W3F1-2003-0097, Core Operating Limits Report, Cycle 13, Revision 1, Change 1

From kanterella
(Redirected from ML033370803)
Jump to navigation Jump to search
Core Operating Limits Report, Cycle 13, Revision 1, Change 1
ML033370803
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/20/2003
From: Sen G
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2003-0097
Download: ML033370803 (8)


Text

Entergy Operations, Inc.

ntery 17265 River Road Killona. LA 70066 Tel 504 739 6650 W3F1-2003-0097 November 20, 2003 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Core Operating Limits Report - Cycle 13 Revision 1, Change 1 Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

Waterford 3 Technical Specification 6.9.1.11.3 requires submittal of the Core Operating Limits Report (COLR) for each reload cycle. Revision 1 of the COLR for Waterford 3 Cycle 13 was submitted on November 17, 2003, by letter W3F1 -2003-0094.

The attached COLR Cycle 13 Revision 1, Change 1 revises Section 3.2.7, Axial Shape Index (ASI), to implement a 0.03 positive bias to the lower limit of the allowed ASI range (changed from -0.22 to -0.19) for 2 70% power. This change was necessary due to the upward shift of incore instrumentation due to a modification performed in Refueling Outage 12.

If you have any questions concerning this submittal please contact P.M. Melancon at (504) 739-6614.

There are no new commitments contained in this submittal.

Sincerely,

.~~~

G. Sen Licensing Manager GS/TMM/cbh Attachment(s)

W3F11-2003-0097 Page 2 cc: Mr. Thomas P. Gwynn Acting Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-7 DI Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Platts Energy ATTN: B. Lewis 1200 G. St., N.W. Suite 1000 Washington, DC 20005

Attachment I W3F1 -2003-0097 Waterford 3 Core Operating Limits Report Cycle 13, Revision 1, Change 1

CORE OPERATING LIMITS REPORT CYCLE 13 REVISION I CHANGE NO. 1 REPLACEMENT PAGE(S)

(4 pages)

Replace the following pages of the Waterford 3 Core Operating Limits Report with the attached pages. The revised pages are identified by Revision Number 1, Change Number 1 in the bottom footer and contain a vertical line indicating the areas of change.

Remove Insert 1 1 2 2 5 5 3/4 2-12 3/4 2-12

ENTERGY OPERATIONS WATERFORD 3 CORE OPERATING LIMITS REPORT FOR CYCLE 13 REVISION 1, CHG. 1 Prepared by: P.M. Melancon P +

Nuc lbar Engineering Reviewed by: J.M. Manzella

, sin u Approved by: B. Holman ///

uclear Engineering Approved by: G. Sen A N6,;Vt )A A lo/ 19/°)3 Licensi6g WATERFORD 3 Page 1 CYCLE 13 REVISION 1, CHG. 1 I

WATERFORD 3 CORE OPERATING LIMITS REPORT CYCLE 13, REVISION 1, CHG. I INDEX PAGE

1. INTRODUCTION 5 II. AFFECTED TECHNICAL SPECIFICATIONS 6 3.1.1.1 Shutdown Margin - Any CEA Withdrawn COLR 3/4 1-1 3.1.1.2 Shutdown Margin - All CEAs Fully Inserted COLR 3/4 1-3 3.1.1.3 Moderator Temperature Coefficient COLR 3/4 1-4 3.1.2.9 Boron Dilution COLR 3/4 1-15 3.1.3.1 Movable Control Assemblies - CEA Position COLR 3/4 1-18 3.1.3.6 Regulating and Group P CEA Insertion Limits COLR 3/4 1-25 3.2.1 Linear Heat Rate COLR 3/4 2-1 3.2.3 Azimuthal Power Tilt - Tq COLR 3/4 2-4 3.2.4 DNBR Margin COLR 3/4 2-6 3.2.7 Axial Shape Index COLR 3/4 2-12 3.9.1 Boron Concentration COLR 3/4 9-1 Ill. METHODOLOGIES 33 LIST OF EFFECTIVE PAGES Revision 0 Pages 1-6, COLR 3/4 1-1 through COLR 3/4 9-1 and Page 33 Revision I Pages 1-6, COLR 3/4 1-1 through COLR 3/4 9-1 and Page 33 Revision 1 Pages 1, 2, 5, and COLR 3/4 2-12 Chg. 1 I WATERFORD 3 Page 2 CYCLE 13 REVISION 1, CHG. 1 I

