ML040570370
| ML040570370 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/26/2004 |
| From: | NRC/NRR/DLPM/LPD3 |
| To: | |
| Lyon C, NRR/DLPM, 415-2296 | |
| Shared Package | |
| ML040580026 | List: |
| References | |
| TAC MC1573 | |
| Download: ML040570370 (1) | |
Text
REACTOR COOLANT SYSTEM SURVEILLANCE REOUIREMENTS (Continued)
Notes: (1)
In all inspections, previously degraded tubes must exhibit significant (> 10%)
further wall penetrations to be included in the above percentage calculations.
(2)
Where special inspections are performed pursuant to 4.4.5.2.b, defective or degraded tubes found as a result of the inspection shall be included in determining the Inspection Results Category for that special inspection but need not be included in determining the Inspection Results Category for the general steam generator inspection.
4.4.5.3 Inspection Frequencies - The above required inservice inspections of steam generator tubes shall be performed at the following frequencies:
- a. Inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months** after the previous inspection. If the results of two consecutive inspections for a given group of tubes following service under all volatile treatment (AVT) conditions fall into the C-1 category or if two consecutive inspections demonstrate that previously observed degradation has not continued and no additional degradation has occurred, the inspection interval for that group may be extended to a maximum of 40 months.
- b. If the results of the inservice inspection of a steam generator performed in accordance with Table 4.4-2 at 40 month intervals for a given group* of tubes fall in Category C-3, subsequent inservice inspections shall be performed at intervals of not less than 10 nor more than 20 calendar months after the previous inspection. The increase in inspection frequency shall apply until a subsequent inspection meets the conditions specified in 4.4.5.3a and the interval can be extended to 40 months.
- c. Additional, unscheduled inservice inspections shall be performed on each steam generator in accordance with the first sample inspection specified in Table 4.4-2 during the shutdown subsequent to any of the following conditions:
I. Primary-to-secondary tube leaks (not including leaks originating from tube-to tube sheet welds) in excess of the limits of Specification 3.4.6.2.
If the leak is determined to be from a repair roll joint, rather than selecting a random sample, inspect 100% of the repair roll joints in the affected steam generator. If the results of this inspection fall into the C-3 category, perform additional inspections of the new roll areas in the unaffected steam generator.
- A group of tubes means:
(a) All tubes inspected pursuant to 4.4.5.2.b, or (b) All tubes in a steam generator less those inspected pursuant to 4.4.5.2.b.
- An exception applies for the interval following the March 2002 inspection completed during the Thirteenth Refueling Outage. Under this exception, the next inservice inspection may be delayed until March 31, 2005.
DAVIS-BESSE, UNIT 1 314 4-8 Amendment No. 21, 220, 262