RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E.

One channel inoperable.


NOTE-------------------

One channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing.

E. 1 Place channel in trip.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR E.2 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F.

THERMAL POWER F.1 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

> P-6 and < P-1 0, one POWER to < P-6.

Intermediate Range Neutron Flux channel OR inoperable.

F.2 Increase THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to > P-10.


NOTE----------------

Limited boron concentration changes associated with RCS inventory control or limited plant temperature changes are allowed.

G.

THERMAL POWER G.1 Suspend operations Immediately

> P-6 and < P-1 0, two involving positive reactivity Intermediate Range additions.

Neutron Flux channels inoperable.

AND G.2 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to < P-6.

H.

THERMAL POWER H.1 Restore channel(s) to Prior to increasing

< P-6, one or two OPERABLE status.

THERMAL POWER Intermediate Range to > P-6 Neutron Flux channels inoperable.

(continued)

McGuire Units 1 and 2 3.3.1-3 AmendmentNos.21 6

& 197

RCS Loops - MODE 3 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Loops -MODE 3

LCO 3.4.5 Three RCS loops shall be OPERABLE, and either:

a.

Three RCS loops shall be in operation when the Rod Control System is capable of rod withdrawal; or

b.

One RCS loop shall be in operation when the Rod Control System is not capable of rod withdrawal.


NOTE---------------------------

All reactor coolant pumps may be de-energized for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 and maintain Keff < 0.99; and

b.

Core outlet temperature is maintained at least 1 0F below saturation temperature.

APPLICABILITY:

MODE 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or two required A.1 Restore required RCS 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> RCS loop(s) inoperable.

loop(s) to OPERABLE status.

B.

Required Action and B.1 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

(continued)

McGuire Units 1 and 2 3.4.5-1 Amendment Nos.216 & 197

RCS Loops - MODE 3 3.4.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

One or two required C.1 Restore required RCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> RCS loop(s) not in loop(s) to operation.

operation and Rod Control System capable OR of rod withdrawal.

C.2 De-energize all control rod 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> drive mechanisms (CRDMs).

D.

Three required RCS D.1 De-energize all CRDMs.

Immediately loops inoperable.

AND OR D.2 Suspend operations that Immediately No RCS loop in would cause introduction of operation.

coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.

AND D.3 Initiate action to restore Immediately one RCS loop to OPERABLE status and operation.

McGuire Units 1 and 2 3.4.5-2 Amendment Nos.216 & 197

RCS Loops - MODE 4 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Loops-MODE 4 LCO 3.4.6 Two loops consisting of any combination of RCS loops and residual heat removal (RHR) loops shall be OPERABLE, and one loop shall be in operation.


NOTES-------------------------------------------

1.

All reactor coolant pumps (RCPs) and RHR pumps may be de-energized for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1 and maintain Keff <

0.99; and

b.

Core outlet temperature is maintained at least 1 0F below saturation temperature.

2.

No RCP shall be started with any RCS cold leg temperature < 300'F unless:

a.

Secondary side water temperature of each steam generator (SG) is < 50'F above each of the RCS cold leg temperatures, or

b.

Pressurizer water level is < 92% (1600 ft3).

APPLICABILITY:

MODE 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One RCS loop A.1 Initiate action to restore a Immediately OPERABLE.

second loop to OPERABLE status.

AND Two RHR loops inoperable.

(continued)

McGuire Units 1 and 2 3.4.6-1 Amendment Nos. 216 & 197

RCS Loops - MODE 4 3.4.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

One RHR loop B.1 Be in MODE 5.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE.

AND ALL RCS loops inoperable.

C.

Both required RCS or C.1 Suspend operations that Immediately RHR loops inoperable.

would cause introduction of coolant into the RCS with OR boron concentration less than required to meet the No RCS or RHR loop in SDM of LCO 3.1.1 and operation.

maintain Keff < 0.99.

AND C.2 Initiate action to restore Immediately one loop to OPERABLE status and operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.6.1 Verify one RHR or RCS loop is in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.6.2 Verify SG secondary side water levels are > 12% narrow 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> range for required RCS loops.

SR 3.4.6.3 Verify correct breaker alignment and indicated power are 7 days available to the required pump that is not in operation.

McGuire Units I and 2 3.4.6-2 AmendmentNos.21 6

& 197

RCS Loops - MODE 5, Loops Filled 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 RCS Loops-MODE 5, Loops Filled LCO 3.4.7 One residual heat removal (RHR) loop shall be OPERABLE and in operation, and either:

a.

One additional RHR loop shall be OPERABLE; or

b.

The secondary side water level of at least two steam generators (SGs) shall be > 12% narrow range.


NOTES---------------------------------

1.

The RHR pump of the loop in operation may be de-energized for

< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1; and

b.

Core outlet temperature is maintained at least 1 0F below saturation temperature.

2.

One required RHR loop may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RHR loop is OPERABLE and in operation.

3.

No reactor coolant pump shall be started with one or more RCS cold leg temperatures < 300'F unless:

a.

Secondary side water temperature of each SG is < 50 0F above each of the RCS cold leg temperatures, or

b.

Pressurizer water level is < 92% (1600 ft3).

4.

All RHR loops may be removed from operation during planned heatup to MODE 4 when at least one RCS loop is in operation.

APPLICABILITY:

MODE 5 with RCS loops filled.

McGuire Units 1 and 2 3.4.7-1 Amendment Nos. 216 & 197

RCS Loops - MODE 5, Loops Filled 3.4.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One RHR loop A.1 Initiate action to restore a Immediately inoperable.

second RHR loop to OPERABLE status.

AND OR Required SGs secondary side water A.2 Initiate action to restore Immediately levels not within limits.

required SG secondary side water levels to within limits.

B.

Required RHR loops B.1 Suspend operations that Immediately inoperable.

would cause introduction of coolant into the RCS with OR boron concentration less than required to meet SDM No RHR loop in of LCO 3.1.1.

operation.

AND Immediately B.2 Initiate action to restore one RHR loop to OPERABLE status and operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.7.1 Verify one RHR loop is in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.7.2 Verify SG secondary side water level is > 12% narrow 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> range in required SGs.

McGuire Units 1 and 2 3.4.7-2 Amendment Nos. 216 & 197

RCS Loops - MODE 5, Loops Filled 3.4.7 SR 3.4.7.3 Verify correct breaker alignment and indicated power are 7 days available to the required RHR pump that is not in operation.

McGuire Units 1 and 2 3.4.7-3 AmendmentNos.216 & 197

RCS Loops - MODE 5, Loops Not Filled 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 RCS Loops -MODE 5, Loops Not Filled LCO 3.4.8 Two residual heat removal (RHR) loops shall be OPERABLE and one RHR loop shall be in operation.


NOTES-----------------------------------------

1.

All RHR pumps may be de-energized for < 15 minutes when switching from one loop to another provided:

a.

