Jan. 28, 2004 Page 1
of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-4379 USER INFORMATIONAL GE\\ ACH*RO EMPL#:28401 CA#: 0363 Addr UCSA2 Phone 94 TRANSMITTAL INFORMATION:
TO:
3E.
+/-ub M
01/28/2004 LOCATION: - USNRC; FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
\\,>HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM1 -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/22/2004 ADD MANUAL TABLE OF CONTENTS DATE: 01/27/2004 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT 3.11.2.1 REMOVE:
REV:0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT 3.11.2.6 REMOVE:
REV:0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT 3.3.6 REPLACE:
REV:1 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT B3.11.2.6 REMOVE:
REV:0 ADD:
REV: 1 ATEGORY: DOCUMENTS TYPE: TRM1 TEXT LOES REMOVE:
REV:4 WfI1
Jan. 28, 2004 Page 2
of 2 ADD:
REV: 5 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT TOC REMOVE:
REV:1 ADD:
REV: 2 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LISTOFEFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL) 1,.
I i
Section Title Effective Date TOC 1.0 2.0 3.0-3.1 3.2 TABLE OF CONTENTS 01/21/2004 I.
USE AND APPLICATION Pages TRM / 1.0-1 through TRM 1.0-3 PLANT PROGRAMS Pages 2.0-1 through 2.0-2 Page TRM / 2.0-3 Page TRM /2.0-4 Page TRM /2.0-5 Pages TRM /2.0-6 and TRM /2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Pages TRM /2.0-10 and TRM /2.0-11 Page TRM / 2.0-12 Page TRM 2.0-13 APPLICABILITY an Pages TRM /3.0-1 and TRM /3.0-2 X,
Pages TRM /3.0-3 Page TRM 3.0-4 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3., 16 '
Pages TRM / 3.1-7 and TRI 3.1-8 Pages TRM / 3.1-9 aind TRM' i3.1-9a Page TRM / 3.1 10'., \\'
CORE OPERATING LIMITS REPORT Page TRM7,3.2-1 Pages"TRi 13 2-2 through TRM /3.2-37 INSTRiMENTATION (PagesXTRM / 3.3-1 through TRM 1 3.3-3
\\,PageTRM 3.3-4 Pages 3.3-5 through 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Pages TRM / 3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 and TRM / 3.3-14 Page'TRM / 3.3-15 Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 through TRM 13.3-21 Page 3.3-22 10/0412002 08/31/1998 08/01/2001 06/25/2002 04/02/1999 10/2212003 03129/2000 09/04t2002 04/0211999 10122/2003 06/16/2000 04/08/1999 03/1512002 04/08/1999 3.3
'08/31/1998 06/0512002 02/18/1999 02/18/1999 07/07/1999 11/01/2003 07/16/1999
,1112812000 08/31/1998 12/17/1998 12/17/1998 03/30/2001 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10122/2003 08/31/1998 9
SUSQUEHANNA - UNIT 1 ITRM /LOES-1 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5
" LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
)N Section Title Effective Date Pages TRM / 3.3-23 through TRM / 3.3-25 Page TRM / 3.3-26 05/16/2003 10/22/2003 3.4 i
iA,
l il 3.5 3.6 3.7 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM /3.6-4 Page 3.6-5 Pages TRM I 3.6-6 through TRM /3.6-8 PLANT SYSTEMS Pages 3.7-1 through 3.7-3.
Pages TRM /3.7-4 through TRM /3.7-10 Page TRM/ 3.7-11 Pages TRM / 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Page TRM / 3.7-34a Pages TRM / 3.7-35 through TRM / 3.7-37 Pages 3.7-38 through 3.7-40 Pages TRM / 3.7-41 and TRM / 3.7-41 a Pages 3.7-42 and 3.7 Pages 3.7-44 through 3.7-48 Page TRM /3.749 Pages TRM / 3.7-50 and TRM / 3.7-51 Pages TRM / 3.7-52 and TRM / 3.7-53 Page TRM / 3.7-54 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Page 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-9 Page TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-11 a Pages 3.8-12 through 3.8-14 10/23/1998 08/31/1998 08/31/1998 04117/2000 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 08/31/1998 08/02/1999 12/29/1999 08/02/1999 11/16/2001 01/09/2004 11/16/2001 10/05/2002 02/01/1999 08/31/1998 08/11/2000 08/31/1 998 10/13/1998 03/08/2003 03/09/2001 04/15/2003 07/29/1999 04/02/2002 08/31/1998 12/31/2002 04/02/2002 08/31/1 998 07/19/2001 04/02/2002 04/02/2002 08/31/1998 3.8 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 01/21/2004
-A SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25.
04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 08/31/1998 3.9 3.10 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 08/31/1998 08/31/1998 03/08/2003 06/05/2002 04/07/2000 Corrected 04/17/2002 3.11 3.12 4.0 Page TRM /3.10-8 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 and 3.11-18 Page TRM /3.11-19 Pages 3.11-20 and 3.11-21 Pages TRM / 3.11-22 through TRM / 3.11-24 Page 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-32 Pages 3.11-33 through 3.11-47 08/31/1998 09/01/1998 08/31/1998 01/21/2004 08/31/1998 04/02/2002 09/01/1998.
