Letter Sequence Request |
|---|
|
|
MONTHYEARULNRC-04868, Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-11082003-06-27027 June 2003 Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-1108 Project stage: Draft Other ML0318203192003-06-27027 June 2003 Release of Drawings Related to Callaway Project stage: Request ULNRC-04592, Proposed Revision to Technical Specification 1.1, Definitions; Technical Specification 3.7.3 Main Feedwater Isolation Valves (Mfivs); and Steam Generator Tube Rupture with Overfill Re-Analysis2003-06-27027 June 2003 Proposed Revision to Technical Specification 1.1, Definitions; Technical Specification 3.7.3 Main Feedwater Isolation Valves (Mfivs); and Steam Generator Tube Rupture with Overfill Re-Analysis Project stage: Request ML0329605212003-10-28028 October 2003 Notice of Meeting with Union Electric Company on Callaway Plant Project stage: Meeting ML0330801582003-11-0303 November 2003 Request for Withholding Information from Public Disclosure (CAW-03-1606) Tac. MB9879 Project stage: Withholding Request Acceptance 05000483/LER-2003-008, Regarding Technical Specification Violation Due to Valve Control Circuit Modification2003-11-0606 November 2003 Regarding Technical Specification Violation Due to Valve Control Circuit Modification Project stage: Request ML0331804352003-11-12012 November 2003 Meeting Handout to Discuss (1) the Licensees RAI Responses on Two Applications Dated 06/26/03 and (2) Potential Instrumentation Digital Upgrades Project stage: RAI ML0334214692003-12-0404 December 2003 Summary of Meeting W/Union Electric Co. Discussion Ontwo Licensee Applications and Potential Instrumentation Digital Upgrades at the Plant. (Tac. MB9875, MB9876 and MB9879) Project stage: Meeting ULNRC-04926, Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-11082003-12-0909 December 2003 Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-1108 Project stage: Draft Other ULNRC-04939, Response to 11/12/03 Meeting Questions Regarding Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-11082004-01-14014 January 2004 Response to 11/12/03 Meeting Questions Regarding Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-1108 ML0407207262004-03-11011 March 2004 3/11/04 Callaway Plant, Unit 1 - Issuance of Amd. 159 Main Feedwater/Auxiliary Feedwater Modification and Steam Generator Tube Rupture Re-Analysis (Tacs. MB9875/MB9876) Project stage: Approval ML0407503102004-03-11011 March 2004 Technical Specification Pages for Callaway Amendment No. 159 Project stage: Other ULNRC-04974, Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-11082004-04-0505 April 2004 Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-1108 Project stage: Draft Other ML0410506772004-04-12012 April 2004 Issuance of License Amendment 161 Secondary Shield Wall Opening Modification Project stage: Approval ML0411400262004-04-22022 April 2004 4/22/04, Callaway Plant, Unit 1 - Correspondence Letter Issuance of Amendment No. 161 on Secondary Shield Wall Opening Modification Project stage: Approval ML0418403962004-07-0202 July 2004 Forthcoming Meeting with Licensees to Discuss Operator Licensing Program Policies and Recent Revisions Project stage: Request ML0420400102004-07-20020 July 2004 Withdrawal of Request to Apply ASCE 4-86 Methodology Project stage: Withdrawal 2003-06-27
[Table View] |
Text
A FRAMATOME ANP An AREVA and Siemens company FRAMATOME ANP, Inc.
June 27, 2003 NRC:03:042 Document Control Desk ATTN: Chief, Planning, Program and Management Support Branch U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Release of Drawings Related to Callaway Ref.: 1. Letter, Ameren UE (Dave Shafer) to NRC, June 5, 2003, ULNRC 04861.
Ameren issued a letter to the NRC on June 5, 2003, that included numerous attachments (Reference 1). Attachment 6 to that letter contained copies of drawings developed by Framatome ANP that were noted to be the property of Framatome ANP and were not to be copied or further distributed. These drawings are not proprietary.
This letter authorizes the NRC to place copies of these drawings (that is, the drawings in to the referenced letter) in the Public Document Room or ADAMS, as appropriate, and make other distribution of the information as needed to fulfill its regulatory review function.
Very truly yours, James F. Mallay, Director Regulatory Affairs cc:
J. N. Donohew D. E. Shafer Docket 50-483 Auoi FRAMATOME ANP, Inc.
2101 Horn Rapids Road - Richland. WA 99352 Tel.: 509-375-8100 Fax: 509-375-8402 www.us.framatome-anp.com