The core outlet temperature is maintained at least 1 0F below saturation temperature.

b.

No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1; and

c.

No draining operations to further reduce the RCS water volume are permitted.

2.

One RHR loop may be inoperable for < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RHR loop is OPERABLE and in operation.

APPLICABILITY:

MODE 5 with RCS loops not filled.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One RHR loop A.1 Initiate action to restore Immediately inoperable.

RHR loop to OPERABLE status.

(continued)

McGuire Units 1 and 2 3.4.8-1 Amendment Nos. 216 & 197

RCS Loops - MODE 5, Loops Not Filled 3.4.8 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

Required RHR loops B.1 Suspend operations that Immediately inoperable.

would cause introduction of coolant into the RCS with OR boron concentration less than required to meet SDM No RHR loop in of LCO 3.1.1.

operation.

AND B.2 Initiate action to restore Immediately one RHR loop to OPERABLE status and operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify one RHR loop is in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.8.2 Verify correct breaker alignment and indicated power are 7 days available to the required RHR pump that is not in operation.

McGuire Units 1 and 2 3.4.8-2 Amendment Nos. 216 & 197

AC Sources - Shutdown 3.8.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2.2 Suspend movement of Immediately irradiated fuel assemblies.

AND A.2.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND A.2.4 Initiate action to restore Immediately required offsite power circuit to OPERABLE status.

B.

One required DG B.1 Suspend CORE Immediately inoperable.

ALTERATIONS.

AND B.2 Suspend movement of Immediately irradiated fuel assemblies.

AND B.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND B.4 Initiate action to restore Immediately required DG to OPERABLE status.

McGuire Units 1 and 2 3.8.2-2 AmendmentNos. 216 & 197

DC Sources - Shutdown 3.8.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND A.2.4 Initiate action to restore Immediately required channel(s) of DC source(s) to OPERABLE status.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 NOTE The following SRs are not required to be performed:

SR 3.8.4.6, SR 3.8.4.7, and SR 3.8.4.8.

For DC sources required to be OPERABLE, the following In accordance with SRs are applicable:

applicable SRs SR 3.8.4.1 SR 3.8.4.4 SR 3.8.4.7 SR 3.8.4.2 SR 3.8.4.5 SR 3.8.4.8.

SR 3.8.4.3 SR 3.8.4.6 McGuire Units 1 and 2 3.8.5-2 AmendmentNos. 216 & 197

Inverters - Shutdown 3.8.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND A.2.4 Initiate action to restore Immediately required inverters to OPERABLE status.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct voltage and alignments to required AC vital 7 days buses.

McGuire Units 1 and 2 3.8.8-2 Amendment Nos.216 & 197

Distribution Systems - Shutdown 3.8.10 3.8 ELECTRICAL POWER SYSTEMS 3.8.10 Distribution Systems -Shutdown LCO 3.8.10 The necessary portion of AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.

APPLICABILITY:

MODES 5 and 6, During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Declare associated Immediately AC, DC, or AC vital bus supported required electrical power feature(s) inoperable.

distribution subsystems inoperable.

OR A.2.1 Suspend CORE Immediately ALTERATIONS.

AND A.2.2 Suspend movement of Immediately irradiated fuel assemblies.

AND A.2.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND (continued)

McGuire Units 1 and 2 3.8.1 0-1 Amendment Nos. 216 & 197

Nuclear Instrumentation 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Nuclear Instrumentation LCO 3.9.3 APPLICABILITY:

Two source range neutron flux monitors shall be OPERABLE.

MODE 6.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One required source A.1 Suspend CORE Immediately range neutron flux ALTERATIONS.

monitor inoperable.

AND A.2 Suspend operations that Immediately would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.

B.

Two required source B.1 Initiate action to restore Immediately range neutron flux one source range neutron monitors inoperable.

flux monitor to OPERABLE status.

AND B.2 Perform SR 3.9.1.1.

Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> McGuire Units 1 and 2 3.9.3-1 Amendment Nos.

216 & 197

RHR and Coolant Circulation - High Water Level 3.9.5 3.9 REFUELING OPERATIONS 3.9.5 Residual Heat Removal (RHR) and Coolant Circulation -

High Water Level LCO 3.9.5 One RHR loop shall be OPERABLE and in operation.


II t--_--__--___--____--__--

The required RHR loop may be removed from operation for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause introduction of coolant into the Reactor Coolant System with boron concentration less than required to meet the minimum required boron concentration of LCO 3.9.1.

APPLICABILITY:

MODE 6 with the water level Ž 23 ft above the top of reactor vessel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

RHR loop requirements A.1 Suspend operations that Immediately not met.

would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1 AND A.2 Suspend loading irradiated Immediately fuel assemblies in the core.

AND A.3 Initiate action to satisfy Immediately RHR loop requirements.

AND (continued)

McGuire Units 1 and 2 3.9.5-1 Amendment Nos.216 & 197

RHR and Coolant Circulation - Low Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Residual Heat Removal (RHR) and Coolant Circulation -

Low Water Level LCO 3.9.6 Two RHR loops shall be OPERABLE, and one RHR loop shall be in operation.

APPLICABILITY:

MODE 6 with the water level < 23 ft above the top of reactor vessel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Less than the required A.1 Initiate action to restore Immediately number of RHR loops required RHR loops to OPERABLE.

OPERABLE status.

OR A.2 Initiate action to establish Immediately 2 23 ft of water above the top of reactor vessel flange.

B.

No RHR loop in B.1 Suspend operations that Immediately operation.

would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.

AND (continued) l McGuire Units 1 and 2 3.9.6-1 Amendment Nos. 216 & 197

RTS Instrumentation B 3.3.1 BASES ACTIONS (continued)

OPERABLE Intermediate Range Neutron Flux channels. The operator must also reduce THERMAL POWER below the P-6 setpoint within two hours. Below P-6, the Source Range Neutron Flux channels will be able to monitor the core power level. The Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> will allow a slow and controlled power reduction to less than the P-6 setpoint and takes into account the low probability of occurrence of an event during this period that may require the protection afforded by the NIS Intermediate Range Neutron Flux trip. Required Action G.1 is modified by a note to indicate that normal plant control operations that individually add limited positive reactivity (e.g., temperature or boron fluctuations associated with RCS inventory management or temperature control) are not precluded by this Action.

H.1 Condition H applies to the Intermediate Range Neutron Flux trip when THERMAL POWER is below the P-6 setpoint and one or two channels are inoperable. Below the P-6 setpoint, the NIS source range performs the monitoring and protection functions. The inoperable NIS intermediate range channel(s) must be returned to OPERABLE status prior to increasing power above the P-6 setpoint. The NIS intermediate range channels must be OPERABLE when the power level is above the capability of the source range, P-6, and below the capability of the power range, P-10.