01/21/2004 08/31/1998 LOADS CONTROL PROGRAM
- Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 02/05/1999 08/31/1998
.i -
i SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 01121/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTA'ONS (TECHNICAL REQUIREMENTSMANUAL)
Section Title B 3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM I B 3.0-15 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM I B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM I B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 B 3.2
'CORE OPERATING LIMITS BASES Page B 3.2-1 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9
- Pages B 3.3-10 through B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 Effective Date 08/31/1998 03/15/2002 07/13/1999 08/31/1998 07/13/1999 02/18/1999 08/3.111998 04/07/2000 08/31/1998 12/29/2000 03/21/2003 03/30/2001 08/31/1998 10/22/2003 06/25/2002 06/14/2002 06/14/2002 10/22/2003 04/07/2000 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 B 3.5 ECCS AND RCIC BASES
' Pages B 3.5-1 through B 3.5-5 08/31/1998 B 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 I Page TRM / B 3.6-5 Pages TRM / B 3.6-6 through TRM / B 3.6-11 07/26/2001 02/01/1999 08/31/1998 09/23/1999 01/07/2002 12/31/2002 SUSQUEHANNA-UNIT 1 TRM / LOES-4 EFFECTIVE DATE 01/21/2004 L
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) i I
i i
i Ii i
i i
I
. I i
Ii i
'i, ii kl-,
iIiiiI ii it.iij1 i
ii I i ii Section Title Effective Date B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM I B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-1 Oa Pages TRM / B 3.7-11 and TRM / B 3.7-11 a Pages TRM / B 3.7-12 through TRM I B 3.7-14 Page TRM / B 3.7-14a Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM/B 3.7-21 through TRMIB 3.7-21a Pages TRM/B 3.7-22 and TRMIB 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM / B 3.7-32 Page TRM / B 3.7-33 Pages TRM I B 3.7-34 and TRM I B 3.7-35 B 3.8 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 Page TRM I B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-17 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 PageTRM/B3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / B 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 PageTRM/B3.11-10 Pages TRMIB 3.11-11 and TRMIB 3.11-1 la Pages TRMIB 3.11-12 and TRM(B 3.11-13 Page TRM / B 3.11-14 Page TRM I B 3.11-15
- Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 08/31/1998 08/02/1999 08/02/1999 08/0211999 08/02/1999 08102/1999 08/02/1999 08102/1999 01/0912004 02/0111999 08/3111998 05/11/2001 04/07/2000 0813111998 03/0912001 04/1512003 07/05/2000 04/02/2002 04102/2002
-04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 08/31/1 998 03/08/2003 08/23/1999 04/17/2002 08/30/1 998 02/0111999 04/0712000 02/01/1999 11/01/1999
- 02/01/1999 08/30/1998 04/02/2002 i '
!11
_ I _
SUSQUEHANNA - UNIT TRM / LOES-5 EFFECTIVE DATE 01/21/2004
7i i
. Ii A.
lj i
i I
I I
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 f LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page TRM B 3.11-20a Page TRM /B 3.11-21 Page TRMIB 3.11-22 Page TRM/B 3.11-23 Page TRM B 3.11-23a Pages TRM B 3.11-24 and TRM /B 3.11-25 Pages B 3.11-26 through B 3.11-35 Page TRM B 3.11-36 Effective Date 04/02/2002 04/0212002 09/26/2003 04/02/2002 04/02/2002 01/21/2004 08/30/1998 02/12/1999 I
133.12 LOADS CONTROL PROGRAM BASES Pages TRM B 3.12-1 through TRM B 3.12-3 Adept TRM1 te LOES 02/05/1999 i.l i
SUSQUEHANNA - UNIT 1' TRM / LOES-6 EFFECTIVE DATE 01/21/2004
i a
i SUSQUEHANNA STEAM ELECTRIC STATION
.-TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 2 SECTION 1.0 1.1
-TITLE PAGE USE AND APPLICAT ION..................
TRM1.0-1 Definitions..................
TRM/1.0-2 2.0 2.1 2.2 3.0 3.0 3.0 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.2 3.2.1 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 3.3.11 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 PLANT PROGRAMS.........................................
2.0-1 Plant Programs.............................................................................................2.0-1 Instrument Trip Setpoint Table........................................
TRM/2.0-5 APPLICABILITY..........................................................................................TRM3.0-1 TRO) - TR for Operation (TRO) Applicability....................................... TRM13.0-1 (TRS) - TR Surveillance (TRS) Applicability......................................... TRMI3.0-3 REACTIVITY CONTROL SYSTEMS.........................
3.1-1 Alternate Rod Injection..............
3.1-1 CRD Housing Support.3.1-4 Control Rod Block Instrumentation.......................................
3.1-5 Control Rod Scram Accumulators Instrumentation and Check Valve.......................................
