosure Contains Upon Separation This Page is Decontrolled Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

John A. Grobe, Chairman Davis-Besse Oversight Panel Docket No. 50-346 License No. NPF-3 Enclosure: Inspection Report 05000346/2003020(DRS)

( )

cc w/encl ( ):

E. McNeil, (NSIR/DNS/RSS)

B. Westreich, (NSIR/DNS)

cc w/encl w/o :

G. Leidich, President - FENOC Plant Manager The Honorable Dennis Kucinich Manager - Regulatory Affairs M. OReilly, Attorney, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County Steve Arndt, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists J. Riccio, Nuclear Policy Analyst P. Gunter, Director, Nuclear Watchdog Project Enclosure Contains Upon Separation This Page is Decontrolled