1.1 Condition I applies to one inoperable Source Range Neutron Flux trip channel when in MODE 2, below the P-6 setpoint, and performing a reactor startup. With the unit in this Condition, below P-6, the NIS source range performs the monitoring and protection functions. With one of the two channels inoperable, operations involving positive reactivity additions shall be suspended immediately.

This will preclude any power escalation. With only one source range channel OPERABLE, core protection is severely reduced and any actions that add positive reactivity to the core must be suspended immediately.

Required Action 1.1 is modified by a note to indicate that normal plant control operations that individually add limited positive reactivity (e.g.,

temperature or boron fluctuations associated with RCS inventory management or temperature control) are not precluded by this Action.

McGuire Units 1 and 2 B 3.3.1-34 Revision No. 41

RTS Instrumentation B 3.3.1 BASES ACTIONS (continued)

J.1 Condition J applies to two inoperable Source Range Neutron Flux trip channels when in MODE 2, below the P-6 setpoint, and performing a reactor startup, or in MODE 3, 4, or 5 with the RTBs closed and the CRD System capable of rod withdrawal. With the unit in this Condition, below P-6, the NIS source range performs the monitoring and protection functions. With both source range channels inoperable, the RTBs must be opened immediately. With the RTBs open, the core is in a more stable condition and the unit enters Condition L.

K.1 and K.2 Condition K applies to one inoperable source range channel in MODE 3, 4, or 5 with the RTBs closed and the CRD System capable of rod withdrawal. With the unit in this Condition, below P-6, the NIS source range performs the monitoring and protection functions. With one of the source range channels inoperable, 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is allowed to restore it to an OPERABLE status. If the channel cannot be returned to an OPERABLE status, 1 additional hour is allowed to open the RTBs. Once the RTBs are open, the core is in a more stable condition and the unit enters Condition L. The allowance of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to restore the channel to OPERABLE status, and the additional hour to open the RTBs, are justified in Reference 7.

L.1, L.2, and L.3 Condition L applies when the required number of OPERABLE Source Range Neutron Flux channels is not met in MODE 3, 4, or 5 with the RTBs open. With the unit in this Condition, the NIS source range performs a monitoring function. With less than the required number of source range channels OPERABLE, operations involving positive reactivity additions shall be suspended immediately. In addition to suspension of positive reactivity additions, all valves that could add unborated water to the RCS must be closed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> as specified in LCO 3.9.2. The isolation of unborated water sources will preclude a boron dilution accident.

Also, the SDM must be verified within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter as per SR 3.1.1.1, SDM verification. With no source range channels OPERABLE, core monitoring is severely reduced. Verifying the SDM within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allows sufficient time to perform the calculations and determine that the SDM requirements are met. The SDM must also be verified once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter to ensure that the core reactivity has not changed. Required Action L.1 precludes any positive reactivity McGuire Units 1 and 2 B 3.3.1-35 Revision No. 41

RTS Instrumentation B 3.3.1 BASES ACTIONS (continued) additions; therefore, core reactivity should not be increasing, and a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is adequate. The Completion Times of within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> are based on operating experience in performing the Required Actions and the knowledge that unit conditions will change slowly. Required Action L.1 is modified by a note which permits plant temperature changes provided the temperature change is accounted for in the calculated SDM and that Keff remains < 0.99. Introduction of temperature changes including temperature increases when a positive MTC exists, must be evaluated to ensure they do not result in a loss of required SDM or adequate margin to criticality.

M.1 and M.2 Condition M applies to the following reactor trip Functions:

Pressurizer Pressure-Low; Pressurizer Water Level-High; Reactor Coolant Flow-Low (Two Loops);

Undervoltage RCPs; and Underfrequency RCPs.

With one channel inoperable, the inoperable channel must be placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Placing the channel in the tripped condition results in a partial trip condition requiring only one additional channel to initiate a reactor trip above the P-7 setpoint (and below the P-8 setpoint for the Reactor Coolant Flow-Low (Two Loops) Function). These Functions do not have to be OPERABLE below the P-7 setpoint because, for the Pressurizer Water Level-High function, transients are slow enough for manual action; and for the other functions, power distributions that would cause a DNB concern at this low power level are unlikely. The 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowed to place the channel in the tripped condition is justified in Reference 7. An additional 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is allowed to reduce THERMAL POWER to below P-7 if the inoperable channel cannot be restored to OPERABLE status or placed in trip within the specified Completion Time.

Allowance of this time interval takes into consideration the redundant capability provided by the remaining redundant OPERABLE channel, and the low probability of occurrence of an event during this period that may require the protection afforded by the Functions associated with Condition M.

McGuire Units 1 and 2 B 3.3.1-36 Revision No. 41

RCS Loops - MODE 3 B 3.4.5 BASES LCO (continued) characteristics of the RCS are changed. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period specified is adequate to perform the desired tests, and operating experience has shown that boron stratification is not a problem during this short period with no forced flow.

Utilization of the Note is permitted provided the following conditions are met, along with any other conditions imposed by initial startup test procedures:

a.

No operations are permitted that would dilute the RCS boron concentration with coolant at boron concentration less than required to assure the SDM of LCO 3.1.1 and maintain Keff < 0.99, thereby maintaining an adequate margin to criticality. Boron reduction with coolant at boron concentration less than required to assure SDM and Keff < 0.99 is prohibited because a uniform concentration distribution throughout the RCS cannot be ensured when in natural circulation; and

b.

Core outlet temperature is maintained at least 1 00F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

An OPERABLE RCS loop consists of one OPERABLE RCP and one OPERABLE SG in accordance with the Steam Generator Tube Surveillance Program, which has the minimum water level specified in SR 3.4.5.2. An RCP is OPERABLE if it is capable of being powered and is able to provide forced flow if required.

APPLICABILITY In MODE 3, this LCO ensures forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing.

The most stringent condition of the LCO, that is, three RCS loops OPERABLE and three RCS loops in operation, applies to MODE 3 with RTBs in the closed position. The least stringent condition, that is, three RCS loops OPERABLE and one RCS loop in operation, applies to MODE 3 with the RTBs open.

Operation in other MODES is covered by:

LCO 3.4.4, "RCS Loops-MODES 1 and 2";

L00 3.4.6, "RCS Loops-MODE 4';

LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled";

LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled";

LCO 3.4.17, 'RCS Loops-Test Exceptions";

LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.6, 'Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level" (MODE 6).

McGuire Units 1 and 2 B 3.4.5-3 Revision No. 41

RCS Loops - MODE 3 B 3.4.5 BASES ACTIONS A.1 If one or two required RCS loop(s) are inoperable, redundancy for heat removal is lost. The Required Action is restoration of the required RCS loop to OPERABLE status within the Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This time allowance is a justified period to be without the redundant, nonoperating loop because a single loop in operation has a heat transfer capability greater than that needed to remove the decay heat produced in the reactor core and because of the low probability of a failure in the remaining loop occurring during this period.