TRM13.1-9 CORE OPERATING LIMITS REPORT..........................
TRM/3.2-1 Core Operating Limits Report..........................
TRM13.2-1 INSTRUMENTATION.
TRM/3.3-1 Radiation Monitoring Instrumentation...................................
TRM13.3-1 Seismic Monitoring Instrumentation...................................
TRM/3.3-4 Meteorological Monitoring Instrumentation................................
3.3-7 TRM Post-Accident Monitoring Instrumentation................................ TRM/3.3-9 Section Not Used..........
TRM/3.3-12 TRM Containment Isolation Instrumentation......................................
T 3.3-13 Turbine Overspeed Protection System.
................................... TRM13.3-17 Section Not Used...................................
TRM/3.3-19 LPRM Upscale Alarm Instrumentation...................................
3.3-22 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops...................................
TRM/3.3-23 MVP Isolation Instrumentation...................................
TRM13.3-25 REACTOR COOLANT SYSTEM...................................
3.4-1 Reactor Coolant System Chemistry...................................
3.4-1 Structural Integrity...................................
3.4-6 High/Low Pressure Interface Leakage Monitors...................................
3.4-9 Reactor Recirculation Flow and Rod Line Limit...................................
3.4-12 Reactor Vessel Material Surveillances Program...................................
3.4-13 SUSQUEHANNA -UNIT I TRM / TOCA EFFECTIVE DATE 01121/2004
i Ii i
i J, tI Ii i
i iI I
i i
j i
i i
i
.,j i
jii iII SUSQUEHANNA STEAM ELECTRIC STATION
-TABLE OFCONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 2 SECTION TITLE PAGE 3.5 3.5.1 3.5.2 3.5.3 3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.7 3.7.1 3.7.2 3.7.3.1 3.7.3.2 3.7.3.3 3.7.3.4 3.7.3.5 3.7.3.6 3.7.3.7 3.7.3.8 3.7.4 3.7.5.1 3.7.5.2 3.7.5.3 3.7.6 3.7.7 3.7.8 3.7.9 3.7.10 EMERGENCY CORE COOLING AND RCIC........................................
3.5-1 ADS Manual Inhibit........................................................................................3.51 ECCS and RCIC System Monitoring Instrumentation.3.5-3 Long Term Nitrogen Supply to ADS.
3.5-6 CONTAINMENT..................
3.6-1 VENTING or PURGING................................................................................13.1 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.3.6-2 Suppression Pool Alarm Instrumentation...................................
3.63 Primary Containment Closed System Boundaries............................... TRM/3.6-6 PLANT SYSTEMS 3.7-1 Emergency Service Water System (Shutdown)......
3.7-1 Ultimate Heat Sink and Ground Water Level......
3.7-3 Fire Suppression Water Supply System.......
TRM/3.7-4 Spray and Sprinkler Systems....................
TRM13.7-8 C02 systems.
TRM13.7-12 Halon Systems...........
TRM/3.7-16 Fire Hose Stations...........
TRM/3.7-18 Yard Fire Hydrants and Hydrant Hose Houses.......
TRM/3.7-22 Fire Rated Assemblies..................................................................M........TRM 3.7-24 Fire Detection Instrumentation..............................
TRM/3.7-26 Solid Radwaste System................
TRM/3.7-35 Main Condenser Offgas Hydrogen Monitor..
3.7-38 Main Condenser Explosive Gas Mixture..
3.7-39 Liquid Holdup Tanks..
3.7-40 ESSW Pumphouse Ventilation.
.M.....................
- TR3.7-41 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..................
3.7-42 Snubbers.3.7-44.
Control Structure HVAC.TRM/3.7-50 Spent Fuel Storage Pools.TRM3.7-52 SUSQUEHANNA - UNIT I TRM /TOC-2 EFFECTIVE DATE 01/21/2004 SUSQUEHANNA -UNIT 1 TRM / TOC-2 EFFECTIVE DATE 01/21/2004
K)-an K)
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
.PPL Rev. 2 SECTION 3.8 3.8.1 3.8.2.1 3.8.2.2 3.8.3 3.8.4 3.8.5 '
3.8.6 3.9 3.9.1 3.9.2 3.9.3 3.10:
3.10.1 3.10.2 3.10.3 3.10.4 3.11 3.11.1.1 3.11.1.2 TITLE PAGE ELECTRICAL POWER...............
TRM/3.8-1 Primary Containment Penetration Conductor Overcurrent Protective Devices
'.TRM3.8-1 Motor Operated Valves Thermal Overload Protection -
Continuous.
TRM3.8-5 Motor Operated Valves Thermal Overload Protection -
Automatic.
TRM/3.8-11 Diesel Generator (DG) Maintenance Activities.......
3.8-13 24VDC Electrical Power Subsystem........
TRM13.8-15 Degraded Voltage Protection.......
TRM/3.8-21 Emergency Switchgear Room Cooling.......