WATERFORD 3 CORE OPERATING LIMITS REPORT CYCLE 13, REVISION 1, CHG. I I. INTRODUCTION This CORE OPERATING LIMITS REPORT (COLR) has been prepared in accordance with the requirements of Waterford 3 Technical Specification 6.9.1.11 for Waterford 3 Cycle 13. The core operating limits have been developed using the NRC approved methodologies specified in Section III. This is Revision 1 of the Cycle 13 COLR.

The major changes between the Cycle 13 Revision 0 COLR and the Cycle 12 COLR are listed below.

  • The Table of Contents List of Effective Pages was updated.
  • The List of Figures were revised to add COLR Figure 8A and to update the List of Effective Figure Pages
  • This Introduction section was revised to reflect the changes for Cycle 13.
  • The surveillance requirements for Section 3.1.2.9 were changed based on results of a corrective action of Condition Report CR-WF3-2003-02844.
  • Clarifying notes were added below Sections 3.1.3.1.a and 3.1.3.1.b regarding the correspondence of these sections to Technical Specifications.
  • The title for Section 3.1.3.6 was revised to match references in Section III and the Table of Contents
  • Figures 6 & 7 were revised to provide vertical lines from the endpoints of the plotted line to the temperature axis. Also, the equation for the plotted line was added.
  • Section 3.2.4.b was revised to allow use of Figure 8A
  • Notes below the text of Section 3.2.4 for use with Figures 8, 8A & 9 were updated and new notes were added.
  • Figure 8, was revised to incorporate cycle-specific limits for Cycle 13.
  • Figure 8A, was added to provide better resolution for the three power ranges in the lower portion of Figure 8.
  • Figure 9, was revised to incorporate cycle-specific limits for Cycle 13.
  • Section 111.7 was revised to add the document date.
  • Section 111.8 was added in accordance with License Amendment 191.

The changes between the Cycle 13 Revision 1 COLR and the Cycle 13 Revision 0 COLR are listed below.

  • Figures 6 & 7 were revised to implement a 0.1 KWIFT reduction for the specified temperature range to account for greater than 500 but less than 600 plugged tubes in Steam Generator #1 (Ref. ER-WF3-2003-0117-000)

The change between the Cycle 13 Revision I COLR and the Cycle 13 Revision I Chg. I COLR is listed below:

  • Section 3.2.7, Axial Shape Index, was revised to implement a 0.03 positive bias to the lower limit of the allowed ASI range (changed from -0.22 to -0.19) for g 70% power. This change was necessary due to the upward shift of incore instrumentation due to a modification performed in Refueling Outage 12 (Ref. Westinghouse Letter CWTR-03-190, dated 11/17/03).

WATERFORD 3 Page 5 CYCLE 13 REVISION 1,CHG. 1

CORE OPERATING LIMITS REPORT AXIAL SHAPE INDEX 3.2.7 The AXIAL SHAPE INDEX (ASI) shall be maintained within the following limits:

COLSS Operable

-0.19 ASI < +0.26 for THERMAL POWERS 2 70% of RATED THERMAL POWER

-0.26 < ASI < +0.26 for THERMAL POWERS from 20% to 70% of RATED THERMAL POWER COLSS Out of Service

-0.17 < ASI < +0.22 for THERMAL POWERS from 20% to 100% of RATED THERMAL POWER WATERFORD 3 COLR 3/4 2-12 CYCLE 13 REVISION 1, CHG I