B.1 If restoration is not possible within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the unit must be brought to MODE 4. In MODE 4, the unit may be placed on the Residual Heat Removal System. The additional Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is compatible with required operations to achieve cooldown and depressurization from the existing plant conditions in an orderly manner and without challenging plant systems.

C.1 and C.2 If one or two required RCS loop(s) are not in operation, and the Rod Control System is capable of rod withdrawal, the Required Action is either to restore the required RCS loop(s) to operation or to de-energize all CRDMs by opening the RTBs or de-energizing the motor generator (MG) sets. When the Rod Control System is capable of rod withdrawal, it is postulated that a power excursion could occur in the event of an inadvertent control rod withdrawal. This mandates having the heat transfer capacity of three RCS loops in operation. If only one or two loop(s) are in operation, the CRDMs must be deenergized. The Completion Times of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to restore the required RCS loop(s) to operation or de-energize all CRDMs is adequate to perform these operations in an orderly manner without exposing the unit to risk for an undue time period.

D.1. D.2. and D.3 If three required RCS loops are inoperable or no RCS loop is in operation, except as during conditions permitted by the Note in the LCO section, all CRDMs must be de-energized by opening the RTBs or de-energizing the MG sets. All operations involving introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 must be suspended, and action to restore one of the RCS loops McGuire Units 1 and 2 B 3.4.5-4 Revision No. 41

RCS Loops - MODE 3 B 3.4.5 BASES ACTIONS (continued) to OPERABLE status and operation must be initiated. Boron dilution requires forced circulation for proper mixing, and opening the RTBs or de-energizing the MG sets removes the possibility of an inadvertent rod withdrawal. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to criticality.

The immediate Completion Time reflects the importance of maintaining operation for heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.

SURVEILLANCE SR 3.4.5.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the required loops are in operation. Verification includes flow rate, temperature, and pump status monitoring, which help ensure that forced flow is providing heat removal.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS loop performance.

SR 3.4.5.2 SR 3.4.5.2 requires verification of SG OPERABILITY. SG OPERABILITY is verified by ensuring that the secondary side narrow range water level is 2 12% for required RCS loops. If the SG secondary side narrow range water level is < 12%, the tubes may become uncovered and the associated loop may not be capable of providing the heat sink for removal of the decay heat. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room to alert the operator to a loss of SG level.

SR 3.4.5.3 Verification that the required RCPs are OPERABLE ensures that safety analyses limits are met. The requirement also ensures that an additional RCP can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power availability to the required RCPs.

McGuire Units 1 and 2 B 3.4.5-5 Revision No. 41

RCS Loops - MODE 4 B 3.4.6 BASES LCO (continued)

Note 1 permits all RCPs or RHR pumps to be de-energized for c 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. The purpose of the Note is to permit tests that are designed to validate various accident analyses values. One of the tests performed during the startup testing program is the validation of rod drop times during cold conditions, both with and without flow. The no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits the de-energizing of the pumps in order to perform this test and validate the assumed analysis values. If changes are made to the RCS that would cause a change to the flow characteristics of the RCS, the input values must be revalidated by conducting the test again. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period is adequate to perform the test, and operating experience has shown that boron stratification is not a problem during this short period with no forced flow.

Utilization of Note 1 is permitted provided the following conditions are met along with any other conditions imposed by initial startup test procedures:

a.

No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentrations less than required to meet SDM of LCO 3.1.1 and maintain Keff < 0.99, therefore maintaining an adequate margin to criticality. Boron reduction with coolant of boron concentrations less than required to assure SDM and maintain Keff < 0.99 is prohibited because a uniform concentration distribution throughout the RCS cannot be ensured when in natural circulation; and

b.

Core outlet temperature is maintained at least 1 0F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

Note 2 requires that the secondary side water temperature of each SG be

< 500F above each of the RCS cold leg temperatures or that pressurizer water volume be < 92% (1600 ft3) before the start of an RCP with any RCS cold leg temperature < 3000F. This restraint is to prevent a low temperature overpressure event due to a thermal transient when an RCP is started.

An OPERABLE RCS loop comprises an OPERABLE RCP and an OPERABLE SG in accordance with the Steam Generator Tube Surveillance Program, which has the minimum water level specified in SR 3.4.6.2. The water level is maintained by an OPERABLE AFW train in accordance with LCO 3.7.5, "Auxiliary Feedwater System."

Similarly for the RHR System, an OPERABLE RHR loop comprises an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RCPs and RHR pumps are McGuire Units 1 and 2 B 3.4.6-2 Revision No. 41

RCS Loops - MODE 4 B 3.4.6 BASES ACTIONS (continued)

C.1 and C.2 If no loop is OPERABLE or in operation, except during conditions permitted by Note 1 in the LCO section, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 and maintain Keff < 0.99 must be suspended and action to restore one RCS or RHR loop to OPERABLE status and operation must be initiated. The required margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 and maintains Keff < 0.99 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM and Keff requirements maintains acceptable margin to criticality. The immediate Completion Times reflect the importance of maintaining operation for decay heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.

SURVEILLANCE SR 3.4.6.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that one RCS or RHR loop is in operation. Verification includes flow rate, temperature, or pump status monitoring, which help ensure that forced flow is providing heat removal.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS and RHR loop performance.

SR 3.4.6.2 SR 3.4.6.2 requires verification of SG OPERABILITY. SG OPERABILITY is verified by ensuring that the secondary side narrow range water level is 2 12%. If the SG secondary side narrow range water level is < 12%, the tubes may become uncovered and the associated loop may not be capable of providing the heat sink necessary for removal of decay heat.

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room to alert the operator to the loss of SG level.

SR 3.4.6.3 Verification that the required pump is OPERABLE ensures that an additional RCS or RHR pump can be placed in operation, if needed, to McGuire Units 1 and 2 B 3.4.6-4 Revision No. 41

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES APPLICABLE SAFETY ANALYSES (continued)

RCS Loops-MODE 5 (Loops Filled) satisfy Criterion 4 of 10 CFR 50.36 (Ref. 1).

LCO The purpose of this LCO is to require that at least one of the RHR loops be OPERABLE and in operation with an additional RHR loop OPERABLE or two SGs with secondary side narrow range water level 2 12%. One RHR loop provides sufficient forced circulation to perform the safety functions of the reactor coolant under these conditions. An additional RHR loop is required to be OPERABLE to meet single failure considerations. However, if the standby RHR loop is not OPERABLE, an acceptable alternate method is two SGs with their secondary side narrow range water levels 2 12%. Should the operating RHR loop fail, the SGs could be used to remove the decay heat.

Note 1 permits all RHR pumps to be de-energized < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. The purpose of the Note is to permit tests designed to validate various accident analyses values. One of the tests performed during the startup testing program is the validation of rod drop times during cold conditions, both with and without flow. The no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits de-energizing of the pumps in order to perform this test and validate the assumed analysis values. If changes are made to the RCS that would cause a change to the flow characteristics of the RCS, the input values must be revalidated by conducting the test again. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period is adequate to perform the test, and operating experience has shown that boron stratification is not likely during this short period with no forced flow.