3.8-24 REFUELING OPERATIONS...................................................................1...........3.91 Decay Time....................................................................................................3.-1 Communications....................
3.9-2 Refueling Platform......................................................................................... 3.3' MISCELLANEOUS 3.10-1 Sealed Source Contamination 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation.3.10-4 Independent Spent Fuel Storage Installation (ISFSI).TRM3.10-7 Leading Edge Flow Meter (LEFM).T...........................
RM/3.10-8 RADIOACTIVE EFFLUENTS...........................
3.11-1 Liquid Effluents Concentration...........................
3.11-1
-Liquid Effluents Dose...........................
3.11-4 3.11.1.3 Liquid Waste Treatment System...........................
3.11-6 3.11.1 A Liquid Radwaste Effluent Monitoring Instrumentation................................... 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation............................... 3.11-13 3.11.2.1 Dose Rate.......................................
3.11-17 3.11.2.2 Dose - Noble Gases.......................................
3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form
.......... 3.11-21 3.11.2.4 Gaseous Radwaste Treatment System...............................
TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System...............................
TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation............................
3.11-25 3.11.3 Total Dose............................
3.11-33 3.11 A.1 Monitoring Program............................
3.11-35 3.11.4.2 Land Use Census.............................
3.11.45 3.11.4.3 Interlaboratory Comparison Program............................
3.11-47 I
i I
i i -I I ii I
I.j i
SUSQUEHANNA-UNIT I TRM I TOC-3 EFFECTIVE DATE 01121/2004 SUSQUEHANNA - UNIT TRM / TOC-3
-EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION
-TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 2
-41) i i
I i
i I
i i
1 I
i
, i SECTION 3.12 3.12.1 3.12.2 3.12.3 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 i
TITLE PAGE LOADS CONTROL PROGRAM............................
TRM/3.12-1 Crane Travel - Spent Fuel Storage Pool............................
TRM/3.12-1 Heavy Loads Requirements............................
TRM/3.12-3 Light Loads Requirements............................
TRMI3.12-5 ADMINISTRATIVE CONTROLS............................
4.0-1 A *A 1 vlY
--a-- -
t.u I--I-------
Reportable Event Action Safety Limit Violation.
Procedures and Programs.
Reporting Requirements.
Radiation Protection Program.
Training.
I........................................................................
.4.0-2
.4.0-3 A (LA I...........
.4.0-5
,.4.0-7 A rL.J I..........................................................................
i
-4.K)
I SUSQUEHANNA -UNIT 1 TRM / TOC-4 EFFECTIVE DATE 01/21/2004
..,0 SUSQUEHANNA STEAM ELECTRIC STATION' TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 2 SECTION B 3.0 B3.0 B 3.0 B 3.1.1 B 3.1.2 B 3.1.3 B 3.1.4 B 3.2.1 B 3.3.1 B 3.3.2 B 3.3.3 B 3.3.4 B 3.3.5 B 3.3.6 B 3.3.7 B 3.3.8 B 3.3.9 B 3.3.10 B 3.3.11 B 3.4.1 B 3.4.2 B 3.4.3 B 3.4.4 B 3.4.5 B 3.5.1 B 3.5.2 B 3.5.3 TITLE PAGE Applicability.......
B 3.0-1 (TRO) - TR for Operation (TRO) Applicability.......................................
B 3.0-1 (TRS) - TR Surveillance (TRS) Applicability.B 3.0-9 Alternate Rod Injection.TRMNB 3.1-1 CRD Housing Support.TRMB 3.1-4 Control Rod Block Instrumentation.TRM/B 3.1-5 Control Rod Scram Accumulators Instrumentation and Check Valve.......
TRMIB 3.1-8 Core Operating Limits Report (COLR)........
B 3.2-1 Radiation Monitoring Instrumentation........
TRM/B 3.3-1 Seismic Monitoring Instrumentation........
B 3.3-2 Meteorological Monitoring Instrumentation.................................. ;.:.TRM/B 3.3-3 TRM Post-Accident Monitoring Instrumentation............................... TRM/B.3.3-4 Section Not Used.TRM/B 3.3-7 TRM Containment Isolation Instrumentation.B 3.3-10 Turbine Overspeed Protection System.TRM/B 3.3-14 Section Not Used.TRM/B 3.3-15 LPRM Upscale Alarm Instrumentation.................................
TRM/B 3.3-17 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops..
TRMB 3.3-18 MVP Isolation Instrumentation.TR/B 3.3-20 Reactor Coolant System Chemistry.B 3.4-1 Structural Integrity...........
B 3.4-2 High/Low Pressure Interface Leakage Monitors.......
B 3.4-4 Reactor Recirculation Flow and Rod Line Limit.......
TRM/B 3.4-5 Reactor Vessel Material Surveillances Program.......
B 3.4-6 ADS Manual Inhibit......................................
B 3.5-1 ECCS and RCIC System Monitoring Instrumentation.B 3.5-3 Long Term Nitrogen Supply to ADS
.B 3.5-4 SUSQUEHANNA - UNIT I TRM I TOC-5 EFFECTIVE DATE 01/2112004 SUSQUEHANNA -UNIT TRM I TOC-5 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 2 31 SECTION
- B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.7.1 B 3.7.2 B 3.7.3.1 B 3.7.3.2 B 3.7.3.3 B 3.7.3.4 B 3.7.3.5 B 3.7.3.6 B 3.7.3.7 B 3.7.3.8 B 3.7.4 B 3.7.5.1 B 3.7.5.2 B 3.7.5.3 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10
.... :, ;., i TITLE PAGE VENTING or PURGING...........-............................................................ TR /B 3.6-1 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication B 3.6-3 Suppression Pool Alarm Instrumentation.............................................TRM/B 3.6-4 Primary Containment Closed System Boundaries.
TRM/B 3.6-6 Emergericy Service Water System (Shutdown).B 3.7-1 Ultimate Heat Sink and Ground Water Level.B 3.7-2 Fire Suppression Water Supply System.
TRM/B 3.7-3 Spray and Sprinkler Systems.
TRMB 3.7-5 C02 systems.
TRM/B 3.7-7 HalonSystms............................................................................
T RM/B 3.7-8 Halon Systems...RM..B..3.7-8..
Fire Hose Stations........
TRM/B 3.7-10 Yard Fire Hydrants and Hydrant Hose Houses.
TRM/B 3.7-11 Fire Rated Assemblies.............
T.......
RM/B 3.7-12 Fire Detection Instrumentation..............................................................TRM/B 3.7-14 Solid Radwaste System........
TRM/B 3.7-15 Main Condenser Offgas Hydrogen Monitor.B 3.7-17 Main Condenser Explosive Gas Mixture.
B 3.7-19 Liquid Holdup Tanks.
B 3.7-20 ESSW Pumphouse Ventilation......................
TR......
RM/B 3.7-21 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation....
TRM/B 3.7-22 Snubbers...
B 3.7-24 Control Structure HVAC...
TRM/B 3.7-31 Spent Fuel Storage Pools...
TRM/B 3.7-33 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices..............
TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous' TRM/B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
Automatic..
T R/B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities.........
B 3;8-5 B 3.8.4 24VDC Electrical Power Subsystem..........
B 3.8-6 B 3.8.5 Degraded Voltage Protection.........
TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling........
TRM/B 3.8-17 B.3.9.1 B 3.9.2 Decay Time..........
B 3.9-1 Communications..........
B 3.9-2 SU Q E A N
-........ UN T IT M I O -
F E T V A E 0 / 1 2 0 SUSQUEHANNA - UNIT I
'TRM / TOC-6 EFFECTIVE 15ATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION
'rABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 2 SECTION B 3.9.3 B 3.10.1 B 3.10.2 B 3.10.3 B 3.10.4 TITLE PAGE Refueling Platform.....................................
B 3.9-3 Sealed Source Contamination........
B 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation........
B 3.10-2 Independent Spent Fuel Storage hstallation (ISFSI)........
TRM/B 3.10-4 Leading Edge Flow Meter (LEFM).
RM/B 3.1 0-6 B 3.11.1.1 B 3.11.1.2 B 3.11.1.3 B 3.11.1.4 B 3.11.1.5 B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.A.3 B.3.12.1 B.3.12.2 B.3.12.3 Liquid Effluents Concentration......................................
B 3.11-1 Liquid Effluents Dose......................................
B 3.11-4 Liquid Waste Treatment System......................................
B 3.11-6 Liquid Radwaste Effluent Monitoring Instrumentation................................... B 3.11-7 Radioactive Liquid Process Monitoring Instrumentation....................... TRMI/B 3.11 -10
'Dose Rate..............................
TRMNB 3.11-12 Dose - Noble Gases..............................
B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulate Form............................
B 3.11-18 Gaseous Radwaste Treatment System............................
TRM/B 3.11-20 Ventilation Exhaust Treatment System............................
TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation............................
TRM/B 3.11-24 Total Dose............
B 3.11-26 Monitoring Program...........................
B 3.11-28 Land Use Census...........................
B 3.11-34 Interlaboratory Comparison Program...........................
TRM/B 3.11-36 Crane Travel - Spent Fuel Storage Pool...........................
TRM/B 3.12-1 Heavy Loads Requirements...........................
TRMIB 3.12-2 Light Loads Requirements............................
TRM/B 3.12-3 I.
KJ Adept TRM1 text TOC
.)
'I I
SUSQUEHANNA - UNIT 1 TRM I TOC-7 EFFECTIVE DATE 01/2112004
-LI II iii I i i
II i
II i
TRM Isolabon Actuation Instrumentation 3.3.6
. PPL Rev. 1 3.3 Instrumentation 3.3.6 TRM Isolation Actuation instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.
APPLICABILITY:
As specified in Table 3.3.6-1 ACTIONS NOTES Separate Condition entry is allowed for each channel.