Utilization of Note 1 is permitted provided the following conditions are met, along with any other conditions imposed by initial startup test procedures:

a.

No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentration less than required to meet SDM of LCO 3.1.1, therefore maintaining an adequate margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM is maintianed is prohibited because a uniform concentration distribution throughout the RCS cannot be ensured when in natural circulation; and

b.

Core outlet temperature is maintained at least 1 0F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

McGuire Units 1 and 2 B 3.4.7-2 Revision No. 41

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES ACTIONS A.1 and A.2 If one RHR loop is inoperable and the required SGs have secondary side narrow range water levels < 12%, redundancy for heat removal is lost.

Action must be initiated immediately to restore a second RHR loop to OPERABLE status or to restore the required SG secondary side water levels. Either Required Action A.1 or Required Action A.2 will restore redundant heat removal paths. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.

B.1 and B.2 If no RHR loop is in operation, except during conditions permitted by Note 1, or if no loop is OPERABLE, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 must be suspended and action to restore one RHR loop to OPERABLE status and operation must be initiated. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to criticality. The immediate Completion Times reflect the importance of maintaining operation for heat removal.

SURVEILLANCE SR 3.4.7.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the required loop is in operation. Verification includes flow rate, temperature, or pump status monitoring, which help ensure that forced flow is providing heat removal.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RHR loop performance.

SR 3.4.7.2 Verifying that at least two SGs are OPERABLE by ensuring their secondary side narrow range water levels are 2 12% ensures an alternate decay heat removal method in the event that the second RHR loop is not OPERABLE. If both RHR loops are OPERABLE, this Surveillance is not needed. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room to alert the operator to the loss of SG level.

McGuire Units 1 and 2 B 3.4.7-4 Revision No. 41

RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES LCO (continued) and core outlet temperature is maintained at least 1 0F below saturation temperature. The Note prohibits boron dilution with coolant at boron concentration less than required to assure SDM of LCO 3.1.1 is maintained or draining operations when RHR forced flow is stopped.

Note 2 allows one RHR loop to be inoperable for a period of < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, provided that the other loop is OPERABLE and in operation. This permits periodic surveillance tests to be performed on the inoperable loop during the only time when these tests are safe and possible.

An OPERABLE RHR loop is comprised of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger.

RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required.

APPLICABILITY In MODE 5 with loops not filled, this LCO requires core heat removal and coolant circulation by the RHR System.

Operation in other MODES is covered by:

LCO 3.4.4, "RCS Loops-MODES 1 and 2; LCO 3.4.5, "RCS Loops-MODE 3";

LCO 3.4.6, "RCS Loops-MODE 4";

LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled";

LCO 3.4.17, uRCS Loops-Test Exceptions";

LCO 3.9.5, OResidual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level (MODE 6).

ACTIONS A.1 If only one RHR loop is OPERABLE and in operation, redundancy for RHR is lost. Action must be initiated to restore a second loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.

B.1 and B.2 If no required RHR loops are OPERABLE or in operation, except during conditions permitted by Note 1, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 must be suspended and action must be McGuire Units 1 and 2 B 3.4.8-2 Revision No. 41

RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES ACTIONS (continued) initiated immediately to restore an RHR loop to OPERABLE status and operation. The required margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to criticality.

The immediate Completion Time reflects the importance of maintaining operation for heat removal. The action to restore must continue until one loop is restored to OPERABLE status and operation.

SURVEILLANCE SR 3.4.8.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that one loop is in operation.

Verification includes flow rate, temperature, or pump status monitoring, which help ensure that forced flow is providing heat removal. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RHR loop performance.

SR 3.4.8.2 Verification that the required number of pumps are OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to the required pumps. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.

REFERENCES

1.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

McGuire Units 1 and 2 B 3.4.8-3 Revision No. 41

AC Sources-Shutdown B 3.8.2 BASES APPLICABILITY (continued)

a.

Systems to provide adequate coolant inventory makeup are available for the irradiated fuel assemblies in the core;

b.

Systems needed to mitigate a fuel handling accident are available;

c.

Systems necessary to mitigate the effects of events that can lead to core damage during shutdown are available; and

d.

Instrumentation and control capability is available for monitoring and maintaining the unit in a cold shutdown condition or refueling condition.

The AC power requirements for MODES 1, 2, 3, and 4 are covered in LCO 3.8.1.

ACTIONS A.1 An offsite circuit would be considered inoperable if it were not available to one required ESF train. Although two trains are required by LCO 3.8.10, the one train with offsite power available may be capable of supporting sufficient required features to allow continuation of CORE ALTERATIONS and fuel movement. By the allowance of the option to declare required features inoperable, with no offsite power available, appropriate restrictions will be implemented in accordance with the affected required features LCO's ACTIONS.

A.2.1, A.2.2, A.2.3. A.2.4. B.1. B.2. B.3, and B.4 With the offsite circuit not available to all required trains, the option would still exist to declare all required features inoperable. Since this option may involve undesired administrative efforts, the allowance for sufficiently conservative actions is made. With the required DG inoperable, the minimum required diversity of AC power sources is not available. It is, therefore, required to suspend CORE ALTERATIONS, movement of irradiated fuel assemblies, and operations involving positive reactivity additions that could result in loss of required SDM (Mode 5) or required boron concentration (Mode 6). Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limits is required to assure continued safe operation.

Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable McGuire Units 1 and 2 B 3.8.2-4 Revision No. 41

AC Sources-Shutdown B 3.8.2 BASES ACTIONS (continued) margin to maintaining subcritical operation. Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities does not preclude completion of actions to establish a safe conservative condition. These actions minimize the probability or the occurrence of postulated events. It is further required to immediately initiate action to restore the required AC sources and to continue this action until restoration is accomplished in order to provide the necessary AC power to the unit safety systems.

The Completion Time of immediately is consistent with the required times for actions requiring prompt attention. The restoration of the required AC electrical power sources should be completed as quickly as possible in order to minimize the time during which the unit safety systems may be without sufficient power.

Pursuant to LCO 3.0.6, the Distribution System's ACTIONS would not be entered even if all AC sources to it are inoperable, resulting in de-energization. Therefore, the Required Actions of Condition A are modified by a Note to indicate that when Condition A is entered with no AC power to any required ESF bus, the ACTIONS for LCO 3.8.10 must be immediately entered. This Note allows Condition A to provide requirements for the loss of the offsite circuit, whether or not a train is de-energized. LCO 3.8.10 would provide the appropriate restrictions for the situation involving a de-energized train.

SURVEILLANCE SR 3.8.2.1 REQUIREMENTS SR 3.8.2.1 requires the SRs from LCO 3.8.1 that are necessary for ensuring the OPERABILITY of the AC sources in other than MODES 1, 2, 3, and 4. SR 3.8.1.8 is not required to be met since only one offsite circuit is required to be OPERABLE. SRs 3.8.1.12 and 3.8.1.19 are not required to be met because the ESF signals, required for the SRs, are not required to be OPERABLE in MODES 5 or 6. SR 3.8.1.17 is not required to be met because the required OPERABLE DG(s) is not required to undergo periods of being synchronized to the offsite circuit. SR 3.8.1.20 is excepted because starting independence is not required with the DG(s) that is not required to be operable.

This SR is modified by a Note. The reason for the Note is to preclude requiring the OPERABLE DG(s) from being paralleled with the offsite power network or otherwise rendered inoperable during performance of McGuire Units 1 and 2 B 3.8.2-5 Revision No. 41

DC Sources - Shutdown B 3.8.5 BASES LCO (continued)

Systems-Shutdown." This ensures the availability of sufficient DC electrical power sources to operate the unit in a safe manner and to mitigate the consequences of postulated events during shutdown (e.g.,

fuel handling accidents).

APPLICABILITY The channel of DC sources required to be OPERABLE in MODES 5 and 6, and during movement of irradiated fuel assemblies, provide assurance that:

a.

Required features to provide adequate coolant inventory makeup are available for the irradiated fuel assemblies in the core;

b.

Required features needed to mitigate a fuel handling accident are available;

c.

Required features necessary to mitigate the effects of events that can lead to core damage during shutdown are available; and

d.

Instrumentation and control capability is available for monitoring and maintaining the unit in a cold shutdown condition or refueling condition.

The DC electrical power requirements for MODES 1, 2, 3, and 4 are covered in LCO 3.8.4.

ACTIONS A.1. A.2.1, A.2.2, A.2.3, and A.2.4 If two trains are required by LCO 3.8.10, the remaining train with DC power available may be capable of supporting sufficient systems to allow continuation of CORE ALTERATIONS and fuel movement. By allowing the option to declare required features inoperable with the associated DC power source(s) inoperable, appropriate restrictions will be implemented in accordance with the affected required features LCO ACTIONS. In many instances, this option may involve undesired administrative efforts.

Therefore, the allowance for sufficiently conservative actions is made (i.e., to suspend CORE ALTERATIONS, movement of irradiated fuel assemblies, operations involving positive reactivity additions), that could result in loss of required SDM (Mode 5) or required boron concentration (Mode 6). Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limits is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration. This may result in an overall reduction in RCS boron McGuire Units 1 and 2 B 3.8.5-2 Revision No. 41

DC Sources - Shutdown B 3.8.5 BASES ACTIONS (continued) concentration, but provides acceptable margin to maintaining subcritical operation. Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities shall not preclude completion of actions to establish a safe conservative condition. These actions minimize probability of the occurrence of postulated events. It is further required to immediately initiate action to restore the required DC sources and to continue this action until restoration is accomplished in order to provide the necessary DC electrical power to the unit safety systems.

The Completion Time of immediately is consistent with the required times for actions requiring prompt attention. The restoration of the required DC sources should be completed as quickly as possible in order to minimize the time during which the unit safety systems may be without sufficient power.

SURVEILLANCE SR 3.8.5.1 REQUIREMENTS SR 3.8.5.1 requires performance of all Surveillances required by SR 3.8.4.1 through SR 3.8.4.8. Therefore, see the corresponding Bases for LCO 3.8.4 for a discussion of each SR.

This SR is modified by a Note. The reason for the Note is to preclude requiring the OPERABLE DC sources from being discharged below their capability to provide the required power supply or otherwise rendered inoperable during the performance of SRs. It is the intent that these SRs must still be capable of being met, but actual performance is not required.

REFERENCES

1.

UFSAR, Chapter 6.

2.

UFSAR, Chapter 15.

3.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

McGuire Units 1 and 2 B 3.8.5-3 Revision No. 41

Inverters - Shutdown B 3.8.8 BASES LCO (continued) safety buses are de-energized. OPERABILITY of the inverters requires that the AC vital bus be powered by the inverter. When the redundant train of class 1 E AC vital bus electrical power distribution subsystem is required by LCO 3.8.10, the power source for these AC vital buses may consist of 1) the associated inverter powered by its associated battery; or 2) the regulated voltage transformer. This ensures the availability of sufficient power sources to operate the unit in a safe manner and to mitigate the consequences of postulated events during shutdown (e.g., fuel handling accidents).

APPLICABILITY The inverters required to be OPERABLE in MODES 5 and 6 and during movement of irradiated fuel assemblies provide assurance that:

a.

Systems to provide adequate coolant inventory makeup are available for the irradiated fuel in the core;

b.

Systems needed to mitigate a fuel handling accident are available;

c.

Systems necessary to mitigate the effects of events that can lead to core damage during shutdown are available; and

d.

Instrumentation and control capability is available for monitoring and maintaining the unit in a cold shutdown condition or refueling condition.

Inverter requirements for MODES 1, 2, 3, and 4 are covered in LCO 3.8.7.

ACTIONS A.1. A.2.1, A.2.2, A.2.3, and A.2.4 If two trains are required by LCO 3.8.10, "Distribution Systems-Shutdown,' the remaining OPERABLE Inverters may be capable of supporting sufficient required features to allow continuation of CORE ALTERATIONS, fuel movement, and operations with a potential for positive reactivity additions. By the allowance of the option to declare required features inoperable with the associated inverter(s) inoperable, appropriate restrictions will be implemented in accordance with the affected required features LCOs' Required Actions. In many instances, this option may involve undesired administrative efforts. Therefore, the allowance for sufficiently conservative actions is made (i.e., to suspend CORE ALTERATIONS, movement of irradiated fuel assemblies, and operations involving positive reactivity additions), that could result in loss of required SDM (Mode 5) or required boron concentration (Mode 6).

Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limits is required to assure continued safe operation. Introduction of coolant inventory must be from McGuire Units 1 and 2 B 3.8.8-2 Revision No. 41

Inverters - Shutdown B 3.8.8 BASES ACTIONS (continued) sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration.

This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities shall not preclude completion of actions to establish a safe conservative condition. These actions minimize the probability of the occurrence of postulated events. It is further required to immediately initiate action to restore the required inverters and to continue this action until restoration is accomplished in order to provide the necessary inverter power to the unit safety systems.

The Completion Time of immediately is consistent with the required times for actions requiring prompt attention. The restoration of the required inverters should be completed as quickly as possible in order to minimize the time the unit safety systems may be without power or powered from a regulated voltage transformer.