I "I~~~~~
ok, A
CONDITION REQUIRED ACTION COMPLETION TIME J.
I A. One or more required channels inoperable A.1 Place channel in trip.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for Function 1.a and 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 1.a and 2.a B. One or more Functions B.1 Restore isolation 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with isolation capability not capability.
maintained.
I
'i I
SUSQUEHANNA - UNIT 1 TRM / 3.3-13 EFFECTIVE DATE 12/14/1998 X _...... _
TRM Isolation Actuation Instrumentation
.PPL Rev. 1 TECHNICAL REQUIREMENT SURVEILLANCE NOTES
- 1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
3.3.6
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.
SURVEILLANCE FREQUENCY TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
- TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis SUSQUEHANNA - UNIT 1 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998
l
- L TRM Isolation Actuation Instrumentation
.PPL Rev. 1 3.3.6
~~~
TABLE 3.3.6-1 (Page 1 of 2)
PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a. Reactor Building 1,2,3 2
TRS 3.3.6.2 s 108°F Main Steam Tunnel TRS 3.3.6.3 A Temperature - High TRS 3.3.6.5
- b. Turbine Building 1,2,3 2
TRS 3.3.6.2 s 200OF Main Steam Line TRS 3.3.6.3 Tunnel Temperature -
TRS 3.3.6.5 High
- 2. Primary Containment Isolation
- a. Main Steam Line 1,2,3 2
TRS 3.3.6.1 s 21 x full power Radiation - High, High TRS 3.3.6.2 background without TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(a)
- 3. High Pressure Coolant Injection (HPCI) System Isolation
- a. HPCI Pipe Routing 1,2,3 1
TRS 3.3.6.2 s 98F Area A Temperature -
- b. HPCI Equipment Room 1.2,3 1
TRS 3.3.6.2 s 98°F A Temperature - High TRS 3.3.6.3 TRS 3.3.6.5 (continued)
(a) Radiation detectors are exempt from response time testing.
SUSQUEHANNA - UNIT 1 TRM / 3.3-15 UTEFFECTIVE DATE 10/22/2003
. TRM Isolation Actuation Instrumentation 3.3.6
-PPL Rev. 1 TABLE 3.3.6-1 (Page 2 of 2)
PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE FUNCTION
- 4.
Reactor Core Isolation Cooling (RCIC) System Isolation
- a. RCIC Pipe Routing Area A Temperature -
High 1,2,3 I
TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5 s 98F I-1
- b. RCIC Equipment Room A Temperature - High
- 5.
Reactor Water Cleanup (RWCU) System Isolation
- a. RWCU Penetration Area A Temperature -
High
- b. RWCU Pump Area A Temperature - High
- c.
RWCU Heat Exchanger Area A Temperature -
High
- 6.
Shutdown Cooling System Isolation (a)
-1,2,3 1,2,3 1.2,3 1,2,3 1
1 A1 1
TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5
.TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5 TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5 TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5 s 98&F
< 72*F
< 72 01F
< 720F
- a. RHR Flow - High 3,4,5 I
TRS 3.3.6.1 TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5
- 26,000 gpm (a)
Not required when'the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.-
SUQEAN NT1TM/331 FFCIEDT
/720
PPL Rev. 1 Dose Rate 3.11.2.1 3.11 Radioactive Effluents 3.11.2 Gaseous Effluents 3.11.2.1 Dose Rate TRO 3.11.2.1 The dose rate due to radioactive materials released in gaseous effluents to areas at and beyond the SITE BOUNDARY (See FSAR Section 2.1.1.3) shall be limited to the following:
I.
For Noble Gases:
A Less than or equal to 500 mrems/yr to the total body, and B.
Less than or equal to 3000 mrems/yr to the skin AND II.
For iodine-131, iodine-133, tritium, and all radionuclides in particulate form with half lives greater than 8 days A
Less than or equal to 1500 mremlyr to any organ (Inhalation pathways only.)
APPLICABILITY:
At all times.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A
Dose rate(s) exceed A.1 Restore the release rate Immediately the above limits to within the above limits
. -i,
.! -1 j
i.1 SUSQUEHANNA - UNIT 1
.3.1 1-17 EFFECTIVE DATE 8/31/1998
i I
i.
.II i
I -
PPL Rev. 1 Dose Rate 3.11.2.1 I
ii 4i.
- I i
I i
1.
16 I
I
. I:
i TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.11.2.1.1 Determine the dose rate due to noble See ODCM gases in gaseous effluents.