SURVEILLANCE SR 3.8.8.1 REQUIREMENTS This Surveillance verifies that the power sources are functioning properly with all required circuit breakers closed and AC vital buses energized from the required power source. The verification of proper voltage ensures that the required power is readily available for the instrumentation connected to the AC vital buses. The 7 day Frequency takes into account the redundant capability of the power sources and other indications available in the control room that alert the operator to inverter malfunctions.

REFERENCES

1.

UFSAR, Chapter 6.

2.

UFSAR, Chapter 15.

3.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

McGuire Units 1 and 2 B 3.8.8-3 Revision No. 41

Distribution Systems-Shutdown B 3.8.10 BASES LCO (continued) energization of the portions of the electrical distribution system necessary to support OPERABILITY of required systems, equipment, and components - all specifically addressed in each LCO and implicitly required via the definition of OPERABILITY.

Maintaining these portions of the distribution system energized ensures the availability of sufficient power to operate the unit in a safe manner to mitigate the consequences of postulated events during shutdown (e.g.,

fuel handling accidents)..

APPLICABILITY The AC and DC electrical power distribution subsystems required to be OPERABLE in MODES 5 and 6, and during movement of irradiated fuel assemblies, provide assurance that:

a.

Systems to provide adequate coolant inventory makeup are available for the irradiated fuel in the core;

b.

Systems needed to mitigate a fuel handling accident are available;

c.

Systems necessary to mitigate the effects of events that can lead to core damage during shutdown are available; and

d.

Instrumentation and control capability is available for monitoring and maintaining the unit in a cold shutdown condition and refueling condition.

The AC, DC, and AC vital bus electrical power distribution subsystems requirements for MODES 1, 2, 3, and 4 are covered in LCO 3.8.9.

ACTIONS A.1, A.2.1. A.2.2, A.2.3, A.2.4, A.2.5 and A.2.6 Although redundant required features may require redundant trains of electrical power distribution subsystems to be OPERABLE, one OPERABLE distribution subsystem train may be capable of supporting sufficient required features to allow continuation of CORE ALTERATIONS and fuel movement. By allowing the option to declare required features associated with an inoperable distribution subsystem inoperable, appropriate restrictions are implemented in accordance with the affected distribution subsystem LCO's Required Actions. In many instances, this option may involve undesired administrative efforts. Therefore, the allowance for sufficiently conservative actions is made (i.e., to suspend CORE ALTERATIONS, movement of irradiated fuel assemblies, and operations involving positive reactivity additions that could result in loss of l McGuire Units 1 and 2 B 3.8.10-2 Revision No. 41

Distribution Systems-Shutdown B 3.8.10 BASES ACTIONS (continued) required SDM (Mode 5) or required boron concentration (Mode 6).

Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limits is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration.

This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities does not preclude completion of actions to establish a safe conservative condition. These actions minimize the probability of the occurrence of postulated events. It is further required to immediately initiate action to restore the required AC and DC electrical power distribution subsystems and to continue this action until restoration is accomplished in order to provide the necessary power to the unit safety systems.

Notwithstanding performance of the above conservative Required Actions, a required residual heat removal (RHR) subsystem or required Low Temperature Overpressure Protection (LTOP) feature may be inoperable. In this case, Required Actions A.2.1 through A.2.4 do not adequately address the concerns relating to coolant circulation and heat removal. Pursuant to LCO 3.0.6, the RHR or LTOP ACTIONS would not be entered. Therefore, Required Actions A.2.5 and A.2.6 are provided to direct declaring RHR and LTOP features inoperable, which results in taking the appropriate actions.

The Completion Time of immediately is consistent with the required times for actions requiring prompt attention. The restoration of the required distribution subsystems should be completed as quickly as possible in order to minimize the time the unit safety systems may be without power.

McGuire Units 1 and 2 B 3.8.10-3 Revision No. 41

Boron Concentration B 3.9.1 BASES ACTIONS A.1 and A.2 Continuation of CORE ALTERATIONS or positive reactivity additions (including actions to reduce boron concentration) is contingent upon maintaining the unit in compliance with the LCO. If the boron concentration of any coolant volume in the RCS, the refueling canal, or the refueling cavity is less than its limit, all operations involving CORE ALTERATIONS or positive reactivity additions must be suspended immediately.

Suspension of CORE ALTERATIONS and positive reactivity additions shall not preclude moving a component to a safe position. Operations that individually add limited positive reactivity (e.g., temperature fluctuations from inventory addition or temperature control fluctuations),

but when combined with all other operations affecting core reactivity (e.g.,

intentional boration) result in overall net negative reactivity addition, are not precluded by this action.

A.3 In addition to immediately suspending CORE ALTERATIONS and positive reactivity additions, boration to restore the concentration must be initiated immediately.

In determining the required combination of boration flow rate and concentration, no unique Design Basis Event must be satisfied. The only requirement is to restore the boron concentration to its required value as soon as possible. In order to raise the boron concentration as soon as possible, the operator should begin boration with the best source available for unit conditions. An acceptable method is to borate at greater than or equal to 30 gpm of a solution containing greater than or equal to 7000 ppm boron or its equivalent.

Once actions have been initiated, they must be continued until the boron concentration is restored. The restoration time depends on the amount of boron that must be injected to reach the required concentration.

SURVEILLANCE SR 3.9.1.1 REQUIREMENTS This SR ensures that the coolant boron concentration in the RCS, the refueling canal, and the refueling cavity is within the COLR limits. The boron concentration of the coolant in each volume is determined periodically by chemical analysis. One sample from the refueling canal or refueling cavity is sufficient to determine the boron concentration in that volume of water. An additional sample is taken from the RCS.

McGuire Units 1 and 2 B 3.9.1 -3 Revision No. 41

Unborated Water Source Isolation Valves B 3.9.2 B 3.9 REFUELING OPERATIONS B 3.9.2 Unborated Water Source Isolation Valves BASES BACKGROUND During MODE 6 operations, all isolation valves for reactor makeup water sources containing unborated water that are connected to the Reactor Coolant System (RCS) must be closed to prevent unplanned boron dilution of the reactor coolant. The isolation valves must be secured in the closed position. One of the following groups of valves is required to be closed: 1) NV-250, or 2) NV-1 31, NV-1 40, NV-1 76, NV-468, NV-808, and either NV-32 or NV-1 026 when it is necessary to makeup to the RWST during refueling operations.

The Chemical and Volume Control System is capable of supplying borated and unborated water to the RCS through various flow paths.

Since a positive reactivity addition, that could result in failure to meet the minimum SDM or boron concentration limits, is inappropriate during MODE 6, isolation of all unborated water sources prevents an unplanned boron dilution.

APPLICABLE The possibility of an inadvertent boron dilution event (Ref. 1) occurring SAFETY ANALYSES during MODE 6 refueling operations is precluded by adherence to this LCO, which requires that potential dilution sources be isolated. Closing the required valves during refueling operations prevents the flow of unborated water to the filled portion of the RCS. The valves are used to isolate unborated water sources. These valves have the potential to indirectly allow dilution of the RCS boron concentration in MODE 6. By isolating unborated water sources, a safety analysis for an uncontrolled boron dilution accident in accordance with the Standard Review Plan (Ref. 2) is not required for MODE 6.

The RCS boron concentration satisfies Criterion 2 of 10 CFR 50.36 (Ref.

3).

LCO This LCO requires that flow paths to the RCS from unborated water sources be isolated to prevent unplanned boron dilution during MODE 6 and thus avoid a reduction in SDM.

McGuire Units 1 and 2 B 3.9.2-1 Revision No. 41

Nuclear Instrumentation B 3.9.3 BASES ACTIONS A.1 and A.2 With only one required source range neutron flux monitor OPERABLE, redundancy has been lost. Since these instruments are the only direct means of monitoring core reactivity conditions, CORE ALTERATIONS and introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 must be suspended immediately. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that which would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. Performance of Required Action A.1 shall not preclude completion of movement of a component to a safe position.

B.1 With no required source range neutron flux monitor OPERABLE, action to restore a monitor to OPERABLE status shall be initiated immediately.

Once initiated, action shall be continued until a source range neutron flux monitor is restored to OPERABLE status.

B.2 With no source range neutron flux monitor OPERABLE, there are no direct means of detecting changes in core reactivity. However, since CORE ALTERATIONS and positive reactivity additions are not to be made, the core reactivity condition is stabilized until the source range neutron flux monitors are OPERABLE. This stabilized condition is determined by performing SR 3.9.1.1 to ensure that the required boron concentration exists.

The Completion Time of once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient to obtain and analyze a reactor coolant sample for boron concentration and ensures that unplanned changes in boron concentration would be identified. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is reasonable, considering the low probability of a change in core reactivity during this time period.

McGuire Units 1 and 2 B 3.9.3-3 Revision No. 41

RHR and Coolant Circulation - High Water Level B 3.9.5 BASES LCO (continued)

a.

Removal of decay heat;

b.

Mixing of borated coolant to minimize the possibility of criticality; and

c.

Indication of reactor coolant temperature.

An OPERABLE RHR loop includes an RHR pump, a heat exchanger, valves, piping, instruments, and controls to ensure an OPERABLE flow path and to determine the low end temperature. The flow path starts in one of the RCS hot legs and is returned to the RCS cold legs. The operability of the operating RHR train and the supporting heat sink is dependent on the ability to maintain the desired RCS temperature.

The LCO is modified by a Note that allows the required operating RHR loop to be removed from service for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would dilute the RCS boron concentration with coolant at boron concentrations less than required to meet the minimum boron concentration of LCO 3.9.1. Boron concentration reduction with coolant at boron concentrations less than required to assure minimum required RCS boron concentration is maintained is prohibited because uniform concentration distribution cannot be ensured without forced circulation. This permits operations such as core mapping or alterations in the vicinity of the reactor vessel hot leg nozzles and RCS to RHR isolation valve testing. During this 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, decay heat is removed by natural convection to the large mass of water in the refueling cavity.

APPLICABILITY One RHR loop must be OPERABLE and in operation in MODE 6, with the water level 2 23 ft above the top of the reactor vessel flange, to provide decay heat removal. The 23 ft water level was selected because it corresponds to the 23 ft requirement established for fuel movement in LCO 3.9.7, "Refueling Cavity Water Level. Requirements for the RHR System in other MODES are covered by LCOs in Section 3.4, Reactor Coolant System (RCS), and Section 3.5, Emergency Core Cooling Systems (ECCS). RHR loop requirements in MODE 6 with the water level < 23 ft are located in LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level.

ACTIONS RHR loop requirements are met by having one RHR loop OPERABLE and in operation, except as permitted in the Note to the LCO.

McGuire Units 1 and 2 B 3.9.5-2 Revision No. 41

RHR and Coolant Circulation - High Water Level B 3.9.5 BASES ACTIONS (continued)

A.1 If RHR loop requirements are not met, there will be no forced circulation to provide mixing to establish uniform boron concentrations. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that which would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

A.2 If RHR loop requirements are not met, actions shall be taken immediately to suspend loading of irradiated fuel assemblies in the core. With no forced circulation cooling, decay heat removal from the core occurs by natural convection to the heat sink provided by the water above the core.

A minimum refueling water level of 23 ft above the reactor vessel flange provides an adequate available heat sink. Suspending any operation that would increase decay heat load, such as loading a fuel assembly, is a prudent action under this condition.

A.3 If RHR loop requirements are not met, actions shall be initiated and continued in order to satisfy RHR loop requirements. With the unit in MODE 6 and the refueling water level 2 23 ft above the top of the reactor vessel flange, corrective actions shall be initiated immediately.

A.4 If RHR loop requirements are not met, all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere must be closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. With the RHR loop requirements not met, the potential exists for the coolant to boil and release radioactive gas to the containment atmosphere. Closing containment penetrations that are open to the outside atmosphere ensures dose limits are not exceeded.

The Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable, based on the low probability of the coolant boiling in that time.

McGuire Units 1 and 2 B 3.9.5-3 Revision No. 41

RHR and Coolant Circulation - Low Water Level B 3.9.6 BASES LCO (continued)

An OPERABLE RHR loop consists of an RHR pump, a heat exchanger, valves, piping, instruments and controls to ensure an OPERABLE flow path and to determine the low end temperature. The flow path starts in one of the RCS hot legs and is returned to the RCS cold legs. The operability of the operating RHR train and the supporting heat sink is dependent on the ability to maintain the desired RCS temperature.

Both RHR pumps may be aligned to the Refueling Water Storage Tank to support filling the refueling cavity or for performance of required testing.

APPLICABILITY Two RHR loops are required to be OPERABLE, and one RHR loop must be in operation in MODE 6, with the water level < 23 ft above the top of the reactor vessel flange, to provide decay heat removal. Requirements for the RHR System in other MODES are covered by LCOs in Section 3.4, Reactor Coolant System (RCS), and Section 3.5, Emergency Core Cooling Systems (ECCS). RHR loop requirements in MODE 6 with the water level 2 23 ft are located in LCO 3.9.5, OResidual Heat Removal (RHR) and Coolant Circulation-High Water Level."

ACTIONS A.1 and A.2 If less than the required number of RHR loops are OPERABLE, action shall be immediately initiated and continued until the RHR loop is restored to OPERABLE status and to operation or until Ž 23 ft of water level is established above the reactor vessel flange. When the water level is 2 23 ft above the reactor vessel flange, the Applicability changes to that of LCO 3.9.5, and only one RHR loop is required to be OPERABLE and in operation. An immediate Completion Time is necessary for an operator to initiate corrective actions.

B.1 If no RHR loop is in operation, there will be no forced circulation to provide mixing to establish uniform boron concentrations. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that which would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

McGuire Units 1 and 2 B 3.9.6-2 Revision No. 41