TRS 3.11.2.1.2 The dose rate due to iodine-1 31, iodine-See Table 133, tritium, and all radionuclides in 3.11.2.1-1 particulate form with half-lives greater than 8 days in gaseous effluents shall be determined to be within the limits in accordance with the methodology and parameters of the ODCM by obtaining representative samples and performing analyses in accordance with the sampling and analysis program specified in Table 3.11.2.1-1 SUSQUEHANNA - UNIT 1
- 3.11-18 EFFECTIVE DATE 8/31/1998
PPL Rev. I Dose Rate 3.11.2.1 TABLE 3.11.2.1-1 RADIOACTIVE GASEOUS EFFLUENT SAMPLING AND ANALYSIS Sampling Lower Limit of Method and Minimum Feqhodeny Analysis Type of Activity Detection (LLD)
Gaseous Release Type
.Frequency Frequency Analysis
(.tCi/ml)
A Containment Purge Prior to each purge Prior to each Principal Noble 1E-4 Grab Sample purge Gas Gamma Emitters H-3 1 E-6 B. Reactor Building Vents, Turbine Building Vents, and SGTS 31 daysa)
Grab Sample 31 days (')
Principal Noble Gas. Gamma Emitters 1E-4 H-3 1 E-6 Continuous° Iodine 7days(c) 1-131 1E-12 Cartridge Sample 1-133 1E-10 Continuous°b 7 days (c)
Principal IE-11 Particulate Gamma Particulate sample Emitters 1-131 Continuous° 92 days Gross Alpha 1 E-1 1 Composite d Particulate Sample Continuous° 92 days Sr-89, Sr-90 1E-11 Composite(d)
Particulate sample Noble gas analyses shall be performed following shutdown, startup, or a THERMAL POWER change exceeding 15% of the RATED THERMAL POWER within a 1-hour period.
The ratio of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with TROs 3.11.2.1, 3.11.2.2, and 3.11.2.3.
Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after changing, or after removal from sampler. Sampling shall also be performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for at least 7 days following each shutdown, startup, or THERMAL POWER change exceeding 15% of RATED THERMAL POWER in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and analyses completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of changing.
When samples collected for < 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are analyzed, the corresponding LLDs may be increased by a factor of 10.
d Minimum frequency for initiation of required analysis.
I SUSQUEHANNA - UNIT 1 TRM i13.1 1-19 EFFECTIVE DATE 01/21/2004
PPL Rev. 1 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 3.11 Radioactive Effluents 3.11.2 Gaseous Effluents
.3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.
APPLICABILITY:
According to Table 3.11.2.6-1 ACTIONS NOTE Separate condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A
Radioactive gaseous A.1 Suspend the release of Immediately effluent monitoring radioactive gaseous instrumentation effluents monitored by channel alarm/trip the affected channel setpoint less conservative than OR required to ensure that the limits of A.2 Declare the channel inoperable Immediately Requirement 3.11.2.1 are not exceeded (continued)
SUSQUEHANNA - UNIT 1 3.11-25 EFFECTIVE DATE 9/01/1998
I I
i i
I iI-L.
14 i
i I
PPL Rev. 1 Radi6active Gaseous Effluent Monitoring Instrumentation 3.11.2.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B.
Reactor Building B.1 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Ventilation System while release is Noble Gas Activity in progress.
Monitor low range AND channel inoperable B.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the of grab sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)
AND B.3 Restore monitoring 30 days instrumentation C. Deleted D. Reactor Building Ventilation!
D.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System Effluent while release is System Flow Rate Monitor in progress or Sampler Flow Rate AND Monitor inoperable D.2 Restore monitoring 30 days instrumentation (continued) i' SUSQUEHANNA - UNIT 1 TRM 3.1 1-26 EFFECTIVE DATE 01121/2004
PPL Rev. I Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Turbine Building E.1 Verify mechanical vacuum Immediately Ventilation System pump is not in operation Noble Gas Activity Monitor low range AND channel inoperable E.2 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required after sample LLDs for the principal noble gas gamma emitters (Table 3.11.2.1-1)
AND E.4 Restore monitoring instrumentation 30 days F.
Deleted G. Turbine Building G.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Ventilation Monitoring while release is System Effluent System in progress.
Flow Rate Monitor or AND Sampler Flow Rate Monitor inoperable G.2 Restore monitoring 30 days instrumentation (continued) i ir
)
. I i
i
. Ii i
SUSQUEHANNA - UNIT 1 TRM / 3.11-27 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME H. Standby Gas Treatment H.1 Take grab samples Once per.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System Noble Gas while release is Activity Monitor low in progress range channel inoperable AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activiy to the of grab sample required LLDs for being taken principal noble gas gamma emitters (Table 3.11.2.1-1)
AND H.3 Restore monitoring 30 days instrumentation I.
Deleted J.
SGTS Ventilation Monitoring J.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System Effluent flow rate while release is monitor or sample flow in progress.
rate monitor AND inoperable J.2 Restore monitoring 30 days instrumentation I
(continued)
.I
.i V
SUSQUEHANNA - UNIT 1 ITRM / 3.1 1-28 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 1PPL Rev. 1 ACTIONS (continued)
CONDITION REQUIRED ACTION.
COMPLETION TIME K.
Required Actions and K.1 Explain why this In the next Annual Completion Times not inoperability was not Radioactive Effluents met for Conditions B corrected in a timely manner Release Report per through J TS Section 5.6 TECHNICAL REQUIREMENT SURVEILLANCE
- NOTE Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.
SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months I
SUSQUEHANNA - UNIT 1 TRM 3.11-29 EFFECTIVE DATE 01/21/2004
PPL Rev. 1 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.1 1.2.6-1 (Page 1 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 1. REACTOR BUILDING VENTILATION MONITORING SYSTEM
- a. Noble Gas Activity Monitor At all Times 1
TRS 3.11.2.6.1 (Low Range)
TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b.
Deleted
- c. Deleted
- d. Effluent System Flow Rate
'At all Times 1
TRS 3.11.2.6.1 Monitor TRS 3.11.2.6.4 TRS 3.11.2.6.5
- e. Sampler Flow Rate Monitor At all Times 1
TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
-I I
SUSQUEHANNA - UNIT I TRM / 3.1 1-30 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 1 TABLE 3.11.2.6-1 (Page 2 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 2. TURBINE BUILDING VENTILATION MONITORING SYSTEM
- a. Noble Gas Activity Monitor At all Times I
TRS 3.11.2.6.1 (Low Range)
TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b. Deleted
- c.
Deleted
- d. Effluent System Flow Rate all Times 1
TRS 3.11.2.6.1 Monitor TRS 3.11.2.6.4 TRS 3.11.2.6.5
- e. Sampler Flow Rate Monitor At all Times I
TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Ellil I'
.i2 li I
-~
-ur EFFECTIVE DATE 01/21/2004 SUSQUEHANNA - UNIT 1 TRM / 3.1 1-31
i i
I li i
PPL Rev. 1 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1 (Page 3 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 3. STANDBY GAS TREATMENT SYSTEM (STGS) MONITOR
- a. Noble Gas Activity Monitor During 1
TRS 3.11.2.6.1 (Low Range) operation of TRS 3.11.2.6.3 SGTS TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b. Deleted
- c.
Deleted
- d. Effluent System Flow Rate During 1
TRS 3.11.2.6.1 Monitor operation of TRS 3.11.2.6.4 SGTS TRS 3.11.2.6.5
- e. Sampler Flow Rate Monitor During 1
TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS TRS 3.11.2.6.5 I.
SUSQUEHANNA - UNIT 1 TRM / 3.1 1-32 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 1 B 3.11.2.6 B 3.112.6 Radioactive Gaseous Effluent Monitoring Instrumentation BASES TRO The radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents. The alarm/trip setpoints for these instruments shall be calculated in accordance with the procedures in the ODCM (Reference 2) to ensure that the alam/rip will occur prior to exceeding the release rate limits corresponding to dose rates above background to a member of the public at or beyond the site boundary to S 500 mrem/yr to the total body or to S 3000 mrem/yr to the skin.
The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50. (References 3 and 4)
OPERABILITY requires their alarm/trip setpoints set to ensure that the limits of Requirement 3.11.2.1 are not exceeded. The alarm/trip setpoints of these channels shall be determined in accordance with the methodology and parameters in the ODCM.
This section of the TRM is also part of the ODCM (Reference 2).
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
Low range Noble Gas channel readings from the local vent monitor may be used to meet the requirement for a Noble Gas grab sample and grab sample analysis.
Noble Gas release grab samples are not required to be taken when there are no releases via that pathway. Effluent flow is to be determined by vent flow instrumentation or by a vent flow estimate every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Continuous sample collection shall be on the same basis as described in the Bases for TRO 3.11.2.1 Monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.
(continued)
)~~~~
SUSQUEHANNA
-UNIT I
TRM /B 3.11-24 EFFECTIVE DATE 01/21/2004~~~~~~~~~~~~~~~~~~~~
SUSQUEHANNA - UNIT 1 TRM / B 3.11-24 EFFECTIVE DATE 01121/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 0
B 3.11.2.6 PPL Rev. 1 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation BASES (continued)
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the monitoring instrumentation is maintained OPERABLE.-
The TRSs shall be performed in accordance with the Technical Specification definition for the test with the following additional requirements:
The CHANNEL FUNCTIONAL TEST for all noble gas activity monitors shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:
- 1. Instrument indicates measured levels above the alarm/trip setpoint,
- 2. Circuit failure, and
- 3. Instrument indicates a downscale failure.
The initial CHANNEL CALIBRATION for all noble gas activity monitors shall be performed using one or more of the reference standards certified by the National Institute of Standards and Technology (NIST) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NIST. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration may be used in lieu of reference standards associated with the initial calibration.
1, I
Particulate or iodine sampling required to be in continuous service will be considered to remain and have been in continuous service when its service is interrupted for a period of time not to exceed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per sampling period.
For particulate and iodine sampling, this is a small fraction of the normal minimum analysis frequency.
REFERENCES
- 1.
Technical Specification 5.5.4 - Radioactive Effluent Controls program.
- 2.
Technical Specification 5.5.1 - Offsite Dose Calculation Manual.
- 3.
10CFRPart20.
- 4.
I II l
SUSQUEHANNA - UNIT TRM / B 3.11-25 EFFECTIVE DATE 01/21/2004